Permit Application Status

PRCOM20244682


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20244682
Building Permit - Commercial
Issued - Partial
DOUGLAS STATION PARTNERS LLC
NEW MULTI-FAMILY
THE HAVEN AT DOUGLAS STATION - NEW APARTMENT BUILDING WITH INTEGRAL CLUBHOUSE AND ALL SITE DEVELOPMENT FOR UTILITIES AND PAVING. Mike Weisenborn 04/15/2025 2:30 PM Release for full site development, foundation, underslab and slab on grade only. No other work on the structure shall be performed until released by the Fire Department.
09/03/2024
04/06/2025
Locations
Contacts
DOUGLAS STATION PARTNERS LLC, Address:8305 NE 89TH ST  
LEVEL BUILDERS LLC, Address:P O BOX 29145, Phone:(816) 541-4204  
Shane Turnbow - Level Builders, Address:3170 NE Carnegie, Suite 400, Phone:(816) 721-2747  
Polar Aire Heating & Cooling Service, Address:400 S. Kansas Ave, Phone:(913) 782-8238  
M & S ELECTRIC, Address:PO BOX 1147, Phone:(816) 427-5913  
PINNACLE PLUMBING COMPANY LLC, Address:P O BOX 2407, Phone:(913) 375-3783  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
KANSAS CITY TESTING & ENGINEERING, Address:1308 ADAMS STREET, Phone:(913) 321-8100  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 10/29/2024 04/16/2025
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
10/23/2024

This review includes all structures on site. Separate permits will be created for each structure at a later date. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Final Development Plan
Resolved
04/15/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Resolved
11/05/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 10/3/2024 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
10/23/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred per request. 10/3/2024 - Acknowledged in letter.
Health Dept Review (aquatic)
Resolved
04/16/2025

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter. 4/16/2025 - comment moved to pool permit PRCOM20251180
Health Dept Inspection (aquatic)
Resolved
04/16/2025

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter. 4/16/2025 - comment moved to pool permit PRCOM20251180
Miscellaneous Correction
Corrective Action Required
04/02/2025

Vertical construction will not be permitted until released by the Fire Department. Paved access and live hydrants must be present adjacent to the structure.
Final Development Plan Review Approved 04/11/2025 04/08/2025
Mike Weisenborn
Alarm Plan Review Released for Construction 03/14/2025 03/13/2025
Craig Hill
Alarm Plan Review Rejected 02/24/2025 02/24/2025
Craig Hill
Alarm testing.
Informational
03/13/2025

2018 IFC 904.4.2- Alarm testing. Notification appliances, connections to fire alarm systems, and connections to approved supervising stations shall be tested in accordance with this section and Section 907 to verify proper operation. Information Only: Call 816-969-1300 to schedule alarm testing 24 hours in advance. Coordinate with sprinkler testing.
Misc
Resolved
03/13/2025

Provide additional notification in buildings 1, 2 and 5, on each floor above the ground floor. Position in the middle of the corridor.
Alarms connected to automatic sprinkler system
Informational
03/13/2025

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system. Information Only:
Special Inspections Review Approved 11/05/2024
Joe Frogge
Fire Plan Review Approved 10/29/2024 10/29/2024
Craig Hill
Miscellaneous Correction
Corrective Action Required
03/24/2025

Hydrants and the base asphalt for the parking lots shall be in place before any vertical combustible construction.
Licensed Contractors Approved 10/29/2024 10/29/2024
Joe Frogge
Licensed Contractors Rejected 10/29/2024 10/23/2024
Joe Frogge
Fire Plan Review Rejected 10/07/2024 10/08/2024
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
09/30/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control Deferred submittal is allowed.
Construction documents - Fire protection systems
Corrective Action Required
09/30/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Deferred submittal is allowed.
Address numbers required
Corrective Action Required
09/30/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Misc
Corrective Action Required
09/30/2024

2018 IFC 506.1 Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. Action Required: (verified at inspection) Each building will need an external knox box. All knox boxes for buildings 1-5 and elevators can be obtained at knoxbox.com. Boxes shall be located 6'AFF over the FDC.
Corrective Action Required
09/30/2024

407.3 Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. Action Required: (verified at inspection) All rooms, areas, buildings storing pool chemicals and other types of acids, solvents, chemicals or fuels shall be posted with the NFPA 704 placard with the MSDS hazard ratings on the placard.
Corrective Action Required
09/30/2024

Pool deck does not have adequate exiting for the occupant load.
Miscellaneous Correction
Corrective Action Required
10/03/2024

All exits from the pool deck are required to have panic hardware on the gates.
Miscellaneous Correction
Corrective Action Required
10/07/2024

For Information Only-All required fire hydrants and access drives and parking lots (asphalt or cooncrete base) shall be in place at the time of construction construction with combustible materials.
Building Plan Review Rejected 10/07/2024 10/03/2024
Joe Frogge
Misc
Corrective Action Required
09/30/2024

This review includes all structures on site. Separate permits will be created for each structure at a later date. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Final Development Plan
Corrective Action Required
09/30/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
IBC 1704.2 Special Inspections
Corrective Action Required
09/30/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 10/3/2024 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
09/30/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Action required: Comment is informational. Truss packages deferred per request. 10/3/2024 - Acknowledged in letter.
Project cost
Resolved
10/03/2024

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide construction cost estimates for pool and garages.
IBC 7013.4 Fire and Smoke Protection - fire-resistance rating
Resolved
10/03/2024

Inadequate information to complete review. Action required: Provide complete UL details for rated assemblies that include nail/screw patterns. Also, either remove garage fire barrier references on A0.02 or specify rated walls on A8.01 thru A8.07. 10/3/2024 - provided in spec
Health Dept Review (aquatic)
Corrective Action Required
09/30/2024

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
Health Dept Inspection (aquatic)
Corrective Action Required
09/30/2024

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 10/3/2024 - Acknowledged in letter.
IBC 1209.2 Finish materials
Resolved
10/03/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at clubhouse restrooms and mop sink.
Code analysis required
Resolved
10/03/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis for clubhouse.
IBC 2902.2 Separate facilities - fixture
Resolved
09/30/2024

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or submit Code Modification Request to use 2024 IBC section 2902.2. If you choose to use separate gendered restrooms each gender will need an accessible stall.
IBC 1011.11 Handrails - handrails at stairways
Resolved
10/03/2024

Unified Development Ordinance Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of non slip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. Action required: Provide additional handrail at pool steps to comply.
IBC 1208.2 Attic spaces
Resolved
10/03/2024

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic spaces.
IPC 604.8 Water pressure reducing valve
Resolved
10/03/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 10/07/2024 10/03/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/30/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/3/2024 - (waiting on Mechanical contractor)
Fire Plan Review Rejected 09/17/2024 09/17/2024
Zachary Nelson
Construction documents for fire alarm systems
Corrective Action Required
09/16/2024

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Construction documents - Fire protection systems
Corrective Action Required
09/16/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Address numbers required
Corrective Action Required
09/16/2024

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Misc
Corrective Action Required
09/16/2024

2018 IFC 506.1 Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. Action Required: (verified at inspection) Each building will need an external knox box. All knox boxes for buildings 1-5 and elevators can be obtained at knoxbox.com
Corrective Action Required
09/16/2024

407.3 Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 5003.5. Action Required: (verified at inspection) All rooms, areas, buildings storing pool chemicals and other types of acids, solvents, chemicals or fuels shall be posted with the NFPA 704 placard with the MSDS hazard ratings on the placard.
Corrective Action Required
09/16/2024

Clarification needed on sheet No. E0.00. Exit/ELU Combo, is this an exit sign with exterior illumination?
Corrective Action Required
09/16/2024

The occupant load of the clubhouse and pool area are not provided. Action Required: Provide occupant load of clubhouse and pool area.
Building Plan Review Rejected 09/17/2024 09/13/2024
Joe Frogge
Misc
Corrective Action Required
09/12/2024

This review includes all structures on site. Separate permits will be created for each structure at a later date. Action required: Comment is informational.
Final Development Plan
Corrective Action Required
09/12/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
09/12/2024

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Engineered truss package
Corrective Action Required
09/12/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Action required: Comment is informational. Truss packages deferred per request.
Project cost
Corrective Action Required
09/12/2024

The project cost, which is used to establish the permit fee, has not been provided. Action required: Provide construction cost estimates for pool and garages.
IBC 7013.4 Fire and Smoke Protection - fire-resistance rating
Corrective Action Required
09/12/2024

Inadequate information to complete review. Action required: Provide complete UL details for rated assemblies that include nail/screw patterns. Also, either remove garage fire barrier references on A0.02 or specify rated walls on A8.01 thru A8.07.
Health Dept Review (aquatic)
Corrective Action Required
09/12/2024

For the Health Department review of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Services Division, at (816) 223-9769. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection (aquatic)
Corrective Action Required
09/12/2024

For the Health Department inspection of public pools contact Casey Elledge with the Jackson County Public Works Department, Environmental Health Division at (816) 223-9769. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 1209.2 Finish materials
Corrective Action Required
09/12/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at clubhouse restrooms and mop sink.
Code analysis required
Corrective Action Required
09/13/2024

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis for clubhouse.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
09/13/2024

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or submit Code Modification Request to use 2024 IBC section 2902.2. If you choose to use separate gendered restrooms each gender will need an accessible stall.
IBC 1011.11 Handrails - handrails at stairways
Corrective Action Required
09/13/2024

Unified Development Ordinance Section 7-1010. - Steps or ladders. Two (2) or more means of egress in the form of steps or ladders shall be provided for all swimming pools. At least one such means of egress shall be located on a side of the pool at both the deep end and shallow end of the pool. Treads of steps and ladders shall be constructed of non slip material and at least three (3) inches wide for their full length. Steps and ladders shall have a handrail on both sides. Exception: Pools accessory to one- and two-family dwellings. Action required: Provide additional handrail at pool steps to comply.
IBC 1208.2 Attic spaces
Corrective Action Required
09/13/2024

2018 IBC 1208.2 Attic spaces. An opening not less than 20 inches by 30 inches shall be provided to any attic area having a clear height of over 30 inches. Clear headroom of not less than 30 inches shall be provided in the attic space at or above the access opening. Action required: Provide access to attic spaces.
IPC 604.8 Water pressure reducing valve
Corrective Action Required
09/13/2024

2018 IPC 604.8 Water Pressure reducing valve or regulator. Where water pressure within a building exceeds 80 psi static, an approved water-pressure reducing valve conforming to ASSE 1003 or CSA B356 with strainer shall be installed to reduce the pressure in the building water distribution piping to not greater than 80 psi static. Action required: Provide pressure reducing valve at water entry. (Our Water Department requires PRV installation in all locations regardless of pressure)
Licensed Contractors Rejected 09/17/2024 09/12/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
09/12/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $22,184.57 $22,184.57 Paid 04/15/2025
7232302-Residential License Tax Fee $14,426.88 $14,426.88 Paid 04/15/2025
9110071-Site Grading Fee $2,733.56 $2,733.56 Paid 03/28/2025
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 03/28/2025
91100C9-Water Insp Fee $2,260.93 $2,260.93 Paid 04/15/2025
91100C8-Sanitary Sewer Insp Fees $312.24 $312.24 Paid 04/15/2025
9110081-Paved Surface Inspection Fee $16,955.30 $16,955.30 Paid 04/15/2025
9110068-Storm Fee $4,389.82 $4,389.82 Paid 04/15/2025
9110072-Water Test Fee $200.00 $200.00 Paid 04/15/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Alarm Test Pending
Erosion Control Inspection Pending
Footing Inspection - Commercial Pending
Piers/Caissons Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Underground Electrical Inspection - Commercial Pending
Storm Sewer Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Water Line - Construction Inspection Pending
Site Visit Pending
Misc
Informational
04/23/2025
04/23/25 Wednesday JMJ Contractor continued grading Tuesday and Wednesday.
Site Visit Partial 04/23/2025
Misc
Informational
04/23/2025
04/23/25 Wednesday JMJ Contractor continued grading Tuesday and Wednesday.
Documents & Images
Date Uploaded File Type Document Name
09/03/2024 Application Form APPLICATION
09/05/2024 Plans 24 0902 - Haven at DS Permit Set
09/05/2024 Engineer Report/Study 24 0902 - Haven at DS Geotech Report
09/05/2024 Engineer Report/Study 24 0902 - Haven at DS Struct Calcs
09/05/2024 Specifications 24 0902 - Haven at DS Specifications
09/05/2024 Email CPTED info from PD
09/16/2024 Letter License Tax Bill
09/17/2024 Letter DS P/R Corrections Document
09/30/2024 Letter 24 0927 - Haven at DS Code Modification Request
09/30/2024 Letter 24 0927 - Haven at DS Comment Response Letter
09/30/2024 Plans 24 0927 - Haven at DS Permit Set_REV 1
09/30/2024 Specifications 24 0927 - Haven at DS Specifications_REV 1
09/30/2024 Code Mod Request Approved Code Modification Request
10/08/2024 Letter DS P/R Corrections Document
10/22/2024 Plans 24 1021 - Haven at DS Permit Set
10/22/2024 Letter 24 1021 - Douglas Station City Comment Responses
10/29/2024 Approved Plans Approved construction plans
11/05/2024 3rd Party Permit/Approval SI Intent Letter
02/10/2025 Plans Sealed - Douglas Station Fire Alarm Plans
02/24/2025 Letter Fire (Alarm) Plan Review Notice
03/07/2025 Plans Sealed - Douglas Station Fire Alarm Plans - Revised - Clouded
03/13/2025 Plans Sealed - Douglas Station Fire Alarm Plans - Revised - Clouded_RFC
03/13/2025 Letter Fire (Alarm) Plan Review Notice
03/26/2025 Approved Plans APPROVED HAVEN MASS GRADING AND EROSION CONTROL_REV 0_PL2023213
03/28/2025 Receipt Receipt for transaction:2025-001884
03/31/2025 Permit DS Building Permit
03/31/2025 Activity Document THE HAVEN INFRASTRUCTURE FEE SHEET
04/07/2025 Approved Plans APPROVED THE HAVEN FDP SET_REV 0_PL2023213
04/15/2025 Receipt Receipt for transaction: 2025-002334
04/16/2025 Letter DS Building Permit
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home