Summary
PRCOMCOM20245134
Building Permit - Commercial
Issued
VAAP CHAPEL RIDGE LLC
CHANGE OF TENANT
SKY WINE & SPIRITS - CHANGE OF TENANT FOR LIQUOR STORE
09/27/2024
01/03/2025
04/19/2025
Locations
Contacts
THE ISLAS FAM, Address:106 S VERMONT, Phone:(816) 835-9753  
A & S MECHANICAL HVAC, Inc., Address:9018 Pine St., Phone:(913) 601-2711  
THE ISLAS FAM, Address:106 S VERMONT, Phone:(816) 835-9753  
THE ISLAS FAM, Address:106 S VERMONT, Phone:(816) 835-9753  
Riad Baghdadi, Address:11661 College Blvd, Phone:(913) 375-7659  
donato islas - the islas fam, Address:106 s vermont ave, Phone:(816) 835-9753  
VAAP CHAPEL RIDGE LLC, Address:PO BOX 24193  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/07/2024 12/18/2024
Joe Frogge
LC - General Contractor
Resolved
12/18/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 10/17/24 - Not addressed. 10/31/24 - Acknowledged in letter.
LC - MEP Subs
Resolved
12/18/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/17/24 - Not addressed. 10/31/24 - Acknowledged in letter.
Building Plan Review Approved 11/07/2024 10/31/2024
Joe Frogge
Miscellaneous Correction
Resolved
10/31/2024

Insufficient information to complete review. Provide the following: - - - -
IBC 1209.2 Finish materials
Resolved
10/31/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish at toilet and mop sink. If paint is used it must be epoxy based. 10/17/24 - Not addressed.
IBC 1606.2 Design dead load - structural
Resolved
10/31/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units. 10/17/24 - Not addressed. 10/31/24 - Signed off on by architect in letter.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
10/31/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) on roof to comply or provide verification of existing compliant receptacle(s). 10/17/24 - Not addressed.
Fire Plan Review Approved 11/07/2024 10/31/2024
Joe Frogge
Fire Plan Review Approved 10/23/2024 10/21/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
10/16/2024

1008.1 Means of egress illumination. Illumination shall be provided in the means of egress in accordance with Section 1008.2. Under emergency power, means of egress illumination shall comply with Section 1008.3. Action Required: Privide exterior emergency illumination at both front and back exits.
Building Plan Review Rejected 10/23/2024 10/17/2024
Joe Frogge
Suite address
Resolved
10/17/2024

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Address for this suite is 3680 NE Akin Dr, Unit:134. Update all records.
Miscellaneous Correction
Corrective Action Required
10/16/2024

Insufficient information to complete review. Provide the following: - Identify use of room in rear of suite. (modify occupant load accordingly if applicable) - Complete plumbing design or detailed scope of work. - Complete HVAC design including outside air calculations. - Clarify purpose of note #6 on 01. 10/17/24 - Not addressed.
IBC 1209.2 Finish materials
Corrective Action Required
10/16/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish at toilet and mop sink. If paint is used it must be epoxy based. 10/17/24 - Not addressed.
IBC 1606.2 Design dead load - structural
Corrective Action Required
10/16/2024

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units. 10/17/24 - Not addressed.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
10/16/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) on roof to comply or provide verification of existing compliant receptacle(s). 10/17/24 - Not addressed.
Licensed Contractors Rejected 10/23/2024 10/17/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
10/16/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 10/17/24 - Not addressed.
LC - MEP Subs
Corrective Action Required
10/16/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/17/24 - Not addressed.
Fire Plan Review Rejected 10/17/2024 10/14/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
10/14/2024

1008.1 Means of egress illumination. Illumination shall be provided in the means of egress in accordance with Section 1008.2. Under emergency power, means of egress illumination shall comply with Section 1008.3. Action Required: Privide exterior emergency illumination at both front and back exits.
Building Plan Review Rejected 10/17/2024 10/14/2024
Joe Frogge
Suite address
Corrective Action Required
10/14/2024

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Address for this suite is 3680 NE Akin Dr, Unit:134. Update all records.
Miscellaneous Correction
Corrective Action Required
10/14/2024

Insufficient information to complete review. Provide the following: - Identify use of room in rear of suite. (modify occupant load accordingly if applicable) - Complete plumbing design or detailed scope of work. - Complete HVAC design including outside air calculations. - Clarify purpose of note #6 on 01.
IBC 1209.2 Finish materials
Corrective Action Required
10/14/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish at toilet and mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Corrective Action Required
10/14/2024

"2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by new condensing units..
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
10/14/2024

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle(s) on roof to comply or provide verification of existing compliant receptacle(s).
Licensed Contractors Rejected 10/17/2024 10/14/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
10/14/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
10/14/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $260.00 $260.00 Paid 12/18/2024
$0.00
7232302-Commercial Excise Tax Fee $5,651.25 $5,651.25 Paid 10/10/2024
$5,651.25
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Pending
Above Ceiling Inspection Pending
Rough Plumbing Inspection - Commercial Pending
Misc
Corrective Action Required
04/10/2025
-Protect plumbing at bottom wall track with BOCA plate -Install plumbing for ADA drinking fountain -Support cooler condensate drain pipe every 4 ft -Provide access to rooftop unit
Rough Electrical Inspection - Commercial Passed 4/10/2025 04/10/2025
Rough Plumbing Inspection - Commercial Failed 4/10/2025 04/10/2025
Misc
Corrective Action Required
04/10/2025
-Protect plumbing at bottom wall track with BOCA plate -Install plumbing for ADA drinking fountain -Support cooler condensate drain pipe every 4 ft -Provide access to rooftop unit
Underslab Plumbing Inspection - Commercial Passed 4/10/2025 04/10/2025
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home