| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Building Plan Review
|
Approved
|
08/04/2025
|
08/01/2025
|
|
|
Joe Frogge
|
|
|
IBC 2902.2 Separate facilities - fixture
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Action required: Label restrooms per gender or complete Code Modification Request form and request use of 2024 IBC in regards to separate genders.
6/20/2025 - Not addressed.
|
|
|
IMC 602.2.1 Materials within plenums
2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions)
Action required: Provide pipe material schedule to verify that there will be no plastic in plenum.
6/20/2025 - PVC listed as approved material but will not be allowed in plenums.
|
|
|
|
|
Fire Plan Review
|
Approved
|
08/04/2025
|
08/01/2025
|
|
|
Joe Frogge
|
|
|
a
|
|
Licensed Contractors
|
Approved
|
08/04/2025
|
08/01/2025
|
|
|
Joe Frogge
|
|
|
|
|
Building Plan Review
|
Rejected
|
06/20/2025
|
06/20/2025
|
|
|
Joe Frogge
|
|
|
IBC 502.1 - Address Identification
2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained.
Action required: This building is under the address 2000 SE Blue Pkwy. Update records and inform your client.
|
|
|
Suite address
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Provide suite designation.
|
|
|
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Action required: Label restrooms per gender or complete Code Modification Request form and request use of 2024 IBC in regards to separate genders.
6/20/2025 - Not addressed.
|
|
|
IMC 602.2.1 Materials within plenums
Corrective Action Required
2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions)
Action required: Provide pipe material schedule to verify that there will be no plastic in plenum.
6/20/2025 - PVC listed as approved material but will not be allowed in plenums.
|
|
|
|
|
Licensed Contractors
|
Approved
|
06/20/2025
|
06/20/2025
|
|
|
Joe Frogge
|
|
|
|
|
Fire Plan Review
|
Approved
|
06/20/2025
|
06/17/2025
|
|
|
Craig Hill
|
|
|
|
|
Fire Plan Review
|
Approved
|
05/01/2025
|
05/01/2025
|
|
|
Craig Hill
|
|
|
Construction documents for fire alarm systems
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action Required: Provide deferred submittal for fire alarm system.
|
|
|
Construction documents - Fire protection systems
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action Required: Provide deferred submittal for fire protection system.
|
|
|
|
|
Building Plan Review
|
Rejected
|
05/01/2025
|
04/30/2025
|
|
|
Joe Frogge
|
|
|
IBC 502.1 - Address Identification
Corrective Action Required
2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained.
Action required: This building is under the address 2000 SE Blue Pkwy. Update records and inform your client.
|
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Provide suite designation.
|
|
|
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Action required: Label restrooms per gender or complete Code Modificate Request form and request use of 2024 IBC in regards to separate genders.
|
|
|
IMC 602.2.1 Materials within plenums
Corrective Action Required
2018 IMC 602.2.1 Materials within plenums. Except as required by Sections 602.2.1.1 through 602.2.1.5, materials within plenums shall be noncombustible or shall be listed and labeled as having a flame spread index of not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with ASTM E84 or UL 723. (see code section for exceptions)
Action required: Provide pipe material schedule to verify that there will be no plastic in plenum.
|
|
|
|
|
Licensed Contractors
|
Approved
|
06/14/2025
|
04/21/2025
|
|
|
Joe Frogge
|
|
|
|
|
Alarm Plan Review
|
Pending
|
|
|
|
|
Craig Hill
|
|
|
|
|
Sprinkler Plan Review
|
Pending
|
|
|
|
|
Craig Hill
|
|
|
|