Permit Application Status

PRCOM20243960


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20243960
Building Permit - Commercial
Certificate of Occupancy
RED SUMMIT FAIR LLC
ADDITION COMMERCIAL
CRAFT PUTT - TENANT FINISH FOR RESTAURANT WITH MINI GOLF COURSE **processed as an addition because of new exterior cooler
07/30/2024
09/30/2024
10/25/2025
04/28/2025
Locations
Contacts
Origin Build Co LLC, Address:5723 Nall Ave  
Ryan Stamer - Origin Build Co, Address:5723 Nall Ave, Phone:(913) 636-5867  
RODINA COMPANY INC, Address:1204 N 59TH ST, Phone:(913) 334-5336  
EMPOWERED ELECTRIC , Address:110 E 13TH AVE, Phone:(816) 401-8949  
IPLUMBKC LLC, Address:34108 E TRUMAN RD, Phone:(833) 758-6252  
CLOCKWORK, Address:423 DELAWARE STREET #102, Phone:(816) 807-3787  
RED SUMMIT FAIR LLC, Address:ONE E WASHINGTON ST STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 05/08/2025 04/25/2025
Craig Hill
Alarm Plan Review Rejected 12/24/2024 12/18/2024
Craig Hill
Misc
Corrective Action Required
12/17/2024

Remove horn strobes on the North patio. They are not required.
Fire Plan Review Approved 08/20/2024 08/19/2024
Craig Hill
Construction documents - Fire protection systems
Corrective Action Required
08/13/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval,and hood and hood suppression specifications.
Miscellaneous Correction
Corrective Action Required
08/13/2024

Widen the cased opening into Corridor 110 to 44 inches.
Portable fire extinguishers - general
Corrective Action Required
08/13/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show proposed locations of the fire extinguishers.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/13/2024

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. Location not shown. Provide at the manual pull station for the hood system with appropriate signage.
Emergency power for illumination
Corrective Action Required
08/13/2024

2018 IFC 1008.3.1 & 3.2 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Provide exterior emergency lighting ove the exterior doors and patio.
Health Department Review Approved 08/19/2024
Joe Frogge
Building Plan Review Approved with Conditions 08/20/2024 08/13/2024
Joe Frogge
Health Dept Review
Resolved
08/19/2024

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational. 8/13/24 - Acknowledged in letter.
Health Dept Inspection
Corrective Action Required
08/13/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 8/13/24 - Acknowledged in letter.
Gen - Plan submittals 2018 codes
Resolved
08/13/2024

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Comment is informational. We have reviewed and will inspect golf area per ICC/ANSI A117.1-2009 1107. (1007 noted on drawings)
License Tax - Payment
Corrective Action Required
08/13/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $874.50. (cooler is considered a building addition) 8/13/24 - Acknowledged in letter.
Licensed Contractors Approved 08/13/2024 08/13/2024
Joe Frogge
Fire Plan Review Rejected 08/09/2024 08/08/2024
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
08/08/2024

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide sprinkler plans for review and approval,and hood and hood suppression specifications.
Portable fire extinguishers - general
Corrective Action Required
08/08/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Show proposed locations of the fire extinguishers.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
08/08/2024

2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. Location not shown. Provide at the manual pull station for the hood system with appropriate signage.
Emergency power for illumination
Corrective Action Required
08/08/2024

2018 IFC 1008.3.1 & 3.2 Emergency power for illumination. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically illuminate all of the following: 1. Aisles and unenclosed egress stairways in rooms and spaces that require two or more means of egress. 2. Corridors, interior exit stairways and ramps and exit passageways in buildings required to have two or more exits. 3. Exterior egress components at other than their levels of exit discharge until exit discharge is accomplished for buildings required to have two or more exits. Provide exterior emergency lighting ove the exterior doors and patio.
Building Plan Review Rejected 08/09/2024 08/07/2024
Joe Frogge
Health Dept Review
Corrective Action Required
08/07/2024

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
08/07/2024

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
Gen - Plan submittals 2018 codes
Corrective Action Required
08/07/2024

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Comment is informational. We have reviewed and will inspect golf area per ICC/ANSI A117.1-2009 1107. (1007 noted on drawings)
License Tax - Payment
Corrective Action Required
08/07/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $874.50. (cooler is considered a building addition)
Licensed Contractors Approved 08/09/2024 08/07/2024
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $6,600.00 $6,600.00 Paid 09/30/2024
$63,921.00
7232302-Commercial License Tax Fee $31,960.50 $31,960.50 Paid 08/07/2024
$31,960.50
7232302-Commercial License Tax Fee $874.50 $874.50 Paid 09/30/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 10/25/2024 10/25/2024 10/25/2024
Misc
Informational
10/25/2024
Approved to exterior wall to GI location
Misc
Informational
10/25/2024
Underslab plumbing approved to exterior of building to GI location
Underslab Electrical Inspection - Commercial Passed 10/28/2024 10/28/2024
Underslab Plumbing Inspection - Commercial Passed 11/25/2024 11/25/2024 11/25/2024
Misc
Resolved
11/25/2024
Approved to exterior wall to GI location
Gas Service Inspection - Commercial Failed 12/17/2024 12/17/2024 12/17/2024
Misc
Corrective Action Required
12/17/2024
12/17/24 -Not ready for service inspection
In-wall Inspection Passed 12/17/2024 12/17/2024
Above Ceiling Inspection Partial 12/17/2024 12/17/2024
Miscellaneous Correction
Informational
12/17/2024
Hard lids and soffits ok to cover
Gas Service Inspection - Commercial Passed 3/3/2025 3/3/2025 03/03/2025
Misc
Resolved
03/03/2025
12/17/24 -Not ready for service inspection
Hood/Duct Inspection Failed 3/12/2025 3/12/2025 03/12/2025
Misc
Corrective Action Required
03/12/2025
-Seal all pinholes in welds
Hood/Duct Inspection Partial 3/13/2025 3/13/2025 03/13/2025
Misc
Informational
03/13/2025
-Light test approved at both ducts
Hood/Duct Inspection Partial 3/17/2025 3/17/2025 03/17/2025
Misc
Informational
03/13/2025
-Light test approved at both ducts -1st layer of wrap approved both ducts
Above Ceiling Inspection Failed 3/20/2025 3/20/2025 03/20/2025
Miscellaneous Correction
Informational
12/17/2024
Hard lids and soffits ok to cover -Complete all MEPs, support electrical and lights, expose all J boxes
Above Ceiling Inspection Partial 3/21/2025 3/21/2025 03/21/2025
Miscellaneous Correction
Informational
03/20/2025
Hard lids and soffits ok to cover -Remove temp lighting, install cover plate at associated J box -Remove extra whip and install knockout cover at kitchen -Install cover at low volt J box at kitchen **OK for tile everywhere not listed above. Leave tile out for inspection items
Hood/Duct Inspection Passed 3/21/2025 3/21/2025 03/21/2025
Misc
Resolved
03/21/2025
-Light test approved at both ducts -1st layer of wrap approved both ducts
Above Ceiling Inspection Passed 3/24/2025 03/24/2025
Miscellaneous Correction
Resolved
03/24/2025
Hard lids and soffits ok to cover -Remove temp lighting, install cover plate at associated J box -Remove extra whip and install knockout cover at kitchen -Install cover at low volt J box at kitchen **OK for tile everywhere not listed above. Leave tile out for inspection items
Verify Final Inspection Status - New Com Development Complete 5/1/2025 04/21/2025
Occupancy Inspection - Codes Commercial Failed 4/24/2025 4/24/2025 04/24/2025
Misc
Corrective Action Required
04/24/2025
-Complete corrections for all other departments -Install lockouts at sign breakers -Provide ASSE 1022 backflow devices at all carbonated beverage dispensers -Cut drain pipes 2x pipe diameter above floor drains -Provide GFCI protection at kitchen, bar, dishwash and prep areas -Remove exit sign at side door -Provide permanent tag at gas meter -Label exterior electrical disconnect -Install screens at vents on exterior cooler -Label all dedicated non GFCI receptacles -Upload Health Department report -Provide documentation for plastic wall covering -Missing cover plate at J box above dining area
Occupancy Inspection - Planning Passed 4/24/2025 4/24/2025 04/24/2025
Occupancy Inspection - Fire Failed 4/24/2025 4/24/2025 04/25/2025
Occupancy Inspection - Codes Commercial Full C of O 4/28/2025 04/28/2025
Misc
Resolved
04/28/2025
-Complete corrections for all other departments -Install lockouts at sign breakers -Provide ASSE 1022 backflow devices at all carbonated beverage dispensers -Cut drain pipes 2x pipe diameter above floor drains -Provide GFCI protection at kitchen, bar, dishwash and prep areas -Remove exit sign at side door -Provide permanent tag at gas meter -Label exterior electrical disconnect -Install screens at vents on exterior cooler -Label all dedicated non GFCI receptacles -Upload Health Department report -Provide documentation for plastic wall covering -Missing cover plate at J box above dining area
Sprinkler - Flow Test Passed 04/28/2025
Occupancy Inspection - Fire Passed 4/28/2025 04/28/2025
Documents & Images
Date Uploaded File Type Document Name
07/30/2024 Application Form Commercial Permit Application-Craft Putt
07/30/2024 Code Mod Request CMR for Craft Putt
07/31/2024 Plans Craft Putt Lees Summit_Permit Set_07_29_2024
08/07/2024 Letter License Tax Bill
08/09/2024 Letter DS P/R Corrections Document
08/13/2024 Letter Craft Putt - Lees Summit - Clockwork Response - 08 13 2024
08/13/2024 Plans Craft Putt Lees Summit_REV01_08_13_2024
08/19/2024 Letter jackson county health approval
08/19/2024 Approved Plans Approved construction set
09/30/2024 Receipt Receipt for transaction:2024-007990
09/30/2024 Letter DS Building Permit
10/25/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
10/28/2024 Letter INSPECTION SUMMARY
11/25/2024 Letter INSPECTION SUMMARY
12/10/2024 Sealed - Craft Putt Summit Fair, Fire Alarm
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/17/2024 Letter INSPECTION SUMMARY
12/18/2024 Letter Fire (Alarm) Plan Review Notice
03/10/2025 Letter INSPECTION SUMMARY
03/12/2025 Letter INSPECTION SUMMARY
03/13/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
03/20/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
04/24/2025 Letter INSPECTION SUMMARY
04/24/2025 Drawing CRAFTPUTT -FP-1 (1)
04/24/2025 Health Report
04/24/2025 Designer Plants Core Panel Fire Report
04/24/2025 Designer Plants Technical Specification Safety Sheet
04/25/2025 CRAFTPUTT -FP-1 (1) RFC
04/25/2025 Letter Fire (Sprinkler) Plan Review
04/28/2025 Photograph Green wall removed_photo
04/28/2025 Letter Codes Final Certificate of Occupancy
04/28/2025 Letter Field Certificate of Occupancy
04/29/2025 Letter Craft Putt - Lee Summit - Decorative Vegetation - 04 28 2025
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home