Permit Application Status

PRCOM20251204


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251204
Building Permit - Commercial
Issued
RYNARD INVESTMENT PROPERTIES LLC
CHANGE OF TENANT
ADMINISTRATIVE OFFICE SERVING RESTAURANT AT DIFFERENT LOCATION **Invite Planner to final to verify parking and screening**
04/01/2025
04/23/2025
10/08/2025
Locations
Contacts
RYNARD INVESTMENT PROPERTIES LLC, Address:312 SW GREENWICH DR STE 196  
THOLEN-WOLFE CONTRACTORS INC, Address:516 NE TOPAZ DR, Phone:(816) 215-0029  
ADAM WOLFE, Phone:(816) 520-3681  
LAKESIDE HEATING AND COOLING, Address:1036 NE JIB CT STE A , Phone:(816) 254-4515  
SMART POWER SERVICES, Address:1151 SE CENTURY DR, Phone:(816) 366-0385  
FIVE STAR MECHANICAL CONTRACT INC, Address:P O BOX 11964, Phone:(816) 358-4444  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 04/22/2025 04/21/2025
Joe Frogge
LC - General Contractor
Resolved
04/21/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 4/18/2025 - Acknowledged in letter.
LC - MEP Subs
Resolved
04/21/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 4/18/2025 - Acknowledged in letter.
Fire Plan Review Approved 04/22/2025 04/18/2025
Joe Frogge
Building Plan Review Approved with Conditions 04/22/2025 04/18/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
04/15/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. After credit for previous warehouse tenant, the fee will be $5,007.75. 4/18/2025 - Acknowledged in letter.
Gen - Plan submittals 2018 codes
Resolved
04/18/2025

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Amend Code Notes on cover sheet to show 2009 ICC/ANSI
IPC 403.2 Separate facilities
Resolved
04/18/2025

2018 IPC 403.2 Separate Facilities. (As amended by Lee’s Summit Code of Ordinances Section 7-405) Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate facilities shall not be required for dwelling units and sleeping units. 2. Separate facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. Action required: Label restrooms per gender or request unisex by filing for a code modification request (CMR).
IPC 403.1 Minimum number of fixtures
Resolved
04/18/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink. (include mop sink area in finish schedule to verify compliant wall finish)
Misc
Corrective Action Required
04/15/2025

Insufficient parking on site. Action required: Submit proposal/design for how minimum number of parking stalls, including ADA. Provide verification of shared parking plan/agreement if needed. See pre-app notes in the portal.
Planning - Screening of ground mounted equipment
Resolved
04/18/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (must be either masonry or approved evergreen plantings)
Building Plan Review Rejected 04/11/2025 04/09/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
04/09/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. After credit for previous warehouse tenant, the fee will be $5,007.75.
Gen - Plan submittals 2018 codes
Corrective Action Required
04/09/2025

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Amend Code Notes on cover sheet to show 2009 ICC/ANSI
IPC 403.2 Separate facilities
Corrective Action Required
04/09/2025

2018 IPC 403.2 Separate Facilities. (As amended by Lee’s Summit Code of Ordinances Section 7-405) Where plumbing fixtures are required, separate facilities shall be provided for each sex. Exceptions: 1. Separate facilities shall not be required for dwelling units and sleeping units. 2. Separate facilities shall not be required in structures or tenant spaces with a total occupant load, including both employees and customers, of 15 or fewer. 3. Separate facilities shall not be required in mercantile occupancies in which the maximum occupant load is 100 or fewer. 4. Separate facilities shall not be required in business occupancies in which the maximum occupant load is 25 or fewer. Action required: Label restrooms per gender or request unisex by filing for a code modification request (CMR).
IPC 403.1 Minimum number of fixtures
Corrective Action Required
04/09/2025

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink. (include mop sink area in finish schedule to verify compliant wall finish)
Misc
Corrective Action Required
04/09/2025

Insufficient parking on site. Action required: Submit proposal/design for how minimum number of parking stalls, including ADA. Provide verification of shared parking plan/agreement if needed. See pre-app notes in the portal.
Planning - Screening of ground mounted equipment
Corrective Action Required
04/09/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (must be either masonry or approved evergreen plantings)
Zoning Review Rejected 04/11/2025 04/09/2025
Joe Frogge
Misc
Corrective Action Required
04/09/2025

Address parking and screening issues spelled out in building plan review.
Licensed Contractors Rejected 04/11/2025 04/09/2025
Joe Frogge
LC - General Contractor
Corrective Action Required
04/09/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
04/09/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved 04/11/2025 04/02/2025
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for Change of Tenant $200.00 $200.00 Paid 04/21/2025
Commercial Excise Tax Fee $5,733.75 $5,733.75 Paid 06/23/2025
$726.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Commercial Pending 8/4/2025
Misc
Corrective Action Required
07/25/2025
- No parking lot striping in front of the south entrance. - Exterior siding repair needs to be painted to match the color of the building. - over grown vegetation needs to be cut, proper drainage and sod shall be installed around the building. -remove all plywood, trash, pallets from north east side of building. - remove roll off dumpster from parking area. - no sid or vegetation around the building mostly gravel. Provide clarification on exterior improvements time line.
Occupancy Inspection - Planning Pending 8/4/2025
Underslab Plumbing Inspection - Commercial Passed 4/29/2025 4/29/2025 04/29/2025
In-wall Inspection Failed 6/2/2025 6/2/2025 06/02/2025
Misc
Corrective Action Required
06/02/2025
-secure MC with in 12” of boxes in exercise area -remove old wiring not being used in exercise area
Above Ceiling Inspection Passed 6/2/2025 06/02/2025
In-wall Inspection Passed 6/3/2025 6/3/2025 06/03/2025
Misc
Resolved
06/03/2025
-secure MC with in 12” of boxes in exercise area -remove old wiring not being used in exercise area
Occupancy Inspection - Planning Passed 7/21/2025 7/21/2025 07/21/2025
Occupancy Inspection - Codes Commercial Failed 7/21/2025 7/21/2025 07/21/2025
Misc
Corrective Action Required
07/21/2025
-drinking fountain not to be above 34” -bathroom mirrors to be 40” to reflective surface -toilets to be 16”-18” to center off side wall -open grounds on gfci’s at coffee bar -open junction box at SW most office -Address any other outstanding items from other departments
Occupancy Inspection - Codes Commercial Failed 7/25/2025 7/25/2025 07/25/2025
Misc
Corrective Action Required
07/25/2025
- No parking lot striping in front of the south entrance. - Exterior siding repair needs to be painted to match the color of the building. - over grown vegetation needs to be cut, proper drainage and sod shall be installed around the building. -remove all plywood, trash, pallets from north east side of building. - remove roll off dumpster from parking area. - no sid or vegetation around the building mostly gravel. Provide clarification on exterior improvements time line.
Occupancy Inspection - Fire Passed 7/21/2025 7/21/2025 07/31/2025
Documents & Images
Date Uploaded File Type Document Name
04/01/2025 Application Form APPLICATION
04/01/2025 Plans Spencer CD-Set 3-31-25
04/01/2025 Letter License Tax Bill
04/09/2025 Letter Pre-Application Meeting Summary
04/09/2025 Letter DS P/R Corrections Document
04/15/2025 Plans Spencer CD-Set 4-14-25
04/15/2025 Letter City Review Response 4-14-25
04/18/2025 Approved Plans Approved construction plans
04/21/2025 Receipt Receipt for transaction:2025-002468
04/23/2025 Letter DS Building Permit
04/29/2025 Letter INSPECTION SUMMARY
05/01/2025 Letter Parking Agreement - Signed 1309 SW Jefferson
06/02/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
06/03/2025 Letter INSPECTION SUMMARY
06/23/2025 Receipt Receipt for transaction: 2025-004771
07/21/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter INSPECTION SUMMARY
07/25/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home