Permit Application Status

PRCOM20202187


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20202187
Building Permit - Commercial
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW COMMERCIAL
CLUBHOUSE AND POOL
08/06/2020
04/29/2021
02/03/2021
08/23/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
B & A ARCHITECTURE, Address:100 W 31ST ST STE 100, Phone:(816) 753-6100  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
vincent@summithomeskc.com, Address:vincent@summithomeskc.com  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 08/26/2020 04/29/2021
Joe Frogge
Final Development Plan
Resolved
04/29/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 8/20/20 - Acknowledged in letter
Health Dept Review (aquatic)
Resolved
09/17/2020

For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Comment is for informational purposes. 8/20/20 - Acknowledged in letter
Health Dept Inspection (aquatic)
Corrective Action Required
08/19/2020

For the Health Department inspection contact Amanda Burch with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7198. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Comment is for informational purposes. 8/20/20 - Acknowledged in letter
Gen - Plan submittals 2018 codes
Resolved
08/20/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Comment is for informational purposes. We are currently enforcing the 2009 version of the ICC/ANSI A117.1. (this means you can reduce turning radii back down to 60" if you prefer)
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Resolved
08/20/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clear at latch side of door 007 out of Female Restroom.
Engineered truss package
Corrective Action Required
08/19/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral. 8/20/20 - deferred per request
IBC 1209.2 Finish materials
Resolved
08/20/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Provide compliant wall material at mop sink. If paint is used it must be epoxy based.
Planning - Screening of ground mounted equipment
Corrective Action Required
08/19/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (condensing unit) will be screened from all 4 sides per referenced UDO section. 8/20/20 - Acknowledged in letter. To be field verified
IPC 708.1 Cleanouts required
Resolved
08/20/2020

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near edge of foundation.
Licensed Contractors Approved 08/26/2020 08/20/2020
Joe Frogge
Fire Plan Review Approved with Conditions 08/26/2020 08/19/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/19/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage: 53 Clubhouse: 182 Pool Area
Hazardous material identification
Corrective Action Required
08/19/2020

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection) Post appropriate signage to outside of room where chemicals will be stored.
Address numbers required
Resolved
08/19/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/19/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC Fire Extinguisher in the Clubhouse. Provide 1 2A10BC Fire Extinguisher in the pool area.
Illumination required
Resolved
08/19/2020

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide exterior emergency lighting at Exit Door 002.
Building Plan Review Rejected 08/20/2020 08/07/2020
Joe Frogge
Final Development Plan
Corrective Action Required
08/06/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Health Dept Review (aquatic)
Corrective Action Required
08/06/2020

For the Health Department review contact Amanda Burch with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7198. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Comment is for informational purposes.
Health Dept Inspection (aquatic)
Corrective Action Required
08/06/2020

For the Health Department inspection contact Amanda Burch with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7198. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Comment is for informational purposes.
Gen - Plan submittals 2018 codes
Corrective Action Required
08/07/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit. Action required: Comment is for informational purposes. We are currently enforcing the 2009 version of the ICC/ANSI A117.1. (this means you can reduce turning radii back down to 60" if you prefer)
ICC A117.1 404.2.3.2 Swinging Doors Maneuvering Clearance
Corrective Action Required
08/07/2020

ICC A117.1 Section 404.2.3.2 Swinging Doors and gates. Swinging doors and gates shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Provide minimum 18" clear at latch side of door 007 out of Female Restroom.
Engineered truss package
Corrective Action Required
08/07/2020

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide roof truss package or request deferral.
IBC 1209.2 Finish materials
Corrective Action Required
08/07/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Provide compliant wall material at mop sink. If paint is used it must be epoxy based.
Planning - Screening of ground mounted equipment
Corrective Action Required
08/07/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment (condensing unit) will be screened from all 4 sides per referenced UDO section.
IPC 708.1 Cleanouts required
Corrective Action Required
08/07/2020

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanout near edge of foundation.
Fire Plan Review Approved with Conditions 08/20/2020 08/07/2020
Michael Weissenbach
Posting of occupant load
Corrective Action Required
08/07/2020

2018 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (Verified At Inspection) Post occupant load signage: 53 Clubhouse: 182 Pool Area
Hazardous material identification
Corrective Action Required
08/07/2020

2018 IFC 407.3- Identification. Individual containers of hazardous materials, cartons or packages shall be marked or labeled in accordance with applicable federal regulations. Buildings, rooms and spaces containing hazardous materials shall be identified by hazard warning signs in accordance with Section 2703.5. (Verified At Inspection) Post appropriate signage to outside of room where chemicals will be stored.
Address numbers required
Corrective Action Required
08/07/2020

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). (Verified At Inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/07/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC Fire Extinguisher in the Clubhouse. Provide 1 2A10BC Fire Extinguisher in the pool area.
Illumination required
Corrective Action Required
08/07/2020

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Verified At Inspection) Provide exterior emergency lighting at Exit Door 002.
Licensed Contractors Approved 08/20/2020 08/06/2020
Joe Frogge
Licensed Contractors Approved 08/20/2020 08/06/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $2,140.00 $2,140.00 Paid 01/19/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 01/19/2021
8331504-EFHB Middle Big Creek, Full $401.76 $401.76 Paid 01/19/2021
91100C8-Sanitary Sewer Insp Fees $26.19 $26.19 Paid 03/02/2021
91100C9-Water Insp Fee $28.97 $28.97 Paid 03/02/2021
9110068-Storm Sewer Inspection Fee $1,089.99 $1,089.99 Paid 03/02/2021
9110081-Paved Surface Inspection Fee $2,054.10 $2,054.10 Paid 03/02/2021
9110071-Site Grading Fee $338.00 $338.00 Paid 03/02/2021
8331401-Water Tap Fee $9,549.00 $9,549.00 Paid 03/02/2021
8350015-Water Meter Fee $715.62 $715.62 Paid 03/02/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/02/2021
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm Sewer Construction Inspection Partial 5/3/2021 5/3/2021 05/03/2021
Misc
Informational
05/03/2021
5-3-21 2:04pm Bair excavating is on site installing storm pipe. They have cut into the storm box on Walsh Dr. and ran pipe to D.B. 1-2. They have installed curb inlet 2-1 and ran pipe into 1-2. They have plenty of rock and are backfilling. They will be pouring the collar for the storm box at 3pm. 3:35pm They have poured the collar for the invert.
Storm Sewer Construction Inspection Partial 5/4/2021 5/4/2021 05/04/2021
Misc
Informational
05/03/2021
5-3-21 2:04pm Bair excavating is on site installing storm pipe. They have cut into the storm box on Walsh Dr. and ran pipe to D.B. 1-2. They have installed curb inlet 2-1 and ran pipe into 1-2. They have plenty of rock and are backfilling. They will be pouring the collar for the storm box at 3pm. 3:35pm They have poured the collar for the invert. 5-4-21 9:43am Light rain. Bair has ran storm line 1 from 1-2 to 1-3. I have taken a pic of the run. They are now backfilling.
Storm Sewer Construction Inspection Partial 05/04/2021
Misc
Informational
05/04/2021
5-3-21 2:04pm Bair excavating is on site installing storm pipe. They have cut into the storm box on Walsh Dr. and ran pipe to D.B. 1-2. They have installed curb inlet 2-1 and ran pipe into 1-2. They have plenty of rock and are backfilling. They will be pouring the collar for the storm box at 3pm. 3:35pm They have poured the collar for the invert. 5-4-21 9:43am Light rain. Bair has ran storm line 1 from 1-2 to 1-3. I have taken a pic of the run. They are now backfilling. 3:15pm They have ran 52’ of storm pipe and are backfilling.
Water Service Inspection Partial 5/6/2021 5/6/2021 05/06/2021
Misc
Informational
05/06/2021
5-6-21 9:48am The water department has made the tap and Bair has ran the 1” line to the meter pit. They set the meter pit and ran the 2” copper water line to the footing per plan. They are now backfilling.
Footing Inspection - Commercial Passed 5/6/2021 05/06/2021
Sanitary Sewer Construction Inspection Partial 06/02/2021
Misc
Informational
06/02/2021
6-1-21 3:10pm The contractor connected the service line for sanitary. They had plenty of rock for the backfill.
Underslab Plumbing Inspection - Commercial Passed 6/2/2021 6/2/2021 06/02/2021
Footing Inspection - Commercial Passed 6/8/2021 (2:00) 6/8/2021 06/08/2021
Curb - Proof Roll Partial 6/17/2021 06/17/2021
Misc
Informational
06/17/2021
6-17-21 10:11am 86 degrees with full sun. The curb proof roll passed with no issues.
Site Visit Partial 6/21/2021 06/21/2021
Misc
Informational
06/21/2021
6-21-21 9:37am light rain. There is a crew working on the building.There are no inspections needed from me at this time.
Pool Steel/Bonding - Commercial Partial 7/12/2021 7/12/2021 07/12/2021
Misc
Informational
07/12/2021
BONDED AREAS BELOW OK -POOL SHELL, (7) POINTS -UNDER WATER LIGHT HOUSINGS -BONDING FOR PUMP MOTOR
Rough Framing Inspection - Commercial Partial 7/14/2021 7/14/2021 07/14/2021
Misc
Informational
07/14/2021
- 7/14/21 - INSPECTED NAILING PATTERN OSB EXTERIOR, OK FOR COVER EXTERIOR
In-wall Inspection Passed 10/6/2021 10/6/2021 10/06/2021
Gas Service Inspection - Commercial Passed 10/6/2021 10/6/2021 10/06/2021
Pool Steel/Bonding - Commercial Passed 11/18/2021 11/18/2021 11/18/2021
Misc
Resolved
11/18/2021
Electrical Service Inspection Passed 11/29/2021 11/29/2021
Miscellaneous Inspection Failed 4/15/2022 4/15/2022 04/15/2022
Misc
Corrective Action Required
04/15/2022
PERFORMED PRE FINAL WALKTHROUGH, OK TO STORE POOL FURNITURE ALONG EAST FENCE AS DISCUSSED, THERE WILL BE A FEW BOXES STACKED IN CENTER OF GATHERING SPACE INDOORS AS DISCUSSED. NO ADDITIONAL OCCUPANCY GRANTED BEYOND STORAGE
Rough Framing Inspection - Commercial Passed 4/27/2022 04/27/2022
Misc
Resolved
04/27/2022
- 7/14/21 - INSPECTED NAILING PATTERN OSB EXTERIOR, OK FOR COVER EXTERIOR
Miscellaneous Inspection Passed 4/27/2022 04/27/2022
Misc
Resolved
04/27/2022
PERFORMED PRE FINAL WALKTHROUGH, OK TO STORE POOL FURNITURE ALONG EAST FENCE AS DISCUSSED, THERE WILL BE A FEW BOXES STACKED IN CENTER OF GATHERING SPACE INDOORS AS DISCUSSED. NO ADDITIONAL OCCUPANCY GRANTED BEYOND STORAGE
Above Ceiling Inspection Passed 4/27/2022 04/27/2022
Pavement-Surface Passed 4/21/2022 04/28/2022
Sanitary Sewer - Vacuum Not Ready 04/28/2022
Curb - Proof Roll Passed 04/28/2022
Misc
Informational
06/17/2021
6-17-21 10:11am 86 degrees with full sun. The curb proof roll passed with no issues.
Storm Sewer Construction Inspection Passed 04/28/2022
Misc
Informational
05/04/2021
5-3-21 2:04pm Bair excavating is on site installing storm pipe. They have cut into the storm box on Walsh Dr. and ran pipe to D.B. 1-2. They have installed curb inlet 2-1 and ran pipe into 1-2. They have plenty of rock and are backfilling. They will be pouring the collar for the storm box at 3pm. 3:35pm They have poured the collar for the invert. 5-4-21 9:43am Light rain. Bair has ran storm line 1 from 1-2 to 1-3. I have taken a pic of the run. They are now backfilling. 3:15pm They have ran 52’ of storm pipe and are backfilling. 5-5-21 1:09pm Bair has installed storm line 3 and are backfilling. They will be working on the water tap next.
ESC - (Vegetation/Ground Cover) Passed 4/28/2022 04/28/2022
Pavement-Stabilized Subgrade Partial 04/28/2022
Pavement-Curb Construction Partial 04/28/2022
Pavement-Aggregate Base Partial 04/28/2022
Pavement-Proof Roll Not Ready 04/28/2022
Water Line - Construction Inspection Passed 04/28/2022
Grading/Excavation/Fill Inspection Passed 04/28/2022
Occupancy Inspection - Engineering Passed 4/28/2022 04/28/2022
Misc
Informational
04/28/2022
Passed for full occupancy.
Occupancy Inspection - Fire Failed 4/28/2022 4/28/2022 04/28/2022
Corrective Action Required
04/28/2022
Exterior illumination at both exits did were not operational. 704 placard was not properly installed, needs a 4 in the blue area and OX in white.
Occupancy Inspection - Codes Commercial Failed 4/28/2022 4/28/2022 04/28/2022
Misc
Corrective Action Required
04/28/2022
-NO INSPECTION PERFORMED ON LIGHT POLE BASES AND UNDERGROUND ELECTRICAL FOR LIGHTPOLES AT PARKING LOT -LABEL SERVICE PANELS -MAINTAIN CLEARANCE AT SERVICE PANELS, MOVE PLUMBING AS DISCUSSED -PERMANENT OCCUPANT LOAD SIGN -GFCI PROTECTION REQUIRED AT EXTERIOR RECEPTACLES, RECEPTACLE RIGHT OF BBQ GRILL ON COLUMN AND RECEPTACLE UNDER GRILL IN CABINET -GATES AT POOL AREA MUST BE SELF CLOSING AND SELF LATCHING -PROVIDE TAMPER RESISTANT VALVE CAPS AT AC COMPRESSOR **SEE FIRE INSPECTION REPORT FOR CORRECTIONS REQUIRED BY FIRE DEPT**
Piers/Caissons Inspection - Commercial Failed 4/28/2022 4/28/2022 04/28/2022
Misc
Corrective Action Required
04/28/2022
-NO INSPECTION PERFORMED ON LIGHT POLE BASES AND UNDERGROUND ELECTRICAL FOR LIGHTPOLES AT PARKING LOT
Underground Electrical Inspection - Commercial Failed 4/28/2022 04/28/2022
Corrective Action Required
04/28/2022
-NO INSPECTION PERFORMED ON LIGHT POLE BASES AND UNDERGROUND ELECTRICAL FOR LIGHTPOLES AT PARKING LOT
Occupancy Inspection - Planning Passed 4/28/2022 04/28/2022
Occupancy Inspection - Codes Commercial Temporary C of O 5/5/2022 5/5/2022 05/05/2022
Misc
Corrective Action Required
04/28/2022
-NO INSPECTION PERFORMED ON LIGHT POLE BASES AND UNDERGROUND ELECTRICAL FOR LIGHTPOLES AT PARKING LOT, PROVIDE LETTER FROM ELECTRICIAN AS DISCUSSED, PROVIDE ENGINEER LETTER ON LIGHT POLE BASES -PERMANENT OCCUPANT LOAD SIGN -INSTALL PLAYGROUND **OK FOR TCO**
Occupancy Inspection - Fire Passed 5/5/2022 5/5/2022 05/05/2022
Occupancy Inspection - Water Utilities Passed 5/5/2022 05/17/2022
Footing Inspection - Commercial Failed 6/13/2022 (11:30) 6/13/2022 06/13/2022
Misc
Corrective Action Required
06/13/2022
INSPECTED (4) PIERS FOR POOL CANOPY COVERS, SUBMIT ENGINEERED DRAWINGS FOR APPROVAL ON SITE
Footing Inspection - Commercial Passed 07/18/2022
Misc
Resolved
07/18/2022
Piers/Caissons Inspection - Commercial Passed 7/18/2022 07/18/2022
Misc
Resolved
07/18/2022
Underground Electrical Inspection - Commercial Passed 7/18/2022 07/18/2022
Occupancy Inspection - Codes Commercial Failed 7/14/2022 7/18/2022 07/18/2022
Misc
Corrective Action Required
05/05/2022
-COMPLETE SHADE CANOPY INSTALLATION AT POOL **OK FOR TCO**
Occupancy Inspection - Codes Commercial Full C of O 8/23/2022 08/23/2022
Misc
Resolved
08/23/2022
-COMPLETE SHADE CANOPY INSTALLATION AT POOL **OK FOR TCO**
Documents & Images
Date Uploaded File Type Document Name
08/06/2020 Application Form Osage - Building Permit Application
08/06/2020 Email proj cost clarification
08/06/2020 Engineer Report/Study 00-Osage Clubhouse - Structural Calcs
08/06/2020 Plans Osage Clubhouse - Permit Set
08/06/2020 Letter License Tax Not Applicable
08/07/2020 Letter Fire Building Plan Review
08/07/2020 Letter DS P/R Corrections Document
08/18/2020 Letter Plan Review Responses - Osage 081420
08/18/2020 Plans Osage Clubhouse - Permit Set_rev1
08/19/2020 Letter Fire Building Plan Review
09/17/2020 Letter Pool Approval
01/19/2021 Receipt Receipt for transaction: 2021-000272
03/02/2021 Receipt Receipt for transaction: 2021-001020
04/29/2021 Approved Plans approved - Osage Clubhouse - Permit Set_rev1
04/29/2021 Letter DS Building Permit
03/02/2021 Approved Plans Approved Osage Pool FDP 3.2.21
05/03/2021 Storm box 12 inch 2-1.jpg
05/03/2021 Storm collar.jpg
05/03/2021 Letter INSPECTION SUMMARY
05/04/2021 Line 1 storm pipe.jpg
05/04/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/06/2021 Water tap.jpg
05/06/2021 Copper water line .jpg
05/06/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/08/2021 Letter INSPECTION SUMMARY
06/17/2021 Letter INSPECTION SUMMARY
06/21/2021 Letter INSPECTION SUMMARY
07/12/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
10/06/2021 Letter INSPECTION SUMMARY
11/18/2021 Letter INSPECTION SUMMARY
11/29/2021 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter Fire Loss Reduction Form
04/28/2022 Letter INSPECTION SUMMARY
04/28/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/05/2022 Letter Codes Temporary Certificate of Occupancy
05/27/2022 Engineer Report/Study Osage Clubhouse Light Pole Base_Foundation Evaluation Report_5-26-22
06/01/2022 Letter INSPECTION SUMMARY
06/13/2022 Letter INSPECTION SUMMARY
06/14/2022 Osage Pier Footing Detail for Pool Shade
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home