Permit Application Status

PRCOM20215090


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215090
Building Permit - Commercial
Certificate of Occupancy
CHAPEL RIDGE TOWNHOMES LLC
NEW MULTI-FAMILY
NEW 3PLEX
09/28/2021
01/21/2022
04/06/2022
06/27/2023
Locations
Contacts
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
DAVIDSON ARCHITECTURE & ENGINEERING, Address:4301 INDIAN CREEK PKWY, Phone:(913) 451-9390  
CHAPEL RIDGE TOWNHOMES LLC, Address:3701 NE AKIN DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Final Development Plan Review Approved 01/19/2022
Joe Frogge
Building Plan Review Rejected 11/08/2021 11/01/2021
Joe Frogge
Final Development Plan
Corrective Action Required
11/01/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 11/1/21 - acknowledged in letter
Miscellaneous Correction
Resolved
11/01/2021

Provide combustion air designs for all furnaces and water heaters.
Miscellaneous Correction
Resolved
11/01/2021

IRC Table 302.6. Gyp between garages and units to be minimum 5/8" type X. (shown correctly in Garage General Notes, but incorrect in wall schedule P2)
Misc
Corrective Action Required
11/01/2021

Truss package deferred. Package must be received and approved prior to inspections. 11/1/21 - acknowledged in letter
Miscellaneous Correction
Resolved
11/01/2021

Provide receptacle within 25' of all condensing units.
Miscellaneous Correction
Corrective Action Required
11/01/2021

This report represents all 16 townhome structures. 11/1/21 - acknowledged in letter
Licensed Contractors Approved 11/08/2021 11/01/2021
Joe Frogge
LC - MEP Subs
Resolved
11/01/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 10/12/2021 10/08/2021
Joe Frogge
Final Development Plan
Corrective Action Required
10/08/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Project cost
Resolved
10/08/2021

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes. (needs to be broken down per structure)
Miscellaneous Correction
Corrective Action Required
10/08/2021

Provide combustion air designs for all furnaces and water heaters.
Miscellaneous Correction
Corrective Action Required
10/08/2021

IRC Table 302.6. Gyp between garages and units to be minimum 5/8" type X. (shown correctly in Garage General Notes, but incorrect in wall schedule P2)
Misc
Corrective Action Required
10/08/2021

Truss package deferred. Package must be received and approved prior to inspections.
Miscellaneous Correction
Corrective Action Required
10/08/2021

Provide receptacle within 25' of all condensing units.
Miscellaneous Correction
Corrective Action Required
10/08/2021

This report represents all 16 townhome structures.
Licensed Contractors Rejected 10/08/2021
Joe Frogge
LC - MEP Subs
Corrective Action Required
10/08/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
8331506-EFHB Maybrook, Full $1,406.13 $1,406.13 Paid 01/20/2022
8331507-Sewer Connection Fee $990.00 $990.00 Paid 01/20/2022
7232302-Residential Excise Tax Fee $1,827.84 $1,827.84 Paid 01/20/2022
9110078-Valuation Fee for New 3 or 4 Family $1,805.45 $1,805.45 Paid 01/20/2022
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/02/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Passed 4/26/2022 (2:00) 4/26/2022 04/26/2022
Underslab Plumbing Inspection - Commercial Passed 5/5/2022 5/5/2022 05/05/2022
Rated Assembly Inspection Partial 7/11/2022 7/11/2022 07/11/2022
Misc
Informational
07/11/2022
Attic separation-1st layer ok **Email information on the fire-resistant sheathing
Rated Assembly Inspection Partial 7/14/2022 7/14/2022 07/14/2022
Misc
Informational
07/11/2022
Attic separation-1st layer ok, 7/14/22 2nd LAYER OK **Email information on the fire-resistant sheathing
Electrical Service Inspection Passed 8/22/2022 8/22/2022 08/22/2022
Gas Service Inspection - Commercial Failed 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/22/2022
-Unit B&C fails-No pressure
All Rough Inspection - Commercial Failed 8/22/2022 8/22/2022 08/22/2022
Misc
Corrective Action Required
08/22/2022
UNIT A: -Anchor garage/stair braced wall -Nail hanger above foyer -Fb half bathroom wall from soffit -S-traps not allowed. Vent connection must be above trap weir -Support NM cables above kitchen per code -Secure SE cables within 12” of service enclosure -Fb floor opening at laundry/bathroom wall -Fasten trusses to wall plate at rear corner bedroom -Strap top plates lapped less than two ft at rear corner bedroom closet -Fb bottom wall plate opening at rear bedroom -Protect wiring within six ft of attic access -Tie down girder truss -Protect water line at master closet UNIT B: -Toe nail joists to top wall plate per code -Fill in gap at front door strike plate -Fb half bathroom wall -Nail hanger above foyer -S-traps not allowed. Vent connection must be above trap weirs -Support NM cables above kitchen per code -Support DVW at 4 ft or less above rear dining -Complete electrical to rear outdoor receptacle -Fb all floor penetrations -Provide B-vent shield in attic -No gas piping pressure -Support vent in attic per code -Protect blue water line at master shower wall UNIT C: -Fb half bathroom wall -S-traps not allowed. Vent connection must be above trap weir -Support NM cables above kitchen per code -No gas piping pressure **OK TO INSULATE
All Rough Inspection - Commercial Failed 8/26/2022 8/26/2022 08/26/2022
Misc
Corrective Action Required
08/22/2022
UNIT A: -S-traps not allowed. Vent connection must be above trap weir **master shower trap -Support NM cables above kitchen per code **secure at max 4.5 ft interval -Fb bottom wall plate opening at rear bedroom **at bedroom/stair wall. Use 2x lumber or approved material -Tie down girder truss **left side UNIT B: -Fill in gap at front door strike plate -S-traps not allowed. Vent connection must be above trap weirs **master shower trap -Support NM cables above kitchen per code **secure at max 4.5 ft interval UNIT C: -S-traps not allowed. Vent connection must be above trap weir **master shower trap -Support NM cables above kitchen per code **secure at max 4.5 ft interval
Gas Service Inspection - Commercial Passed 8/26/2022 8/26/2022 08/26/2022
Misc
Resolved
08/26/2022
-Unit B&C fails-No pressure
All Rough Inspection - Commercial Passed 9/1/2022 9/1/2022 09/01/2022
Misc
Resolved
09/01/2022
UNIT A: UNIT B: UNIT C:
Rated Assembly Inspection Partial 9/7/2022 9/7/2022 09/07/2022
Misc
Informational
07/14/2022
Attic separation-OK Dwelling separation-1st layer OK
Rated Assembly Inspection Passed 9/13/2022 9/13/2022 09/13/2022
Misc
Resolved
09/13/2022
Attic separation-OK Dwelling separation-OK
Occupancy Inspection - Codes Commercial Failed 1/27/2023 1/27/2023 01/27/2023
Misc
Corrective Action Required
01/27/2023
-Final grade, sod, splash blocks -Flashing above horizontal protrusion at service -Seal exterior wall penetrations, lights -Paint gas service piping -Complete electrical to unit C AC UNIT A-OK UNIT B: -Install box extensions for kitchen countertop receptacle boxes UNIT C-OK
Occupancy Inspection - Codes Commercial Ready for Temp CO 2/1/2023 02/01/2023
Misc
Corrective Action Required
01/27/2023
-Final grade, sod, splash blocks -Flashing above horizontal protrusion at service -Seal exterior wall penetrations, lights -Paint gas service piping **TCO APPROVED FOR ALL UNITS
Occupancy Inspection - Codes Commercial Temporary C of O 6/22/2023 6/22/2023 06/22/2023
Misc
Corrective Action Required
02/01/2023
-Approval from Fire, Field Engineer, Water, and Planning are required -Correct remaining items on sent list
Occupancy Inspection - Engineering Failed 6/22/2023 6/22/2023 06/22/2023
Miscellaneous Correction
Corrective Action Required
06/22/2023
6-22-23 DP. Final Inspection did not pass on our end. Below I will list a punch list of items needed before we can pass final. -Check all Storm structures private and public. There is debris in some which needs to be cleaned out. Also remove all waddles in Storm structure throats and clean any remaining debris they leave behind. Don't forget the structures along the public road as well. -Clean up Tops of storm structure lids and remove Porta Potties from top of lids. -Sweep Streets, a lot of debris and dirt left behind -Install Stop Signs at both exits. Scott said this shouldn't be a problem. -Remove equipment and material staged on roads, including any dumpsters -Paint any PRIVATE Fire Hydrant Bonnets Silver
Occupancy Inspection - Engineering Temporary C of O 6/22/2023 06/22/2023
Miscellaneous Correction
Corrective Action Required
06/22/2023
6-22-23 DP. Final Inspection did not pass on our end. Below I will list a punch list of items needed before we can pass final. -Check all Storm structures private and public. There is debris in some which needs to be cleaned out. Also remove all waddles in Storm structure throats and clean any remaining debris they leave behind. Don't forget the structures along the public road as well. -Clean up Tops of storm structure lids and remove Porta Potties from top of lids. -Sweep Streets, a lot of debris and dirt left behind -Install Stop Signs at both exits. Scott said this shouldn't be a problem. -Remove equipment and material staged on roads, including any dumpsters -Paint any PRIVATE Fire Hydrant Bonnets Silver
Occupancy Inspection - Fire Failed 6/22/2023 6/22/2023 06/22/2023
Occupancy Inspection - Water Utilities Passed 6/22/2023 6/22/2023 06/23/2023
Occupancy Inspection - Codes Commercial Temporary C of O 6/23/2023 6/23/2023 06/23/2023
Misc
Corrective Action Required
06/22/2023
-Approval from Fire, Field Engineer, Water, and Planning are required
Occupancy Inspection - Engineering Passed 6/26/2023 6/26/2023 06/26/2023
Miscellaneous Correction
Corrective Action Required
06/22/2023
6-22-23 DP. Final Inspection did not pass on our end. Below I will list a punch list of items needed before we can pass final. -Check all Storm structures private and public. There is debris in some which needs to be cleaned out. Also remove all waddles in Storm structure throats and clean any remaining debris they leave behind. Don't forget the structures along the public road as well. -Clean up Tops of storm structure lids and remove Porta Potties from top of lids. -Sweep Streets, a lot of debris and dirt left behind -Install Stop Signs at both exits. Scott said this shouldn't be a problem. -Remove equipment and material staged on roads, including any dumpsters -Paint any PRIVATE Fire Hydrant Bonnets Silver 6-26-23 DP. All punch list items have been completed. PASSED
Misc
Informational
06/26/2023
Occupancy Inspection - Engineering Passed 6/26/2023 06/26/2023
Miscellaneous Correction
Corrective Action Required
06/22/2023
6-22-23 DP. Final Inspection did not pass on our end. Below I will list a punch list of items needed before we can pass final. -Check all Storm structures private and public. There is debris in some which needs to be cleaned out. Also remove all waddles in Storm structure throats and clean any remaining debris they leave behind. Don't forget the structures along the public road as well. -Clean up Tops of storm structure lids and remove Porta Potties from top of lids. -Sweep Streets, a lot of debris and dirt left behind -Install Stop Signs at both exits. Scott said this shouldn't be a problem. -Remove equipment and material staged on roads, including any dumpsters -Paint any PRIVATE Fire Hydrant Bonnets Silver 6-26-23 DP. All punch list items have been complete. Passed.
Occupancy Inspection - Planning Temporary C of O 6/22/2023 6/22/2023 06/26/2023
Corrective Action Required
06/26/2023
PARKING SPACES. - The six (6) banks of parking spaces located along the main drive loop are not striped. All of the parking areas shall be striped per the approved development plan. - One the banks of parking spaces requires an ADA parking space per the approved plan. The space shall be marked with a wheelchair symbol; shall have an ADA parking space sign posted at the head of the space; shall also have a sign denoting that the space is van accessible; and shall have the ADA signage mounted a minimum 5' above finished grade, measured to the bottom of the sign.
Occupancy Inspection - Fire Passed 6/27/2023 6/27/2023 06/26/2023
Occupancy Inspection - Planning Passed 06/27/2023
Occupancy Inspection - Codes Commercial Full C of O 6/27/2023 6/27/2023 06/27/2023
Misc
Resolved
06/27/2023
-Approval from Planning required
Documents & Images
Date Uploaded File Type Document Name
09/28/2021 Application Form 2021.09.28 Chapel Ridge Townhomes phase 5 license tax application
09/28/2021 Application Form 2021.09.28 Chapel Ridge Townhomes phase 5 permit application
09/29/2021 Engineer Report/Study 2021_09_27_ Chapel Ridge_Lot 15C_Calc Book_Sealed
09/29/2021 Plans 2021_09_27 Chapel Ridge Townhomes Phase 5 Permit Set
10/08/2021 Letter DS P/R Corrections Document
10/29/2021 Letter 2021-10-29 Chapel Ridge Townhomes phase 5 response
10/29/2021 Application Form 2021_09_27 Chapel Ridge Townhomes phase 5 permit application
10/29/2021 Plans 2021_10_29 revision Chapel Ridge Townhomes Phase 5 Permit Set
11/01/2021 Approved Plans approved - 2021_10_29 revision Chapel Ridge Townhomes Phase 5 Permit Set
01/05/2022 Drawing addresses
01/20/2022 Receipt Receipt for transaction:2022-000334
04/26/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
08/26/2022 Letter INSPECTION SUMMARY
09/01/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/13/2022 Letter INSPECTION SUMMARY
01/27/2023 Letter INSPECTION SUMMARY
06/02/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/02/2023 Receipt Receipt for transaction:2023-003915
06/22/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/22/2023 Letter INSPECTION SUMMARY
06/22/2023 Letter INSPECTION SUMMARY
06/23/2023 Letter DS Building Permit
06/23/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/26/2023 Letter INSPECTION SUMMARY
06/26/2023 Letter INSPECTION SUMMARY
06/26/2023 Letter INSPECTION SUMMARY
06/26/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter INSPECTION SUMMARY
06/27/2023 Letter Field Certificate of Occupancy
06/27/2023 Letter Codes Final Certificate of Occupancy
12/20/2023 Codes Temporary Certificate of Occupancy212
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home