Permit Application Status

PRCOM20243864


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20243864
Building Permit - Commercial
Issued
DPLS P1 LOT 6 LLC
NEW COMMERCIAL
DISCOVERY ANIMAL HOSPITAL - NEW ANIMAL HOSPITAL
07/25/2024
05/02/2025
02/04/2025
Locations
Contacts
DPLS P1 LOT 6 LLC, Address:4240 PHILIPS FARM RD  
Goebel Mitts Construction, Address:6600 College Blvd. Suite 320 , Phone:(913) 787-1738  
Ryan Thomas - Goebel Mitts, Address:6600 College Blvd, Phone:(913) 220-4346  
LGHVAC Mechanical, Address:3616 Utica Square Dr., Phone:(405) 823-6513  
ELECTRICAL ASSOCIATES LLC, Address:886 N Jan Mar Ct, Phone:(913) 825-2537  
INTEGRITY PLUMBING SERVICES LLC, Address:405 SW Nelson Dr., Phone:(816) 803-9032  
PORTER/BERENDZEN Architects, Address:200 s. Hentry Clay Blvd, Phone:(573) 657-2022  
UES dba GEOTECHNOLOGY LLC, Address:5055 ANTIOCH RD, Phone:(913) 438-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/26/2024 04/03/2025
Joe Frogge
LC - MEP Subs
Resolved
04/03/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 8/21/24 - Acknowledged in letter.
Building Plan Review Approved with Conditions 03/05/2025 03/03/2025
Joe Frogge
License Tax - Payment
Corrective Action Required
03/03/2025

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $14,454.00 8/21/24 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
03/03/2025

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral. 8/21/24 - Deferred per request.
Fire Plan Review Approved with Conditions 03/05/2024 02/24/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
02/24/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/24/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for protection system.
Alarms connected to automatic sprinkler system
Corrective Action Required
02/24/2025

2018 IFC 903.4.2- Alarms. Approved audible and visual devices shall be connected to every automatic sprinkler system. Such sprinkler water-flow alarm devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Listed alarm notification devices shall be provided on the exterior and interior of the building in an approved location. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate the building fire alarm system. Information only.
Building Plan Review Approved with Conditions 08/26/2024 10/09/2024
Joe Frogge
Final Development Plan
Resolved
10/09/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 8/21/24 - Acknowledged in letter.
License Tax - Payment
Corrective Action Required
08/19/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $14,454.00 8/21/24 - Acknowledged in letter.
Engineered truss package
Corrective Action Required
08/19/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral. 8/21/24 - Deferred per request.
IBC 1803.1 General - geotech
Resolved
08/21/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
IBC 1209.2 Finish materials
Resolved
08/21/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at toilets and mop sinks. If paint is used it must be epoxy based.
NEC Article 250.66 Size of AC Grounding electrode conductor
Resolved
08/21/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Provide wire sizes for all grounding electrode conductors.
IPC 708.1 Cleanouts required
Resolved
08/21/2024

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sanitary leaves building.
Final Development Plan Review Approved 09/16/2024 09/16/2024
Daniel Fernandez
Fire Plan Review Approved 08/26/2024 08/26/2024
Craig Hill
Fire Plan Review Approved 08/08/2024 08/07/2024
Craig Hill
Portable fire extinguishers - general
Corrective Action Required
08/07/2024

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/07/2024

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
Building Plan Review Rejected 08/08/2024 08/06/2024
Joe Frogge
Final Development Plan
Corrective Action Required
08/05/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
License Tax - Payment
Corrective Action Required
08/05/2024

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $14,454.00
Engineered truss package
Corrective Action Required
08/05/2024

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral.
IBC 1803.1 General - geotech
Corrective Action Required
08/05/2024

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf.
IBC 1209.2 Finish materials
Corrective Action Required
08/05/2024

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish materials at toilets and mop sinks. If paint is used it must be epoxy based.
NEC Article 250.66 Size of AC Grounding electrode conductor
Corrective Action Required
08/06/2024

2017 NEC Article 250.66 Size of Alternating-Current Grounding Electrode Conductor. The size of the grounding electrode conductor at the service, at each building or structure where supplied by a feeder(s) or branch circuit(s), or at a separately derived system of a grounded or ungrounded ac system shall not be less than given in Table 250.66, except as permitted in 250.66(A) through (C). Action required: Provide wire sizes for all grounding electrode conductors.
IPC 708.1 Cleanouts required
Corrective Action Required
08/06/2024

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near where sanitary leaves building.
Licensed Contractors Rejected 08/12/2024 08/05/2024
Joe Frogge
LC - MEP Subs
Corrective Action Required
08/05/2024

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $6,000.00 $6,000.00 Paid 05/01/2025
91100C8-Sanitary Sewer Insp Fees $806.25 $806.25 Paid 04/02/2025
91100C9-Water Insp Fee $3,188.10 $3,188.10 Paid 04/02/2025
9110068-Storm Sewer Inspection Fee $3,622.50 $3,622.50 Paid 04/02/2025
9110081-Paved Surface Inspection Fee $22,620.90 $22,620.90 Paid 04/02/2025
9110071-Site Grading Fee $284.04 $284.04 Paid 04/02/2025
8331401-Water Tap Fee $26,485.00 $26,485.00 Paid 04/02/2025
8350015-Water Meter Fee $3,879.96 $3,879.96 Paid 04/02/2025
8331507-Sanitary Sewer Development Fee $15,241.00 $15,241.00 Paid 04/02/2025
9110072-Water Test Fee $200.00 $200.00 Paid 04/02/2025
Outstanding Fees Amount Paid Owing Date Paid
7232302-Commercial Excise Tax Fee $14,454.00 $0.00 $14,454.00 Not Paid


$14,454.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Commercial Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Footing Inspection - Commercial Pending
Misc
Informational
05/15/2025
Footing OK: -Ext. wall footing -5 col. pads
Erosion Control Inspection Pending
Misc
Informational
06/04/2025
6-4-25 DP. Perimeter protection needs to be installed with a construction entrance established if accessing from paved road.
Sanitary Sewer - Camera Test Pending 6/16/2025
Above Ceiling Inspection Pending 7/31/2025
Sanitary Sewer Construction Inspection Partial 5/12/2025 5/12/2025 05/12/2025
Misc
Informational
05/12/2025
5-12-25 DP. MH 16-115 has changed from public to private. Aarons crew cored into the MH and is running sewer pipe towards lot 6
Footing Inspection - Commercial Partial 5/13/2025 5/13/2025 05/13/2025
Misc
Informational
05/13/2025
Footing OK: -Ext. footing from A.2/7 to C/7 to C/1.2 -5 col. pads
Sanitary Sewer Construction Inspection Partial 5/13/2025 5/13/2025 05/15/2025
Misc
Informational
05/12/2025
5-12-25 DP. MH 16-115 has changed from public to private. Aarons crew cored into the MH and is running sewer pipe towards lot 6 5-13-25 DP Aarons crew is continuing to run the private sewer line towards lot 6 with correct amount of aggregate and tracer wire.
Sanitary Sewer Construction Inspection Passed 5/14/2025 5/14/2025 05/15/2025
Misc
Informational
05/15/2025
5-15-25 DP. My previous inspections are not showing up now, but Aarons crew finished running the private sewer line which lamp posts by lot 6.
Footing Inspection - Commercial Partial 5/15/2025 5/15/2025 05/15/2025
Misc
Informational
05/13/2025
Footing OK: -Ext. wall footing -5 col. pads
Underslab Plumbing Inspection - Commercial Partial 5/22/2025 5/22/2025 05/22/2025
Misc
Corrective Action Required
05/22/2025
Sanitary drain east of col. line 4-OK
Underslab Plumbing Inspection - Commercial Passed 5/23/2025 5/23/2025 05/23/2025
Misc
Informational
05/23/2025
Sanitary drain and fire riser and domestic water -OK
Underslab Plumbing Inspection - Commercial Passed 5/28/2025 5/28/2025 05/28/2025
Miscellaneous Correction
Informational
05/28/2025
Under slab plumbing C1 to C4
Underslab Electrical Inspection - Commercial Passed 5/28/2025 05/28/2025
Misc
Informational
05/28/2025
Under slab electrical A1-2 to B 1-2
Erosion Control Inspection Partial 6/4/2025 6/4/2025 06/04/2025
Misc
Informational
06/04/2025
6-4-25 DP. Perimeter protection needs to be installed with a construction entrance established if accessing from paved road.
Documents & Images
Date Uploaded File Type Document Name
07/25/2024 Application Form APPLICATION
07/25/2024 Letter 2023-ACE-8071-OE - DPLS - Lot 6 FAA permit
07/25/2024 Plans Discovery Animal Hospital - BULIDING PERMIT SET - 14june2024
07/29/2024 Letter License Tax Bill
08/08/2024 Letter DS P/R Corrections Document
08/16/2024 Plans Discovery Animal Hospital - BULIDING PERMIT SET REV1 - 16aug2024
08/16/2024 Letter Lee's Summit Animal Hospital -PBAresponse-city-16aug2024
08/16/2024 Engineer Report/Study OWN 24SP30033 Discovery Park Lot 6 Intrinsic Development, Lee's Summit, MO (1)
08/27/2024 Approved Plans Approved building permit set
10/09/2024 Engineer Report/Study J044702.07 Discovery Animal Hospital Initial SI Letter
09/30/2024 Approved Plans Stamped Approved Plans_Rev0_PL2024136_Animal Hospital
02/21/2025 Plans Discovery Animal Hospital - FULL SET - REV2 - 20250130
02/21/2025 Letter Lee's Summit Animal Hospital -PBA Re-Submittal Narrative-city-20feb2025
03/03/2025 Approved Plans Approved construction plans
04/02/2025 Receipt Receipt for transaction:2025-001995
05/01/2025 Receipt Receipt for transaction:2025-002734
05/02/2025 Letter DS Building Permit
05/12/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
05/22/2025 Letter INSPECTION SUMMARY
05/23/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
05/28/2025 Letter INSPECTION SUMMARY
06/04/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home