Permit Application Status

PRCOM20170618


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20170618
Building Permit - Commercial
Certificate of Occupancy
M-III LONGVIEW LLC
NEW COMMERCIAL
NEW 7 SCREEN FULL SERVICE MOVIE THEATER WITH FOOD SERVICE
03/08/2017
07/12/2017
09/30/2017
08/22/2018
Locations
Contacts
BOX REAL ESTATE DEVELOPMENT, Address:440 SW LONGVIEW BLVD, Phone:(913) 735-9861  
CITY WIDE SHEET METAL, INC, Address:2820 G ROE LN, Phone:(913) 871-7464  
HARRISONVILLE ELECTRIC LLC, Address:P O BOX 755, Phone:(816) 380-2012  
PLUMBING BY FISHER INC, Address:9875 KILL CREEK RD, Phone:(913) 583-1971  
THE HOLLIS & MILLER GROUP, Address:1828 WALNUT ST STE 922, Phone:(816) 525-5600  
OLSSON , Address:7301 W 133RD ST STE 200, Phone:(913) 381-1170  
PROSSER WILBERT CONSTRUCTION INC, Address:13730 W 108TH ST, Phone:(913) 906-0104  
M-III LONGVIEW LLC, Address:4601 COLLEGE BLVD STE 300, Phone:(816) 561-3796  
NLV THEATRE HOLDINGS LLC, Address:3152 SW GRANDSTAND CIR  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 02/12/2018
Joe Frogge
Health Department Review Approved 03/22/2017 02/12/2018
Joe Frogge
Alarm Plan Review Released for Construction 01/23/2018
Joe Dir
Installation acceptance testing
Corrective Action Required
01/23/2018

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Acceptance testing of the system will be required prior to the final occupancy inspection. Contact the fire department to schedule testing. (816)969-1300.
Building Plan Review Approved with Conditions 05/16/2017 07/11/2017
Joe Frogge
Final Development Plan
Resolved
07/11/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
License Tax Application
Corrective Action Required
05/09/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Health Dept Review
Resolved
06/20/2017

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Health Dept Inspection
Corrective Action Required
05/09/2017

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Screening - Rooftop equipment
Corrective Action Required
05/09/2017

Unified Development Ordinance Article 7, Section 7.180.E - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. 4/3/17 - Proposed solution via site-line study denied by Planning Department 5/18/17 - field verify
Bldg - Occupant load posting 1004.3
Corrective Action Required
05/09/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Post maximum occupant loads in all assembly areas. 3/31/17- acknowledged in letter - field verify
Misc 16
Resolved
05/09/2017

Clarifications to domestic water meter and irrigation system required to complete review. Action required: Clarify size of water meter. The civil drawings indicate a 2-1/2” meter which we do not offer. I have attached a breakdown of the meters available along with their associated fees and flows. Keep in mind that any meter over 2” is required to be installed in a vault which is easily a $10k add. Lastly, the electrical drawings indicate a circuit for an irrigation system but this is not reflected in the plumbing design. Please clarify. 4/3/17 - Waiting for reply
Final Development Plan Review Approved 03/22/2017 07/11/2017
Joe Frogge
Fire Plan Review Approved with Conditions 05/16/2017 06/29/2017
Joe Frogge
Posting of occupant load
Corrective Action Required
05/09/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: (acknowledged) Post the occupanct load in each auditorium. (verified at inspection)
Construction documents for fire alarm systems
Corrective Action Required
05/09/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (acknowledged) Have the fire alarm system contractor provide engineered shop drawings of the fire alarm system to be installed. (information purposes)
Address numbers required
Corrective Action Required
05/09/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (acknowledged) Post the numeric address of 3201 on the exterior of the building in a contrasting color to the background. Address shall be visible from the roadway (Fascination Dr.) (verified at inspection).
Knox box required
Corrective Action Required
05/09/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: (acknowledged) Knox box can be obtained on line at, knoxbox.com The knox box shall be mounted approximately 5-6 feet above finsh grade above the fire department connection. (verified at inspection)
Construction documents - Fire protection systems
Corrective Action Required
05/09/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (acknowledged) Have the fire sprinkler system contractor provide engineered shop drawings of the fire sprinkler system to be installed. (information purposes)
Installation acceptance testing
Corrective Action Required
05/09/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the fire alarm, fire sprinkler and type-1 hood systems shall be required prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300. (information purposes)
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
05/09/2017

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. ACTION REQUIRED): Provide a k-class fire extinguisher for the kitchen area. 904.11.5 Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving solid fuels or vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher in accordance with Section 904.11.5.1 or 904.11.5.2, as applicable. (verified at inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
05/09/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: mount fire extinguishers accorind to the plans. (verified at inspection)
Misc
Corrective Action Required
05/09/2017

Door locks: [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. (verified at inspection)
Misc
Corrective Action Required
05/09/2017

Illumnation level: ACTION REQUIRED: Illumination required at all times at floor level on the ramps and stairs in the auditoriums. [B] 1006.2 Illumination level. The means of egress illumination level shall not be less than 1 footcandle (11 lux) at the walking surface. Exception: For auditoriums, theaters, concert or opera halls and similar assembly occupancies, the illumination at the walking surface is permitted to be reduced during performances to not less than 0.2 footcandle (2.15 lux), provided that the required illumination is automatically restored upon activation of a premises’ fire alarm system where such system is provided. (verified at inspection)
Misc
Corrective Action Required
05/09/2017

Area of refuge / assisted rescue: ACTION REQUIRED: (acknowledged) [B] 1007.9 Signage. Signage indicating special accessibility provisions shall be provided as shown: 1. Each door providing access to an area of refuge from an adjacent floor area shall be identified by a sign stating: AREA OF REFUGE. 2. Each door providing access to an exterior area for assisted rescue shall be identified by a sign stating: EXTERIOR AREA FOR ASSISTED RESCUE. Signage shall comply with the ICC A117.1 requirements for visual characters and include the International Symbol of Accessibility. Where exit sign illumination is required by Section 1011.3, the signs shall be illuminated. Additionally, raised character and Braille signage complying with ICC A117.1 shall be located at each door to an area of refuge and exterior area for assisted rescue in accordance with Section 1011.4. (verified at inspection)
Licensed Contractors Approved 05/09/2017 06/29/2017
Joe Frogge
LC - General Contractor
Resolved
06/29/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 3/31/17- acknowledged in letter
LC - MEP Subs
Resolved
06/29/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/31/17- acknowledged in letter
Sprinkler Plan Review Released for Construction 05/24/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
09/25/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the system will bw required prior to the final occupancy inspection. contact the fire department to schedule testing.(816)969-1300.
Building Plan Review Rejected 04/06/2017 04/03/2017
Joe Frogge
Final Development Plan
Corrective Action Required
03/30/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
License Tax Application
Corrective Action Required
03/30/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Health Dept Review
Corrective Action Required
03/30/2017

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Health Dept Inspection
Corrective Action Required
03/30/2017

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/31/17- acknowledged in letter
Misc
Resolved
03/30/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Resolved
03/31/2017

2012 IBC 1028.11.3 Tread contrasting marking stripe. A contrasting marking stripe shall be provided on each tread at the nosing or leading edge such that the location of each tread is readily apparent when viewed in decent. Such stripe shall be a minimum of 1 inch, and a maximum of 2 inches wide. (see code for exception) Action required: Modify finish plan to show contrasting marking stripes at stair treads in auditoriums. 3/31/17- plastic strip added
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Resolved
03/31/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" at latch side of doors 05a, 06a, and 07a. 3/31/17- drawings updated
Misc
Resolved
03/31/2017

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Modify hatch details to specify railing extension. 3/31/17- plans updated
Bldg - Types I and II construction allowable materials 602.2
Resolved
03/31/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: All wood blocking and plywood sheathing/blocking/decking to be fire-retardant-treated. Update relevant details. 3/31/17- plans updated
Screening - Rooftop equipment
Corrective Action Required
03/30/2017

Unified Development Ordinance Article 7, Section 7.180.E - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section. 4/3/17 - Proposed solution via site-line study denied by Planning Department
Bldg - Urinal partitions 1210.3.2
Resolved
03/31/2017

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Modify documents to reflect minimum 60" partition heights. 3/31/17- plans updated
Bldg - Interior finish requirements 803.9
Resolved
03/31/2017

2012 IBC 803.9 Interior finish requirements based on group. Interior wall and ceiling finish shall have a flame spread index not greater than that specified in Table 803.9 for the group and location designated. Interior wall and ceiling finish materials tested in accordance with NFPA 286 and meeting the acceptance criteria of Section 803.1.2.1 shall be permitted to be used where a Class A Classification in accordance with ASTM E 84 or UL 723 is required. Action required: Provide verification that wall cover fabrics are minimum Class 'C'. 3/31/17- specs provided
Misc
Resolved
03/31/2017

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Either relocate condensing unit CU-2 or provide guard rail at edge or roof. 3/31/17- plans updated - unit relocated
Misc
Resolved
03/31/2017

2012 IMC 506.5.3 Exhaust fan mounting. An upblast fan shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning. The ductwork shall extend a minimum of 18 inches above the roof surface. Action required: Modify grease hood fan detail to show hinge and flexible conduit. 3/31/17- plans updated
Plumb - Cleanouts - Building sewer 708.3.2
Resolved
03/31/2017

2012 IPC 708.3.1 Horizontal drains within buildings. All horizontal drains shall be provided with cleanouts located not more than 100 feet apart. Action required: Provide additional cleanouts to comply. To include, but not be limited to, end of line in Mechanical Room 118, every 100' horizontal, and at the ends of water closet banks. 3/31/17- plans updated
Misc 14
Resolved
03/31/2017

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit sign at door 05b on south side of Auditorium 05. 3/31/17- plans updated
Misc 15
Resolved
03/31/2017

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in kitchen as well as within 6' of a sink (bar area) will by GFCI protected. 3/31/17- plans updated
Bldg - Occupant load posting 1004.3
Corrective Action Required
03/30/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Post maximum occupant loads in all assembly areas. 3/31/17- acknowledged in letter - field verify
Misc 16
Corrective Action Required
03/30/2017

Clarifications to domestic water meter and irrigation system required to complete review. Action required: Clarify size of water meter. The civil drawings indicate a 2-1/2” meter which we do not offer. I have attached a breakdown of the meters available along with their associated fees and flows. Keep in mind that any meter over 2” is required to be installed in a vault which is easily a $10k add. Lastly, the electrical drawings indicate a circuit for an irrigation system but this is not reflected in the plumbing design. Please clarify. 4/3/17 - Waiting for reply
Fire Plan Review Approved with Conditions 04/06/2017 03/31/2017
Joe Dir
03/31/2017

03/31/2017

03/31/2017

03/31/2017

Posting of occupant load
Corrective Action Required
03/30/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: (acknowledged) Post the occupanct load in each auditorium. (verified at inspection)
Construction documents for fire alarm systems
Corrective Action Required
03/30/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: (acknowledged) Have the fire alarm system contractor provide engineered shop drawings of the fire alarm system to be installed. (information purposes)
Address numbers required
Corrective Action Required
03/30/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: (acknowledged) Post the numeric address of 3201 on the exterior of the building in a contrasting color to the background. Address shall be visible from the roadway (Fascination Dr.) (verified at inspection).
Knox box required
Corrective Action Required
03/30/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: (acknowledged) Knox box can be obtained on line at, knoxbox.com The knox box shall be mounted approximately 5-6 feet above finsh grade above the fire department connection. (verified at inspection)
Construction documents - Fire protection systems
Corrective Action Required
03/30/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: (acknowledged) Have the fire sprinkler system contractor provide engineered shop drawings of the fire sprinkler system to be installed. (information purposes)
Installation acceptance testing
Corrective Action Required
03/30/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the fire alarm, fire sprinkler and type-1 hood systems shall be required prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300. (information purposes)
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
03/30/2017

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. ACTION REQUIRED): Provide a k-class fire extinguisher for the kitchen area. 904.11.5 Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving solid fuels or vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher in accordance with Section 904.11.5.1 or 904.11.5.2, as applicable. (verified at inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/30/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: mount fire extinguishers accorind to the plans. (verified at inspection)
Misc
Corrective Action Required
03/30/2017

Door locks: [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware. (verified at inspection)
Misc
Corrective Action Required
03/30/2017

Illumnation level: ACTION REQUIRED: Illumination required at all times at floor level on the ramps and stairs in the auditoriums. [B] 1006.2 Illumination level. The means of egress illumination level shall not be less than 1 footcandle (11 lux) at the walking surface. Exception: For auditoriums, theaters, concert or opera halls and similar assembly occupancies, the illumination at the walking surface is permitted to be reduced during performances to not less than 0.2 footcandle (2.15 lux), provided that the required illumination is automatically restored upon activation of a premises’ fire alarm system where such system is provided. (verified at inspection)
Misc
Corrective Action Required
03/30/2017

Area of refuge / assisted rescue: ACTION REQUIRED: (acknowledged) [B] 1007.9 Signage. Signage indicating special accessibility provisions shall be provided as shown: 1. Each door providing access to an area of refuge from an adjacent floor area shall be identified by a sign stating: AREA OF REFUGE. 2. Each door providing access to an exterior area for assisted rescue shall be identified by a sign stating: EXTERIOR AREA FOR ASSISTED RESCUE. Signage shall comply with the ICC A117.1 requirements for visual characters and include the International Symbol of Accessibility. Where exit sign illumination is required by Section 1011.3, the signs shall be illuminated. Additionally, raised character and Braille signage complying with ICC A117.1 shall be located at each door to an area of refuge and exterior area for assisted rescue in accordance with Section 1011.4. (verified at inspection)
Licensed Contractors Rejected 03/30/2017 03/31/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
03/30/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 3/31/17- acknowledged in letter
LC - MEP Subs
Corrective Action Required
03/30/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/31/17- acknowledged in letter
Fire Plan Review Rejected 03/22/2017 03/15/2017
Joe Dir
03/31/2017

Posting of occupant load
Corrective Action Required
03/15/2017

2012 IFC 1004.3- Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. ACTION REQUIRED: Post the occupanct load in each auditorium. (verified at inspection)
Construction documents for fire alarm systems
Corrective Action Required
03/15/2017

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. ACTION REQUIRED: Have the fire alarm system contractor provide engineered shop drawings of the fire alarm system to be installed. (information purposes)
Address numbers required
Corrective Action Required
03/15/2017

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). ACTION REQUIRED: Post the numeric address of 3201 on the exterior of the building in a contrasting color to the background. Address shall be visible from the roadway (Fascination Dr.) (verified at inspection).
Knox box required
Corrective Action Required
03/15/2017

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. ACTION REQUIRED: Knox box can be obtained on line at, knoxbox.com The knox box shall be mounted approximately 5-6 feet above finsh grade above the fire department connection. (verified at inspection)
Construction documents - Fire protection systems
Corrective Action Required
03/15/2017

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. ACTION REQUIRED: Have the fire sprinkler system contractor provide engineered shop drawings of the fire sprinkler system to be installed. (information purposes)
Installation acceptance testing
Corrective Action Required
03/15/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED: Field tests and acceptance testing of the fire alarm, fire sprinkler and type-1 hood systems shall be required prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300. (information purposes)
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
03/15/2017

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. ACTION REQUIRED): Provide a k-class fire extinguisher for the kitchen area. 904.11.5 Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving solid fuels or vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher in accordance with Section 904.11.5.1 or 904.11.5.2, as applicable. (verified at inspection)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
03/15/2017

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. ACTION REQUIRED: mount fire extinguishers accorind to the plans. (verified at inspection)
Misc
Corrective Action Required
03/15/2017

DOOR HARDWARE: Provide additional information on all of the exit door hardware.
Misc
Corrective Action Required
03/15/2017

Door locks: [B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. [B] 1008.1.10 Panic and fire exit hardware. Doors serving a Group H occupancy and doors serving rooms or spaces with an occupant load of 50 or more in a Group A or E occupancy shall not be provided with a latch or lock unless it is panic hardware or fire exit hardware.
Misc
Corrective Action Required
03/15/2017

Illumnation level: ACTION REQUIRED: Illumination required at all times at floor level on the ramps and stairs in the auditoriums. [B] 1006.2 Illumination level. The means of egress illumination level shall not be less than 1 footcandle (11 lux) at the walking surface. Exception: For auditoriums, theaters, concert or opera halls and similar assembly occupancies, the illumination at the walking surface is permitted to be reduced during performances to not less than 0.2 footcandle (2.15 lux), provided that the required illumination is automatically restored upon activation of a premises’ fire alarm system where such system is provided.
Misc
Corrective Action Required
03/15/2017

Area of refuge / assisted rescue: ACTION REQUIRED: [B] 1007.9 Signage. Signage indicating special accessibility provisions shall be provided as shown: 1. Each door providing access to an area of refuge from an adjacent floor area shall be identified by a sign stating: AREA OF REFUGE. 2. Each door providing access to an exterior area for assisted rescue shall be identified by a sign stating: EXTERIOR AREA FOR ASSISTED RESCUE. Signage shall comply with the ICC A117.1 requirements for visual characters and include the International Symbol of Accessibility. Where exit sign illumination is required by Section 1011.3, the signs shall be illuminated. Additionally, raised character and Braille signage complying with ICC A117.1 shall be located at each door to an area of refuge and exterior area for assisted rescue in accordance with Section 1011.4.
Misc
Corrective Action Required
03/15/2017

Type One hood system: ACTION REQUIRED: Provide manufacturers specs on the Type-1 hood and the supression system to be installed.
Misc
Corrective Action Required
03/15/2017

HVAC/ AHU duct detection. ACTION REQUIRED: 907.2.13.1.2 Duct smoke detection. Duct smoke detectors complying with Section 907.3.1 shall be located as follows: 1. In the main return air and exhaust air plenum of each air-conditioning system having a capacity greater than 2,000 cubic feet per minute (cfm) (0.94 m3/s). Such detectors shall be located in a serviceable area downstream of the last duct inlet. 2. At each connection to a vertical duct or riser serving two or more stories from a return air duct or plenum of an air-conditioning system. In Group R-1 and R-2 occupancies, a smoke detector is allowed to be used in each return air riser carrying not more than 5,000 cfm (2.4 m3/s) and serving not more than 10 air-inlet openings. 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building’s fire alarm control unit when a fire alarm system is required by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with this code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. Exceptions: 1. The supervisory signal at a constantly attended location is not required where duct smoke detectors activate the building’s alarm notification appliances. 2. In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector trouble conditions shall activate a visible or audible signal in an approved location and shall be identified as air duct detector trouble.
Building Plan Review Rejected 03/22/2017 03/14/2017
Joe Frogge
Final Development Plan
Corrective Action Required
03/14/2017

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
License Tax Application
Corrective Action Required
03/14/2017

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Health Dept Review
Corrective Action Required
03/14/2017

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
03/14/2017

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
03/14/2017

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Misc
Corrective Action Required
03/14/2017

2012 IBC 1028.11.3 Tread contrasting marking stripe. A contrasting marking stripe shall be provided on each tread at the nosing or leading edge such that the location of each tread is readily apparent when viewed in decent. Such stripe shall be a minimum of 1 inch, and a maximum of 2 inches wide. (see code for exception) Action required: Modify finish plan to show contrasting marking stripes at stair treads in auditoriums.
Accessibility - Swinging doors - maneuvering clearance 404.2.3.2
Corrective Action Required
03/14/2017

ICC A117.1-2009 Section 404.2.3.2 Swinging Doors. Swinging doors shall have maneuvering clearances complying with Table 404.2.3.2. Action required: Modify design to provide minimum 18" at latch side of doors 05a, 06a, and 07a.
Misc
Corrective Action Required
03/14/2017

2012 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment requiring access or appliances are located on an elevated structure or the roof of a building such that personnel will have to climb higher than 16 feet above grade to access such equipment or appliances, an interior or exterior means of access shall be provided. Such access shall not require climbing over obstructions greater than 30 inches in height or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal. Such access shall not require the use of portable ladders. Where access involves climbing over parapet walls, the height shall be measured to the top of the parapet wall. Permanent ladders installed to provide the required access shall comply with the following minimum design criteria: 1. The side railing shall extend above the parapet or roof edge not less than 30" (see code section for additional construction requirements) Action required: Modify hatch details to specify railing extension.
Bldg - Types I and II construction allowable materials 602.2
Corrective Action Required
03/14/2017

2012 IBC 602.2 – Types I and II. Types I and II construction are those types of construction in which the building elements listed in Table 601 are of noncombustible materials, except as permitted in Section 603 and elsewhere in this code. Action required: All wood blocking and plywood sheathing/blocking/decking to be fire-retardant-treated. Update relevant details.
Screening - Rooftop equipment
Corrective Action Required
03/14/2017

Unified Development Ordinance Article 7, Section 7.180.E - Commercial businesses located along existing public streets shall be subject to the following design standards: a. buildings shall be designed with four (4) sided architecture, the same level of finish on all sides (no "back"); b. rooftop or ground-level mechanical equipment shall be totally screened from view by using either parapet walls at the same height of the mechanical units for rooftop mounts or by providing screening for ground mounted units acceptable to the Director; c. Wherever possible, parking areas and pedestrian walks shall connect internally to parking areas and pedestrian walks of existing adjoining businesses. Provisions shall be make for future connections to adjoining property not yet developed or redeveloped. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Bldg - Urinal partitions 1210.3.2
Corrective Action Required
03/14/2017

2012 IBC 1210.3.2 – Urinal partitions. Each urinal utilized by the public or employees shall occupy a separate area with walls or partitions to provide privacy. The walls or partitions shall begin at a height not more than 12 inches from and extend not less than 60 inches above the finished floor surface. The walls or partitions shall extend from the wall surface at each side of the urinal not less than 18 inches or to a point not less than 6 inches beyond the outermost front lip of the urinal measured from the finished backwall surface, whichever is greater. (See code section for possible exceptions.) Action required: Modify documents to reflect minimum 60" partition heights.
Bldg - Interior finish requirements 803.9
Corrective Action Required
03/14/2017

2012 IBC 803.9 Interior finish requirements based on group. Interior wall and ceiling finish shall have a flame spread index not greater than that specified in Table 803.9 for the group and location designated. Interior wall and ceiling finish materials tested in accordance with NFPA 286 and meeting the acceptance criteria of Section 803.1.2.1 shall be permitted to be used where a Class A Classification in accordance with ASTM E 84 or UL 723 is required. Action required: Provide verification that wall cover fabrics are minimum Class 'C'.
Misc
Corrective Action Required
03/14/2017

2012 IBC 1013.6 Mechanical equipment. Guards shall be provided where appliances, equipment, fans, roof hatch openings or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be constructed so as to prevent the passage of a sphere 21 inches in diameter. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan, or component. Action required: Either relocate condensing unit CU-2 or provide guard rail at edge or roof.
Misc
Corrective Action Required
03/14/2017

2012 IMC 506.5.3 Exhaust fan mounting. An upblast fan shall be hinged and supplied with a flexible weatherproof electrical cable to permit inspection and cleaning. The ductwork shall extend a minimum of 18 inches above the roof surface. Action required: Modify grease hood fan detail to show hinge and flexible conduit.
Plumb - Cleanouts - Building sewer 708.3.2
Corrective Action Required
03/14/2017

2012 IPC 708.3.1 Horizontal drains within buildings. All horizontal drains shall be provided with cleanouts located not more than 100 feet apart. Action required: Provide additional cleanouts to comply. To include, but not be limited to, end of line in Mechanical Room 118, every 100' horizontal, and at the ends of water closet banks.
Misc 14
Corrective Action Required
03/14/2017

2012 IBC Exit Signs 1011.1 Where Required. Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. The path of egress travel to exits and within exits shall be marked by readily visible exit signs to clearly indicate the direction of egress travel in cases where the exit of the path of egress travel is not immediately visible to the occupants. Intervening means of egress doors within exits shall be marked by exit signs. Exit sign placement shall be such that no point in an exit access corridor or exit passageway is more than 100 feet or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (see code section for exceptions) Action required: Provide exit sign at door 05b on south side of Auditorium 05.
Misc 15
Corrective Action Required
03/14/2017

2011 NEC 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas where electrical diagnostic equipment, electrical hand tools, or portable lighting equipment are to be used. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles in kitchen as well as within 6' of a sink (bar area) will by GFCI protected.
Bldg - Occupant load posting 1004.3
Corrective Action Required
03/14/2017

2012 IBC 1004.3 - Posting of occupant load. Every room or space that is an assembly occupancy shall have the occupant load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. Action required: Post maximum occupant loads in all assembly areas.
Misc 16
Corrective Action Required
03/17/2017

Clarifications to domestic water meter and irrigation system required to complete review. Action required: Clarify size of water meter. The civil drawings indicate a 2-1/2” meter which we do not offer. I have attached a breakdown of the meters available along with their associated fees and flows. Keep in mind that any meter over 2” is required to be installed in a vault which is easily a $10k add. Lastly, the electrical drawings indicate a circuit for an irrigation system but this is not reflected in the plumbing design. Please clarify.
Licensed Contractors Rejected 03/22/2017 03/14/2017
Joe Frogge
LC - General Contractor
Corrective Action Required
03/14/2017

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
03/14/2017

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Commercial $16,245.00 $16,245.00 Paid 07/06/2017
8331507-Sewer Connection Fee $1,050.00 $1,050.00 Paid 07/06/2017
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 07/06/2017
8350015-Water Meter Fee $2,604.75 $2,604.75 Paid 07/06/2017
8331401-Water Tap Fee $22,067.00 $22,067.00 Paid 07/06/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 7/20/2017 07/20/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/20/2017
Footings at east end of building (Lower Auditorium). Areas inspected have been marked on City-Approved plans in trailer.
Footing Inspection - Commercial Partial 7/21/2017 07/21/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/20/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side
Footing Inspection - Commercial Partial 7/21/2017 07/21/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/21/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner
Footing Inspection - Commercial Partial 7/24/2017 (11:00) 7/24/2017 07/24/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/21/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room.
Footing Inspection - Commercial Partial 7/25/2017 07/25/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/24/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room. - K LINE 1-2 -1 LINE SOUTH COMPLETE
Footing Inspection - Commercial Partial 7/26/2017 07/26/2017
THE FOLLOWING AREAS ARE APPROVED
Informational
07/25/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room. - K LINE 1-2 -1 LINE SOUTH COMPLETE -RETAINING WALL FOOTING FROM 3 LINE TO 7 LINE APPROVED -1/4 CIRCLE FOOTING FROM K LINE TO 7 LINE APPROVED
Footing Inspection - Commercial Partial 7/26/2017 07/26/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/26/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room. - K LINE 1-2 -1 LINE SOUTH COMPLETE -RETAINING WALL FOOTING FROM 3 LINE TO 7 LINE APPROVED -1/4 CIRCLE FOOTING FROM K LINE TO 7 LINE APPROVED
Footing Inspection - Commercial Not Ready 7/28/2017 (10:00) 7/28/2017 07/28/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/26/2017
INSPECTED & APPROVED: Areas inspected have been marked on City-Approved plans in trailer. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room. - K LINE 1-2 -1 LINE SOUTH COMPLETE -RETAINING WALL FOOTING FROM 3 LINE TO 7 LINE APPROVED -1/4 CIRCLE FOOTING FROM K LINE TO 7 LINE APPROVED
Misc
Corrective Action Required
07/28/2017
no inspection- did not cancel, not ready. MARK HARDING 07/28/2017 11:47 AM
Footing Inspection - Commercial Partial 8/1/2017 (10:00) 8/1/2017 08/01/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
07/28/2017
INSPECTED & APPROVED: 11-interior piers completed. -Northeast corner of building (Lower Auditorium). -East side -Southeast corner-SE to Sw; Sw-mechanical room. - K LINE 1-2 -1 LINE SOUTH COMPLETE -RETAINING WALL FOOTING FROM 3 LINE TO 7 LINE APPROVED -1/4 CIRCLE FOOTING FROM K LINE TO 7 LINE APPROVED
Misc
Resolved
08/01/2017
no inspection- did not cancel, not ready. MARK HARDING 07/28/2017 11:47 AM
Erosion Control Inspection Residential Partial 8/1/2017 08/01/2017
Underslab Electrical Inspection - Commercial Partial 8/3/2017 8/3/2017 08/03/2017
Misc
Corrective Action Required
08/03/2017
primary outside the building and 2nd to the MDP
Underslab Plumbing Inspection - Commercial Partial 8/4/2017 8/4/2017 08/04/2017
Misc
Corrective Action Required
08/04/2017
main 6"- bath groups, line to concession area. 6" to floor drain. 113,112,114,111,103
Underslab Plumbing Inspection - Commercial Partial 8/8/2017 8/8/2017 08/08/2017
Misc
Corrective Action Required
08/04/2017
main 6"- bath groups, line to concession area. 6" to floor drain. 113,112,114,111,103 janitor , Bar complete.
Concrete Walls and Columns Inspection Partial 8/8/2017 (9:00) 8/8/2017 08/08/2017
Misc
Corrective Action Required
08/08/2017
northeast corner
Footing Inspection - Commercial Partial 8/9/2017 (9:00) 8/9/2017 08/09/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/01/2017
INSPECTED & APPROVED: 11-interior piers completed. footing lINE 10 K-J WALL- LINE 11 F-B
Concrete Walls and Columns Inspection Partial 8/16/2017 (10:00) 8/16/2017 at 9:10 AM 08/16/2017
Misc
Corrective Action Required
08/08/2017
Center east wall section complete
Underslab Electrical Inspection - Commercial Passed 8/16/2017 at 10:10 AM 08/16/2017
Misc
Corrective Action Required
08/03/2017
primary outside the building and 2nd to the MDP
Footing Inspection - Commercial Partial 8/23/2017 at 1:00 AM 08/23/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
08/09/2017
INSPECTED & APPROVED: ALL AREAS COMPLETE PENDING LAST SECTION
Underslab Plumbing Inspection - Commercial Passed 8/25/2017 8/25/2017 at 1:10 AM 08/25/2017
Misc
Resolved
08/25/2017
main 6"- bath groups, line to concession area. 6" to floor drain. 113,112,114,111,103 janitor , Bar complete.
Footing Inspection - Commercial Passed 10/26/2017 (11:00) 10/26/2017 08/25/2017
THE FOLLOWING AREAS ARE APPROVED
Carried Forward
08/25/2017
perimeter and interior footings complete.
Concrete Walls and Columns Inspection Passed 9/12/2017 (2:00) 9/15/2017 at 8:00 AM 09/15/2017
Misc
Resolved
09/15/2017
Center east wall section complete
Underground Plumbing Inspection - Commercial Passed 10/31/2017 10/31/2017 at 11:00 AM 10/31/2017
Miscellaneous Inspection Passed 11/7/2017 11/7/2017 at 11:00 AM 11/07/2017
Rough Framing Inspection - Commercial Partial 12/1/2017 12/5/2017 at 11:00 AM 12/05/2017
Misc
Corrective Action Required
12/05/2017
theater rooms 2-7 ok to rock mezzanine framing walls and partial floor system.
Gas Service Inspection - Commercial Partial 12/5/2017 12/5/2017 at 11:30 AM 12/05/2017
Misc
Corrective Action Required
12/05/2017
parial inspection ok to release -rooftop units installed. walls ok to firepalce and drop to kitchen unit. fireplace and kitchen appliances are not installed.
Rough Electrical Inspection - Commercial Partial 12/5/2017 at 12:00 PM 12/05/2017
Misc
Corrective Action Required
12/05/2017
rough elect- rooms 2-7 ok to cover walls inspected. mezzanineen walls ok to cover
Rough Electrical Inspection - Commercial Partial 12/5/2017 at 12:30 PM 12/05/2017
Misc
Corrective Action Required
12/05/2017
rough elect- rooms 2-7 ok to cover walls inspected. mezzanineen walls ok to cover
Sidewalk Inspection Partial 11/27/2017 12/7/2017 at 3:00 PM 12/07/2017
PW-Install sidewalk
Informational
12/07/2017
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
Rated Assembly Inspection Partial 12/13/2017 12/15/2017 12/15/2017
Misc
Corrective Action Required
12/15/2017
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 1- 2-PARTAIL 3-PARTIAL 4-PARTIAL 5- 6- 7-
Rated Assembly Inspection Partial 12/18/2017 at 7:00 AM 12/18/2017
Misc
Corrective Action Required
12/15/2017
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 1- 2-PARTAIL-1-2 3-PARTIAL 1-2 4-PARTIAL 1-2 5-PARTAIL 1- 6- 7-
All Rough Inspection - Commercial Partial 12/1/2017 12/18/2017 at 8:00 AM 12/18/2017
Misc
Corrective Action Required
12/18/2017
ALL-ROUGH FLOORING AREAS: GROUP BATHROOMS-1-2 SMALL EAST BATHS EAST TALL WALL. THEATERS- 2,3,4,5
Hood/Duct Inspection Partial 12/19/2017 at 7:00 AM 12/19/2017
Misc
Corrective Action Required
12/19/2017
HOOD LIGHT TEST ON WELDS- PARTIAL GROUND LIGHT INSPECTION SHOP WELDS
Rated Assembly Inspection Partial 12/19/2017 at 7:30 AM 12/19/2017
Misc
Corrective Action Required
12/18/2017
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 1- 2-PARTAIL-1-2 3-PARTIAL 1-2 4-PARTIAL 1-2 5-PARTAIL 1-TOP 6- 7-
Rated Assembly Inspection Partial 12/20/2017 12/20/2017
Misc
Corrective Action Required
12/19/2017
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 1- 2-PARTAIL-1-2 3-PARTIAL 1-2 4-PARTIAL 1-2 5-PARTAIL 1-TOP 6- 7-
Hood/Duct Inspection Partial 12/20/2017 12/20/2017
Misc
Corrective Action Required
12/19/2017
HOOD LIGHT TEST ON WELDS- PARTIAL GROUND LIGHT INSPECTION SHOP WELDS -1st layer of wrap down to offset
Rated Assembly Inspection Partial 12/21/2017 12/21/2017
Misc
Corrective Action Required
12/20/2017
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 2,3,4,5, 6-partial 7-
Hood/Duct Inspection Partial 12/21/2017 12/21/2017
Misc
Corrective Action Required
12/20/2017
HOOD LIGHT TEST ON WELDS- PARTIAL GROUND LIGHT INSPECTION SHOP WELDS -1st layer of wrap down to offset -2nd layer to off set
Sidewalk Inspection Partial 12/27/2017 at 10:30 AM 12/27/2017
PW-Install sidewalk
Informational
12/07/2017
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
12/27/2017
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
Above Ceiling Inspection Partial 12/28/2017 12/28/2017 12/28/2017
Misc
Corrective Action Required
12/28/2017
Following areas approved for Ceiling Tile- theater #2 theater #3
All Rough Inspection - Commercial Partial 12/28/2017 12/28/2017
Misc
Corrective Action Required
12/18/2017
ALL-ROUGH FOLLOWING AREAS: GROUP BATHROOMS-1-2 SMALL EAST BATHS EAST TALL WALL. OFFICE1, OFFICE 2, LIQUOR ROOM. HALLWAY NORTH SIDE 116, WEST SIDE PARTIAL OF CONCESSION STAND .
All Rough Inspection - Commercial Partial 1/3/2018 1/3/2018 01/03/2018
Misc
Corrective Action Required
12/28/2017
ALL-ROUGH FOLLOWING AREAS: GROUP BATHROOMS-1-2 SMALL EAST BATHS EAST TALL WALL. OFFICE1, OFFICE 2, LIQUOR ROOM. HALLWAY NORTH SIDE 116, WEST SIDE PARTIAL OF CONCESSION STAND .; EAST 2 BATHS . SOFFITS -PARTAIL
Above Ceiling Inspection Partial 1/3/2018 1/3/2018 01/03/2018
Misc
Corrective Action Required
12/28/2017
Following areas approved for Ceiling Tile- theater #2 theater #3,4,5
Above Ceiling Inspection Partial 1/9/2018 1/9/2018 at 7:00 AM 01/09/2018
Misc
Corrective Action Required
01/03/2018
Following areas approved for Ceiling Tile- theater #2 theater #3,4,5,6,7
Sidewalk Inspection Partial 1/10/2018 at 9:00 AM 01/10/2018
PW-Install sidewalk
Informational
12/27/2017
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
12/27/2017
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
01/10/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
Underground Electrical Inspection - Commercial Passed 1/10/2018 1/10/2018 01/10/2018
Above Ceiling Inspection Partial 1/18/2018 1/18/2018 01/18/2018
Misc
Corrective Action Required
01/09/2018
Following areas approved for Ceiling Tile- theater #2 theater #3,4,5,6,7 front soffit area, partial
Electrical Service Inspection Passed 1/19/2018 at 10:00 AM 01/19/2018
Sidewalk Inspection Failed 1/18/2018 at 10:30 AM 01/19/2018
PW-Install sidewalk
Informational
01/10/2018
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
01/10/2018
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
01/10/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
01/19/2018
The sidewalk does not meet ADA guidelines. The ADA ramp that had to be removed to tye into the sanitary MH on the east side of kessler was put back in but does not meed ADA standards.Steve Robbins 01/19/2018 2:24 PM
Above Ceiling Inspection Partial 1/22/2018 at 7:00 AM 01/22/2018
Misc
Corrective Action Required
01/18/2018
Following areas approved for Ceiling Tile- theater #2 theater #3,4,5,6,7 front soffit area, partial
In-wall Inspection Partial 1/22/2018 1/22/2018 at 8:00 AM 01/22/2018
Misc
Corrective Action Required
12/28/2017
AREAS APPROVED
Above Ceiling Inspection Partial 1/26/2018 1/26/2018 at 7:00 AM 01/26/2018
Misc
Corrective Action Required
01/22/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7
Sidewalk Inspection Failed 1/30/2018 at 10:30 AM 01/30/2018
PW-Install sidewalk
Informational
01/19/2018
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
01/19/2018
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
01/19/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
01/19/2018
The sidewalk does not meet ADA guidelines. The ADA ramp that had to be removed to tye into the sanitary MH on the east side of kessler was put back in but does not meed ADA standards.Steve Robbins 01/19/2018 2:24 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
01/30/2018
The sidewalk does not meet ADA guidelines. The contractors are moving dirt and grading today, but have not yet replaced the section on kessler that does not meet ada standards.Steve Robbins 01/30/2018 11:25 AM
Above Ceiling Inspection Partial 2/1/2018 2/1/2018 at 10:30 AM 02/01/2018
Misc
Corrective Action Required
01/26/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7
Sprinkler - Hydrostatic Test Passed 2/2/2018 02/02/2018
Above Ceiling Inspection Partial 2/7/2018 2/7/2018 at 10:00 AM 02/07/2018
Misc
Corrective Action Required
02/01/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 HALL 116 BATH 113-114 OPEN BOXES ABOVE OFFICES AND MAIN BOX IN KITCHEN.
Above Ceiling Inspection Failed 2/9/2018 2/9/2018 at 9:00 AM 02/09/2018
Misc
Corrective Action Required
02/07/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 HALL 116 BATH 113-114 OPEN BOXES ABOVE OFFICES AND MAIN BOX IN KITCHEN. still open boxes in the office and small north bathroom MARK H 02/09/2018
Above Ceiling Inspection Partial 2/12/2018 2/12/2018 at 11:10 AM 02/12/2018
Misc
Corrective Action Required
02/09/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 lobby, lounge-102 pending 4 open boxes for strip lights -107-109;111-114;lounge 102, 110, janitor room needs one can fixed , need to see led boxes when tied in. ok to install tile.
Above Ceiling Inspection Partial 2/15/2018 2/15/2018 at 7:00 AM 02/15/2018
Misc
Corrective Action Required
02/12/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 lobby, lounge-102 pending 4 open boxes for strip lights -107-109;111-114;;111-114;lounge 102, 110, janitor room needs one can fixed , need to see led boxes when tied in. ok to install tile.
Sidewalk Inspection Failed 2/21/2018 at 11:15 AM 02/21/2018
PW-Install sidewalk
Informational
01/30/2018
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
01/30/2018
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
01/30/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
01/30/2018
The sidewalk does not meet ADA guidelines. The ADA ramp that had to be removed to tye into the sanitary MH on the east side of kessler was put back in but does not meed ADA standards.Steve Robbins 01/19/2018 2:24 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
01/30/2018
The sidewalk does not meet ADA guidelines. The contractors are moving dirt and grading today, but have not yet replaced the section on kessler that does not meet ada standards.Steve Robbins 01/30/2018 11:25 AM
PW-Curb ramp is out of compliance
Corrective Action Required
02/21/2018
The ada ramp on kessler and facsination will be worked on next week, I talked with Harold about it and he is aware and will take care of it. They also have some sidewalk to do in front of the building.Steve Robbins 02/21/2018 11:35 AM
Above Ceiling Inspection Partial 2/26/2018 2/26/2018 at 11:40 AM 02/26/2018
Misc
Corrective Action Required
02/15/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 lobby, lounge-102 pending 4 open boxes for strip lights -107-109;111-114;;111-114;lounge 102, 110, janitor room needs one can fixed , need to see led boxes when tied in. ok to install tile. 101 all approved to drop except two tiles to see j boxes for exterior lighing closed.
Rough Electrical Inspection - Commercial Passed 11/30/2017 03/07/2018
Misc
Resolved
03/07/2018
rough elect- rooms 2-7 ok to cover walls inspected. mezzanineen walls ok to cover
Alarm Test Passed 3/7/2018 03/07/2018
Alternate Protection Systems Inspection Passed 3/7/2018 03/07/2018
Sprinkler - Flow Test Passed 3/7/2018 03/07/2018
Above Ceiling Inspection Passed 3/2/2018 3/7/2018 03/07/2018
Misc
Resolved
03/07/2018
Following areas approved for Ceiling Tile- theater 1,#2 theater #3,4,5,6,7 lobby, lounge-102 pending 4 open boxes for strip lights -107-109;111-114;;111-114;lounge 102, 110, janitor room needs one can fixed , need to see led boxes when tied in. ok to install tile. 101 all approved to drop except two tiles to see j boxes for exterior lighing closed.
Gas Service Inspection - Commercial Passed 3/7/2018 03/07/2018
Misc
Resolved
03/07/2018
parial inspection ok to release -rooftop units installed. walls ok to firepalce and drop to kitchen unit. fireplace and kitchen appliances are not installed.
Rated Assembly Inspection Passed 3/7/2018 03/07/2018
Misc
Resolved
03/07/2018
ROCK INSPECTION- PARTAIL KITCHEN WALL OK TO HANG WHERE HOOD IS LOCATED. MEZZANINE/CATWALK-PARTAIL THEATERS: 2,3,4,5, 6-partial 7-
Hood/Duct Inspection Passed 3/7/2018 03/07/2018
Misc
Resolved
03/07/2018
HOOD LIGHT TEST ON WELDS- PARTIAL GROUND LIGHT INSPECTION SHOP WELDS -1st layer of wrap down to offset -2nd layer to off set
Rough Framing Inspection - Commercial Passed 11/30/2017 03/07/2018
Misc
Resolved
03/07/2018
theater rooms 2-7 ok to rock mezzanine framing walls and partial floor system.
All Rough Inspection - Commercial Passed 1/2/2018 03/07/2018
Misc
Resolved
03/07/2018
ALL-ROUGH FOLLOWING AREAS: GROUP BATHROOMS-1-2 SMALL EAST BATHS EAST TALL WALL. OFFICE1, OFFICE 2, LIQUOR ROOM. HALLWAY NORTH SIDE 116, WEST SIDE PARTIAL OF CONCESSION STAND .; EAST 2 BATHS . SOFFITS -PARTAIL
In-wall Inspection Passed 1/19/2018 03/07/2018
Misc
Resolved
03/07/2018
AREAS APPROVED
Sidewalk Inspection Failed 3/7/2018 at 1:00 PM 03/07/2018
PW-Install sidewalk
Informational
02/21/2018
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
02/21/2018
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
02/21/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
02/21/2018
The sidewalk does not meet ADA guidelines. The ADA ramp that had to be removed to tye into the sanitary MH on the east side of kessler was put back in but does not meed ADA standards.Steve Robbins 01/19/2018 2:24 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
02/21/2018
The sidewalk does not meet ADA guidelines. The contractors are moving dirt and grading today, but have not yet replaced the section on kessler that does not meet ada standards.Steve Robbins 01/30/2018 11:25 AM
PW-Curb ramp is out of compliance
Corrective Action Required
02/21/2018
The ada ramp on kessler and facsination will be worked on next week, I talked with Harold about it and he is aware and will take care of it. They also have some sidewalk to do in front of the building.Steve Robbins 02/21/2018 11:35 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/07/2018
The contractors fixed the ramp out of compliance to meet the less than 2% slope. There are a total of 7 ada ramps that have a 4 ft. dome instead of a 5 ft. They are tearing them out this afternoon and plan on pouring them back in the morning.Steve Robbins 03/07/2018 3:58 PM
Occupancy Inspection - Fire Passed 3/8/2018 03/08/2018
Occupancy Inspection - Planning Temporary C of O 3/8/2018 03/08/2018
Resolved
08/07/2018
General site clean up is needed (construction debris, machinery, roll-off containers, etc.)
Resolved
08/07/2018
Site restoration and grass is required to be established.
Resolved
08/07/2018
The front entry concrete area is still under construction.
Resolved
08/07/2018
Front entry landscaping was not complete.
Resolved
08/07/2018
A final determination is needed regarding the screening for the roof-top equipment. This final inspection will be at a later date.
Occupancy Inspection - Water Utilities Temporary C of O 3/8/2018 03/08/2018
Occupancy Inspection - Engineering Temporary C of O 3/8/2018 03/08/2018
Misc
Corrective Action Required
03/08/2018
pending punch list and final completion
Occupancy Inspection - Codes Commercial Temporary C of O 3/8/2018 3/8/2018 03/08/2018
Misc
Corrective Action Required
03/08/2018
- health ok - planning ok for TCO -engineering ok for TCO water ok for cofo Fire ok for COFO Codes ok for TCO
Sidewalk Inspection Passed 3/8/2018 at 3:00 PM 03/08/2018
PW-Install sidewalk
Informational
03/07/2018
The contractors are installing sidewalk in the ROW on west side of the building , they still have an ADA turn-around to install on fascination and longview.Steve Robbins 12/07/2017 3:48 PM
PW-Install sidewalk
Informational
03/07/2018
The contractors have installed some pf tje sidewalk that is around the property in the ROW. I have not been able to check if properly done yet because it still has blankets on it. I will be able to check it when they remove the blankets from the sidewalk.Steve Robbins 12/27/2017 1:46 PM
PW-Misc
Informational
03/07/2018
All the ROW sidewalk has been installed, all the ADA has been installed. The contractors still have blankets on the concrete so I am not able to check the work.Steve Robbins 01/10/2018 11:37 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/07/2018
The sidewalk does not meet ADA guidelines. The ADA ramp that had to be removed to tye into the sanitary MH on the east side of kessler was put back in but does not meed ADA standards.Steve Robbins 01/19/2018 2:24 PM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/07/2018
The sidewalk does not meet ADA guidelines. The contractors are moving dirt and grading today, but have not yet replaced the section on kessler that does not meet ada standards.Steve Robbins 01/30/2018 11:25 AM
PW-Curb ramp is out of compliance
Corrective Action Required
03/07/2018
The ada ramp on kessler and facsination will be worked on next week, I talked with Harold about it and he is aware and will take care of it. They also have some sidewalk to do in front of the building.Steve Robbins 02/21/2018 11:35 AM
PW-Sidewalk does not meet ADA requirements
Corrective Action Required
03/07/2018
The contractors fixed the ramp out of compliance to meet the less than 2% slope. There are a total of 7 ada ramps that have a 4 ft. dome instead of a 5 ft. They are tearing them out this afternoon and plan on pouring them back in the morning.Steve Robbins 03/07/2018 3:58 PM
PW-Install ADA for sidewalk
Resolved
03/08/2018
The contractors corrected 7 ADA ramps by tearing them out and putting in a new truncated dome for each one.Steve Robbins 03/08/2018 3:58 PM
Occupancy Inspection - Water Utilities Passed 5/22/2018 05/22/2018
Occupancy Inspection - Planning Temporary C of O 5/22/2018 05/22/2018
Resolved
08/07/2018
Re-paint ADA space adjacent to the westernmost driveway/parking lot entrance.
Resolved
08/07/2018
Complete sod / vegetation around eastern driveway entrance.
Resolved
08/07/2018
Follow up correspondence will be sent regarding rooftop HVAC screening.
Resolved
08/07/2018
Note one of the evergreen trees near the southeast corner of the building is turning brown, and the deciduous tree in the same area has been damaged.
Resolved
08/07/2018
Complete all landscaping plantings per the approved landscaping plan
Occupancy Inspection - Engineering Temporary C of O 5/22/2018 05/22/2018
Misc
Corrective Action Required
03/08/2018
pending punch list and final completion
Corrective Action Required
05/22/2018
Provide As-Builts for the public sanitary sewer main.
Corrective Action Required
05/22/2018
Provide maintenance bond for the public sanitary sewer main.
Informational
05/23/2018
Informational only. The silt fences and gutter buddies can be removed.
Occupancy Inspection - Engineering Passed 8/7/2018 08/07/2018
Misc
Corrective Action Required
05/22/2018
pending punch list and final completion
Occupancy Inspection - Planning Temporary C of O 8/7/2018 08/07/2018
Resolved
08/09/2018
Replace tree that was removed along the east side of the building. Note, deciduous tree shall have a minimum of a 3" caliper or an evergreen tree shall have a minimum height of 8 ft.
Resolved
08/09/2018
Repaint/touchup the angled parking lot space lines along SW Fascination Dr.
Occupancy Inspection - Planning Passed 8/9/2018 08/09/2018
Occupancy Inspection - Codes Commercial Full C of O 8/7/2018 08/22/2018
Misc
Corrective Action Required
03/08/2018
- planning ok for TCO -engineering PASSED water PASSED FIRE PASSED Codes PASSED Health PASSED
Documents & Images
Date Uploaded File Type Document Name
03/15/2017 Letter Fire Building Plan Review
03/17/2017 Letter Codes P/R Corrections Document
03/30/2017 Spec Insp Letter
03/31/2017 Letter Fire Building Plan Review
04/03/2017 Letter Codes P/R Corrections Document
04/03/2017 RTU Screening response
06/20/2017 RE New Food Establishment Plan Review - Approved FTG 0001230
06/28/2017 Letter B&B NLV7 - Health Department Plan Approval
07/06/2017 Receipt Receipt for transaction: 2017-004702
07/11/2017 Letter Codes Plan Review Conditions
07/12/2017 Letter Codes Building Permit
07/21/2017 Letter Inspection Summary
07/25/2017 Letter Inspection Summary
07/27/2017 Engineer Report/Study DOC072717-021
08/01/2017 Letter Inspection Summary
08/03/2017 Letter Inspection Summary
08/08/2017 Letter Inspection Summary
08/09/2017 Letter Inspection Summary
08/25/2017 Letter Inspection Summary
11/07/2017 Letter Inspection Summary
12/05/2017 Letter Inspection Summary
12/07/2017 Letter DE-Daily Inspection Summary
12/21/2017 Letter Inspection Summary
12/27/2017 Letter DE-Daily Inspection Summary
01/09/2018 Letter Inspection Summary
01/10/2018 Letter DE-Daily Inspection Summary
01/10/2018 Letter Inspection Summary
01/19/2018 Letter DE-Daily Inspection Summary
01/22/2018 Letter Inspection Summary
01/22/2018 Letter Inspection Summary
01/23/2018 Letter Fire (Alarm) Plan Review Notice
01/26/2018 Letter Inspection Summary
01/30/2018 Letter DE-Daily Inspection Summary
02/01/2018 Letter Inspection Summary
02/09/2018 Letter Inspection Summary
02/12/2018 Letter Inspection Summary
03/07/2018 Letter DE-Daily Inspection Summary
03/08/2018 Letter Codes Temporary Certificate of Occupancy
03/08/2018 Letter DE-Daily Inspection Summary
03/13/2018 Letter DOC031318-004
05/22/2018 Letter Inspection Summary
08/22/2018 Letter Codes Final Certificate of Occupancy
01/19/2018 Letter Inspection Summary
01/18/2018 Letter Inspection Summary
01/03/2018 Letter Inspection Summary
12/19/2017 Letter Inspection Summary
12/18/2017 Letter Inspection Summary
12/15/2017 Letter Inspection Summary
10/31/2017 Letter Inspection Summary
09/25/2017 Letter Fire (Sprinkler) Plan Review
09/15/2017 Letter Inspection Summary
08/23/2017 Letter Inspection Summary
08/16/2017 Letter Inspection Summary
08/04/2017 Letter Inspection Summary
07/28/2017 Letter Inspection Summary
07/26/2017 Letter Inspection Summary
07/26/2017 Letter Inspection Summary
07/24/2017 Letter Inspection Summary
07/20/2017 Letter Inspection Summary
08/23/2018 Letter Codes Final Certificate of Occupancy
08/09/2018 Letter Planning Inspection Summary
02/26/2018 Letter Inspection Summary
02/21/2018 Letter DE-Daily Inspection Summary
02/15/2018 Letter Inspection Summary
02/07/2018 Letter Inspection Summary
08/07/2018 Letter Planning Inspection Summary
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home