Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
12/28/2023
|
04/16/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
10/18/23 - acknowledged in letter
|
|
|
Building Plan Review
|
Approved with Conditions
|
12/28/2023
|
04/10/2024
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Misc
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is for informational purposes. The fee will be $59,383.50
10/18/23 - not addressed
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
IBC 1803.1 General - geotech
Corrective Action Required
2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional.
Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0)
10/18/23 - deferred to pier submittal
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Comment is informational. Truss packages deferred.
|
|
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space.
A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met.
(a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted.
(b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition.
110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic hardware on door out of Electrical Room 145.
10/18/23 - Clarification required. Door schedule on A8.1 shows hardware set 002 but spec appears to show set 022. Neither of which refer to a panic device.
12/27/23 - per letter HW set specified includes panic device - to be field verified.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
12/28/2023
|
12/27/2023
|
|
Joe Frogge
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
10/23/2023- Acknowledged
.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
10/23/2023- Acknowledged
|
|
Miscellaneous Correction
Corrective Action Required
BE] 1013.2 Floor-level exit signs in Group R-1. Where
exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side.
10/23/2023- aAcknowledged through most of the building except at the north first floor and the door to the lobby from the first floor corridor. Also provide exit signage above the lobby door to the exterior. Verified at inspection.
|
|
|
Final Development Plan Review
|
Approved
|
11/03/2023
|
12/19/2023
|
|
Mike Weisenborn
|
|
|
Fire Plan Review
|
Approved with Conditions
|
10/23/2023
|
10/23/2023
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
10/23/2023- Acknowledged
.
|
|
Knox box required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Action required- Provide a Knox box over the FDC at 6' A.F.F.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
10/23/2023- Acknowledged
|
|
Stairway identification signs
2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
|
|
Key boxes for non-standardized fire service elevator keys
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Action required- Provide a Knox elevator key box next to the elevator on the first floor.
|
|
Miscellaneous Correction
Complete Final Development Plan requirements for the site.
|
|
Miscellaneous Correction
Class 1 hose connections/standpipe shall be provided in the stairwells.
|
|
Miscellaneous Correction
Corrective Action Required
BE] 1013.2 Floor-level exit signs in Group R-1. Where
exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side.
10/23/2023- aAcknowledged through most of the building except at the north first floor and the door to the lobby from the first floor corridor. Also provide exit signage above the lobby door to the exterior. Verified at inspection.
|
|
|
Building Plan Review
|
Rejected
|
10/23/2023
|
10/18/2023
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
IBC 1704.2 Special Inspections
2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions)
Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
|
|
Misc
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is for informational purposes. The fee will be $59,383.50
10/18/23 - not addressed
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
10/18/23 - not addressed
|
|
Misc
Light pole base detail incomplete.
Action required: Provide concrete reinforcement information. (Sheet E-10 references structural designs that are not found in submittals for building permit or FDP)
|
|
IBC 1803.1 General - geotech
Corrective Action Required
2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional.
Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0)
10/18/23 - deferred to pier submittal
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Comment is informational. Truss packages deferred.
|
|
IMC 306.5 Equipment on roofs
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Amend Roof Hatch Ladder detail 4/A1.5 to show side rail extender.
|
|
IMC 501.3.1 Location of exhaust outlets
2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5)
3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious.
Action required: Detail 3/M-7 shows exhaust too close to a door and combustion intakes. Amend design to comply.
|
|
IPC 1101.3 Prohibited drainage
2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system.
Action required: Elevator sump not allowed to discharge into sanitary sewer system. Route to either storm drainage system or daylight.
|
|
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space.
A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met.
(a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted.
(b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition.
110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic hardware on door out of Electrical Room 145.
10/18/23 - Clarification required. Door schedule on A8.1 shows hardware set 002 but spec appears to show set 022. Neither of which refer to a panic device.
|
|
|
Licensed Contractors
|
Rejected
|
10/23/2023
|
10/18/2023
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
10/18/23 - acknowledged in letter
|
|
|
Special Inspections Review
|
Approved
|
|
10/18/2023
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Rejected
|
09/20/2023
|
09/20/2023
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required- Provide deferred shop drawings for review and approval.
|
|
Knox box required
Corrective Action Required
2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official.
Action required- Provide a Knox box over the FDC at 6' A.F.F.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Action required- Provide deferred shop drawings for review and approval.
|
|
Stairway identification signs
Corrective Action Required
2018 IFC (B) 1023.9 Stairway identification signs. A sign shall be provided at each floor landing in an interior exit stairway and ramp connecting more than three stories designating the floor level, the terminus of the top and bottom of the interior exit stairway and ramp and the identification of the stair or ramp. The signage shall also state the story of, and the direction to, the exit discharge and the availability of roof access from the interior exit stairway and ramp for the fire department. The sign shall be located 5 feet (1524mm) above the floor landing in a position that is readily visible when the doors are in the open an dclosed positions. In addition to the stairway identification sign, a floor-level sign in raised characters and Braille complying with the ICC A1 17.1 shall be located at each floor-level landing adjacent to the door leading from the interior exit stairway and ramp into the corridor to identify the floor level.
|
|
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official.
Action required- Provide a Knox elevator key box next to the elevator on the first floor.
|
|
Miscellaneous Correction
Corrective Action Required
Complete Final Development Plan requirements for the site.
|
|
Miscellaneous Correction
Corrective Action Required
Class 1 hose connections/standpipe shall be provided in the stairwells.
|
|
Miscellaneous Correction
Corrective Action Required
BE] 1013.2 Floor-level exit signs in Group R-1. Where
exit signs are required in Group R-1 occupancies by Section 1013.1, additional low-level exit signs shall be provided in all areas serving guestrooms in Group R-1 occupancies and shall comply with Section 1013.5.The bottom of the sign shall be not less than 10 inches (254 mm) nor more than 18 inches (455 mm) above the floor level. The sign shall be flush mounted to the door or wall. Where mounted on the wall, the edge of the sign shall be within 4 inches (102 mm) of the door frame on the latch side.
Mentioned in Light Fixture Schedule, but not shown on plans.
|
|
|
Building Plan Review
|
Rejected
|
09/20/2023
|
09/14/2023
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
|
|
IBC 1704.2 Special Inspections
Corrective Action Required
2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions)
Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
|
|
Misc
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is for informational purposes. The fee will be $59,383.50
|
|
Elevator Equipment Permit
Corrective Action Required
Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative.
Action required: Comment is informational.
|
|
Elevator Equipment Inspection
Corrective Action Required
Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector.
Action required: Comment is informational.
|
|
Elevator Certificate of Inspection
Corrective Action Required
Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380.
Action required: Comment is informational.
|
|
Misc
Corrective Action Required
Light pole base detail incomplete.
Action required: Provide concrete reinforcement information. (Sheet E-10 references structural designs that are not found in submittals for building permit or FDP)
|
|
IBC 1803.1 General - geotech
Corrective Action Required
2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional.
Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (4,000 noted on sheet S0.0)
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Comment is informational. Truss packages deferred.
|
|
IMC 306.5 Equipment on roofs
Corrective Action Required
2018 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30"
(see code section for additional construction requirements)
Action required: Amend Roof Hatch Ladder detail 4/A1.5 to show side rail extender.
|
|
IMC 501.3.1 Location of exhaust outlets
Corrective Action Required
2018 IMC 501.3.1 Location of exhaust outlets. The termination point of exhaust outlets and ducts discharging to the outdoors shall be located with the following minimum distances: (see code for items 1, 2, 4, & 5)
3. For all environmental air exhaust: 3 feet from property lines; 3 feet from operable openings into building for all occupancies other than Group U, and 10 feet from mechanical air intakes. Such exhaust shall not be considered hazardous or noxious.
Action required: Detail 3/M-7 shows exhaust too close to a door and combustion intakes. Amend design to comply.
|
|
IPC 1101.3 Prohibited drainage
Corrective Action Required
2018 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-413) Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system.
Action required: Elevator sump not allowed to discharge into sanitary sewer system. Route to either storm drainage system or daylight.
|
|
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space.
A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met.
(a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted.
(b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition.
110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic hardware on door out of Electrical Room 145.
|
|
|
Licensed Contractors
|
Rejected
|
09/06/2023
|
09/07/2023
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
|
|
|