Review Type |
Outcome |
Est. Completion Date |
Completed |
Licensed Contractors
|
Approved
|
06/14/2021
|
06/23/2021
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
6/7/21 - acknowledged in letter
|
|
|
Building Plan Review
|
Approved with Conditions
|
06/14/2021
|
06/07/2021
|
|
Joe Frogge
|
|
IBC 602.1 Type of Construction - general
2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code.
Action required: Update Building Code Design Data to show correct construction type which is 5B.
|
|
Misc
Unable to determine pipe materials.
Action required: Provide pipe material schedule that includes waste, vent, and NG.
|
|
Miscellaneous Correction
Electrical power riser diagram doesn't match diagram provided at shell building construction.
Action required: Coordinate electric service design with existing conditions and update new diagram accordingly.
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Provide verification that this tenant will be suite C as submitted. Shell construction indicates 3 suites with the middle suite being B. Designs provided look like this is the middle suite.
6/7/21 - verified by architect/tenant - field verify
|
|
|
Fire Plan Review
|
Approved
|
06/14/2021
|
06/07/2021
|
|
Michael Weissenbach
|
|
Miscellaneous Correction
(Informational Purposes)
1. Knox Box is not required.
2. Building is not sprinkled.
|
|
Door operations
2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
(Verified At Inspection)
|
|
|
Building Plan Review
|
Rejected
|
06/02/2021
|
05/24/2021
|
|
Joe Frogge
|
|
IBC 602.1 Type of Construction - general
Corrective Action Required
2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code.
Action required: Update Building Code Design Data to show correct construction type which is 5B.
|
|
Misc
Corrective Action Required
Unable to determine pipe materials.
Action required: Provide pipe material schedule that includes waste, vent, and NG.
|
|
Miscellaneous Correction
Corrective Action Required
Electrical power riser diagram doesn't match diagram provided at shell building construction.
Action required: Coordinate electric service design with existing conditions and update new diagram accordingly.
|
|
Suite address
Corrective Action Required
This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located.
Action required: Provide verification that this tenant will be suite C as submitted. Shell construction indicates 3 suites with the middle suite being B. Designs provided look like this is the middle suite.
|
|
|
Licensed Contractors
|
Rejected
|
06/02/2021
|
05/24/2021
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/02/2021
|
05/20/2021
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
(Informational Purposes)
1. Knox Box is not required.
2. Building is not sprinkled.
|
|
Door operations
Corrective Action Required
2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
(Verified At Inspection)
|
|
|
Fire Plan Review
|
Approved with Conditions
|
06/02/2021
|
05/20/2021
|
|
Michael Weissenbach
|
|
Miscellaneous Correction
Corrective Action Required
(Informational Purposes)
1. Knox Box is not required.
2. Building is not sprinkled.
|
|
Door operations
Corrective Action Required
2018 IFC 1010.1.9 Door operations. Except as specifically permitted by this section, egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.