Review Type |
Outcome |
Est. Completion Date |
Completed |
Building Plan Review
|
Approved with Conditions
|
08/26/2020
|
04/29/2021
|
|
Joe Frogge
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is for informational purposes.
8/20/20 - Acknowledged in letter
|
|
Health Dept Review (aquatic)
For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Comment is for informational purposes.
8/20/20 - Acknowledged in letter
|
|
Health Dept Inspection (aquatic)
Corrective Action Required
For the Health Department inspection contact Amanda Burch with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7198. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Comment is for informational purposes.
8/20/20 - Acknowledged in letter
|
|
Gen - Plan submittals 2018 codes
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Comment is for informational purposes. We are currently enforcing the 2009 version of the ICC/ANSI A117.1. (this means you can reduce turning radii back down to 60" if you prefer)
|
|
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Provide minimum 18" clear at latch side of door 007 out of Female Restroom.
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Provide roof truss package or request deferral.
8/20/20 - deferred per request
|
|
IBC 1209.2 Finish materials
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Provide compliant wall material at mop sink. If paint is used it must be epoxy based.
|
|
Planning - Screening of ground mounted equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.F
Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (condensing unit) will be screened from all 4 sides per referenced UDO section.
8/20/20 - Acknowledged in letter. To be field verified
|
|
IPC 708.1 Cleanouts required
2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11.
708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access.
Action required: Provide cleanout near edge of foundation.
|
|
|
Licensed Contractors
|
Approved
|
08/26/2020
|
08/20/2020
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
08/26/2020
|
08/19/2020
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load signage: 53 Clubhouse: 182 Pool Area
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Verified At Inspection)
Post appropriate signage to outside of room where chemicals will be stored.
|
|
Address numbers required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified At Inspection)
|
|
Portable fire extinguishers - conspicuous locations
Corrective Action Required
2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
(Verified At Inspection)
Provide 1 2A10BC Fire Extinguisher in the Clubhouse. Provide 1 2A10BC Fire Extinguisher in the pool area.
|
|
Illumination required
2018 IFC 1008.1 Illumination required. The means of egress,
shall be illuminated at all times the building space served by the means of egress is occupied.
(Verified At Inspection)
Provide exterior emergency lighting at Exit Door 002.
|
|
|
Building Plan Review
|
Rejected
|
08/20/2020
|
08/07/2020
|
|
Joe Frogge
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is for informational purposes.
|
|
Health Dept Review (aquatic)
Corrective Action Required
For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Comment is for informational purposes.
|
|
Health Dept Inspection (aquatic)
Corrective Action Required
For the Health Department inspection contact Amanda Burch with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7198. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Comment is for informational purposes.
|
|
Gen - Plan submittals 2018 codes
Corrective Action Required
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Comment is for informational purposes. We are currently enforcing the 2009 version of the ICC/ANSI A117.1. (this means you can reduce turning radii back down to 60" if you prefer)
|
|
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2.
Action required: Provide minimum 18" clear at latch side of door 007 out of Female Restroom.
|
|
Engineered truss package
Corrective Action Required
Copies of the engineered truss package were not provided at the time of permit application.
Action required: Provide roof truss package or request deferral.
|
|
IBC 1209.2 Finish materials
Corrective Action Required
2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4.
2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches.
2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.)
1209.2.3 Showers. (see code for details)
1209.2.4 Waterproof joints. (see code for details)
Action required: Provide compliant wall material at mop sink. If paint is used it must be epoxy based.
|
|
Planning - Screening of ground mounted equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.F
Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (condensing unit) will be screened from all 4 sides per referenced UDO section.
|
|
IPC 708.1 Cleanouts required
Corrective Action Required
2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11.
708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access.
Action required: Provide cleanout near edge of foundation.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
08/20/2020
|
08/07/2020
|
|
Michael Weissenbach
|
|
Posting of occupant load
Corrective Action Required
2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent.
(Verified At Inspection)
Post occupant load signage: 53 Clubhouse: 182 Pool Area
|
|
Hazardous material identification
Corrective Action Required
2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5.
(Verified At Inspection)
Post appropriate signage to outside of room where chemicals will be stored.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
(Verified At Inspection)
|
|
Portable fire extinguishers - conspicuous locations
Corrective Action Required
2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel.
(Verified At Inspection)
Provide 1 2A10BC Fire Extinguisher in the Clubhouse. Provide 1 2A10BC Fire Extinguisher in the pool area.
|
|
Illumination required
Corrective Action Required
2018 IFC 1008.1 Illumination required. The means of egress,
shall be illuminated at all times the building space served by the means of egress is occupied.
(Verified At Inspection)
Provide exterior emergency lighting at Exit Door 002.
|
|
|
Licensed Contractors
|
Approved
|
08/20/2020
|
08/06/2020
|
|
Joe Frogge
|
|
|
Licensed Contractors
|
Approved
|
08/20/2020
|
08/06/2020
|
|
Joe Frogge
|
|
|