Permit Application Status

PRCOM20234175


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20234175
Building Permit - Commercial
Certificate of Occupancy
THE UNITED METHODIST CHURCH OF LEES SUMM
NEW COMMERCIAL
DETACHED STORAGE FACILITY FOR CHURCH GROUNDS EQUIPMENT
08/22/2023
09/29/2023
03/16/2024
02/06/2025
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:3381 NW CHIPMAN RD  
STEVE SKINNER CONSTRUCTION, Address:30112 E 155TH , Phone:(816) 225-2517  
Tom Skinner  
ELDECON INC, Address:120 SE 30TH ST, Phone:(660) 553-1121  
MANTEL TETER ARCHITECTS, INC, Address:929 WALNUT ST, SUITE 5104, Phone:(816) 931-5600  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 09/18/2023 09/18/2023
Scott Ready
The Summit Church - Maintenance Facility.
Building Plan Review Rejected 09/25/2023 09/18/2023
Joe Frogge
Final Development Plan
Corrective Action Required
09/18/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 9/12/23 - acknowledged in letter
Engineered truss package
Corrective Action Required
09/18/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Deferred per request. 9/12/23 - acknowledged in letter
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
09/18/2023

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Comment is informational. These dimensions will be verified at resubmittal that shows new sidewalk and door landing. 9/12/23 - Not compliant as shown. With current door configuration you will need at least 36" between latch side of door and edge of landing. See Fig. 404.2.3.2(c) - Reversing swing of door would work also
Fire Plan Review Approved with Conditions 09/25/2023 09/18/2023
Joe Frogge
Licensed Contractors Approved 09/18/2023 09/18/2023
Joe Frogge
Fire Plan Review Approved 09/18/2023 09/15/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
09/11/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum 2,10B,C fire extinguisher at a conspicuous location in a normal pathway. Verified at inspection.
Building Plan Review Rejected 09/18/2023 09/12/2023
Joe Frogge
Final Development Plan
Corrective Action Required
09/11/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 9/12/23 - acknowledged in letter
Engineered truss package
Corrective Action Required
09/11/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Deferred per request. 9/12/23 - acknowledged in letter
IBC 1010.1.6 Landings at doors
Resolved
09/12/2023

2018 IBC 1010.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches. Exception: Landing length in the direction of travel in Groups R-3 and U and within individual units of Group R-2 need not exceed 36 inches. Action required: Extend driveway concrete to man-door to act as a landing.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
09/11/2023

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Comment is informational. These dimensions will be verified at resubmittal that shows new sidewalk and door landing. 9/12/23 - Not compliant as shown. With current door configuration you will need at least 36" between latch side of door and edge of landing. See Fig. 404.2.3.2(c) - Reversing swing of door would work also
Licensed Contractors Approved 09/18/2023 09/12/2023
Joe Frogge
LC - General Contractor
Resolved
09/12/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
Fire Plan Review Approved with Conditions 09/06/2023 08/24/2023
Jim Eden
Portable fire extinguishers - general
Corrective Action Required
08/24/2023

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Provide a minimum 2,10B,C fire extinguisher at a conspicuous location in a normal pathway. Verified at inspection.
Building Plan Review Rejected 09/06/2023 08/23/2023
Joe Frogge
Final Development Plan
Corrective Action Required
08/23/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Engineered truss package
Corrective Action Required
08/23/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Deferred per request.
IBC 1010.1.6 Landings at doors
Corrective Action Required
08/23/2023

2018 IBC 1010.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches. Where a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches. Exception: Landing length in the direction of travel in Groups R-3 and U and within individual units of Group R-2 need not exceed 36 inches. Action required: Extend driveway concrete to man-door to act as a landing.
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
08/23/2023

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Comment is informational. These dimensions will be verified at resubmittal that shows new sidewalk and door landing.
Licensed Contractors Rejected 09/06/2023 08/23/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
08/23/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $520.00 $520.00 Paid 09/19/2023
$990.00
7232302-Commercial License Tax Fee $495.00 $495.00 Paid 08/23/2023
$495.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Partial 10/23/2023 10/23/2023 10/23/2023
Misc
Informational
10/23/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today.
Erosion Control Inspection Partial 10/24/2023
Misc
Informational
10/23/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order.
Erosion Control Inspection Partial 11/06/2023
Misc
Informational
10/24/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order.
Erosion Control Inspection Partial 11/15/2023
Misc
Informational
11/06/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order.
Erosion Control Inspection Partial 11/17/2023
Misc
Informational
11/15/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order.
Site Visit Partial 11/27/2023 11/27/2023 11/27/2023
Misc
Informational
11/27/2023
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition.
Erosion Control Inspection Partial 12/4/2023 12/4/2023 12/04/2023
Misc
Informational
11/17/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order.
Site Visit Partial 12/4/2023 12/4/2023 12/04/2023
Misc
Informational
11/27/2023
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today.
Erosion Control Inspection Partial 12/12/2023
Misc
Informational
12/04/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order.
Erosion Control Inspection Failed 1/2/2024 1/2/2024 01/02/2024
Misc
Informational
12/12/2023
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order.
Misc
Corrective Action Required
01/02/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Site Visit Partial 1/18/2024 1/18/2024 01/18/2024
Misc
Informational
12/04/2023
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow.
Site Visit Partial 1/23/2024 1/23/2024 01/23/2024
Misc
Informational
01/18/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development.
Site Visit Partial 3/4/2024 3/4/2024 03/04/2024
Misc
Informational
01/23/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection.
Site Visit Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
03/04/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment.
Erosion Control Inspection Partial 4/8/2024 4/8/2024 04/08/2024
Misc
Informational
01/02/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order.
Misc
Corrective Action Required
01/02/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Erosion Control Inspection Partial 4/18/2024 4/18/2024 04/18/2024
Misc
Informational
04/08/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order.
Misc
Corrective Action Required
04/08/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Erosion Control Inspection Partial 4/25/2024 4/25/2024 04/25/2024
Misc
Informational
04/18/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order.
Misc
Corrective Action Required
04/18/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Site Visit Partial 5/6/2024 5/6/2024 05/06/2024
Misc
Informational
04/08/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment. 5-6-24 DP. No work for FEI. Crew was working on the roof today
Erosion Control Inspection Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
04/25/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order.
Misc
Corrective Action Required
04/25/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Site Visit Partial 5/15/2024 5/15/2024 05/15/2024
Misc
Informational
05/06/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment. 5-6-24 DP. No work for FEI. Crew was working on the roof today 5-15-24 DP. No work for FEI
Erosion Control Inspection Partial 5/31/2024 5/31/2024 05/31/2024
Misc
Informational
05/15/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order.
Misc
Corrective Action Required
05/15/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Erosion Control Inspection Partial 6/25/2024 6/25/2024 06/25/2024
Misc
Informational
05/31/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order.
Misc
Corrective Action Required
05/31/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Rough Framing Inspection - Commercial Failed 6/28/2024 06/28/2024
Misc
Corrective Action Required
06/28/2024
- Upload Third Party footing inspection - Nail off studs on exterior corner on North East - Sill plate to be anchored within 12” of plate break and at least 3” from end at south & East wall - Provide Simpson LST A30 straps @ each door from header to studs per plans - Sheeting breaks on portal frame to be blocked and nailed with 8d @ 3” o.c. - Complete grid nail pattern for portal frame at header per plans - Electrical no completed
Site Visit Partial 7/1/2024 7/1/2024 07/02/2024
Misc
Informational
05/15/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment. 5-6-24 DP. No work for FEI. Crew was working on the roof today 5-15-24 DP. No work for FEI 7-1-24 DP. No work for FEI
Erosion Control Inspection Partial 7/16/2024 7/16/2024 07/16/2024
Misc
Informational
06/25/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order. 7-16-24 DP. ESC is in good working order.
Misc
Corrective Action Required
06/25/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Rough Framing Inspection - Commercial Failed 7/22/2024 7/22/2024 07/22/2024
Misc
Corrective Action Required
06/28/2024
- Upload Third Party footing inspection - Provide Simpson LST A30 straps @ each door from header to studs per plans - - Electrical no completed No electrical inspection done - panel not labeled
Driveway Inspection Partial 7/22/2024 7/22/2024 07/22/2024
Misc
Informational
07/22/2024
7-22-24 DP. Crew was onsite pouring the driveway today. They did not call in an inspection. They had rebar laying on the rock. They did have aggregate down but didn't look very compacted from what I could see.
Erosion Control Inspection Partial 7/23/2024 7/23/2024 07/23/2024
Misc
Informational
07/16/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order. 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order.
Misc
Corrective Action Required
07/16/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Driveway Inspection Passed 7/31/2024 7/31/2024 07/31/2024
Misc
Informational
07/22/2024
7-22-24 DP. Crew was onsite pouring the driveway today. They did not call in an inspection. They had rebar laying on the rock. They did have aggregate down but didn't look very compacted from what I could see. 7-31-24 DP. Driveway is complete
Site Visit Partial 9/17/2024 9/17/2024 09/17/2024
Misc
Informational
07/02/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment. 5-6-24 DP. No work for FEI. Crew was working on the roof today 5-15-24 DP. No work for FEI 7-1-24 DP. No work for FEI 9-17-24 NS No work being done.
Miscellaneous Inspection Failed 10/3/2024 10/03/2024
Misc
Corrective Action Required
10/03/2024
Called Steve Skinner 816-225-2517 no answer, left message. No footing inspection done or third party report subbmitted. all rough deficiencies: portal frame straps, electrical panel labels. no one on location when I went by. Shawn Hoffman 10/03/2024 3:06 PM
Miscellaneous Inspection Failed 11/19/2024 11/19/2024
Misc
Corrective Action Required
10/03/2024
Called Steve Skinner 816-225-2517 no answer, left message. No footing inspection done or third party report subbmitted. all rough deficiencies: portal frame straps, electrical panel labels. no one on location when I went by. Shawn Hoffman 10/03/2024 3:06 PM
Misc
Corrective Action Required
11/19/2024
Shawn Hoffman 11/19/2024 3:12 PM - received footing third party report that failed. - pictures of straps
Footing Inspection - Commercial Failed 11/19/2024 11/19/2024
Misc
Corrective Action Required
11/19/2024
- Footing inspection by third party. Report submitted has failed by third party.
Footing Inspection - Commercial Passed 12/2/2024 12/02/2024
Misc
Corrective Action Required
11/19/2024
- Footing inspection by third party.
Miscellaneous Inspection Failed 12/2/2024 12/02/2024
Misc
Corrective Action Required
11/19/2024
Called Steve Skinner 816-225-2517 no answer, left message. No footing inspection done or third party report subbmitted. all rough deficiencies: portal frame straps, electrical panel labels. no one on location when I went by. Shawn Hoffman 10/03/2024 3:06 PM
Misc
Corrective Action Required
11/19/2024
Shawn Hoffman 11/19/2024 3:12 PM - received footing third party report that failed. - pictures of straps
Misc
Informational
12/02/2024
- New footing letter accepted - need to schedule inspection for me to look at straps and electrical.
Erosion Control Inspection Residential Passed 12/2/2024 12/02/2024
Rough Framing Inspection - Commercial Passed 12/2/2024 12/02/2024
Misc
Resolved
12/02/2024
- Upload Third Party footing inspection - Provide Simpson LST A30 straps @ each door from header to studs per plans - - Electrical no completed No electrical inspection done - panel not labeled
Miscellaneous Inspection Passed 12/4/2024 12/04/2024
Misc
Resolved
12/02/2024
Called Steve Skinner 816-225-2517 no answer, left message. No footing inspection done or third party report subbmitted. all rough deficiencies: portal frame straps, electrical panel labels. no one on location when I went by. Shawn Hoffman 10/03/2024 3:06 PM
Misc
Resolved
12/02/2024
Shawn Hoffman 11/19/2024 3:12 PM - received footing third party report that failed. - pictures of straps
Misc
Resolved
12/02/2024
- New footing letter accepted - need to schedule inspection for me to look at straps and electrical.
Site Visit Complete 12/4/2024 12/4/2024 12/04/2024
Misc
Informational
09/17/2024
11-27-23 DP. No site work for multiple weeks. ESC is still in proper condition. 12-4-23 DP. No site work for development today. 1-18-24 DP. Crews have not been on site since before the Holidays due to the holidays and then the weather to follow. 1-23-24 DP. No work for development. 3-4-24 DP. There has been no site work since last inspection. 4-8-24 DP. Crew is onsite working on the building. Nothing for FEI at the moment. 5-6-24 DP. No work for FEI. Crew was working on the roof today 5-15-24 DP. No work for FEI 7-1-24 DP. No work for FEI 9-17-24 NS No work being done.
Erosion Control Inspection Passed 12/4/2024 12/4/2024 12/04/2024
Misc
Informational
07/23/2024
10-23-23 DP. Contractor started digging foundation today. There was no Erosion control and rain is on its way tomorrow. I called Steve and he said they would have it installed today. 10-24-23 DP. Silt fence was installed and is currently in good working order. 11-6-23 DP. ESC is currently in good working order. 11-15-23 DP. ESC is currently in good working order. 11-17-23 DP. ESC is currently in good working order. 12-4-23 DP. ESC is still in good working order. 12-12-23 DP. ESC is still in good working order. 4-8-24 DP. ESC is in good working order. 4-18-24 DP. ESC is in good working order. 4-25-24 DP. ESC is in good working order. 5-15-24 DP. ESC is in good working order. 5-31-24 DP. ESC is in good working order. 6-25-24 DP. ESC is in good working order. 7-16-24 DP. ESC is in good working order. 7-23-24 DP. ESC is in good working order.
Misc
Corrective Action Required
07/23/2024
1-2-24 DP. The silt fence on the north side of the pad is laid over. We need to get this re established and maintained with it being so close to the detention basin.
Occupancy Inspection - Engineering Passed 12/05/2024
Occupancy Inspection - Codes Commercial Failed 12/11/2024 12/11/2024
Misc
Corrective Action Required
12/11/2024
Failed by Fire deparment
Occupancy Inspection - Fire Passed 12/11/2024 12/11/2024
Occupancy Inspection - Planning Temporary C of O 12/6/2024 at 7:25 AM 12/12/2024
Corrective Action Required
12/12/2024
LIGHT FIXTURES. The exterior wall pack light fixtures used on the north, south and east sides of the storage building do not comply with the requirement for having full cut-offs so as to shield the view of the light source from off the site and so as to direct the light downward. The wall pack fixture with full cut-offs used on the west side of the storage building does comply with the City's lighting standards. Change out the wall packs used on the north, south and east sides of the storage building to match the fixture on the west side of the storage building.
Occupancy Inspection - Planning Passed 2/7/2025 02/06/2025
Occupancy Inspection - Codes Commercial Full C of O 2/6/2025 02/06/2025
Misc
Resolved
02/06/2025
Failed by Fire deparment
Documents & Images
Date Uploaded File Type Document Name
08/22/2023 Application Form The Summit Maintenance Bldg - Commercial Permit Application
08/23/2023 Plans 23-0822 The Summit Maintenance Bldg - Construction Drawings
08/23/2023 Letter License Tax Bill
09/05/2023 Letter DS P/R Corrections Document
09/09/2023 Plans 23-0909 The Summit Maintenance Bldg - Construction Drawings REV1
09/09/2023 Letter The Summit Maintenance Bldg - Permit Review Comment Response Letter
09/18/2023 Letter DS P/R Corrections Document
09/18/2023 Plans 23-0918 The Summit Maintenance Bldg - Construction Drawings REV2
09/18/2023 Approved Plans Approved - 23-0918 The Summit Maintenance Bldg - Construction Drawings REV2
09/18/2023 Approved Plans Approved FDP_The Summit Church Maintenance Facility_09122023
09/19/2023 Receipt Receipt for transaction:2023-007155
09/29/2023 Letter DS Building Permit
10/23/2023 Letter INSPECTION SUMMARY
10/24/2023 Letter INSPECTION SUMMARY
11/06/2023 Letter INSPECTION SUMMARY
11/15/2023 Letter INSPECTION SUMMARY
11/17/2023 Letter INSPECTION SUMMARY
11/27/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/04/2023 Letter INSPECTION SUMMARY
12/12/2023 Letter INSPECTION SUMMARY
01/02/2024 Letter INSPECTION SUMMARY
01/18/2024 Letter INSPECTION SUMMARY
01/23/2024 Letter INSPECTION SUMMARY
03/04/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/08/2024 Letter INSPECTION SUMMARY
04/18/2024 Letter INSPECTION SUMMARY
04/25/2024 Letter INSPECTION SUMMARY
05/06/2024 Letter INSPECTION SUMMARY
05/15/2024 Letter INSPECTION SUMMARY
05/15/2024 Letter INSPECTION SUMMARY
05/31/2024 Letter INSPECTION SUMMARY
06/25/2024 Letter INSPECTION SUMMARY
06/28/2024 Letter INSPECTION SUMMARY
07/02/2024 Letter INSPECTION SUMMARY
07/16/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/23/2024 Letter INSPECTION SUMMARY
07/31/2024 Letter INSPECTION SUMMARY
09/17/2024 Letter INSPECTION SUMMARY
10/03/2024 Letter INSPECTION SUMMARY
11/18/2024 Engineer Report/Study The+Summit+Church+Maintenance+Facility_Foundation+Observations_2023-10-20_02231387_0001 (1)
11/18/2024 Engineer Report/Study The+Summit+Church+Maintenance+Facility_Laboratory+Compaction+Characteristics+Of+Soil_2024-02-01_02231387_0005B (2)
11/19/2024 Photograph IMG_2567
11/19/2024 Photograph IMG_2569
11/19/2024 Photograph IMG_2570
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/26/2024 The+Summit+Church+Maintenance+Facility_Foundation+Observations_2023-10-20_02231387_0001 (5)
11/26/2024 The+Summit+Church+Maintenance+Facility_Laboratory+Compaction+Characteristics+Of+Soil_2024-02-01_02231387_0005B
11/26/2024 The+Summit+Church+Maintenance+Facility_Foundation+Observations_2023-10-20_02231387_0001
11/26/2024 The+Summit+Church+Maintenance+Facility_Foundation+Observations_2023-10-20_02231387_0001 (2)
11/26/2024 3RD Party Insp Report ENGINEER REPORT
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/04/2024 Letter INSPECTION SUMMARY
12/11/2024 Letter INSPECTION SUMMARY
02/06/2025 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home