Permit Application Status

PRCOM20221512


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20221512
Building Permit - Commercial
Certificate of Occupancy
MARION RIDGE SAFETY STORAGE LLC
CHANGE OF TENANT
TENANT FINISH FOR STORAGE OF CLOTHING ** Invite Planner to final to verify screening of hvac behind building
04/15/2022
05/16/2022
10/23/2022
11/18/2022
Locations
Contacts
WARD DEVELOPMENT & INVESTMENT CO, Address:1120 NW EAGLE RIDGE BLVD, Phone:(816) 229-8115  
CHRIS ARRINGTON, Address:CHRISA@STUCKERCONSTRUCTION.NET, Phone:(816) 912-6219  
F & G MECHANICAL SERVICES INC, Address:17219 BEL RAY PLACE, Phone:(816) 322-0810  
BLUE SPRINGS ELECTRICAL SERVICE, Address:3402 LAKE SHORE DR, Phone:(816) 224-9911  
R2 PLUMBING LLC, Address:1705 A SE COUNTY RD AA, Phone:(816) 215-8098  
SBC ARCHITECTURE, Address:3009 ELMIRA CT, Phone:(816) 797-7115  
MARION RIDGE SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 10/31/2022
Jim Eden
Misc
Corrective Action Required
10/31/2022

See shell building alarm plan.
Sprinkler Plan Review Released for Construction 10/31/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
05/26/2022

The FDC shall be on the southwest corner of the building. This will be within 100 feet of a hydrant and will not require closing Independence to access a hydrant. Verifed at inspection. Coordinate with the alarm company to ensure proper placement of the horn/strobe. Corrected. JE 10/31/2022
Installation acceptance testing
Corrective Action Required
05/26/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Action required- Call (816) 969-1300 to schedule hydrostatic and flow testing.
Miscellaneous Correction
Corrective Action Required
05/26/2022

The safety margin is below the 5psi standard set by the Lee's Summit Fire Department.
Fire Plan Review Approved with Conditions 05/09/2022 05/09/2022
Jim Eden
Address numbers required
Resolved
05/09/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- All tenant spaces shall be marked. Verified at inspection.
Miscellaneous Correction
Resolved
05/09/2022

It is recommended the Big Ass Fan (HVLS) be provided with a relay to the building's fire alarm system per newer NFPA 72 standards. It is currently NOT required by the 2018 IFC, but will be by future editions of the code.
Construction documents for fire alarm systems
Informational
05/09/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Informational
05/09/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Building Plan Review Approved with Conditions 05/09/2022 05/04/2022
Joe Frogge
Misc
Resolved
05/04/2022

Insufficient information to complete review. Action required: Provide complete wall construction details for non-rated walls.
IPC 604.9 Water hammer
Resolved
05/04/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Modify note #21 on MP101 to comply. (yes, i do see that another sheet calls for proper arrestors but I can't control which sheet the plumber bids from)
IBC 1209.2 Finish materials
Corrective Action Required
05/02/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Action required: Provide finish material schedule to verify compliance at water closet and mop sink. (If paint is used it must be epoxy based.) 5/4/22 - compliant material required at side of water closet also - to be field verified.
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Resolved
05/04/2022

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Specify height of break area counter. (maximum 34")
Licensed Contractors Approved 05/02/2022 05/02/2022
Joe Frogge
Fire Plan Review Approved with Conditions 04/27/2022 04/26/2022
Jim Eden
Address numbers required
Corrective Action Required
04/26/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- All tenant spaces shall be marked. Verified at inspection.
Miscellaneous Correction
Corrective Action Required
04/26/2022

It is recommended the Big Ass Fan (HVLS) be provided with a relay to the building's fire alarm system per newer NFPA 72 standards. It is currently NOT required by the 2018 IFC, but will be by future editions of the code.
Construction documents for fire alarm systems
Corrective Action Required
04/26/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
04/26/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for review and approval.
Building Plan Review Rejected 04/27/2022 04/22/2022
Joe Frogge
Misc
Corrective Action Required
04/22/2022

Insufficient information to complete review. Action required: Provide complete wall construction details for non-rated walls.
IPC 604.9 Water hammer
Corrective Action Required
04/22/2022

2018 IPC 604.9 Water hammer. The flow velocity of the water distribution system shall be controlled to reduce the possibility of water hammer. A water-hammer arrestor shall be installed where quick-closing valves are utilized. Water-hammer arrestors shall be installed in accordance with the manufacturer’s instructions. Water-hammer arrestors shall conform to ASSE 1010. Action required: Modify note #21 on MP101 to comply. (yes, i do see that another sheet calls for proper arrestors but I can't control which sheet the plumber bids from)
IBC 1209.2 Finish materials
Corrective Action Required
04/22/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. Action required: Provide finish material schedule to verify compliance at water closet and mop sink. (If paint is used it must be epoxy based.)
IBC 1109.11 Seating at tables, counters and work surfaces - accessibility
Corrective Action Required
04/22/2022

2018 IBC 1109.11 Seating at tables, counters and work surfaces. Where seating or standing space at fixed or built-in tables, counters or work surfaces is provided in accessible spaces, at least 5 percent of the seating and standing spaces, but not less than one, shall be accessible. (see code for exception) Action required: Specify height of break area counter. (maximum 34")
Licensed Contractors Approved 04/29/2022 04/19/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $92.00 $92.00 Paid 05/16/2022
8331506-EFHB Maybrook, Full $170.44 $170.44 Paid 05/16/2022
8331507-Sewer Connection Fee $120.00 $120.00 Paid 05/16/2022
7232302-Industrial/Warehouse License Tax Fee $460.00 $460.00 Paid 05/05/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 11/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
In-wall Inspection Passed 7/11/2022 07/11/2022
Misc
Informational
07/11/2022
IN-WALL OK TO COVER: -LOBBY, BREAK AREA, OFFICE, RESTROOM, AND SPRINKLER RM
Electrical Service Inspection Passed 9/7/2022 09/07/2022
Above Ceiling Inspection Passed 9/13/2022 9/13/2022 09/13/2022
Gas Service Inspection - Commercial Failed 9/13/2022 9/13/2022 09/13/2022
Misc
Corrective Action Required
09/13/2022
Provide updated plan for change to gas piping size. Pressure test holds for min ten minutes
Gas Service Inspection - Commercial Passed 9/22/2022 09/22/2022
Misc
Resolved
09/22/2022
Provide updated plan for change to gas piping size. Pressure test holds for min ten minutes
Occupancy Inspection - Codes Commercial Failed 11/4/2022 11/4/2022 11/04/2022
Misc
Corrective Action Required
11/04/2022
-Approval from water and planning departments required -Paint all exterior gas lines -Provide tamper resistant schrader valvles at exterior units -Secure AC whips per code -Sinks in restrooms to be max 34" aff to top of rim -Relocate grab bars in restrooms to comply with 2017 ICC A117.1
Occupancy Inspection - Fire Passed 11/4/2022 11/4/2022 11/07/2022
Corrective Action Required
11/07/2022
All life safety was appropriate. Okay to occupy with approval from codes.
Occupancy Inspection - Codes Commercial Ready for Temp CO 11/7/2022 11/07/2022
Misc
Informational
11/07/2022
-Approval from water and field service engineer departments required
Occupancy Inspection - Codes Commercial Full C of O 11/18/2022 11/18/2022
Misc
Resolved
11/18/2022
-Approval from water and field service engineer departments required
Documents & Images
Date Uploaded File Type Document Name
04/15/2022 Application Form KC Swagger Commercial Permit Application
04/19/2022 Plans KC Swagger Combined
04/19/2022 Letter License Tax Bill
04/22/2022 Email RE_ screening q
04/26/2022 Letter DS P/R Corrections Document
04/27/2022 Letter Fire Building Plan Review
05/02/2022 Letter City plan review response letter
05/02/2022 Plans Kc Swagger combined
05/05/2022 Receipt Receipt for transaction: 2022-002977
05/10/2022 Approved Plans approved - Kc Swagger combined0
05/16/2022 Receipt Receipt for transaction: 2022-003466
05/16/2022 Letter DS Building Permit
06/01/2022 Letter Fire Building Plan Review
06/01/2022 Letter Fire (Sprinkler) Plan Review
07/01/2022 Plans Revised combined A101
07/01/2022 Approved Plans approved - Revised combined A101
07/11/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter Fire (Sprinkler) Plan Review
09/13/2022 Letter INSPECTION SUMMARY
09/16/2022 Approved Plans 2601 gas line revisions
09/22/2022 approved - 2601 gas line revisions
09/22/2022 Letter INSPECTION SUMMARY
11/04/2022 Letter INSPECTION SUMMARY
11/07/2022 Letter Fire Loss Reduction Form
11/07/2022 Certificate/License Codes Temporary Certificate of Occupancy
11/07/2022 Receipt Receipt for transaction:2022-008756
11/18/2022 Letter Codes Final Certificate of Occupancy
11/18/2022 Letter Field Certificate of Occupancy
01/18/2024 Codes Temporary Certificate of Occupancy31
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home