Permit Application Status

PRCOM20234140


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20234140
Building Permit - Commercial
Withdrawn
TOWNSEND SUMMIT LLC
NEW COMMERCIAL
WOODSPRING SUITES HOTEL - NEW 122 ROOM HOTEL
08/22/2023
04/22/2024
06/23/2025
Locations
Contacts
TOWNSEND SUMMIT LLC, Address:230 SCHILLNG CIR STE 120  
Genesis Construction Management CO, Address:4420 Madison Ave. Suite 100  
Marcus Gutierrez - Genesis Construction, Phone:(716) 492-8291  
JAKE'S INDUSTRIAL INC, Address:1101 SW 1ST, Phone:(816) 690-3173  
INTERSTATE ELECTRICAL CONSTRUCTION, Address:3710 ROBINSON PIKE RD, Phone:(816) 761-0200  
NUMER PLUMBING, Address:11550 N PLATTE PURCHASE, Phone:(816) 734-4484  
BRR Architecture, Address:8131 Metcalf Ave, Phone:(913) 262-9095  
CFS ENGINEERS, Address:1421 EAST 104TH STREET STE 100, Phone:(816) 333-4477  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 12/28/2023 04/16/2024
Joe Frogge
LC - General Contractor
Resolved
04/16/2024

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 10/18/23 - acknowledged in letter
Building Plan Review Approved with Conditions 12/28/2023 04/10/2024
Joe Frogge
Final Development Plan
Resolved
01/10/2024

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/18/23 - not addressed
Misc
Corrective Action Required
12/19/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $59,383.50 10/18/23 - not addressed
Elevator Equipment Permit
Corrective Action Required
12/19/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 10/18/23 - not addressed
Elevator Equipment Inspection
Corrective Action Required
12/19/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 10/18/23 - not addressed
Elevator Certificate of Inspection
Corrective Action Required
12/19/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 10/18/23 - not addressed
IBC 1803.1 General - geotech
Corrective Action Required
12/19/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0) 10/18/23 - deferred to pier submittal
Engineered truss package
Corrective Action Required
12/19/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
12/19/2023

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware on door out of Electrical Room 145. 10/18/23 - Clarification required. Door schedule on A8.1 shows hardware set 002 but spec appears to show set 022. Neither of which refer to a panic device. 12/27/23 - per letter HW set specified includes panic device - to be field verified.
Fire Plan Review Approved with Conditions 12/28/2023 12/27/2023
Joe Frogge
Construction documents for fire alarm systems
Corrective Action Required
12/19/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. 10/23/2023- Acknowledged .
Construction documents - Fire protection systems
Corrective Action Required
12/19/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 10/23/2023- Acknowledged
Miscellaneous Correction
Corrective Action Required
12/19/2023

BE] 1013.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. 10/23/2023- aAcknowledged through most of the building except at the north first floor and the door to the lobby from the first floor corridor. Also provide exit signage above the lobby door to the exterior. Verified at inspection.
Final Development Plan Review Approved 11/03/2023 12/19/2023
Mike Weisenborn
Fire Plan Review Approved with Conditions 10/23/2023 10/23/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
10/16/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. 10/23/2023- Acknowledged .
Knox box required
Resolved
10/23/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- Provide a Knox box over the FDC at 6' A.F.F.
Construction documents - Fire protection systems
Corrective Action Required
10/16/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. 10/23/2023- Acknowledged
Stairway identification signs
Resolved
10/23/2023

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
Key boxes for non-standardized fire service elevator keys
Resolved
10/23/2023

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide a Knox elevator key box next to the elevator on the first floor.
Miscellaneous Correction
Resolved
10/23/2023

Complete Final Development Plan requirements for the site.
Miscellaneous Correction
Resolved
10/23/2023

Class 1 hose connections/standpipe shall be provided in the stairwells.
Miscellaneous Correction
Corrective Action Required
10/16/2023

BE] 1013.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. 10/23/2023- aAcknowledged through most of the building except at the north first floor and the door to the lobby from the first floor corridor. Also provide exit signage above the lobby door to the exterior. Verified at inspection.
Building Plan Review Rejected 10/23/2023 10/18/2023
Joe Frogge
Final Development Plan
Corrective Action Required
10/16/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 10/18/23 - not addressed
IBC 1704.2 Special Inspections
Resolved
10/18/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
10/16/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $59,383.50 10/18/23 - not addressed
Elevator Equipment Permit
Corrective Action Required
10/16/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational. 10/18/23 - not addressed
Elevator Equipment Inspection
Corrective Action Required
10/16/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational. 10/18/23 - not addressed
Elevator Certificate of Inspection
Corrective Action Required
10/16/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational. 10/18/23 - not addressed
Misc
Resolved
10/18/2023

Light pole base detail incomplete. Action required: Provide concrete reinforcement information. (Sheet E-10 references structural designs that are not found in submittals for building permit or FDP)
IBC 1803.1 General - geotech
Corrective Action Required
10/16/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0) 10/18/23 - deferred to pier submittal
Engineered truss package
Corrective Action Required
10/16/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred.
IMC 306.5 Equipment on roofs
Resolved
10/18/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Amend Roof Hatch Ladder detail 4/A1.5 to show side rail extender.
IMC 501.3.1 Location of exhaust outlets
Resolved
10/18/2023

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Detail 3/M-7 shows exhaust too close to a door and combustion intakes. Amend design to comply.
IPC 1101.3 Prohibited drainage
Resolved
10/18/2023

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump not allowed to discharge into sanitary sewer system. Route to either storm drainage system or daylight.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
10/16/2023

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware on door out of Electrical Room 145. 10/18/23 - Clarification required. Door schedule on A8.1 shows hardware set 002 but spec appears to show set 022. Neither of which refer to a panic device.
Licensed Contractors Rejected 10/23/2023 10/18/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
10/16/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 10/18/23 - acknowledged in letter
Special Inspections Review Approved 10/18/2023
Joe Frogge
Fire Plan Review Rejected 09/20/2023 09/20/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/20/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide deferred shop drawings for review and approval.
Knox box required
Corrective Action Required
09/20/2023

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. Action required- Provide a Knox box over the FDC at 6' A.F.F.
Construction documents - Fire protection systems
Corrective Action Required
09/20/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide deferred shop drawings for review and approval.
Stairway identification signs
Corrective Action Required
09/20/2023

2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
09/20/2023

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide a Knox elevator key box next to the elevator on the first floor.
Miscellaneous Correction
Corrective Action Required
09/20/2023

Complete Final Development Plan requirements for the site.
Miscellaneous Correction
Corrective Action Required
09/20/2023

Class 1 hose connections/standpipe shall be provided in the stairwells.
Miscellaneous Correction
Corrective Action Required
09/21/2023

BE] 1013.2 Floor-level exit signs in Group R-1. Where exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side. Mentioned in Light Fixture Schedule, but not shown on plans.
Building Plan Review Rejected 09/20/2023 09/14/2023
Joe Frogge
Final Development Plan
Corrective Action Required
09/13/2023

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
IBC 1704.2 Special Inspections
Corrective Action Required
09/13/2023

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
09/13/2023

A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is for informational purposes. The fee will be $59,383.50
Elevator Equipment Permit
Corrective Action Required
09/13/2023

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is informational.
Elevator Equipment Inspection
Corrective Action Required
09/13/2023

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is informational.
Elevator Certificate of Inspection
Corrective Action Required
09/13/2023

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is informational.
Misc
Corrective Action Required
09/13/2023

Light pole base detail incomplete. Action required: Provide concrete reinforcement information. (Sheet E-10 references structural designs that are not found in submittals for building permit or FDP)
IBC 1803.1 General - geotech
Corrective Action Required
09/13/2023

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0)
Engineered truss package
Corrective Action Required
09/13/2023

Copies of the engineered truss package were not provided at the time of permit application. Action required: Comment is informational. Truss packages deferred.
IMC 306.5 Equipment on roofs
Corrective Action Required
09/13/2023

2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Amend Roof Hatch Ladder detail 4/A1.5 to show side rail extender.
IMC 501.3.1 Location of exhaust outlets
Corrective Action Required
09/13/2023

2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5) 3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious. Action required: Detail 3/M-7 shows exhaust too close to a door and combustion intakes. Amend design to comply.
IPC 1101.3 Prohibited drainage
Corrective Action Required
09/13/2023

2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Elevator sump not allowed to discharge into sanitary sewer system. Route to either storm drainage system or daylight.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
09/13/2023

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic hardware on door out of Electrical Room 145.
Licensed Contractors Rejected 09/06/2023 09/07/2023
Joe Frogge
LC - General Contractor
Corrective Action Required
09/07/2023

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
08/22/2023 Application Form APPLICATION
08/22/2023 Engineer Report/Study 23-283 WSS Lee's Summit, MO Calc Package 08-01-23
08/22/2023 Plans 20230816 WSS_Lees Summit, MO_COMBINED PERMIT SET
08/22/2023 Engineer Report/Study COMCheck - Lee's Summit, MO_MEP
08/22/2023 Engineer Report/Study COMcheck-Lee's Summit, MO_ENVELOPE
08/22/2023 Specifications WSS Lee's Summit, MO - SPECS
09/21/2023 Letter DS P/R Corrections Document
10/13/2023 Engineer Report/Study 2023 06 14_WoodSprings Suites Geotech Report
10/13/2023 Drawing 2023 10 04_WSS_Lees Summit, MO_Drawings_REV #2
10/13/2023 Letter 2023 10 04_WSS_Lees Summit, MO_Narrative_REV #2
10/13/2023 Letter 2023 10 04_WSS_Lees Summit, MO_Response Letter_REV #2
10/13/2023 Specifications 2023 10 04_WSS_Lees Summit, MO_Specifications_REV #2
10/13/2023 Engineer Report/Study 2023 10 12_Special Inspection Letter of Intent
10/13/2023 Specifications Water Heater BTH-199 instruction manual
10/23/2023 Letter DS P/R Corrections Document
10/30/2023 Letter License Tax Bill
12/19/2023 Approved Plans Stamped approved final developmet plan - Woodspring Suites
12/19/2023 Specifications 087100 - door hardware
12/19/2023 Specifications Falcon_24_25_Exit_Device_Catalog_106199
12/19/2023 Letter 231208_WSS_Lee's Summit, MO _Narrative_REV#3
12/19/2023 Plans 231208_WSS_Lees Summit, MO_Drawings_REV #3
12/19/2023 Specifications 231208_WSS_Lees Summit, MO_Specifications_REV #3
12/19/2023 Letter 20231208 WSS_Lee's Summit, MO_REV 3_Code Response
01/04/2024 Plans 20231208 WSS_Lees Summit, MO_Thru REV #3
01/04/2024 Specifications 20231208 WSS_Lees Summit, MO_Specs_Thru REV #3
01/04/2024 Approved Plans approved plans
04/25/2024 LC License Certificate
12/02/2024 Email Request for 60-Day Extension for Building Permit - PRCOM20234140
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home