Permit Application Status

PRCOM20244602


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20244602
Building Permit - Commercial
Certificate of Occupancy
ZENIQAY, LLC
NEW TENANT FINISH
TENANT FINISH FOR GENERIC NON-MEDICAL OFFICE
08/28/2024
10/17/2024
01/17/2025
Locations
Contacts
JTI Construction LLC, Address:513 S Persimmon Dr  
Justin Thompson - JTI Construction, Address:513 S Persimmon Dr  
Tharp Mechanical LLC, Address:PO Box 6753  
CRH ELECTRIC INC, Address:4020 E 137TH TER, Phone:(816) 761-1433  
PLUMBING PLUS INC, Address:13117 S 71 HWY, Phone:(816) 761-5757  
CLOCKWORK, Address:423 DELAWARE STREET #102, Phone:(816) 807-3787  
ZENIQAY, LLC, Address:200 NE WOODS CHAPEL RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/11/2024 10/15/2024
Joe Frogge
LC - General Contractor
Resolved
10/11/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact. 10/8/24 - Acknowledged in letter.
LC - MEP Subs
Resolved
10/15/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 10/8/24 - Acknowledged in letter.
Fire Plan Review Approved 10/11/2024 10/08/2024
Joe Frogge
Building Plan Review Approved with Conditions 10/11/2024 10/08/2024
Joe Frogge
Misc
Corrective Action Required
10/04/2024

This permit is for a generic non-medical use. While a certificate of occupancy will be granted at final inspections, a new permit would have to be applied for for any other type of use even if no construction takes place. Action required: Comment is informational. 10/8/24 - Acknowledged in letter.
IPC 504.6 Water heater discharge piping
Resolved
10/08/2024

2018 IPC 504.6 Requirements for discharge piping. The discharge piping serving a pressure relief valve, temperature relief valve or combination thereof shall: 1. Not be directly connected to the drainage system. 2. Discharge through an air gap located in the same room as the water heater. 3. Not be smaller than the diameter of the outlet of the valve served and shall discharge full size to the air gap. 4. Serve a single relief device and shall not connect to piping serving any other relief device or equipment. 5. Discharge to the floor, to the pan serving the water heater or storage tank, to a waste receptor or to the outdoors. 6. Discharge in a manner that does not cause personal injury or structural damage. 7. Discharge to a termination point that is readily observable by the building occupants. 8.Not be trapped. 9. Be installed so as to flow by gravity. 10. Terminate not more than 6 inches above and not less than two times the discharge pipe diameter above the floor or flood level rim of the waste receptor. 11. Not have a threaded connection at the end of such piping. 12. Not have valves or tee fittings. 13. Be constructed of those materials listed in Section 605.4 or materials tested, rated and approved for such use in accordance with ASME A112.4.1. 14. Be one nominal size larger than the size of the relief valve outlet, where the relief valve discharge piping is installed with insert fittings. The outlet end of such tubing shall be fastened in place. Action required: Route water heater overflow from pan to conspicuous location. (see item 7)
Fire Plan Review Approved 09/10/2024 09/10/2024
Craig Hill
Building Plan Review Rejected 09/10/2024 09/06/2024
Joe Frogge
Misc
Corrective Action Required
09/05/2024

This permit is for a generic non-medical use. While a certificate of occupancy will be granted at final inspections, a new permit would have to be applied for for any other type of use even if no construction takes place. Action required: Comment is informational.
IPC 504.6 Water heater discharge piping
Corrective Action Required
09/05/2024

2018 IPC 504.6 Requirements for discharge piping. The discharge piping serving a pressure relief valve, temperature relief valve or combination thereof shall: 1. Not be directly connected to the drainage system. 2. Discharge through an air gap located in the same room as the water heater. 3. Not be smaller than the diameter of the outlet of the valve served and shall discharge full size to the air gap. 4. Serve a single relief device and shall not connect to piping serving any other relief device or equipment. 5. Discharge to the floor, to the pan serving the water heater or storage tank, to a waste receptor or to the outdoors. 6. Discharge in a manner that does not cause personal injury or structural damage. 7. Discharge to a termination point that is readily observable by the building occupants. 8.Not be trapped. 9. Be installed so as to flow by gravity. 10. Terminate not more than 6 inches above and not less than two times the discharge pipe diameter above the floor or flood level rim of the waste receptor. 11. Not have a threaded connection at the end of such piping. 12. Not have valves or tee fittings. 13. Be constructed of those materials listed in Section 605.4 or materials tested, rated and approved for such use in accordance with ASME A112.4.1. 14. Be one nominal size larger than the size of the relief valve outlet, where the relief valve discharge piping is installed with insert fittings. The outlet end of such tubing shall be fastened in place. Action required: Route water heater overflow from pan to conspicuous location. (see item 7)
Licensed Contractors Rejected 09/10/2024 09/05/2024
Joe Frogge
LC - General Contractor
Corrective Action Required
09/05/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
09/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $400.00 $400.00 Paid 10/16/2024
7232302-Commercial License Tax Fee $2,549.25 $2,549.25 Paid 10/16/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 11/13/2024 11/13/2024 11/13/2024
Above Ceiling Inspection Passed 1/3/2025 1/3/2025 01/03/2025
Occupancy Inspection - Codes Commercial Full C of O 1/17/2025 1/17/2025 01/17/2025
Occupancy Inspection - Fire Passed 1/17/2025 1/17/2025 01/18/2025
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home