Permit Application Status

PRCOM20214832


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20214832
Building Permit - Commercial
Closed
SALLEE REAL ESTATE INVESTMENTS LLC
NEW COMMERCIAL
NEW SELF STORAGE BUILDING
09/15/2021
07/31/2022
04/13/2023
Locations
Contacts
SALLEE REAL ESTATE INVESTMENTS LLC, Address:PO BOX 6437  
KAT EXCAVATION INC, Address:309 N OAK, Phone:(816) 690-4611  
ADAM MILLER, KAT EXCAVATING, Address:amiller@katexcavation.com, Phone:(816) 690-4611  
STRICKLAND CONSTRUCTION CO INC, Address:720 S ROGERS RD STE B, Phone:(913) 764-7000  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
BOWERS ELECTRIC LLC, Address:720 S ROGERS RD, STE C200, Phone:(913) 530-8003  
HEARTLAND PLUMBING INC, Address:800 S CREEKSIDE DR, Phone:(913) 856-5846  
DALLENBACH COLE, Address:12035 COLWICK, SUITE 200, Phone:(210) 493-2234  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
tyler@salleedevelopment.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 03/25/2022 03/18/2022
Joe Frogge
Elevator Equipment Permit
Corrective Action Required
03/18/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
03/18/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
03/18/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
Planning - Screening of rooftop equipment
Resolved
03/18/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parapet must be at least as tall as hvac equipment) 2/1/22 - Proposed screening does not meet UDO requirements. For more information contact Jennifer Thompson, planner, at 816.969.1600 3/18/22 - approval verified verbally with Hector Soto
Miscellaneous Correction
Corrective Action Required
03/18/2022

Inadequate information to complete review. Action required: Provide location and type of main shut off valve, backflow preventer, and pressure reducing valve. (fyi - PRV is required regardless of pressure) 1/28/22 - RPZ added. Field verify shut-off and pressure reducing valves.
Fire Plan Review Approved with Conditions 03/25/2022 03/18/2022
Joe Frogge
Licensed Contractors Approved 03/18/2022 03/18/2022
Joe Frogge
Building Plan Review Rejected 02/01/2022 02/01/2022
Joe Frogge
IBC 1704.2 Special Inspections
Resolved
01/25/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
01/25/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
01/25/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
01/25/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 1/28/22 - acknowledged in letter
IBC 1004.5.1 Increase occupant load
Resolved
01/28/2022

2018 IBC 1004.5.1 Increased occupant load. The occupant load permitted in any building, or portion thereof, is permitted to be increased from that number established for the occupancies in Table 1004.5, provided that all other requirements of the code are also met based on such modified number and the occupant load does not exceed one occupant per 7 square feet of occupiable floor space. Where required by the building official, an approved aisle, seating or fixed equipment diagram substantiating any increase in occupant load shall be submitted. Where required by the building official, such diagram shall be posted. Action required: Recalculate occupant load at 1:500 per table 1004.5 or provide additional restroom fixtures to accommodate higher occupant load. 1/28/22 - see approved CMR
IBC 706.1 Fire and Smoke Protection - General
Resolved
01/28/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete fire assembly details that include nail/screw patterns and penetration information.
ICC A117.1 604.5.1 Fixed side wall grab bars
Resolved
01/28/2022

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide vertical side grab bar at toilets. Shown incorrectly on sheet A2.6, details 8 & 9 as well as standard ADA details block.
Planning - Screening of rooftop equipment
Corrective Action Required
01/25/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parapet must be at least as tall as hvac equipment) 2/1/22 - Proposed screening does not meet UDO requirements. For more information contact Jennifer Thompson, planner, at 816.969.1600
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Resolved
01/28/2022

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Per table listed doors in fire barrier must be 1 hour rated. Revise door schedule on sheet A5.1 to comply.
IBC 1704.2 Special Inspections
Resolved
01/28/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IBC 1809.5 Frost protection - foundation
Resolved
01/28/2022

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify drawings to show that all foundations will be at least 36" deep.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
01/28/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional receptacles on roof to comply.
IPC 305.4 Freezing - protection of potable water
Resolved
01/28/2022

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify design to demonstrate how water service entry is protected from freezing. Routing in exterior wall is not recommended.
Misc
Resolved
01/28/2022

Utility entrance locations do not match approved final development plan (FDP) civil drawings. Action required: Coordinate with civil design team and modify civil and/or mep plans.
Miscellaneous Correction
Corrective Action Required
01/25/2022

Inadequate information to complete review. Action required: Provide location and type of main shut off valve, backflow preventer, and pressure reducing valve. (fyi - PRV is required regardless of pressure) 1/28/22 - RPZ added. Field verify shut-off and pressure reducing valves.
Fire Plan Review Approved 02/01/2022 01/28/2022
Jim Eden
Construction documents for fire alarm systems
Informational
01/28/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- A fire alarm system is required. Submit plans for review and approval.
Construction documents - Fire protection systems
Informational
01/28/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler plans for review and approval.
Locks on gates or barriers
Resolved
01/28/2022

2018 IFC 506.1.1-Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required- Use Knox key switches on the gates.
Installation acceptance testing
Informational
01/25/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Key boxes for non-standardized fire service elevator keys
Informational
01/25/2022

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide one Knox elevator key box.
Miscellaneous Correction
Resolved
01/28/2022

BE] 1008.3.2 Buildings. In the event of power supply failure, in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. Action required- Provide exterior emergency illumination at the exits.
Miscellaneous Correction
Resolved
01/28/2022

BE] 1013.1 Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit or the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that any point in an exit access corridor or exit passageway is within 100 feet (30 480 mm) or the listed viewing distance of the sign, whichever is less, from the nearest visible exit sign. Exceptions: 1. Exit signs are not required in rooms or areas that require only one exit or exit access. 2. Main exterior exit doors or gates that are obviously and clearly identifiable as exits need not have exit signs where approved by the fire code official. 3. Exit signs are not required in occupancies in Group U and individual sleeping units or dwelling units in Group R-1, R-2 or R-3. 4. Exit signs are not required in dayrooms, sleeping rooms or dormitories in occupancies in Group I-3. 5. In occupancies in Groups A-4 and A-5, exit signs are not required on the seating side of vomitories oropenings into seating areas where exit signs are provided in the concourse that are readily apparent from the vomitories. Egress lighting is provided to identify each vomitory or opening within the seating area in an emergency. Action required- Provide exit light fixture over the front door of the office and the door to the Stairwell B, from the first floor corridor.
Miscellaneous Correction
Informational
01/25/2022

Class 1 standpipes are required in the stairwells. Include with the sprinkler plans for approval.
Misc
Informational
01/25/2022

The deadbolt on the front entry door shall have a thumblatch (Amended Section 1010.1.9.4).
Licensed Contractors Approved 02/01/2022 01/25/2022
Joe Frogge
LC - MEP Subs
Resolved
01/25/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Special Inspections Review Approved 01/25/2022
Joe Frogge
Fire Plan Review Rejected 01/21/2022 01/12/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
01/11/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- A fire alarm system is required. Submit plans for review and approval.
Construction documents - Fire protection systems
Corrective Action Required
01/11/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Submit sprinkler plans for review and approval.
Locks on gates or barriers
Corrective Action Required
01/11/2022

2018 IFC 506.1.1-Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Action required- Use Knox key switches on the gates.
Installation acceptance testing
Informational
01/11/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Key boxes for non-standardized fire service elevator keys
Informational
01/11/2022

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. Action required- Provide one Knox elevator key box.
Miscellaneous Correction
Corrective Action Required
01/12/2022

BE] 1008.3.2 Buildings. In the event of power supply failure, in buildings that require two or more means of egress, an emergency electrical system shall automatically illuminate all of the following areas: 1. Interior exit access stairways and ramps 2. Interior and exterior exit stairways and ramps. 3. Exit passageways. 4. Vestibules and areas on the level of discharge used for exit discharge in accordance with Section 1028.1. 5. Exterior landings as required by Section 1010.1.6 for exit doorways that lead directly to the exit discharge. Action required- Provide exterior emergency illumination at the exits.
Miscellaneous Correction
Corrective Action Required
01/12/2022

BE] 1013.1 Where required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit or the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that any point in an exit access corridor or exit passageway is within 100 feet (30 480 mm) or the listed viewing distance of the sign, whichever is less, from the nearest visible exit sign. Exceptions: 1. Exit signs are not required in rooms or areas that require only one exit or exit access. 2. Main exterior exit doors or gates that are obviously and clearly identifiable as exits need not have exit signs where approved by the fire code official. 3. Exit signs are not required in occupancies in Group U and individual sleeping units or dwelling units in Group R-1, R-2 or R-3. 4. Exit signs are not required in dayrooms, sleeping rooms or dormitories in occupancies in Group I-3. 5. In occupancies in Groups A-4 and A-5, exit signs are not required on the seating side of vomitories oropenings into seating areas where exit signs are provided in the concourse that are readily apparent from the vomitories. Egress lighting is provided to identify each vomitory or opening within the seating area in an emergency. Action required- Provide exit light fixture over the front door of the office and the door to the Stairwell B, from the first floor corridor.
Miscellaneous Correction
Informational
01/12/2022

Class 1 standpipes are required in the stairwells. Include with the sprinkler plans for approval.
Misc
Informational
01/12/2022

The deadbolt on the front entry door shall have a thumblatch (Amended Section 1010.1.9.4).
Building Plan Review Rejected 01/12/2022 01/10/2022
Joe Frogge
IBC 1704.2 Special Inspections
Corrective Action Required
01/10/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Equipment Permit
Corrective Action Required
01/10/2022

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
01/10/2022

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
01/10/2022

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
IBC 1004.5.1 Increase occupant load
Corrective Action Required
01/12/2022

2018 IBC 1004.5.1 Increased occupant load. The occupant load permitted in any building, or portion thereof, is permitted to be increased from that number established for the occupancies in Table 1004.5, provided that all other requirements of the code are also met based on such modified number and the occupant load does not exceed one occupant per 7 square feet of occupiable floor space. Where required by the building official, an approved aisle, seating or fixed equipment diagram substantiating any increase in occupant load shall be submitted. Where required by the building official, such diagram shall be posted. Action required: Recalculate occupant load at 1:500 per table 1004.5 or provide additional restroom fixtures to accommodate higher occupant load.
IBC 706.1 Fire and Smoke Protection - General
Corrective Action Required
01/12/2022

2018 IBC 706.1 General. Fire walls shall be constructed in accordance with Sections 706.2 through 706.11. The extent and location of such fire walls shall provide a complete separation. Where a fire wall also separates occupancies that are required to be separated by a fire barrier wall, the most restrictive requirements of each separation shall apply. Action required: Provide complete fire assembly details that include nail/screw patterns and penetration information.
ICC A117.1 604.5.1 Fixed side wall grab bars
Corrective Action Required
01/12/2022

ICC A117.1 604.5.1 Fixed side wall grab bars. Fixed side-wall grab bars shall include a horizontal bar complying with Section 604.5.1.1 and a vertical grab bar complying with Section 604.5.12. The vertical grab bar at water closets primarily for children’s use shall comply with Section 609.4.2. ICC A117.1 604.5.1.1 Horizontal grab bar. A horizontal grab bar 42 inches minimum in length shall be located 12 inches maximum from the rear wall and extending 54 inches minimum from the rear wall. ICC A117.1 604.5.1.2 Vertical grab bar. A vertical grab bar 18 inches minimum in length shall be mounted with the bottom of the bar located 39 inches minimum and 41 inches maximum above the floor, and with the center line of the bar located 39 inches minimum and 41 inches maximum from the rear wall. Action required: Provide vertical side grab bar at toilets. Shown incorrectly on sheet A2.6, details 8 & 9 as well as standard ADA details block.
Planning - Screening of rooftop equipment
Corrective Action Required
01/12/2022

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parapet must be at least as tall as hvac equipment)
IBC 716.2 Fire and Smoke Protection - fire door assemblies
Corrective Action Required
01/12/2022

2018 IBC 716.2.2 Performance requirements. Fire door assemblies shall be installed in the assemblies specified in Table 716.1(2) and shall comply with the fire protection rating specified. Action required: Per table listed doors in fire barrier must be 1 hour rated. Revise door schedule on sheet A5.1 to comply.
IBC 1704.2 Special Inspections
Corrective Action Required
01/12/2022

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
IBC 1809.5 Frost protection - foundation
Corrective Action Required
01/12/2022

2018 IBC 1809.5 Frost protection. Except where otherwise protected from frost, foundations and other permanent supports of buildings and structures shall be protected from frost by one or more of the following methods: 1. Extending below the frost line of the locality; 2. Constructing in accordance with ASCE 32; or 3. Erecting on solid rock. (see code section for exceptions) Shallow foundations shall not bear on frozen soil unless such frozen condition is of a permanent character. Action required: Modify drawings to show that all foundations will be at least 36" deep.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
01/12/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide additional receptacles on roof to comply.
IPC 305.4 Freezing - protection of potable water
Corrective Action Required
01/12/2022

Protection of Potable Water System 2018 IPC 305.4 Freezing. Water, soil, and waste pipes shall not be installed outside of a building, in attics or crawl spaces, concealed in outside walls, or in any other place subjected to freezing temperatures unless adequate provision is made to protect such pipes from freezing by insulation or heat or both. Exterior water supply system piping shall be installed not less than 6” below the frost line (42” below grade) and not less than 12 inches below grade. Action required: Modify design to demonstrate how water service entry is protected from freezing. Routing in exterior wall is not recommended.
Misc
Corrective Action Required
01/12/2022

Utility entrance locations do not match approved final development plan (FDP) civil drawings. Action required: Coordinate with civil design team and modify civil and/or mep plans.
Miscellaneous Correction
Corrective Action Required
01/12/2022

Inadequate information to complete review. Action required: Provide location and type of main shut off valve, backflow preventer, and pressure reducing valve. (fyi - PRV is required regardless of pressure)
Licensed Contractors Rejected 01/21/2022 01/10/2022
Joe Frogge
LC - MEP Subs
Corrective Action Required
01/10/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Approved 01/10/2022
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $261.00 $261.00 Paid 10/04/2021
91100C9-Water Insp Fee $2,082.00 $2,082.00 Paid 10/04/2021
9110072-Water Test Fee $200.00 $200.00 Paid 10/04/2021
9110068-Storm Fee $5,436.60 $5,436.60 Paid 10/04/2021
9110081-Paved Surface Inspection Fee $9,255.00 $9,255.00 Paid 10/04/2021
9110071-Site Grading Fee $942.00 $942.00 Paid 10/04/2021
8331401-Water Tap Fee $7,310.00 $7,310.00 Paid 10/04/2021
8350015-Water Meter Fee $958.48 $958.48 Paid 10/04/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/04/2021
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 10/15/2021 10/15/2021 10/15/2021
Misc
Informational
10/15/2021
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
10/15/2021
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
10/15/2021
Grading/Excavation/Fill Inspection Partial 11/15/2021 11/15/2021 11/15/2021
Misc
Informational
10/15/2021
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
10/15/2021
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
10/15/2021
Misc
Informational
11/15/2021
11-15-21 AN. Crew is still breaking up rock
Grading/Excavation/Fill Inspection Partial 2/7/2022 02/07/2022
Misc
Informational
11/15/2021
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
11/15/2021
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
11/15/2021
Misc
Informational
11/15/2021
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/07/2022
2-7-22 AN crew has not been on site in about a month or so
Storm Sewer Construction Inspection Partial 02/08/2022
Misc
Informational
02/08/2022
2-8-22 AN no work being done but storm boxes have been dropped off.
Grading/Excavation/Fill Inspection Partial 2/14/2022 02/14/2022
Misc
Informational
02/07/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/07/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/07/2022
Misc
Informational
02/07/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/07/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/14/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Grading/Excavation/Fill Inspection Partial 2/15/2022 02/15/2022
Misc
Informational
02/14/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/14/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/14/2022
Misc
Informational
02/14/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/14/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/14/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
02/15/2022
2-15-22 test
Grading/Excavation/Fill Inspection Partial 02/16/2022
Misc
Informational
02/15/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/15/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/15/2022
Misc
Informational
02/15/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/15/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/15/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
02/15/2022
2-16-22 AN crew was still removing dirt
Grading/Excavation/Fill Inspection Partial 02/23/2022
Misc
Informational
02/16/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/16/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/16/2022
Misc
Informational
02/16/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/16/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/16/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
02/16/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
02/23/2022
2-23-22 AN no work being done today
Grading/Excavation/Fill Inspection Partial 02/28/2022
Misc
Informational
02/23/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/23/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/23/2022
Misc
Informational
02/23/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/23/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/23/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
02/23/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
02/23/2022
2-23-22 AN no work being done today
Misc
Informational
02/28/2022
2-28-22 no work being done
Grading/Excavation/Fill Inspection Partial 03/15/2022
Misc
Informational
02/28/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/28/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
02/28/2022
Misc
Informational
02/28/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
02/28/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
02/28/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
02/28/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
02/28/2022
2-23-22 AN no work being done today
Misc
Informational
02/28/2022
2-28-22 no work being done
Misc
Informational
03/15/2022
2-28-22 - 3-15-22 AN no work being done
Grading/Excavation/Fill Inspection Partial 03/22/2022
Misc
Informational
03/15/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/15/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/15/2022
Misc
Informational
03/15/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
03/15/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
03/15/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
03/15/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
03/15/2022
2-23-22 AN no work being done today
Misc
Informational
03/15/2022
2-28-22 no work being done
Misc
Informational
03/15/2022
2-28-22 - 3-15-22 AN no work being done
Misc
Informational
03/22/2022
3-22-22 AN no work being done. Also waiting for permits to be paid
Grading/Excavation/Fill Inspection Partial 03/25/2022
Misc
Informational
03/22/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/22/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/22/2022
Misc
Informational
03/22/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
03/22/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
03/22/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
03/22/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
03/22/2022
2-23-22 AN no work being done today
Misc
Informational
03/22/2022
2-28-22 no work being done
Misc
Informational
03/22/2022
2-28-22 - 3-15-22 AN no work being done
Misc
Informational
03/22/2022
3-22-22 AN no work being done. Also waiting for permits to be paid
Misc
Informational
03/25/2022
3-23-22 AN no work being done 3-24-22 no work 3-25-22 no work
Grading/Excavation/Fill Inspection Partial 03/28/2022
Misc
Informational
03/25/2022
10-15-21 AN Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/25/2022
Contractor has taken out about 12ft of dirt and is now in the process of taking out about 4ft of rock
Misc
Informational
03/25/2022
Misc
Informational
03/25/2022
11-15-21 AN. Crew is still breaking up rock
Misc
Informational
03/25/2022
2-7-22 AN crew has not been on site in about a month or so
Misc
Informational
03/25/2022
2-14-22 AN crew is removing a large amount of excess dirt and rock form the lot that was excavated
Misc
Informational
03/25/2022
2-16-22 AN crew was still removing dirt
Misc
Informational
03/25/2022
2-23-22 AN no work being done today
Misc
Informational
03/25/2022
2-28-22 no work being done
Misc
Informational
03/25/2022
2-28-22 - 3-15-22 AN no work being done
Misc
Informational
03/25/2022
3-22-22 AN no work being done. Also waiting for permits to be paid
Misc
Informational
03/25/2022
3-23-22 AN no work being done 3-24-22 no work 3-25-22 no work
Misc
Informational
03/28/2022
3-28-22 AN NO work being done
Site Visit Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/14/2022
No work being done. 4/13-4/14/22 ES
Site Visit Partial 04/15/2022
Misc
Informational
04/14/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
04/15/2022
No work being done. 4/15/22 ES
Site Visit Partial 04/18/2022
Misc
Informational
04/15/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
04/15/2022
No work being done. 4/15/22 ES
Misc
Informational
04/18/2022
No work being done. 4/18/22 ES
Site Visit Partial 05/09/2022
Misc
Informational
04/18/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
04/18/2022
No work being done. 4/15/22 ES
Misc
Informational
04/18/2022
No work being done. 4/18/22 ES
Misc
Informational
05/09/2022
No work being done on site. 5/9/22 ES
Site Visit Partial 06/15/2022
Misc
Informational
05/09/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
05/09/2022
No work being done. 4/15/22 ES
Misc
Informational
05/09/2022
No work being done. 4/18/22 ES
Misc
Informational
05/09/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Site Visit Partial 06/17/2022
Misc
Informational
06/15/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
06/15/2022
No work being done. 4/15/22 ES
Misc
Informational
06/15/2022
No work being done. 4/18/22 ES
Misc
Informational
06/15/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
06/17/2022
6-17-22 AN no work being done today
Site Visit Partial 06/28/2022
Misc
Informational
06/17/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
06/17/2022
No work being done. 4/15/22 ES
Misc
Informational
06/17/2022
No work being done. 4/18/22 ES
Misc
Informational
06/17/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
06/17/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22
Erosion Control Inspection Failed 06/28/2022
Miscellaneous Correction
Corrective Action Required
06/28/2022
6-28-22 AN Storm curb inlets need to be cleaned out
Site Visit Partial 07/07/2022
Misc
Informational
06/28/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
06/28/2022
No work being done. 4/15/22 ES
Misc
Informational
06/28/2022
No work being done. 4/18/22 ES
Misc
Informational
06/28/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
06/28/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22.
Erosion Control Inspection Failed 07/07/2022
Miscellaneous Correction
Corrective Action Required
06/28/2022
6-28-22 AN Storm curb inlets need to be cleaned out
Miscellaneous Correction
Corrective Action Required
07/07/2022
7-7-22 RH. Street curb inlet needs cleaned out. One side was fixed.
Erosion Control Inspection Passed 07/11/2022
Miscellaneous Correction
Corrective Action Required
07/07/2022
6-28-22 AN Storm curb inlets need to be cleaned out
Miscellaneous Correction
Corrective Action Required
07/07/2022
7-7-22 RH. Street curb inlet needs cleaned out. One side was fixed. 7-11-22 RH. Both curbs inlets were cleaned out. 7-12-22 RH. Silt fence is up and in working order.
Site Visit Partial 07/12/2022
Misc
Informational
07/07/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
07/07/2022
No work being done. 4/15/22 ES
Misc
Informational
07/07/2022
No work being done. 4/18/22 ES
Misc
Informational
07/07/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
07/07/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22.
Erosion Control Inspection Residential Partial 07/12/2022
Misc
Informational
07/12/2022
7-12-22 RH. Erosion control is in place and in working order.
Site Visit Partial 07/15/2022
Misc
Informational
07/12/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
07/12/2022
No work being done. 4/15/22 ES
Misc
Informational
07/12/2022
No work being done. 4/18/22 ES
Misc
Informational
07/12/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
07/12/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22. 7-15-22 RH. No work done since 7-12-22.
Site Visit Partial 07/21/2022
Misc
Informational
07/15/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
07/15/2022
No work being done. 4/15/22 ES
Misc
Informational
07/15/2022
No work being done. 4/18/22 ES
Misc
Informational
07/15/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
07/15/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22. 7-15-22 RH. No work done since 7-12-22. 7-21-22 AN no work since 7-15-22
Site Visit Partial 09/09/2022
Misc
Informational
07/21/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
07/21/2022
No work being done. 4/15/22 ES
Misc
Informational
07/21/2022
No work being done. 4/18/22 ES
Misc
Informational
07/21/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
07/21/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22. 7-15-22 RH. No work done since 7-12-22. 7-21-22 AN no work since 7-15-22 9-9-22 AN no work since 7-15-22
Erosion Control Inspection Residential Partial 09/09/2022
Misc
Informational
07/12/2022
7-12-22 RH. Erosion control is in place and in working order. 9-9-22 AN no erosion control issues
Site Visit Partial 10/10/2022
Misc
Informational
09/09/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
09/09/2022
No work being done. 4/15/22 ES
Misc
Informational
09/09/2022
No work being done. 4/18/22 ES
Misc
Informational
09/09/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
09/09/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22. 7-15-22 RH. No work done since 7-12-22. 7-21-22 AN no work since 7-15-22 9-9-22 AN no work since 7-15-22 10-10-22 AN no work since 7-15-22
Erosion Control Inspection Residential Partial 10/10/2022
Misc
Informational
09/09/2022
7-12-22 RH. Erosion control is in place and in working order. 9-9-22 AN no erosion control issues 10-10-22 AN no erosion control issues
Site Visit Partial 11/22/2022
Misc
Informational
10/10/2022
No work being done. 4/13-4/14/22 ES
Misc
Informational
10/10/2022
No work being done. 4/15/22 ES
Misc
Informational
10/10/2022
No work being done. 4/18/22 ES
Misc
Informational
10/10/2022
No work being done on site. 5/9/22 ES 6-15-22 AN no work has been done since before 5-9-22
Misc
Informational
10/10/2022
6-17-22 AN no work being done today 6-27-22 AN 9:47. No work done since 6-17-22 7-7-22 RH. No work done since 6-27-22. 7-12-22 RH. No work Done since 7-7-22. 7-15-22 RH. No work done since 7-12-22. 7-21-22 AN no work since 7-15-22 9-9-22 AN no work since 7-15-22 10-10-22 AN no work since 9-9-22 11-22-22 AN no work since 10-10-22
Erosion Control Inspection Residential Partial 12/14/2022
Misc
Informational
10/10/2022
7-12-22 RH. Erosion control is in place and in working order. 9-9-22 AN no erosion control issues 10-10-22 AN no erosion control issues 12-14-22AN no erosion control issues
ESC - (Vegetation/Ground Cover) Partial 4/13/2023 04/13/2023
Misc
Corrective Action Required
04/13/2023
site visited and it appears that they have erosion control up.
Sewer Service Inspection Partial 05/09/2023
Misc
Corrective Action Required
05/09/2023
5-9-23 NS Site visited this morning and the crew dug up the sewer line and cut it and put a new Y in. They are going to dig the new sewer line to the clean out. I will have pictures of the sewer connection.
Documents & Images
Date Uploaded File Type Document Name
09/15/2021 Approved Plans Approved Lakewood Self Storage FDP Plan Set
10/04/2021 Receipt Receipt for transaction: 2021-007757
10/04/2021 Letter DS Building Permit
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/15/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
11/15/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
01/07/2022 Application Form Commercial Permit Application (signed) 2022.01.06
01/07/2022 Plans 100% Signed Set 2021_12_20
01/07/2022 Letter License Tax Bill
01/13/2022 Letter DS P/R Corrections Document
01/25/2022 Engineer Report/Study Att1 Special Inspection Letter
01/25/2022 Letter Att2 CMR Approval 2021_05_27
01/25/2022 Plans Att5 Struct Dwgs
01/25/2022 Letter Building Review Responses 2022_01_25
01/25/2022 Plans Att6 MEP Dwgs
01/25/2022 Plans Att4 Arch Dwgs
01/28/2022 Letter Fire Building Plan Review
01/31/2022 FAA letter
02/01/2022 Letter DS P/R Corrections Document
02/07/2022 Letter INSPECTION SUMMARY
02/07/2022 Letter INSPECTION SUMMARY
02/07/2022 Letter INSPECTION SUMMARY
02/07/2022 Letter INSPECTION SUMMARY
02/07/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/08/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/14/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/16/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/15/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter Building Review Responses 2022_03_16
03/18/2022 Engineer Report/Study Metl Span - Santa Fe Wall Panel
03/18/2022 Drawing A1_2 (SIGNED)
03/18/2022 Plans 100% Construction Documents 2022_03_18
03/18/2022 Approved Plans approved Construction Documents 2022_03_18
03/22/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/25/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
05/09/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/01/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Sediment in Storm inlet
07/07/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
10/10/2022 Letter INSPECTION SUMMARY
11/22/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
12/14/2022 Letter INSPECTION SUMMARY
01/18/2023 Plans ARCH - LWS-20230103
01/18/2023 Plans ELEC - Updated 1-12-23
01/18/2023 Letter PermitResponseLetter20230103
01/18/2023 Plans PLUMB & MECH - Updated 1-12-23
01/18/2023 Specifications Submittal -MECH Cutsheets - 281890-Lakewood Storage (2)
02/17/2023 Plans PLUMB & MECH - Updated 2-16-23
02/17/2023 Letter PermitResponseLetter20230217
02/17/2023 Plans LWS-20230210-archset
02/17/2023 Activity Document Lakewood Storage - Special Inspections
02/17/2023 Specifications LadderUP Safety Post, Steel - Yellow - Bilco - AccessDoorsAndPanels
02/17/2023 Plans ELEC - Updated 2-16-23
02/17/2023 Plans 80861 Strickland-Lakewood (Permit 80) 11-03-22_stamped
02/17/2023 Specifications 7-2-Panel-prn-1
04/13/2023 Letter INSPECTION SUMMARY
04/13/2023 Letter INSPECTION SUMMARY
05/09/2023 Photograph Lakewood Storage Sewer 1
05/09/2023 Photograph Lakewood Storage Sewer 2
05/09/2023 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home