| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Fire Plan Review
|
Approved
|
09/03/2025
|
09/03/2025
|
|
|
Craig Hill
|
|
|
Misc
Corrective Action Required
Provide racking and storage plans to comply with the 2018 International Fire Code Section. The open area storage shall be arranged so that it does not obstruct required fire department access or hinder the operation of fire protection systems, such as sprinklers, it should also not impede the safe exiting of the occupants of the building.
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Building Plan Review
|
Approved
|
07/24/2025
|
08/26/2025
|
|
|
Joe Frogge
|
|
|
|
|
Building Plan Review
|
Approved
|
08/19/2025
|
08/20/2025
|
|
|
Joe Frogge
|
|
|
Gen - Plan submittal documents
Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri.
Action required: Plans are required to be sealed/signed by MO State architect or engineer.
|
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide code analysis.
|
|
|
Miscellaneous Correction
Inadequate information to complete review.
Action required: Provide MEP designs or detailed scopes of work.
8/15/2025 - Not addressed.
|
|
|
|
|
Fire Plan Review
|
Rejected
|
08/19/2025
|
08/19/2025
|
|
|
Craig Hill
|
|
|
Misc
Corrective Action Required
Provide racking and storage plans to comply with the 2018 International Fire Code Section. The open area storage shall be arranged so that it does not obstruct required fire department access or hinder the operation of fire protection systems, such as sprinklers, it should also not impede the safe exiting of the occupants of the building.
|
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Licensed Contractors
|
Approved
|
08/19/2025
|
08/15/2025
|
|
|
Joe Frogge
|
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (InHome Systems not currently licensed with us)
|
|
|
|
|
Building Plan Review
|
Rejected
|
07/24/2025
|
07/24/2025
|
|
|
Joe Frogge
|
|
|
Gen - Plan submittal documents
Corrective Action Required
Lee's Summit Code Of Ordinances 7-137. - Submittal Documents. Construction documents, special inspection and structural observation programs, and other data shall be submitted in two (2) or more sets with each application for a permit. A registered design professional licensed by the State of Missouri shall prepare the construction documents. Where special conditions exist, the Building Official is authorized to require additional construction documents to be prepared by a registered design professional licensed by the State of Missouri.
Action required: Plans are required to be sealed/signed by MO State architect or engineer.
|
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide code analysis.
|
|
|
Miscellaneous Correction
Corrective Action Required
Inadequate information to complete review.
Action required: Provide MEP designs or detailed scopes of work.
|
|
|
|
|
Licensed Contractors
|
Rejected
|
07/24/2025
|
07/24/2025
|
|
|
Joe Frogge
|
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (InHome Systems not currently licensed with us)
|
|
|
|
|
Fire Plan Review
|
Rejected
|
07/24/2025
|
07/22/2025
|
|
|
Craig Hill
|
|
|
Misc
Corrective Action Required
Provide racking and storage plans to comply with the 2018 International Fire Code Section. The open area storage shall be arranged so that it does not obstruct required fire department access or hinder the operation of fire protection systems, such as sprinklers, it should also not impede the safe exiting of the occupants of the building.
|
|
|
|