Permit Application Status

PRCOM20251363


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251363
Building Permit - Commercial
Certificate of Occupancy
LBP III LLC
CHANGE OF TENANT
CHANGE OF TENANT TO KIDZ FIRST THERAPY
04/08/2025
05/29/2025
10/14/2025
07/16/2025
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
LBP III LLC, Address:3170 NE CARNEGIE DR STE 400  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 06/05/2025 06/02/2025
Craig Hill
Fire Plan Review Approved 04/29/2025 04/29/2025
Craig Hill
Construction documents for fire alarm systems
Informational
04/29/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Informational
04/29/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Miscellaneous Correction
Resolved
04/29/2025

Add exit signage to be seen in corridors 132 and 137.
Portable fire extinguishers - general
Informational
04/22/2025

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Resolved
04/29/2025

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Building Plan Review Approved with Conditions 04/29/2025 04/25/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
04/22/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. After a credit for previouse warehouse use the fee will be $9,916.50.
Licensed Contractors Approved 04/29/2025 04/25/2025
Joe Frogge
LC - MEP Subs
Resolved
04/25/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (HVAC sub required)
Building Plan Review Approved with Conditions 04/18/2025 04/17/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
04/14/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. After a credit for previouse warehouse use the fee will be $9,916.50.
Fire Plan Review Rejected 04/18/2025 04/17/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
04/15/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
04/15/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Miscellaneous Correction
Corrective Action Required
04/15/2025

Add exit signage to be seen in corridors 132 and 137.
Portable fire extinguishers - general
Informational
04/15/2025

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
04/15/2025

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Licensed Contractors Rejected 04/18/2025 04/14/2025
Joe Frogge
LC - MEP Subs
Corrective Action Required
04/14/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (HVAC sub required)
Zoning Review Approved 04/18/2025 04/08/2025
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $903.20 $903.20 Paid 05/28/2025
$0.00
Commercial Excise Tax Fee $12,028.50 $12,028.50 Paid 05/28/2025
$2,112.00
Temporary Occupancy Fee $50.00 $50.00 Paid 06/26/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 5/30/2025 05/30/2025
In-wall Inspection Partial 5/30/2025 5/30/2025 05/30/2025
Misc
Corrective Action Required
05/30/2025
Restroom not ready. OK to rock everywhere else
In-wall Inspection Passed 6/6/2025 6/6/2025 06/06/2025
Misc
Resolved
06/06/2025
Restroom not ready. OK to rock everywhere else
Above Ceiling Inspection Failed 6/13/2025 6/13/2025 06/13/2025
Misc
Corrective Action Required
06/13/2025
-Support MC off grid -Complete electrical near NW corner of corridor directional light -Support ceiling grid beam @ 4 ft -Provide exhaust for restroom
Above Ceiling Inspection Passed 6/17/2025 6/17/2025 06/17/2025
Misc
Resolved
06/17/2025
-Support MC off grid -Complete electrical near NW corner of corridor directional light -Support ceiling grid beam @ 4 ft -Provide exhaust for restroom
Occupancy Inspection - Fire Temporary C of O 6/27/2025 6/25/2025 06/25/2025
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/27/2025 6/25/2025 06/25/2025
Misc
Corrective Action Required
06/25/2025
-Fire department approval required -Tamper resistant receptacles required. 406.12 Tamper-Resistant Receptacles. All 15- and 20-ampere, 125- and 250-volt nonlocking-type receptacles in the areas specified in 406.12(1) through (7) shall be listed tamper-resistant receptacles. (5) Business offices, corridors, waiting rooms and the like in clinics, medical and dental offices and outpatient facilities (6) Subset of assembly occupancies described in 518.2 to include places of waiting transportation, gymnasiums, skating rinks, and auditoriums -Location of restroom signage -Sprinkler head in storage 113
Occupancy Inspection - Codes Commercial Temporary C of O 6/27/2025 6/27/2025 06/27/2025
Misc
Corrective Action Required
06/25/2025
-Fire department approval required **East exit discharge light bulb not working
Occupancy Inspection - Fire Temporary C of O 6/27/2025 06/27/2025
Occupancy Inspection - Codes Commercial Full C of O 7/16/2025 7/16/2025 07/16/2025
Misc
Resolved
07/16/2025
-Fire department approval required **East exit discharge light bulb not working
Documents & Images
Date Uploaded File Type Document Name
04/08/2025 Application Form APPLICATION
04/08/2025 Plans 25060_LBP TI - Permit Set_ArchMEP
04/08/2025 Letter License Tax Bill
04/17/2025 Letter DS P/R Corrections Document
04/22/2025 Plans Revised -LBP TI - Permit Set_ArchMEP_v2
04/22/2025 Letter DS P_R Corrections Document_DAE Response
04/29/2025 Approved Plans Approved construction plans
05/22/2025 PE Stamp Kidz First Therapy J-2472
05/28/2025 Receipt Receipt for transaction:2025-003940
05/30/2025 Letter INSPECTION SUMMARY
05/30/2025 Letter INSPECTION SUMMARY
06/02/2025 PE Stamp Kidz First Therapy J-2472 RFC
06/02/2025 Letter Fire (Sprinkler) Plan Review
06/06/2025 Letter INSPECTION SUMMARY
06/13/2025 Letter DS Building Permit
06/13/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter INSPECTION SUMMARY
06/25/2025 Letter INSPECTION SUMMARY
06/25/2025 Letter INSPECTION SUMMARY
06/26/2025 Certificate/License Codes Temporary Certificate of Occupancy
06/26/2025 Receipt Receipt for transaction:2025-004910
06/27/2025 Certificate/License Codes Temporary Certificate of Occupancy
07/16/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter Field Certificate of Occupancy
07/16/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home