| Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
|
Alarm Test
|
Pending
|
|
|
|
|
Sprinkler - Hydrostatic Test
|
Pending
|
|
|
|
|
Sprinkler - Flow Test
|
Pending
|
|
|
|
|
Underslab Electrical Inspection - Commercial
|
Pending
|
|
|
|
|
|
Misc
|
|
Pavement-Curb Construction
|
Pending
|
|
|
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Pending
|
|
|
|
|
|
Misc
|
|
Gas Piping Inspection - Commercial
|
Pending
|
|
|
|
|
Gas Service Inspection - Commercial
|
Pending
|
|
|
|
|
Above Ceiling Inspection
|
Pending
|
|
|
|
|
Install Street and Stop Signs
|
Pending
|
|
|
|
|
Detention Basin
|
Pending
|
|
|
|
|
Sidewalk Inspection
|
Pending
|
|
|
|
|
|
Misc
|
|
Pavement-Surface
|
Pending
|
|
|
|
|
|
Misc
|
|
Grading/Excavation/Fill Inspection
|
Pending
|
|
|
|
|
|
Misc
|
|
Rated Assembly Inspection
|
Pending
|
|
|
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Site Visit
|
Pending
|
|
|
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Pending
|
|
|
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Electrical Service Inspection
|
Pending
|
|
|
|
|
|
Misc
|
|
|
Misc
Corrective Action Required
|
|
Erosion Control Inspection
|
Pending
|
|
|
|
|
|
Misc
|
|
Site Visit
|
Partial
|
|
|
04/23/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
6/13/2025
|
6/13/2025
|
06/13/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/16/2025
|
6/16/2025
|
06/16/2025
|
|
|
Misc
|
|
Footing Inspection - Commercial
|
Passed
|
6/17/2025
|
6/17/2025
|
06/17/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/17/2025
|
6/17/2025
|
06/17/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/23/2025
|
6/23/2025
|
06/23/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/24/2025
|
6/24/2025
|
06/24/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/25/2025
|
6/25/2025
|
06/25/2025
|
|
|
Misc
|
|
Underslab Plumbing Inspection - Commercial
|
Partial
|
|
|
06/25/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/26/2025
|
6/26/2025
|
06/26/2025
|
|
|
Misc
|
|
Underslab Plumbing Inspection - Commercial
|
Partial
|
6/27/2025
|
6/27/2025
|
06/27/2025
|
|
|
Misc
|
|
Underslab Plumbing Inspection - Commercial
|
Passed
|
7/1/2025
|
7/1/2025
|
07/01/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
6/27/2025
|
6/27/2025
|
07/01/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/1/2025
|
7/1/2025
|
07/01/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/2/2025
|
7/2/2025
|
07/02/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/3/2025
|
7/3/2025
|
07/03/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
|
|
07/03/2025
|
|
|
Misc
|
|
Underslab Electrical Inspection - Commercial
|
Partial
|
7/7/2025
|
7/7/2025
|
07/07/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/7/2025
|
7/7/2025
|
07/07/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/8/2025
|
7/8/2025
|
07/08/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
7/9/2025
|
7/9/2025
|
07/09/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
|
|
07/09/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/10/2025
|
7/10/2025
|
07/11/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/11/2025
|
7/11/2025
|
07/11/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
7/15/2025
|
7/15/2025
|
07/15/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
|
|
07/15/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/15/2025
|
7/15/2025
|
07/15/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
7/16/2025
|
7/16/2025
|
07/16/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/16/2025
|
7/16/2025
|
07/16/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
7/18/2025
|
7/18/2025
|
07/18/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
7/23/2025
|
7/23/2025
|
07/24/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
7/24/2025
|
7/24/2025
|
07/24/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
7/29/2025
|
7/29/2025
|
07/29/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
|
|
07/30/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
7/31/2025
|
7/31/2025
|
07/31/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
|
|
08/04/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
|
|
08/06/2025
|
|
|
Misc
|
|
Sanitary Sewer Construction Inspection
|
Partial
|
8/7/2025
|
8/7/2025
|
08/07/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/7/2025
|
8/7/2025
|
08/07/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/8/2025
|
8/8/2025
|
08/08/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
8/12/2025
|
8/12/2025
|
08/12/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/12/2025
|
8/12/2025
|
08/12/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/13/2025
|
8/13/2025
|
08/13/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/14/2025
|
8/14/2025
|
08/14/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/15/2025
|
8/15/2025
|
08/15/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/18/2025
|
8/18/2025
|
08/18/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
7/7/2025
|
8/19/2025
|
08/19/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
8/20/2025
|
8/20/2025
|
08/20/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
|
|
08/20/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/21/2025
|
8/21/2025
|
08/21/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/22/2025
|
8/22/2025
|
08/22/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/25/2025
|
8/25/2025
|
08/25/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/25/2025
|
8/25/2025
|
08/25/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
8/26/2025
|
8/26/2025
|
08/26/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
8/26/2025
|
8/26/2025
|
08/26/2025
|
|
|
Misc
|
|
Sidewalk Inspection
|
Partial
|
8/26/2025
|
8/26/2025
|
08/26/2025
|
|
|
Misc
|
|
Sidewalk Inspection
|
Partial
|
|
|
08/27/2025
|
|
|
Misc
|
|
Water Line - Hydrostatic Test
|
Passed
|
8/27/2025
|
8/27/2025
|
08/27/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
8/27/2025
|
8/27/2025
|
08/27/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
8/28/2025
|
8/28/2025
|
08/28/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
8/29/2025
|
8/29/2025
|
08/29/2025
|
|
|
Misc
|
|
Water Line - Coliform Test 1
|
Passed
|
|
|
09/02/2025
|
|
|
Misc
|
|
Water Line - Coliform Test 2
|
Passed
|
9/2/2025
|
9/2/2025
|
09/02/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
9/3/2025
|
9/3/2025
|
09/03/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
9/3/2025
|
9/3/2025
|
09/03/2025
|
|
|
Misc
|
|
Storm Sewer Construction Inspection
|
Partial
|
7/31/2025
|
7/31/2025
|
09/05/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
9/5/2025 (P.M.)
|
9/5/2025
|
09/05/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
9/8/2025
|
9/8/2025
|
09/08/2025
|
|
|
Misc
|
|
Grading/Excavation/Fill Inspection
|
Partial
|
9/16/2025
|
9/16/2025
|
09/16/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
|
|
09/24/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
9/24/2025
|
9/24/2025
|
09/24/2025
|
|
|
Misc
|
|
Pavement-Curb Construction
|
Partial
|
9/30/2025
|
9/30/2025
|
09/30/2025
|
|
|
Misc
|
|
Underground Electrical Inspection - Commercial
|
Partial
|
10/2/2025
|
10/2/2025
|
10/02/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
10/2/2025
|
10/2/2025
|
10/02/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
|
|
10/03/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
10/7/2025
|
10/7/2025
|
10/08/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
|
|
10/08/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
10/9/2025
|
10/9/2025
|
10/09/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
10/9/2025
|
10/9/2025
|
10/09/2025
|
|
|
Misc
|
|
Detention Basin
|
Partial
|
10/17/2025
|
10/17/2025
|
10/17/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
|
|
10/29/2025
|
|
|
Misc
|
|
Site Visit
|
Partial
|
11/3/2025
|
11/3/2025
|
11/03/2025
|
|
|
Misc
|
|
Water Line - Construction Inspection
|
Partial
|
11/12/2025
|
11/12/2025
|
11/12/2025
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
11/21/2025
|
11/21/2025
|
11/21/2025
|
|
|
Misc
|
|
Sidewalk Inspection
|
Partial
|
12/15/2025
|
12/15/2025
|
12/15/2025
|
|
|
Misc
|
|
|
Misc
|
|
Sidewalk Inspection
|
Partial
|
12/22/2025
|
12/22/2025
|
12/22/2025
|
|
|
Misc
|
|
Pavement-Surface
|
Partial
|
12/22/2025
|
12/22/2025
|
12/23/2025
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Failed
|
1/5/2026
|
1/5/2026
|
01/05/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Grading/Excavation/Fill Inspection
|
Partial
|
1/6/2026
|
1/6/2026
|
01/06/2026
|
|
|
Misc
|
|
Piers/Caissons Inspection - Commercial
|
Failed
|
1/13/2026
|
1/13/2026
|
01/13/2026
|
|
|
Misc
Corrective Action Required
|
|
Erosion Control Inspection
|
Failed
|
|
|
01/13/2026
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Failed
|
1/14/2026
|
1/14/2026
|
01/14/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Piers/Caissons Inspection - Commercial
|
Partial
|
1/14/2026
|
1/14/2026
|
01/14/2026
|
|
|
Misc
Corrective Action Required
|
|
Site Visit
|
Partial
|
1/6/2026
|
|
01/15/2026
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Failed
|
1/16/2026
|
1/16/2026
|
01/16/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Failed
|
1/21/2026
|
1/21/2026
|
01/21/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
1/21/2026
|
1/21/2026
|
01/21/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
1/27/2026
|
1/27/2026
|
01/27/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
1/27/2026
|
1/27/2026
|
01/27/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Site Visit
|
Partial
|
1/28/2026
|
1/28/2026
|
01/28/2026
|
|
|
Misc
|
|
Rated Assembly Inspection
|
Partial
|
1/29/2026
|
1/29/2026
|
01/29/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Failed
|
1/29/2026
|
1/29/2026
|
01/29/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
1/30/2026
|
1/30/2026
|
01/30/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Site Visit
|
Partial
|
1/30/2026
|
1/30/2026
|
01/30/2026
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Failed
|
2/2/2026
|
2/2/2026
|
02/02/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/4/2026
|
2/4/2026
|
02/04/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/4/2026
|
2/4/2026
|
02/04/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
|
|
02/04/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/4/2026
|
2/4/2026
|
02/04/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/5/2026
|
2/5/2026
|
02/05/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/5/2026
|
2/5/2026
|
02/05/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/9/2026
|
2/9/2026
|
02/05/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Failed
|
2/10/2026
|
2/10/2026
|
02/10/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/11/2026
|
2/11/2026
|
02/11/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/11/2026
|
2/11/2026
|
02/11/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
All Rough Inspection - Commercial
|
Partial
|
2/12/2026
|
2/12/2026
|
02/12/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/12/2026
|
2/12/2026
|
02/12/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Piers/Caissons Inspection - Commercial
|
Partial
|
2/13/2026
|
2/13/2026
|
02/13/2026
|
|
|
Misc
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/20/2026
|
2/20/2026
|
02/20/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Failed
|
2/23/2026
|
2/23/2026
|
02/23/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
2/27/2026
|
2/27/2026
|
02/27/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Rated Assembly Inspection
|
Partial
|
3/3/2026
|
3/3/2026
|
03/03/2026
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
Electrical Service Inspection
|
Failed
|
3/4/2026
|
3/4/2026
|
03/04/2026
|
|
|
Misc
Corrective Action Required
|
|
Erosion Control Inspection
|
Partial
|
1/15/2026
|
1/15/2026
|
03/17/2026
|
|
|
Misc
|
|
Site Visit
|
Partial
|
3/18/2026
|
3/18/2026
|
03/18/2026
|
|
|
Misc
|
|
All Rough Inspection - Commercial
|
Failed
|
3/19/2026
|
3/19/2026
|
03/19/2026
|
|
|
FIRST FLOOR
Corrective Action Required
|
|
|
SECOND FLOOR
Corrective Action Required
|
|
|
THIRD FLOOR
Corrective Action Required
|
|
Piers/Caissons Inspection - Commercial
|
Passed
|
3/26/2026
|
3/26/2026
|
03/26/2026
|
|
|
Misc
|
|
Electrical Service Inspection
|
Partial
|
3/30/2026
|
3/30/2026
|
03/30/2026
|
|
|
Misc
|
|
Electrical Service Inspection
|
Failed
|
3/31/2026
|
3/31/2026
|
03/31/2026
|
|
|
Misc
|
|
|
Misc
Corrective Action Required
|
|
Erosion Control Inspection
|
Partial
|
|
|
03/31/2026
|
|
|
Misc
|
|
Erosion Control Inspection
|
Failed
|
4/1/2026
|
4/1/2026
|
04/01/2026
|
|
|
Misc
|
|
Erosion Control Inspection
|
Partial
|
4/2/2026
|
4/2/2026
|
04/02/2026
|
|
|
Misc
|