Permit Application Status

PRCOM20161761


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20161761
Building Permit - Commercial
Certificate of Occupancy
TOWNSEND SUMMIT LLC
NEW MULTI-FAMILY
BUILDING #3 NEW 4 STORY APARTMENT BUILDING REF: PRCOM20162363 FOR FOUNDATION PERMIT
07/19/2016
05/15/2017
06/21/2018
Locations
Contacts
NEIGHBORS CONSTRUCTION COMPANY INC, Address:1708 E 123RD ST, Phone:(913) 422-5555  
AIR DOCTOR SOLUTIONS LLC, Address:P O BOX 842400, Phone:(435) 688-3060  
LYNN ELECTRIC & COMMUNICATIONS INC, Address:725 N 2ND ST STE K, Phone:(785) 843-5709  
BLUE RIVER PLUMBING INC, Address:9125 BARTON ST, Phone:(913) 701-6410  
NSPJ ARCHITECTS, Address:3515 W 75TH ST, SUITE 201, Phone:(913) 831-1415 Ext:278  
TERRACON CONSULTANTS INC, Address:10841 S RIDGEVIEW ROAD, Phone:(913) 599-6886  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
Reviews
Review Type Outcome Est. Completion Date Completed
Special Inspections Review Approved 02/10/2017
Mike Weisenborn
Licensed Contractors Approved 07/19/2016 02/10/2017
Mike Weisenborn
Alarm Plan Review Released for Construction 12/31/2016
Joe Dir
Sprinkler Plan Review Released for Construction 12/31/2016
Joe Dir
Building Plan Review Approved with Conditions 10/13/2016
Joe Frogge
Final Development Plan Review Approved 10/13/2016
Joe Frogge
Fire Plan Review Approved with Conditions 09/22/2016
Joe Dir
09/22/2016

09/22/2016

09/22/2016

09/22/2016

09/22/2016

Construction documents for fire alarm systems
Corrective Action Required
09/22/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Tenant identification
Corrective Action Required
09/22/2016

2006 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESS OF ECH APARTMENT IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Address numbers required
Corrective Action Required
09/22/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 801 ON ALL FOUR SIDES OF THE BUILDING IN A CONTRASTING COLOR TO THE BACK GROUND LARGE ENOUGH TO READ FROM THE ROADWAY / DRIVEWAY. (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
09/22/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE EXTERIOR WALL OVER THE FIRE DEPARTMENT CONNECTION WITH THE TOP OF THE BOX APPROX. 6' OFF FINISH GRADE. (VERIFIED AT INSPECTION) 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE KNOX BOX FOR THE ELEVATOR ON A WALL BESIDE THE ELEVATOR WITH THE TOP OF THE BOX APPROX. 6' OFF OF FINISH FLOOR. KNOX BOXES CAN BE OBTAINED AT knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
09/22/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
09/22/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED FOR THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
09/22/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS IN EACH APARTMENT AND CORRIDORS ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
09/22/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS AT EACH STAIRWAY DOORWAY ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
09/22/2016

503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. 503.2 Specifications. Fire apparatus access roads shall be installed and arranged in accordance with Sections 503.2.1 through 503.2.8. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS (ROADWAYS APPROVED THROUGH THE FDP'S) AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONSTRUCTION OF THE BUILDINGS.
Misc
Corrective Action Required
09/22/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public.
Misc
Corrective Action Required
09/22/2016

LABEL THE STAIRWAYS AT EACH LANDING DOOR TO INDICATE EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) [B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm).
Fire Plan Review Rejected 08/01/2016 07/27/2016
Joe Dir
Misc
Corrective Action Required
07/27/2016

HAVE ALL FINAL DEVELOPMENT PLANS APPROVED PRIOR TO MOVING FORWARD WITH THE PROJECT
Construction documents for fire alarm systems
Corrective Action Required
07/27/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Tenant identification
Corrective Action Required
07/27/2016

2006 IFC 408.11.2 - Tenant identification. Each occupied tenant space provided with a secondary exit to the exterior or exit corridor shall be provided with tenant identification by business name and/or address. Letters and numbers shall be posted on the corridor side of the door, be plainly legible and shall contrast with their background. POST THE ADDRESS OF ECH APARTMENT IN THE CORRIDORS. LABEL ALL ELECTRICAL ROOM DOORS, MECHANICAL ROOM DOORS, IT ROOM DOORS, FIRE SPRINKLER ROOM DOORS, ELEVATOR MECHANICAL ROOM DOORS. (VERIFIED AT INSPECTION)
Address numbers required
Corrective Action Required
07/27/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF 801 ON ALL FOUR SIDES OF THE BUILDING IN A CONTRASTING COLOR TO THE BACK GROUND LARGE ENOUGH TO READ FROM THE ROADWAY / DRIVEWAY. (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
07/27/2016

2012 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. MOUNT THE KNOX BOX ON THE EXTERIOR WALL OVER THE FIRE DEPARTMENT CONNECTION WITH THE TOP OF THE BOX APPROX. 6' OFF FINISH GRADE. (VERIFIED AT INSPECTION) 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm). MOUNT THE KNOX BOX FOR THE ELEVATOR ON A WALL BESIDE THE ELEVATOR WITH THE TOP OF THE BOX APPROX. 6' OFF OF FINISH FLOOR. KNOX BOXES CAN BE OBTAINED AT knoxbox.com
Construction documents - Fire protection systems
Corrective Action Required
07/27/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
07/27/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED FOR THE FIRE ALARM AND FIRE SPRINKLER SYSTEMS PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE TESTING CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Portable fire extinguishers - general
Corrective Action Required
07/27/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. PROVIDE 2A-10BC FIRE EXTINGUISHERS IN EACH APARTMENT AND CORRIDORS ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION)
Portable fire extinguishers - conspicuous locations
Corrective Action Required
07/27/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MOUNT THE FIRE EXTINGUISHERS IN THE CORRIDORS AT EACH STAIRWAY DOORWAY ON EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) MOUNT THE FIRE EXTINGUISHERS IN THE APARTMENTS IN A EASY ACCESSABLE LOCATION. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
07/27/2016

PROVIDE CIVIL PLANS TO SHOW LOCATIONS OF THE FIRE HYDRANTS.
Misc
Corrective Action Required
07/27/2016

Misc
Corrective Action Required
07/27/2016

903.3.7 FIRE DEPARTMENT CONNECTIONS. THE LOCATION OF THE FIRE DEPARTMENT CONNECTION SHALL BE APPROVED BY THE FIRE CODE OFFICIAL. CONNECTIONS SHALL BE A 4 INCH STORTZ FITTING (INCLUDE A 30 DEGREE ELBOW) AND LOCATED WITHIN 100 FEET OF A FIRE HYDRANT OR AS APPROVED BY THE OFFICIAL.
Misc
Corrective Action Required
07/27/2016

503.1.2 Additional access. The fire code official is authorized to require more than one fire apparatus access road based on the potential for impairment of a single road by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. 503.2 Specifications. Fire apparatus access roads shall be installed and arranged in accordance with Sections 503.2.1 through 503.2.8. PROVIDE TWO MEANS OF ACCESS TO THE CONSTRUCTION AREAS (ROADWAYS APPROVED THROUGH THE FDP'S) AND FIRE HYDRANTS PRIOR TO STARTING ANY VERTICAL CONSTRUCTION OF THE BUILDINGS.
Misc
Corrective Action Required
07/27/2016

[B] 1008.1.9 Door operations. Except as specifically permitted by this section egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. NO KEYED LOCKS ON THE EGRESS SIDE OF A MARKED EXIT. [B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. B] 1008.1.9.8  Access-controlled egress doors. The entrance doors in a means of egress in buildings with an occupancy in Groups A, B, E, I-2, M, R-1 or R-2, and entrance doors to tenant spaces in occupancies in Groups A, B, E, I-2, M, R-1 or R-2, are permitted to be equipped with an approved entrance and egress access control system, listed in accordance with UL 294, which shall be installed in accordance with all of the following criteria: 1. A sensor shall be provided on the egress side arranged to detect an occupant approaching the doors. The doors shall be arranged to unlock by a signal from or loss of power to the sensor. 2. Loss of power to that part of the access control system which locks the doors shall automatically unlock the doors. 3. The doors shall be arranged to unlock from a manual unlocking device located 40 inches to 48 inches (1016 mm to 1219 mm) vertically above the floor and within 5 feet (1524 mm) of the secured doors. Ready access shall be provided to the manual unlocking device and the device shall be clearly identified by a sign that reads “PUSH TO EXIT.” When operated, the manual unlocking device shall result in direct interruption of power to the lock—independent of the access control system electronics—and the doors shall remain unlocked for a minimum of 30 seconds. 4. Activation of the building fire alarm system, if provided, shall automatically unlock the doors, and the doors shall remain unlocked until the fire alarm system has been reset. 5. Activation of the building automatic sprinkler or fire detection system, if provided, shall automatically unlock the doors. The doors shall remain unlocked until the fire alarm system has been reset. 6. Entrance doors in buildings with an occupancy in Group A, B, E or M shall not be secured from the egress side during periods that the building is open to the general public.
Misc
Corrective Action Required
07/27/2016

LABEL THE STAIRWAYS AT EACH LANDING DOOR TO INDICATE EACH FLOOR LEVEL. (VERIFIED AT INSPECTION) [B] 1008.1.9.11 Stairway doors. Interior stairway means of egress doors shall be openable from both sides without the use of a key or special knowledge or effort. Exceptions: 1. Stairway discharge doors shall be openable from the egress side and shall only be locked from the opposite side. 2. This section shall not apply to doors arranged in accordance with Section 403.5.3 of the International Building Code. 3. In stairways serving not more than four stories, doors are permitted to be locked from the side opposite the egress side, provided they are openable from the egress side and capable of being unlocked simultaneously without unlatching upon a signal from the fire command center, if present, or a signal by emergency personnel from a single location inside the main entrance to the building. 4. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group B, F, M and S occupancies where the only interior access to the tenant space is from a single exit stair where permitted in Section 1021.2. 5. Stairway exit doors shall be openable from the egress side and shall only be locked from the opposite side in Group R-2 occupancies where the only interior access to the dwelling unit is from a single exit stair where permitted in Section 1021.2. [B] 1008.1.6 Landings at doors. Landings shall have a width not less than the width of the stairway or the door, whichever is greater. Doors in the fully open position shall not reduce a required dimension by more than 7 inches (178 mm). When a landing serves an occupant load of 50 or more, doors in any position shall not reduce the landing to less than one-half its required width. Landings shall have a length measured in the direction of travel of not less than 44 inches (1118 mm).
Misc
Corrective Action Required
07/27/2016

PROVIDE ADDITIONAL EXTERIOR ACCESS TO THE FIRE SPRINKLER ROOMS.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $18,497.72 $18,497.72 Paid 04/26/2017
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 04/26/2017
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Foundation Inspection - Commercial Passed 5/30/2017 05/30/2017
All Rough Inspection - Commercial Partial 6/7/2017 06/07/2017
Misc
Partial Correction
06/07/2017
OK TO COVER WHEN READY SHEAR WALL AT SOUTH STAIRWELL 1ST LEVEL
Rated Assembly Inspection Partial 6/8/2017 6/8/2017 06/08/2017
Misc
Partial Correction
06/08/2017
RATED ASSEMBLIES AT STAIRWELLS: OK TO COVER AT SOUTH STAIRWELL: LEVEL ONE 1ST LAYER 5/8" TYPE X MOLD-TOUGH GWB;
Electrical Service Inspection Partial 6/9/2017 06/09/2017
Misc
Partial Correction
06/09/2017
RELEASE PEDESTAL-MOUNTED TEMPORARY ELECTRICAL SERVICE
Rated Assembly Inspection Partial 6/15/2017 06/15/2017
Misc
Partial Correction
06/08/2017
RATED ASSEMBLIES AT STAIRWELLS: OK TO COVER AT SOUTH STAIRWELL: BASEMENT 1ST LAYER 5/8" TYPE X MOLD-TOUGH GWB; BASEMENT PRE-ROCK 1ST LAYER AT BACKSIDE JOIST BAYS;
Misc
Partial Correction
06/15/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: PRE-ROCK AT BACKSIDE JOIST BAYS AT BASEMENT;
Rough Framing Inspection - Commercial Partial 6/15/2017 06/15/2017
Misc
Partial Correction
06/15/2017
INTERIOR SHEAR WALL AT SOUTH STAIRWELL -- OK TO COVER AT: 1ST FLOOR;
Rated Assembly Inspection Partial 6/27/2017 06/27/2017
Misc
Partial Correction
06/15/2017
RATED ASSEMBLIES AT STAIRWELLS: OK TO COVER AT SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLR: 1ST LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS;
Misc
Partial Correction
06/15/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS
Rough Framing Inspection - Commercial Partial 6/27/2017 06/27/2017
Misc
Partial Correction
06/15/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Rated Assembly Inspection Partial 6/29/2017 6/30/2017 06/30/2017
Misc
Partial Correction
06/27/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS;
Misc
Partial Correction
06/27/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS
Rated Assembly Inspection Partial 7/5/2017 07/05/2017
Misc
Partial Correction
06/30/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS;
Misc
Partial Correction
06/30/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS
Rated Assembly Inspection Partial 7/20/2017 7/20/2017 07/20/2017
Misc
Partial Correction
07/05/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [SECOND FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [SECOND FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS;
Misc
Partial Correction
07/05/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS [SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS;
Rated Assembly Inspection Partial 7/26/2017 7/26/2017 07/26/2017
Misc
Partial Correction
07/20/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK AT JOIST BAYS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK AT JOIST BAYS;
Misc
Partial Correction
07/20/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK AT JOIST BAYS;
Rough Framing Inspection - Commercial Partial 7/27/2017 7/27/2017 07/27/2017
Misc
Partial Correction
06/27/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
07/27/2017
OK TO COVER WHEN READY INTERIOR VERTICAL STRAPS AT GARAGE PORTALS
Rated Assembly Inspection Partial 8/11/2017 8/11/2017 08/11/2017
Misc
Partial Correction
07/26/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; [2ND LAYER AT WELL FACE; THIRD FLOOR: [1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; [2ND LAYER AT WELL FACE; THIRD FLOOR: [1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS;
Misc
Partial Correction
07/26/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: [1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS;
Rated Assembly Inspection Partial 8/15/2017 8/15/2017 08/15/2017
Misc
Partial Correction
08/11/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK ONLY; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK ONLY;
Misc
Partial Correction
08/11/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK;
Rough Framing Inspection - Commercial Partial 10/5/2017 10/5/2017 at 10:10 AM 10/05/2017
Misc
Partial Correction
07/27/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
07/27/2017
OK TO COVER WHEN READY INTERIOR VERTICAL STRAPS AT GARAGE PORTALS
FOURTH FLOOR
Corrective Action Required
10/05/2017
4TH FLOOR ROUGH FRAMING - CORRECTION ITEMS
Sprinkler - Hydrostatic Test Passed 10/26/2017 10/06/2017
Rough Framing Inspection - Commercial Partial 10/6/2017 10/6/2017 at 3:00 PM 10/06/2017
Misc
Partial Correction
10/05/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
10/05/2017
OK TO COVER WHEN READY INTERIOR VERTICAL STRAPS AT GARAGE PORTALS
FOURTH FLOOR
Corrective Action Required
10/05/2017
4TH FLOOR ROUGH FRAMING - CORRECTION ITEMS IDENTIFIED.
Rough Framing Inspection - Commercial Partial 10/24/2017 10/24/2017 at 3:45 PM 10/24/2017
Misc
Partial Correction
10/06/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
10/06/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
FOURTH FLOOR
Resolved
10/24/2017
4TH FLOOR ROUGH FRAMING - CORRECTION ITEMS IDENTIFIED.
All Rough Inspection - Commercial Not Ready 11/1/2017 11/1/2017 at 2:20 PM 11/01/2017
Misc
Partial Correction
06/07/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
All Rough Inspection - Commercial Partial 11/2/2017 11/2/2017 at 3:05 PM 11/02/2017
Misc
Partial Correction
11/01/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/02/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: [4TH FLOOR; 3RD FLOOR;
Rated Assembly Inspection Partial 11/6/2017 11/6/2017 11/06/2017
Misc
Partial Correction
08/15/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK ONLY; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK ONLY;
Misc
Partial Correction
08/15/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK;
FOURTH FLOOR
Corrective Action Required
11/06/2017
4TH FLOOR -TUB SHOWERS 1ST LAYER
Rated Assembly Inspection Partial 11/7/2017 11/7/2017 at 3:05 PM 11/07/2017
Misc
Partial Correction
11/06/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; [2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; [2ND LAYER COMPLETE AT WELLS & SHOWERS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; [2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; [2ND LAYER COMPLETE AT WELLS & SHOWERS;
Misc
Partial Correction
11/06/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK;
FOURTH FLOOR
Resolved
11/07/2017
4TH FLOOR -TUB SHOWERS 1ST LAYER
All Rough Inspection - Commercial Partial 11/8/2017 11/8/2017 at 2:45 PM 11/08/2017
Misc
Partial Correction
11/02/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/02/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
Rough Framing Inspection - Commercial Partial 11/9/2017 11/9/2017 at 2:35 PM 11/09/2017
Misc
Partial Correction
10/24/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
10/24/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Partial Correction
11/09/2017
PRELIM FRAMING INSPECTION OK AT: 3RD FLR;
All Rough Inspection - Commercial Not Ready 11/9/2017 11/9/2017 11/09/2017
Misc
Partial Correction
11/08/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/08/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR;
All Rough Inspection - Commercial Partial 11/10/2017 11/10/2017 at 1:15 PM 11/10/2017
Misc
Partial Correction
11/09/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/09/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; [1ST FLOOR; BASEMENT
Rated Assembly Inspection Partial 11/13/2017 11/13/2017 at 10:30 AM 11/13/2017
Misc
Partial Correction
11/07/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; [2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; [2ND LAYER COMPLETE AT WELLS & SHOWERS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; [2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; [2ND LAYER COMPLETE AT WELLS & SHOWERS;
Misc
Partial Correction
11/07/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [2ND LAYER PRE-ROCK;
Misc
Partial Correction
11/13/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: [1ST LAYER BEHIND TUBS SHOWERS;
All Rough Inspection - Commercial Partial 11/13/2017 11/13/2017 at 11:00 AM 11/13/2017
Misc
Partial Correction
11/10/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/10/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; BASEMENT
Misc
Partial Correction
11/13/2017
OK TO COVER WHEN READY CEILING & WALL FRAMING & CONCEALED SYSTEMS AT UNITS & SPACES INCLUDING STAIRWELLS AT: [4TH FLOOR;
Rough Framing Inspection - Commercial Not Ready 11/14/2017 11/14/2017 at 10:05 AM 11/14/2017
Misc
Partial Correction
11/09/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
11/09/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Partial Correction
11/09/2017
PRELIM FRAMING INSPECTION OK AT: 3RD FLR;
Rated Assembly Inspection Partial 11/14/2017 11/14/2017 at 10:20 AM 11/14/2017
Misc
Partial Correction
11/13/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS;
Misc
Partial Correction
11/13/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK;
Misc
Partial Correction
11/13/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: 1ST LAYER BEHIND TUBS SHOWERS; [2ND LAYER BEHIND TUBS SHOWERS;
All Rough Inspection - Commercial Partial 11/15/2017 11/15/2017 at 1:50 PM 11/15/2017
Misc
Partial Correction
11/13/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/13/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; BASEMENT OK TO COVER WHEN READY CEILING & WALL FRAMING & CONCEALED SYSTEMS AT UNITS & SPACES INCLUDING STAIRWELLS AT: 4TH FLOOR; [3RD FLOOR; [2ND FLOOR PRELIM FRAMING ONLY;
Rated Assembly Inspection Partial 11/15/2017 11/15/2017 at 2:50 PM 11/15/2017
Misc
Partial Correction
11/14/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS;
Misc
Partial Correction
11/14/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK;
Misc
Partial Correction
11/14/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: 1ST LAYER BEHIND TUBS SHOWERS; 2ND LAYER BEHIND TUBS SHOWERS; 1ST FLOOR: [1ST LAYER BEHIND TUBS SHOWERS;
All Rough Inspection - Commercial Partial 11/16/2017 11/16/2017 at 1:35 PM 11/16/2017
Misc
Partial Correction
11/15/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/15/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; BASEMENT 2ND FLOOR PRELIM FRAMING ONLY; OK TO COVER WHEN READY CEILING & WALL FRAMING & CONCEALED SYSTEMS AT UNITS & SPACES INCLUDING STAIRWELLS AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR; RC CHANNEL IN PLACE & OK TO COVER AT: [4TH FLOOR;
Rated Assembly Inspection Partial 11/16/2017 11/16/2017 at 3:05 PM 11/16/2017
Misc
Partial Correction
11/15/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS;
Misc
Partial Correction
11/15/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK;
Misc
Partial Correction
11/15/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; 2ND LAYER BEHIND TUBS & SHOWERS; 1ST FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; [2ND LAYER BEHIND TUBS & SHOWERS; BASEMENT: [1ST LAYER BEHIND TUBS & SHOWERS;
Rough Framing Inspection - Commercial Partial 11/17/2017 11/17/2017 at 2:35 PM 11/17/2017
Misc
Partial Correction
11/14/2017
SHEAR WALLS AT STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: 1ST FLOOR;
Misc
Partial Correction
11/14/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Partial Correction
11/14/2017
PRELIM FRAMING OBSERVATIONS AT: 3RD FLR; 1ST FLR;
All Rough Inspection - Commercial Partial 11/20/2017 11/20/2017 at 3:30 PM 11/20/2017
Misc
Partial Correction
11/16/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/16/2017
OK TO PRE-ROCK WHEN READY WALLS AT TUBS/SHOWERS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; 1ST FLOOR; BASEMENT 2ND FLOOR PRELIM FRAMING ONLY; OK TO COVER WHEN READY CEILING & WALL FRAMING & CONCEALED SYSTEMS AT UNITS & SPACES INCLUDING STAIRWELLS AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR; [TUB/SHOWER PLUMBING CONNECTIONS TO ABOVE 1ST FLOOR; [TUB/SHOWER PLUMBING CONNECTIONS TO ABOVE RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; [3RD FLOOR;
Rated Assembly Inspection Partial 11/20/2017 11/20/2017 at 4:00 PM 11/20/2017
Misc
Partial Correction
11/16/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; [1ST LAYER AT UNITS & CORRIDOR; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; [1ST LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/16/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; FOURTH FLOOR: [1ST LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/16/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; 2ND LAYER BEHIND TUBS & SHOWERS; 1ST FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; [2ND LAYER BEHIND TUBS & SHOWERS; BASEMENT: [1ST LAYER BEHIND TUBS & SHOWERS;
Rated Assembly Inspection Partial 11/27/2017 11/27/2017 at 9:40 AM 11/27/2017
Misc
Partial Correction
11/20/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; [2NDLAYER AT UNITS & CORRIDOR; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; [2NDLAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/20/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; [2NDLAYER AT UNITS & CORRIDOR;
Misc
Resolved
11/27/2017
COMPONENTS OF RATED ASSEMBLIES IN UNITS AT BACKSIDE OF STAIRWELLS AND ELEVATOR SHAFT: 2ND FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; 2ND LAYER BEHIND TUBS & SHOWERS; 1ST FLOOR: 1ST LAYER BEHIND TUBS & SHOWERS; 2ND LAYER BEHIND TUBS & SHOWERS; BASEMENT: 1ST LAYER BEHIND TUBS & SHOWERS;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: [4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS;
Rated Assembly Inspection Partial 11/28/2017 11/28/2017 at 2:45 PM 11/28/2017
Misc
Partial Correction
11/27/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; [1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2NDLAYER AT UNITS & CORRIDOR; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; [1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2NDLAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/27/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; [1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS;
All Rough Inspection - Commercial Partial 11/28/2017 at 2:55 PM 11/28/2017
Misc
Partial Correction
11/20/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/20/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR:
Misc
Partial Correction
11/27/2017
ROUGH-IN AT ELEVATOR SHAFT 4TH FLOOR OK TO COVER WHEN READY
All Rough Inspection - Commercial Partial 11/29/2017 at 8:25 AM 11/29/2017
Misc
Partial Correction
11/28/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL
Misc
Partial Correction
11/28/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; [2ND FLOOR COMPLETE THROUGHOUT;
Misc
Partial Correction
11/28/2017
ROUGH-IN AT ELEVATOR SHAFT 4TH FLOOR OK TO COVER WHEN READY
Rated Assembly Inspection Partial 11/29/2017 11/29/2017 at 8:40 AM 11/29/2017
Misc
Partial Correction
11/28/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; [2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2NDLAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: [1ST LAYER; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2NDLAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: [1ST LAYER;
Misc
Partial Correction
11/28/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; [2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; [1ST LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/28/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS;
Rated Assembly Inspection Partial 11/30/2017 11/30/2017 at 10:25 AM 11/30/2017
Misc
Partial Correction
11/29/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; [2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; [2ND LAYER; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; [2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2NDLAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; [2ND LAYER;
Misc
Partial Correction
11/29/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; [2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/29/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: [SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS;
Rated Assembly Inspection Partial 12/1/2017 12/1/2017 at 2:15 PM 12/01/2017
Misc
Partial Correction
11/30/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; [1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; [1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER;
Misc
Partial Correction
11/30/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; [1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR;
Misc
Partial Correction
11/30/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS;
All Rough Inspection - Commercial Partial 12/4/2017 12/4/2017 at 1:10 PM 12/04/2017
Misc
Partial Correction
11/29/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL;
Misc
Partial Correction
12/04/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT;
Misc
Partial Correction
11/29/2017
ROUGH-IN AT ELEVATOR SHAFT: 4TH FLOOR OK TO COVER WHEN READY
Misc
Partial Correction
12/04/2017
ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: [1ST FLOOR: M/E/P OK -- FRAMING TO BE RE-INSPECTED BEFORE COVER;
All Rough Inspection - Commercial Partial 12/5/2017 12/5/2017 at 2:15 PM 12/05/2017
Misc
Partial Correction
12/04/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL;
Misc
Partial Correction
12/04/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT;
Misc
Partial Correction
12/04/2017
ROUGH-IN AT ELEVATOR SHAFT: 4TH FLOOR OK TO COVER WHEN READY
Misc
Partial Correction
12/04/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: [1ST FLOOR COMPLETE; [BASEMENT NOT APPROVED
Rated Assembly Inspection Partial 12/5/2017 12/5/2017 at 3:30 PM 12/05/2017
Misc
Partial Correction
12/01/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; [3RD LAYER + HAT CHANNEL AT CEILINGS; NORTH STAIRWELL: FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; [3RD LAYER + HAT CHANNEL AT CEILINGS;
Misc
Partial Correction
12/01/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: [1ST LAYER FULL HEIGHT;
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS;
All Rough Inspection - Commercial Partial 12/6/2017 at 3:10 PM 12/06/2017
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY SHEAR WALL AT: SOUTH STAIRWELL 1ST LEVEL; [NORTH STAIRWELL BSMT LEVEL;
Misc
Partial Correction
12/05/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT;
Misc
Resolved
12/06/2017
ROUGH-IN AT ELEVATOR SHAFT: 4TH FLOOR OK TO COVER WHEN READY
Misc
Partial Correction
12/05/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; [BASEMENT;
Rated Assembly Inspection Partial 12/6/2017 12/6/2017 at 3:40 PM 12/06/2017
Misc
Partial Correction
12/05/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; [4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: [TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; [4TH LAYER AT CEILINGS
Misc
Partial Correction
12/05/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; [2ND LAYER FULL HEIGHT;
Misc
Partial Correction
12/05/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: [SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS;
Above Ceiling Inspection Partial 12/6/2017 at 4:25 PM 12/06/2017
Misc
Partial Correction
12/06/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN SYSTEMS TO BE CONCEALED AT DROP CEILINGS, SOFFITS, FUR-DOWNS AT: [4TH FLOOR;
Rough Framing Inspection - Commercial Partial 12/7/2017 12/7/2017 at 9:10 AM 12/07/2017
Misc
Partial Correction
11/17/2017
OK TO COVER WHEN READY SHEAR WALLS AT: STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: BSMT LEVEL; 1ST FLOOR; UNITS: PARTIAL (NOT DONE AT S UNIT)
Misc
Partial Correction
11/17/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Partial Correction
11/17/2017
PRELIM FRAMING OBSERVATIONS AT: 3RD FLR; 1ST FLR;
Rough Framing Inspection - Commercial Partial 12/8/2017 12/8/2017 at 10:15 AM 12/08/2017
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY SHEAR WALLS AT: STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: BSMT LEVEL; 1ST FLOOR; AT UNITS: [BASEMENT;
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Partial Correction
12/07/2017
PRELIM FRAMING OBSERVATIONS AT: 3RD FLR; 1ST FLR;
All Rough Inspection - Commercial Partial 12/8/2017 at 10:30 AM 12/08/2017
Misc
Resolved
12/07/2017
Misc
Partial Correction
12/06/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT; [GARAGES;
Misc
Partial Correction
12/06/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; BASEMENT;
All Rough Inspection - Commercial Partial 12/11/2017 12/11/2017 at 12:55 PM 12/11/2017
Misc
Partial Correction
12/08/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT; 1ST FLOOR COMPLETE; BASEMENT COMPLETE;
Misc
Partial Correction
12/08/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; BASEMENT;
Rated Assembly Inspection Partial 12/14/2017 12/14/2017 at 2:10 PM 12/14/2017
Misc
Partial Correction
12/06/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Partial Correction
12/06/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
12/06/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; ELEVATOR MACHINE RM: [1ST LAYER @ CEILING;
Rated Assembly Inspection Partial 12/15/2017 at 11:00 AM 12/15/2017
Misc
Partial Correction
12/14/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Partial Correction
12/14/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
12/14/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; **12/15-INSPECTED ALL 1ST FL WALL&CEILING AND SHEAR WALLS; ELEVATOR CONTROL RM-2ND LAYER @ CEILING ELEVATOR MACHINE RM: [1ST LAYER @ CEILING;
Rated Assembly Inspection Partial 12/18/2017 at 1:10 PM 12/18/2017
Misc
Partial Correction
12/14/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Partial Correction
12/14/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
12/14/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; ELEVATOR MACHINE RM: [1ST LAYER @ CEILING; **12/15-INSPECTED ALL 1ST FL WALL&CEILING AND SHEAR WALLS; ELEVATOR CONTROL RM-2ND LAYER @ CEILING **12/18-ELEVATOR CONTROL RM-3RD LAYER @ CEILING; BASEMENT SHEAR WALLS; 4TH FL-FINAL LAYER AT TOP LID OF ELEVATOR SHAFT
Rated Assembly Inspection Partial 12/19/2017 12/19/2017 at 2:05 PM 12/19/2017
Misc
Partial Correction
12/18/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Partial Correction
12/18/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
12/18/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; ELEVATOR MACHINE RM: [1ST LAYER @ CEILING; **12/15-INSPECTED ALL 1ST FL WALL&CEILING AND SHEAR WALLS; ELEVATOR CONTROL RM-2ND LAYER @ CEILING **12/18-ELEVATOR CONTROL RM-3RD LAYER @ CEILING; BASEMENT SHEAR WALLS; 4TH FL-FINAL LAYER AT TOP LID OF ELEVATOR SHAFT **12/19-ELEVATOR CONTROL RM-FINAL LAYER @ CEILING; 2ND LAYER AT STAIR ENCLOSURE AT BASEMENT LEVEL
All Rough Inspection - Commercial Partial 12/21/2017 12/21/2017 at 2:50 PM 12/21/2017
Misc
Partial Correction
12/11/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT; 1ST FLOOR COMPLETE; BASEMENT COMPLETE;
Misc
Partial Correction
12/11/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; BASEMENT; **12/21-WALL&CEILING BEHIND ELECTRICAL SERVICE AT BOTH SIDES OF BUILDING-SECURELY FASTEN ALL SE CABLES WITHIN 12" OF SERVICE ENCLOSURES
Rated Assembly Inspection Partial 12/21/2017 12/21/2017 at 2:55 PM 12/21/2017
Misc
Partial Correction
12/19/2017
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Partial Correction
12/19/2017
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Partial Correction
12/19/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; ELEVATOR MACHINE RM: [1ST LAYER @ CEILING; **12/15-INSPECTED ALL 1ST FL WALL&CEILING AND SHEAR WALLS; ELEVATOR CONTROL RM-2ND LAYER @ CEILING **12/18-ELEVATOR CONTROL RM-3RD LAYER @ CEILING; BASEMENT SHEAR WALLS; 4TH FL-FINAL LAYER AT TOP LID OF ELEVATOR SHAFT **12/19-ELEVATOR CONTROL RM-FINAL LAYER @ CEILING; 2ND LAYER AT STAIR ENCLOSURE AT BASEMENT LEVEL **12/21-BASEMENT FLOOR: WALLS & CEILINGS; 2ND LAYER SHEAR WALLS
All Rough Inspection - Commercial Partial 12/22/2017 12/22/2017 at 10:35 AM 12/22/2017
Misc
Partial Correction
12/21/2017
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT; 1ST FLOOR COMPLETE; BASEMENT COMPLETE;
Misc
Partial Correction
12/21/2017
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; BASEMENT; **12/21-WALL&CEILING BEHIND ELECTRICAL SERVICE AT BOTH SIDES OF BUILDING-OK TO COVER
Electrical Service Inspection Passed 12/29/2017 12/29/2017 at 2:20 PM 12/29/2017
Misc
Resolved
12/29/2017
RELEASE PEDESTAL-MOUNTED TEMPORARY ELECTRICAL SERVICE
Miscellaneous Inspection Partial 5/22/2017 (1:00) 4/17/2018 at 1:30 PM 04/17/2018
All Rough Inspection - Commercial Passed 12/22/2017 04/17/2018
Misc
Resolved
04/17/2018
RC CHANNEL IN PLACE & OK TO COVER AT: 4TH FLOOR; 3RD FLOOR; 2ND FLOOR COMPLETE THROUGHOUT; 1ST FLOOR COMPLETE; BASEMENT COMPLETE;
Misc
Resolved
04/17/2018
OK TO COVER WHEN READY FRAMING & ROUGH-IN ABOVE CEILING AND IN WALL CAVITIES: 1ST FLOOR; BASEMENT; **12/21-WALL&CEILING BEHIND ELECTRICAL SERVICE AT BOTH SIDES OF BUILDING-OK TO COVER
Miscellaneous Inspection Partial 4/18/2018 at 7:10 AM 04/18/2018
Misc
Partial Correction
04/18/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT
Underground Electrical Inspection - Commercial Partial 4/24/2018 4/24/2018 at 1:20 PM 04/24/2018
Misc
Partial Correction
04/24/2018
UNDETGROUND ELECTRICAL TO LIGHT POLE INSPECTED: -UE FROM HANDHOLE TO LP ON SW SIDE OF BUILDING 3, UE FROM GARAGE ON WEST SIDE OF BUILDING 3 TO LP AT SIDEWALK
Miscellaneous Inspection Partial 5/4/2018 at 11:45 AM 05/04/2018
Misc
Partial Correction
04/18/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9;
Miscellaneous Inspection Partial 5/7/2018 at 10:45 AM 05/07/2018
Misc
Partial Correction
05/04/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9;
Miscellaneous Inspection Partial 5/7/2018 at 2:50 PM 05/07/2018
Misc
Partial Correction
05/07/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9;
Occupancy Inspection - Water Utilities Passed 5/30/2018 05/08/2018
Corrective Action Required
11/01/2017
Miscellaneous Inspection Partial 5/14/2018 at 9:40 AM 05/14/2018
Misc
Partial Correction
05/07/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9;
Miscellaneous Inspection Partial 5/14/2018 at 2:05 PM 05/14/2018
Misc
Partial Correction
05/14/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9;
Miscellaneous Inspection Partial 5/17/2018 at 1:20 PM 05/17/2018
Misc
Partial Correction
05/14/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Above Ceiling Inspection Passed 12/6/2017 05/17/2018
Misc
Resolved
05/17/2018
OK TO COVER WHEN READY FRAMING & ROUGH-IN SYSTEMS TO BE CONCEALED AT DROP CEILINGS, SOFFITS, FUR-DOWNS AT: [4TH FLOOR;
Rated Assembly Inspection Passed 12/21/2017 05/17/2018
Misc
Resolved
05/17/2018
OK TO COVER COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: SOUTH STAIRWELL: BASEMENT: 1ST & 2ND LAYER 5/8" TYPE X MOLD-TOUGH GWB INCLUDING PRE-ROCK BACKSIDE JOIST BAYS; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS NORTH STAIRWELL: BASEMENT: TWO LAYERS PRE-ROCK BETWEEN TRUSS JOIST AT WELL FACE; [1 LAYER 5/8" TYPE X AT WELL FACE; FIRST FLOOR 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 2ND LAYER AT WELL FACE; 1ST LAYER AT CORRIDOR & UNITS; 2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER @ WELL FACE + PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK ONLY; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER GWB AT SHOWERS; 2ND LAYER COMPLETE AT WELLS & SHOWERS; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; TOWER + CEILINGS & WALLS AT LANDING: 1ST LAYER; 2ND LAYER AT CEILINGS; 3RD LAYER + HAT CHANNEL AT CEILINGS; 4TH LAYER AT CEILINGS
Misc
Resolved
05/17/2018
RATED ASSEMBLIES AT ELEVATOR SHAFT: BASEMENT: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; 1ST LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; 2ND LAYER AT TUBS/SHOWERS AT STAIRWELLS & ELEVATOR SHAFT; FIRST FLOOR: 1ST & 2ND LAYERS PRE-ROCK AT BACKSIDE JOIST BAYS; [ONE LAYER AT UNITS, ROOMS & GARAGES; SECOND FLOOR 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK AT JOIST BAYS; 1ST LAYER AT CORRIDOR & UNITS; [2ND LAYER AT CORRIDOR & UNITS THIRD FLOOR: 1ST LAYER PRE-ROCK AT BACKSIDE JOIST BAYS; 2ND LAYER PRE-ROCK; 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; FOURTH FLOOR: 1ST LAYER AT UNITS & CORRIDOR; 2ND LAYER AT UNITS & CORRIDOR; SHAFT FACE: 1ST LAYER FULL HEIGHT; 2ND LAYER FULL HEIGHT; ELEVATOR SHAFT LID: [3 LAYERS + HAT CHANNEL;
Misc
Resolved
05/17/2018
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT CEILINGS AND WALLS AT: 4TH FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 3RD FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 2ND FLOOR: SINGLE LAYER AT CORRIDOR AND UNITS CEILINGS & WALLS + CEILINGS AT STAIRWELL LANDINGS; 1ST FLOOR: [ONE LAYER @ SHEAR WALLS; ELEVATOR MACHINE RM: [1ST LAYER @ CEILING; **12/15-INSPECTED ALL 1ST FL WALL&CEILING AND SHEAR WALLS; ELEVATOR CONTROL RM-2ND LAYER @ CEILING **12/18-ELEVATOR CONTROL RM-3RD LAYER @ CEILING; BASEMENT SHEAR WALLS; 4TH FL-FINAL LAYER AT TOP LID OF ELEVATOR SHAFT **12/19-ELEVATOR CONTROL RM-FINAL LAYER @ CEILING; 2ND LAYER AT STAIR ENCLOSURE AT BASEMENT LEVEL **12/21-BASEMENT FLOOR: WALLS & CEILINGS; 2ND LAYER SHEAR WALLS
Rough Framing Inspection - Commercial Passed 12/8/2017 05/17/2018
Misc
Resolved
05/17/2018
OK TO COVER WHEN READY SHEAR WALLS AT: STAIRWELLS: SOUTH STAIR: 1ST FLOOR; NORTH STAIR: BSMT LEVEL; 1ST FLOOR; AT UNITS: [BASEMENT;
Misc
Resolved
05/17/2018
OK TO COVER WHEN READY: INTERIOR VERTICAL STRAPS AT GARAGE PORTALS; EXTERIOR WALL SHEATHING FULL HEIGHT
Misc
Resolved
05/17/2018
PRELIM FRAMING OBSERVATIONS AT: 3RD FLR; 1ST FLR;
Underground Electrical Inspection - Commercial Passed 4/24/2018 05/17/2018
Misc
Resolved
05/17/2018
UNDETGROUND ELECTRICAL TO LIGHT POLE INSPECTED: -UE FROM HANDHOLE TO LP ON SW SIDE OF BUILDING 3, UE FROM GARAGE ON WEST SIDE OF BUILDING 3 TO LP AT SIDEWALK
Miscellaneous Inspection Partial 5/22/2018 at 2:40 PM 05/22/2018
Misc
Partial Correction
05/17/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Alarm Test Passed 5/24/2018 05/24/2018
Sprinkler - Flow Test Passed 5/24/2018 05/24/2018
Miscellaneous Inspection Partial 5/24/2018 at 9:50 AM 05/24/2018
Misc
Partial Correction
05/22/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Miscellaneous Inspection Partial 5/29/2018 at 7:25 AM 05/29/2018
Misc
Partial Correction
05/24/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Miscellaneous Inspection Partial 5/29/2018 at 11:15 AM 05/29/2018
Misc
Partial Correction
05/29/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Miscellaneous Inspection Partial 5/29/2018 at 1:20 PM 05/29/2018
Misc
Partial Correction
05/29/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Miscellaneous Inspection Partial 5/30/2018 at 7:15 AM 05/30/2018
Misc
Partial Correction
05/29/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Occupancy Inspection - Fire Not Ready 5/30/2018 05/30/2018
Occupancy Inspection - Codes Commercial Not Ready 5/29/2018 5/30/2018 at 10:55 AM 05/30/2018
Miscellaneous Inspection Passed 5/30/2018 at 1:50 PM 05/30/2018
Misc
Resolved
05/30/2018
REFRIGERATOR RECEPTACLES TESTED ALL FLOORS. MW RECEPTACLES TESTED ALL EXCEPT @ ADA UNITS AT BASEMENT. FULL PRE-FINAL AT: 4TH FLR/ SEE NOTES FOR 12, 11, 10, 9; 3RD FLR/ SEE NOTES;
Occupancy Inspection - Codes Commercial Not Ready 5/30/2018 at 2:00 PM 05/30/2018
Occupancy Inspection - Codes Commercial Failed 5/30/2018 at 3:15 PM 05/30/2018
Misc
Corrective Action Required
05/30/2018
CHECK/ADJUST ALL DOOR CLOSERS
Misc
Corrective Action Required
05/30/2018
CHECK ALL FUNNEL DRAINS AT WATER HEATER ROOM FOR DEBRIS; REMOVE
Misc
Corrective Action Required
05/30/2018
1ST FLOOR & BASEMENT: CLEAN ALL GLASS AT HAZARDOUS LOCATIONS TO ALLOW "TEMPERED" ETCHING TO BE VERIFIED.
Misc
Corrective Action Required
05/30/2018
REMOVE ALL SMOKE ALARM DUST COVERS PER LSFD.
Misc
Corrective Action Required
05/30/2018
JANITOR CLOSET @ 1ST FLOOR: NO TPR DOWN-PIPE APPARENT
Misc
Corrective Action Required
05/30/2018
1ST FLOOR & BASEMENT: PENETRATIONS/HOLES AT CEILING AND RATED WALLS NOT FIRE-STOPPED OR NOT PROPERLY DONE. PROVIDE LISTING VERIFICATION FOR WHITE FOAM MATERIAL USED AT SOME. LIPSTICKING WITH FIRE-CAULK IS NOT APPROVED.
Misc
Corrective Action Required
05/30/2018
EXTEIOR HOSE BIB NEXT TO FIRE SPRINKLER ROOM NOT SECURED TO WALL
Misc
Corrective Action Required
05/30/2018
ADDRESS LABELING ON HOUSE METER AT SW NOT PERMANENT
Misc
Corrective Action Required
05/30/2018
ALSO OBTAIN APPROVAL FROM: - FIRE DEPT - PLANNING
Occupancy Inspection - Codes Commercial Failed 6/1/2018 6/1/2018 at 7:25 AM 06/01/2018
Misc
Corrective Action Required
05/30/2018
CHECK/ADJUST ALL DOOR CLOSERS
Misc
Corrective Action Required
05/30/2018
CHECK ALL FUNNEL DRAINS AT WATER HEATER ROOM FOR DEBRIS; REMOVE
Misc
Corrective Action Required
05/30/2018
1ST FLOOR & BASEMENT: CLEAN ALL GLASS AT HAZARDOUS LOCATIONS TO ALLOW "TEMPERED" ETCHING TO BE VERIFIED.
Misc
Corrective Action Required
05/30/2018
REMOVE ALL SMOKE ALARM DUST COVERS PER LSFD.
Misc
Corrective Action Required
05/30/2018
JANITOR CLOSET @ 1ST FLOOR: NO TPR DOWN-PIPE APPARENT
Misc
Corrective Action Required
05/30/2018
1ST FLOOR & BASEMENT: PENETRATIONS/HOLES AT CEILING AND RATED WALLS NOT FIRE-STOPPED OR NOT PROPERLY DONE. PROVIDE LISTING VERIFICATION FOR WHITE FOAM MATERIAL USED AT SOME. LIPSTICKING WITH FIRE-CAULK IS NOT APPROVED.
Misc
Corrective Action Required
05/30/2018
EXTEIOR HOSE BIB NEXT TO FIRE SPRINKLER ROOM NOT SECURED TO WALL
Misc
Corrective Action Required
05/30/2018
ADDRESS LABELING ON HOUSE METER AT SW NOT PERMANENT
Misc
Corrective Action Required
05/30/2018
ALSO OBTAIN APPROVAL FROM: - FIRE DEPT - PLANNING
Occupancy Inspection - Fire Passed 6/1/2018 06/01/2018
Occupancy Inspection - Planning Temporary C of O 5/30/2018 06/01/2018
Partial Correction
06/12/2018
Complete installation of landscaping and sod per approved landscape plan.
Resolved
06/12/2018
Either remove extra ADA space under carport or install required ADA sign for the space.
Occupancy Inspection - Codes Commercial Temporary C of O 6/1/2018 at 10:15 AM 06/01/2018
Misc
Resolved
06/01/2018
CHECK/ADJUST ALL DOOR CLOSERS
Misc
Resolved
06/01/2018
CHECK ALL FUNNEL DRAINS AT WATER HEATER ROOM FOR DEBRIS; REMOVE
Misc
Corrective Action Required
06/01/2018
1ST FLOOR & BASEMENT: CLEAN ALL GLASS AT HAZARDOUS LOCATIONS TO ALLOW "TEMPERED" ETCHING TO BE VERIFIED. SEE GLAZING AT BOTTOM OF STAIRWELLS.
Misc
Resolved
06/01/2018
REMOVE ALL SMOKE ALARM DUST COVERS PER LSFD.
Misc
Resolved
06/01/2018
JANITOR CLOSET @ 1ST FLOOR: NO TPR DOWN-PIPE APPARENT
Misc
Resolved
06/01/2018
1ST FLOOR & BASEMENT: PENETRATIONS/HOLES AT CEILING AND RATED WALLS NOT FIRE-STOPPED OR NOT PROPERLY DONE. PROVIDE LISTING VERIFICATION FOR WHITE FOAM MATERIAL USED AT SOME. LIPSTICKING WITH FIRE-CAULK IS NOT APPROVED.
Misc
Resolved
06/01/2018
EXTEIOR HOSE BIB NEXT TO FIRE SPRINKLER ROOM NOT SECURED TO WALL
Misc
Resolved
06/01/2018
ADDRESS LABELING ON HOUSE METER AT SW NOT PERMANENT
Misc
Corrective Action Required
06/01/2018
ALSO OBTAIN APPROVAL FROM: - PLANNING
Sewer Service Inspection Passed 06/06/2018
Occupancy Inspection - Codes Commercial Partial 6/11/2018 at 8:10 AM 06/11/2018
Misc
Resolved
06/11/2018
1ST FLOOR & BASEMENT: CLEAN ALL GLASS AT HAZARDOUS LOCATIONS TO ALLOW "TEMPERED" ETCHING TO BE VERIFIED. SEE GLAZING AT BOTTOM OF STAIRWELLS.
Misc
Corrective Action Required
06/01/2018
ALSO OBTAIN APPROVAL FROM: - PLANNING
Occupancy Inspection - Codes Commercial Partial 6/12/2018 at 8:50 AM 06/12/2018
Misc
Corrective Action Required
06/11/2018
ALSO OBTAIN APPROVAL FROM: - PLANNING
Occupancy Inspection - Planning Temporary C of O 6/12/2018 06/12/2018
Corrective Action Required
06/12/2018
Complete installation of required landscaping. Install missing trees along east side of building and near carport area. Also, install missing landscaping along rear side of parking garage.
Occupancy Inspection - Codes Commercial Partial 6/12/2018 at 3:15 PM 06/12/2018
Misc
Corrective Action Required
06/12/2018
ALSO OBTAIN APPROVAL FROM: - PLANNING
Occupancy Inspection - Codes Commercial Partial 6/13/2018 at 12:30 PM 06/13/2018
Misc
Corrective Action Required
06/12/2018
OBTAIN APPROVAL FROM PLANNING DIV
Investigation Inspection Complete 6/19/2018 06/19/2018
Occupancy Inspection - Planning Passed 6/21/2018 06/21/2018
Informational
06/21/2018
The three (3) trees to be planted in the landscape island with the carport for building #3 (805) and the sod from the garage to the driveway entry will be installed with the landscaping for building #7 (819).
Occupancy Inspection - Codes Commercial Full C of O 6/21/2018 at 3:10 PM 06/21/2018
Misc
Resolved
06/21/2018
OBTAIN APPROVAL FROM PLANNING DIV
Documents & Images
Date Uploaded File Type Document Name
07/27/2016 Letter Fire Building Plan Review
08/08/2016 Site Map
09/22/2016 Letter Fire Building Plan Review
04/26/2017 Receipt Receipt for transaction: 2017-001604
05/15/2017 Letter Codes Plan Review Conditions
05/15/2017 Letter Codes Building Permit
05/30/2017 Letter Inspection Summary
06/07/2017 Letter Inspection Summary
06/08/2017 Letter Inspection Summary
06/09/2017 Letter Inspection Summary
06/15/2017 Letter Inspection Summary
06/27/2017 Letter Inspection Summary
06/30/2017 Letter Inspection Summary
07/05/2017 Letter Inspection Summary
07/20/2017 Letter Inspection Summary
07/26/2017 Letter Inspection Summary
07/27/2017 Letter Inspection Summary
08/11/2017 Letter Inspection Summary
08/15/2017 Letter Inspection Summary
10/06/2017 Letter Inspection Summary
10/24/2017 Letter Inspection Summary
11/02/2017 Letter Inspection Summary
11/06/2017 Letter Inspection Summary
11/07/2017 Letter Inspection Summary
11/08/2017 Letter Inspection Summary
11/09/2017 Letter Inspection Summary
11/10/2017 Letter Inspection Summary
11/13/2017 Letter Inspection Summary
11/14/2017 Letter Inspection Summary
11/15/2017 Letter Inspection Summary
11/16/2017 Letter Inspection Summary
11/17/2017 Letter Inspection Summary
11/20/2017 Letter Inspection Summary
11/27/2017 Letter Inspection Summary
11/28/2017 Letter Inspection Summary
11/29/2017 Letter Inspection Summary
11/30/2017 Letter Inspection Summary
12/01/2017 Letter Inspection Summary
12/04/2017 Letter Inspection Summary
12/05/2017 Letter Inspection Summary
12/06/2017 Letter Inspection Summary
12/08/2017 Letter Inspection Summary
12/11/2017 Letter Inspection Summary
12/14/2017 Letter Inspection Summary
12/15/2017 Letter Inspection Summary
12/18/2017 Letter Inspection Summary
12/19/2017 Letter Inspection Summary
12/21/2017 Letter Inspection Summary
12/22/2017 Letter Inspection Summary
12/29/2017 Letter Inspection Summary
04/24/2018 Letter Inspection Summary
05/30/2018 Letter Inspection Summary
06/01/2018 Letter Planning Inspection Summary
06/01/2018 Letter Codes Temporary Certificate of Occupancy
06/12/2018 Letter Planning Inspection Summary
06/21/2018 Letter Planning Inspection Summary
06/21/2018 Letter Field Certificate of Occupancy
06/22/2018 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home