Permit Application Status

PRCOM20161180


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20161180
Building Permit - Commercial
Certificate of Occupancy
JOHN KNOX VILLAGE
NEW MULTI-FAMILY
BUILDING A - NEW 3 AND 5 STORY INDEPENDENT LIVING UNIT BUILDING WITH LOWER LEVEL PARKING
05/23/2016
11/21/2016
11/30/2016
07/30/2018
Locations
Contacts
PARIC CORPORATION , Address:77 WESTORT PLAZA STE 250, Phone:(636) 561-9795  
GREEN FIELD ENERGY GROUP INC, Address:5 SW 4TH ST, Phone:(816) 524-5616  
TORGESON ELECTRIC CO INC, Address:3545 SW 6TH AVE, Phone:(785) 233-2213 Ext:101  
LMG CONSTRUCTION, Address:3011 ROANOKE RD, Phone:(816) 474-0333  
JOHN KNOX VILLAGE, Address:400 NW MURRAY RD  
SFCS ARCHITECTS, Address:1927 SOUTH TRYON ST, SUITE 207, Phone:(704) 372-7327  
KRUGER TECHNOLOGIES INC, Address:8271 MELROSE DR, Phone:(913) 498-1114  
Reviews
Review Type Outcome Est. Completion Date Completed
Sprinkler Plan Review Released for Construction 04/21/2017
Joe Dir
Installation acceptance testing
Corrective Action Required
04/21/2017

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. ACTION REQUIRED:(information purposes) Field and acceptance tests will be required for the system prior to the final occupancy inspection. To schedule a test contact the fire department at 816-969-1300.
Licensed Contractors Approved 06/23/2016 11/21/2016
Mike Weisenborn
LC - MEP Subs
Corrective Action Required
06/23/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Final Development Plan Review Approved 11/21/2016
Mike Weisenborn
Special Inspections Review Approved 10/14/2016
Joe Frogge
Fire Plan Review Approved with Conditions 06/27/2016 06/24/2016
Joe Dir
06/24/2016

06/24/2016

06/24/2016

Misc
Corrective Action Required
06/23/2016

DO NOT INSTALL STOBES DEVICES (ALARM NOTIFICATION DEVICES) IN THE STAIRWAYS
Construction documents for fire alarm systems
Corrective Action Required
06/23/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE SELECTED CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Address numbers required
Corrective Action Required
06/23/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF EACH BUILDING READABLE FROM THE ADDRESSES ROADWAY. (VERIFIED AT INSPECTION)
Knox box required
Corrective Action Required
06/23/2016

2012IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. PROVIDE A KNOX BOX FOR EACH BUILDING AND ELEVATOR BANK. BOXES CAN BE OBTAINED ON LINE knoxbox.com 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm).
Construction documents - Fire protection systems
Corrective Action Required
06/23/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE SELECTED CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
06/23/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
06/23/2016

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Portable fire extinguishers - general
Corrective Action Required
06/23/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. MINIMUM SIZE FRIE EXTINGUISHERS SHALL BE (5POUND) 2A-10BC.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/23/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MAXIMUM TRAVEL DISTANCE TO A FIRE EXTINGUISHER SHALL BE 75'
Misc
Corrective Action Required
06/23/2016

STAIRWAY LANDINGS SHALL BE LABELED WITH THE FLOOR LEVEL DESIGNATION. (VERIFIED AT INSPECTION
Misc
Corrective Action Required
06/23/2016

B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. B] 1008.1 Doors.Means of egress doors shall meet the requirements of this section. Doors serving a means of egress system shall meet the requirements of this section and Section 1020.2. Doors provided for egress purposes in numbers greater than required by this code shall meet the requirements of this section. NO KEYED LOCKS ON THE EGRESS SIDE A MARKED EXIT.
Misc
Corrective Action Required
06/23/2016

LABEL ALL DOORS TO SPRINKLER ROOMS, MECHANICAL ROOMS, ELEVATOR ROOMS WITH THE ROOM DESIGNATION. (VERIFIED AT INSPECTION)
Misc
Corrective Action Required
06/23/2016

ALL EXTERIOR HORN STROBES SHALL BE LOCATED AT OR ABOVE THE FDCS (VERIFIED AT INSPECTION)
Building Plan Review Rejected 06/30/2016 06/23/2016
Joe Frogge
License Tax Application
Corrective Action Required
06/23/2016

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes. 6/23/16 - acknowledged in letter
Final Development Plan
Corrective Action Required
06/23/2016

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes. 6/23/16 - acknowledged in letter
Misc
Resolved
10/14/2016

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 6/23/16 - not found in submittal
Elevator Certificate of Inspection
Corrective Action Required
06/23/2016

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 6/23/16 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
06/23/2016

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 6/23/16 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
06/23/2016

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes. 6/23/16 - acknowledged in letter
Misc
Resolved
06/23/2016

Footings, pads, etc. to be designed per site conditions. Action required: Provide soils report by licensed engineer to verify existing soils conditions. Plans cite 2500 psf while 2000 psf is common in this area.
Misc
Resolved
06/23/2016

Additional information required. Action required: Provide complete details and information for -- U.L. 438 (wall P2) GA #351 (wall HH2) U.L. U905 (walls W, W1, & W2) U.L. unknown (Wall JJ)
Misc
Resolved
06/23/2016

ICC A117.1-2009 Section 1004.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for exceptions) Action required: Provide blocking for future accessible features as noted in all Type B units.
Misc
Resolved
06/23/2016

ICC A117.1-2009 1003.11.2.4.2 Clearance Width. Clearance around the water closet shall be 60 inches minimum in width, measured perpendicular from the side wall. Action required: Maintain minimum water closet clearance width at Type A units.
Misc
Resolved
06/23/2016

ICC A117.1-2009 Section 1004.11.3.1.2.2.1 Clearance Width. Clearance around the water closet shall be 48 inches minimum in width, measured perpendicular from the side of the clearance that is 16 inches minimum and 18 inches maximum from the water closet centerline. Action required: Maintain minimum water closet clearance width at unit Type C.
Misc
Resolved
06/23/2016

ICC A117.1-2009 Section 1004.11.3.1.3.3 Shower Compartment. If a shower compartment is the only bathing facility, the shower compartment shall have dimensions of 36 inches minimum in width and 36 inches minimum in depth. A clearance of 48 inches minimum in length, measured perpendicular from the shower head wall, and 30 inches minimum in depth, measured from the face of the shower compartment, shall be provided. Reinforcing for a shower seat is not required in shower compartments larger than 36 inches in width and 36 inches in depth. Action required: Provide minimum shower compartment floor dimensions. Not compliant as scaled.
Misc
Resolved
06/23/2016

2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Review and update door schedule as concerns minimum fire ratings. Multiple found to be incorrect or missing.
Miscellaneous Correction
Corrective Action Required
06/23/2016

2012 IBC 3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. (see code for exceptions) Action required: Comment is for informational purposes. May be field verified. 6/23/16 - acknowledged in letter (field verify)
Engineered truss package
Corrective Action Required
06/23/2016

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request to defer to construction. 6/23/16 - deferred
Screening - Ground mounted equipment
Resolved
06/23/2016

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Miscellaneous Correction
Resolved
06/23/2016

2012 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Modify drawings to show compliance. 6/23/16 - it has been decided to allow based upon complexity/quantity of loop vents, quantity of penetrations in fire rated horizontal assembly, and presence of maintenance staff.
Misc 12
Resolved
06/23/2016

20012 IPC 708.3.4 Base of stack. A cleanout shall be provided at the base of each waste or soil stack. Action required: Modify drawings and/or diagrams to demonstrate compliance.
Misc 13
Resolved
06/23/2016

2012 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-414) Storm water shall not be drained into sewers intended for sewage only. Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Re-route elevator sump discharge to approved storm drainage location. Drainage into sanitary sewer is prohibited.
Misc 14
Resolved
06/23/2016

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At rooms with large electrical equipment as defined above provide outswinging doors with panic hardware and emergency exit light.
Fire Plan Review Rejected 06/07/2016 06/01/2016
Joe Dir
Misc
Corrective Action Required
06/01/2016

1ST FLOOR EGRESS FROM STAIRWAYS. STAIR#2 DOOR A102 & A103 DOORS NEED TO SWING IN THE DIRECTION OF EGRESS.
Misc
Corrective Action Required
06/01/2016

NO STOBES (ALARM NOTIFICATION DEVICES)IN THE STAIRWAYS
Construction documents for fire alarm systems
Corrective Action Required
06/01/2016

2012 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. HAVE THE SELECTED CONTRACTOR PROVIDE SHOP DRAWINGS OF THE FIRE ALARM SYSTEM TO BE INSTALLED.
Access roads required for building and facilities
Corrective Action Required
06/01/2016

2012 IFC 503.1.1 Buildings and facilities. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall comply with the requirements of this section and shall extend to within 150 feet (45 720 mm) of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. Exception: The fire code official is authorized to increase the dimension of 150 feet (45,720 mm) where: 1.The building is equipped throughout with an approved automatic sprinkler system installed in accordance with Section 903.3.1.1, 903.3.1.2 or 903.3.1.3. 2. Fire apparatus access roads cannot be installed because of location on property, topography, waterways, nonnegotiable grades or other similar conditions, and an approved alternative means of fire protection is provided. 3. There are not more than two Group R-3 or Group U occupancies. PROVIDE DETAILS OF THE ACCESS ROADWAY AS PER PDP
Address numbers required
Corrective Action Required
06/01/2016

2012 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). POST THE NUMERIC ADDRESS OF EACH BUILDING READABLE FROM THE ADDRESSES ROADWAY.
Knox box required
Corrective Action Required
06/01/2016

2012IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. PROVIDE A KNOX BOX FOR EACH BUILDING AND ELEVATOR BANK. BOXES CAN BE OBTAINED ON LINE knoxbox.com 506.1.2 Key boxes for nonstandardized fire service elevator keys. Key boxes provided for nonstandardized fire service elevator keys shall comply with Section 506.1 and all of the following: 1. The key box shall be compatible with an existing rapid entry key box system in use in the jurisdiction and approved by the fire code official. 2. The front cover shall be permanently labeled with the words “Fire Department Use Only—Elevator Keys.” 3. The key box shall be mounted at each elevator bank at the lobby nearest to the lowest level of fire department access. 4. The key box shall be mounted 5 feet 6 inches (1676 mm) above the finished floor to the right side of the elevator bank. 5. Contents of the key box are limited to fire service elevator keys. Additional elevator access tools, keys and information pertinent to emergency planning or elevator access shall be permitted when authorized by the fire code official. 6. In buildings with two or more elevator banks, a single key box shall be permitted to be used when such elevator banks are separated by not more than 30 feet (9144 mm). Additional key boxes shall be provided for each individual elevator or elevator bank separated by more than 30 feet (9144 mm).
Construction documents - Fire protection systems
Corrective Action Required
06/01/2016

2012 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. HAVE THE SELECTED CONTRACTOR PROVIDE SHOP DRAWINGS FOR THE FIRE SPRINKLER SYSTEM TO BE INSTALLED.
Installation acceptance testing
Corrective Action Required
06/01/2016

2012 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. FIELD AND ACCEPTANCE TESTING WILL BE REQUIRED PRIOR TO THE FINAL OCCUPANCY INSPECTION. TO SCHEDULE A TEST CONTACT THE FIRE DEPARTMENT AT 816-969-1300.
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
06/01/2016

2012 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Portable fire extinguishers - general
Corrective Action Required
06/01/2016

2012 IFC 906.2 - General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. MINIMUM SIZE FRIE EXTINGUISHERS SHALL BE (5POUND) 2A-10BC.
Portable fire extinguishers - conspicuous locations
Corrective Action Required
06/01/2016

2012 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. MAXIMUM TRAVEL DISTANCE TO A FIRE EXTINGUISHER SHALL BE 75'
Misc
Corrective Action Required
06/01/2016

STAIRWAY LANDINGS SHALL BE LABELED WITH THE FLOOR LEVEL DESIGNATION.
Misc
Corrective Action Required
06/01/2016

B] 1008.1.9.1 Hardware. Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. B] 1008.1 Doors.Means of egress doors shall meet the requirements of this section. Doors serving a means of egress system shall meet the requirements of this section and Section 1020.2. Doors provided for egress purposes in numbers greater than required by this code shall meet the requirements of this section. NO KEYED LOCKS ON THE EGRESS SIDE A MARKED EXIT.
Misc
Corrective Action Required
06/01/2016

LABEL ALL DOORS TO SPRINKLER ROOMS, MECHANICAL ROOMS, ELEVATOR ROOMS WITH THE ROOM DESIGNATION.
Misc
Corrective Action Required
06/01/2016

ALL EXTERIOR HORN STROBES SHALL BE LOCATED AS CLOSE TO OR ABOVE THE FDCS
Misc
Corrective Action Required
06/01/2016

NO MENTION OF CO MONITORING IN THE GARAGE AREA. CONFIRM IF CO MONITORING WILL BE PRESENT OR NOT.
Building Plan Review Rejected 06/07/2016 05/27/2016
Joe Frogge
License Tax Application
Corrective Action Required
05/27/2016

A License Tax application completed by the contractor must be submitted to the City of Lee's Summit, Codes Administration Department, and any applicable License Tax paid prior to issuing a building permit. Action required: Comment is for informational purposes.
Final Development Plan
Corrective Action Required
05/27/2016

The building permit for this project can not be issued until the Codes Administration Department has received the approved Final Development Plan from the Planning and Development Department. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
05/27/2016

2012 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Elevator Certificate of Inspection
Corrective Action Required
05/27/2016

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated prusuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
05/27/2016

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
05/27/2016

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Contact the Lee's Summit Codes Administration. Action required: Comment is for informational purposes.
Misc
Corrective Action Required
05/27/2016

Footings, pads, etc. to be designed per site conditions. Action required: Provide soils report by licensed engineer to verify existing soils conditions. Plans cite 2500 psf while 2000 psf is common in this area.
Misc
Corrective Action Required
05/27/2016

Additional information required. Action required: Provide complete details and information for -- U.L. 438 (wall P2) GA #351 (wall HH2) U.L. U905 (walls W, W1, & W2) U.L. unknown (Wall JJ)
Misc
Corrective Action Required
05/27/2016

ICC A117.1-2009 Section 1004.11.1 Grab Bar and Shower Seat Reinforcement. Reinforcement shall be provided for the future installation of grab bars and shower seats at water closets, bathtubs, and shower compartments. Where walls are located to permit the installation of grab bars and seats complying with Section 604.5 at water closets; grab bars complying with Section 607.4 at bathtubs; and for grab bars and shower seats complying with Sections, 608.3, 608.2.1.3, 608.2.2.3 and 608.2.3.2 at shower compartments; reinforcement shall be provided for the future installation of grab bars and seats complying with those requirements. (see code for exceptions) Action required: Provide blocking for future accessible features as noted in all Type B units.
Misc
Corrective Action Required
05/27/2016

ICC A117.1-2009 1003.11.2.4.2 Clearance Width. Clearance around the water closet shall be 60 inches minimum in width, measured perpendicular from the side wall. Action required: Maintain minimum water closet clearance width at Type A units.
Misc
Corrective Action Required
05/27/2016

ICC A117.1-2009 Section 1004.11.3.1.2.2.1 Clearance Width. Clearance around the water closet shall be 48 inches minimum in width, measured perpendicular from the side of the clearance that is 16 inches minimum and 18 inches maximum from the water closet centerline. Action required: Maintain minimum water closet clearance width at unit Type C.
Misc
Corrective Action Required
05/27/2016

ICC A117.1-2009 Section 1004.11.3.1.3.3 Shower Compartment. If a shower compartment is the only bathing facility, the shower compartment shall have dimensions of 36 inches minimum in width and 36 inches minimum in depth. A clearance of 48 inches minimum in length, measured perpendicular from the shower head wall, and 30 inches minimum in depth, measured from the face of the shower compartment, shall be provided. Reinforcing for a shower seat is not required in shower compartments larger than 36 inches in width and 36 inches in depth. Action required: Provide minimum shower compartment floor dimensions. Not compliant as scaled.
Misc
Corrective Action Required
05/27/2016

2012 IBC 716.5 Fire door and shutter assemblies. Approved fire door and fire shutter assemblies shall be constructed of any material or assembly of component materials that conforms to the test requirements of Section 716.5.1, 716.5.2 or 716.5.3 and the fire protection rating indicated in Table 716.5. Fire door frames with transom lights, sidelights or both shall be permitted in accordance with Section 716.5.6. Fire door assemblies and shutters shall be installed in accordance with the provisions of this section and the NFPA 80. Action required: Review and update door schedule as concerns minimum fire ratings. Multiple found to be incorrect or missing.
Miscellaneous Correction
Corrective Action Required
05/27/2016

2012 IBC 3002.3 Emergency signs. An approved pictorial sign of a standardized design shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire. The sign shall read: IN CASE OF FIRE, ELEVATORS ARE OUT OF SERVICE. USE EXIT STAIRS. (see code for exceptions) Action required: Comment is for informational purposes. May be field verified.
Engineered truss package
Corrective Action Required
05/27/2016

Copies of the engineered truss package were not provided at the time of permit application. Action required: Provide floor and roof truss packages or request to defer to construction.
Screening - Ground mounted equipment
Corrective Action Required
05/27/2016

Unified Development Ordinance Article 7, Section 7.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened per referenced UDO section.
Miscellaneous Correction
Corrective Action Required
05/27/2016

2012 IPC 918.1 General. (as amended by LSCO 7-412) Section 918.1 is hereby amended to read as follows: Air admittance valve are only allowed when approved by the Administrative Authority. Vent systems utilizing air admittance valves shall comply with this section. Stack-type air admittance valves shall conform to ASSE 1050. Individual- and branch-type air admittance valves shall conform to ASSE 1051. Action required: Modify drawings to show compliance.
Misc 12
Corrective Action Required
05/27/2016

20012 IPC 708.3.4 Base of stack. A cleanout shall be provided at the base of each waste or soil stack. Action required: Modify drawings and/or diagrams to demonstrate compliance.
Misc 13
Corrective Action Required
05/27/2016

2012 IPC 1101.3 Prohibited drainage. (as amended by LSCO 7-414) Storm water shall not be drained into sewers intended for sewage only. Sanitary sewer systems shall be designed, built and maintained in such a manner to prevent all storm or ground water from draining, discharging or entering into the sanitary sewer system. Connection of sump pumps, foundation drains, yard drains, gutter downspouts and any other storm water drainage receptacle(s) or system(s) are specifically prohibited from being connected to the sanitary sewer system. Action required: Re-route elevator sump discharge to approved storm drainage location. Drainage into sanitary sewer is prohibited.
Misc 14
Corrective Action Required
05/27/2016

2011 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 1200 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic bars, pressure plates or other devices that are normally latched but open under simple pressure. Action required: At rooms with large electrical equipment as defined above provide outswinging doors with panic hardware and emergency exit light.
Licensed Contractors Rejected 05/23/2016 05/27/2016
Joe Frogge
LC - MEP Subs
Corrective Action Required
05/27/2016

No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Excerpt from Sec. 7-130, Lees Summit Code of Ordinances. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Multi-Family $48,697.05 $48,697.05 Paid 11/21/2016
8331507-Sewer Connection Fee $3,000.00 $3,000.00 Paid 11/21/2016
8331401-Water Tap Fee $44,134.00 $44,134.00 Paid 11/22/2016
8350015-Water Meter Fee $5,633.46 $5,633.46 Paid 11/22/2016
$5,209.50
9110073-Right of Way Permit Fee $75.00 $75.00 Paid 11/21/2016
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 11/21/2016 11/23/2016
Corrective Action Required
11/23/2016
Corrective Action Required
11/23/2016
Footing Inspection - Commercial Partial 11/23/2016 11/23/2016
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2);
Footing Inspection - Commercial Partial 12/5/2016 12/5/2016 12/05/2016
Misc
Partial Correction
11/23/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (X) CW TO (Y);
Footing Inspection - Commercial Partial 12/6/2016 (1:30) 12/6/2016 12/06/2016
Misc
Partial Correction
12/05/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Footing Inspection - Commercial Partial 12/13/2016 (1:00) 12/13/2016 12/13/2016
Misc
Partial Correction
12/06/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
12/13/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2;
Footing Inspection - Commercial Partial 12/15/2016 (2:00) 12/15/2016 12/15/2016
Misc
Partial Correction
12/13/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
12/13/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3;
Misc
Partial Correction
12/15/2016
OK TO POUR WHEN READY PIT SLAB AT SOUTH ELEVATOR @ F.8/12
Footing Inspection - Commercial Not Ready 12/22/2016 (9:00) 12/22/2016 12/22/2016
Misc
Partial Correction
12/15/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
12/15/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3;
Misc
Partial Correction
12/15/2016
OK TO POUR WHEN READY PIT SLAB AT SOUTH ELEVATOR @ F.8/12
Foundation Inspection - Commercial Partial 12/27/2016 12/27/2016
Misc
Partial Correction
12/27/2016
OK TO POUR WHEN READY PIT WALLS AT SOUTH ELEVATOR @ F.8/11-12
Footing Inspection - Commercial Partial 12/29/2016 (8:00) 12/29/2016 12/29/2016
Misc
Partial Correction
12/22/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
12/22/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3;
Misc
Partial Correction
12/22/2016
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Foundation Inspection - Commercial Partial 12/29/2016 12/29/2016
Misc
Partial Correction
12/27/2016
OK TO POUR WHEN READY PIT WALLS AT SOUTH ELEVATOR @ F.8/11-12
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY FOUNDATION WALL ~8' LONG ON (13) PER SECTION 1/S3.4
Concrete Walls and Columns Inspection Partial 1/6/2017 01/06/2017
Misc
Partial Correction
01/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); CONSULT SPECIAL INSPECTOR RE POSSIBLE CENTERING OF #5 "FLOATING" VERTICAL BARS.
Footing Inspection - Commercial Partial 1/6/2017 (11:00) 1/10/2017 01/10/2017
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY SECTIONS OF SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; AFTER CLEARANCE IS APPROVED BY SPECIAL INSPECTOR OK TO POUR WHEN READY F/6; F/7; F/8; G/5;
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Underslab Electrical Inspection - Commercial Partial 1/11/2017 1/11/2017 01/11/2017
Misc
Partial Correction
01/11/2017
NO ISSUES FOUND ON DEEP UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: TEN 4" PVC SECONDARY ELECTRICAL CONDUITS FROM [A109] SOUTHEAST TO F.2/12.5;
Foundation Inspection - Commercial Partial 1/12/2017 01/12/2017
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY PIT WALLS AT: SOUTH ELEVATOR @ F.8/11-12; NORTH ELEVATOR PIT
Misc
Partial Correction
12/29/2016
OK TO POUR WHEN READY FOUNDATION WALL ~8' LONG ON (13) PER SECTION 1/S3.4
Concrete Walls and Columns Inspection Partial 1/12/2017 01/12/2017
Misc
Partial Correction
01/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); CONSULT SPECIAL INSPECTOR RE POSSIBLE CENTERING OF #5 "FLOATING" VERTICAL BARS.
Misc
Partial Correction
01/12/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/4;
Concrete Walls and Columns Inspection Partial 1/13/2017 01/13/2017
Misc
Partial Correction
01/12/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7);
Misc
Partial Correction
01/12/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/4; F/4; F/5;
Footing Inspection - Commercial Partial 1/18/2017 (1:00) 1/18/2017 01/18/2017
Misc
Partial Correction
01/17/2017
OK TO POUR WHEN READY SECTIONS OF WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
01/17/2017
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10;
Misc
Partial Correction
01/17/2017
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Concrete Walls and Columns Inspection Partial 1/18/2017 01/18/2017
Misc
Partial Correction
01/13/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7);
Misc
Partial Correction
01/13/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/4; F/4; F/5; B/2; B/3; C/1; C/2; F/3.6;
Concrete Walls and Columns Inspection Partial 1/20/2017 01/20/2017
Misc
Partial Correction
01/18/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) TO (X) TO (Y);
Misc
Partial Correction
01/18/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: G/4; F/4; F/5; B/2; B/3; C/1; C/2; F/3.6;
Footing Inspection - Commercial Partial 1/23/2017 (1:00) 1/23/2017 01/23/2017
Misc
Partial Correction
01/18/2017
OK TO POUR WHEN READY SECTIONS OF WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19);
Misc
Partial Correction
01/18/2017
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10; G/6; G/7; G/8; G/9;
Misc
Partial Correction
01/18/2017
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Concrete Walls and Columns Inspection Partial 1/26/2017 01/26/2017
Misc
Partial Correction
01/20/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11);
Misc
Partial Correction
01/20/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Footing Inspection - Commercial Partial 1/26/2017 (8:00) 2/1/2017 02/01/2017
Misc
Partial Correction
01/23/2017
OK TO POUR WHEN READY SECTIONS OF WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19); REMAINING SEGMENTS ADJACENT TO NE & SE CORNERS OF NORTH ELEVATOR PIT SLAB
Misc
Partial Correction
01/23/2017
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10; G/6; G/7; G/8; G/9;
Misc
Partial Correction
01/23/2017
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Concrete Walls and Columns Inspection Partial 2/3/2017 (8:00) 2/3/2017 02/03/2017
Misc
Partial Correction
01/26/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL: ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11); WALLS AT N STAIRWELL, N ELEVATOR SHAFT, SE TO PRINT MARK (12);
Misc
Partial Correction
01/26/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Footing Inspection - Commercial Partial 2/6/2017 02/06/2017
Misc
Partial Correction
02/01/2017
OK TO POUR WHEN READY SECTIONS OF WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19); REMAINING SEGMENTS ADJACENT TO NE & SE CORNERS OF NORTH ELEVATOR PIT SLAB; H/5.3 TO H/6.8;
Misc
Partial Correction
02/01/2017
OK TO POUR WHEN READY ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10; G/6; G/7; G/8; G/9;
Misc
Resolved
02/06/2017
OK TO POUR WHEN READY PIT SLAB AT: SOUTH ELEVATOR @ F.8/12; NORTH ELEVATOR
Concrete Walls and Columns Inspection Partial 2/6/2017 02/06/2017
Misc
Partial Correction
02/03/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL: ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11); WALLS AT N STAIRWELL, N ELEVATOR SHAFT, SE TO PRINT MARK (12); PRINT MARK (8) TO (9);
Misc
Partial Correction
02/03/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Concrete Walls and Columns Inspection Partial 2/10/2017 (8:00) 2/10/2017 02/10/2017
Misc
Partial Correction
02/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL: ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11); WALLS AT N STAIRWELL, N ELEVATOR SHAFT, SE TO PRINT MARK (12); PRINT MARK (8) TO (9); SE TO H/6.8;
Misc
Partial Correction
02/06/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Footing Inspection - Commercial Partial 2/13/2017 (8:00) 2/13/2017 02/13/2017
Misc
Partial Correction
02/06/2017
OK TO POUR WHEN READY SECTIONS OF PARKING GARAGE WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19); REMAINING SEGMENTS ADJACENT TO NE & SE CORNERS OF NORTH ELEVATOR PIT SLAB; H/5.3 TO H/6.8; H/6.8 TO H/7.6 TO COMPLETE PARKING GARAGE PERIMETER
Misc
Partial Correction
02/06/2017
OK TO POUR WHEN READY PARKING GARAGE ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10; G/6; G/7; G/8; G/9;
Concrete Walls and Columns Inspection Partial 2/15/2017 (1:00) 2/15/2017 02/15/2017
Misc
Partial Correction
02/10/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL: ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11); WALLS AT N STAIRWELL, N ELEVATOR SHAFT, SE TO PRINT MARK (12); PRINT MARK (8) TO (9); SE TO H/6.8; H/6.8 TO H/8.2
Misc
Partial Correction
02/10/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Footing Inspection - Commercial Partial 2/21/2017 (1:00) 2/21/2017 02/21/2017
Misc
Resolved
02/21/2017
OK TO POUR WHEN READY SECTIONS OF PARKING GARAGE WALL SPREAD FOOTING BETWEEN POINTS MARKED ON PERMIT PRINTS FOUNDATION PLAN: (1) CCW TO (2); (20) CW TO (19); (3) TO (4) TO (5); (5) TO (6) TO (7) TO (8) TO (9) TO (10) TO (19); REMAINING SEGMENTS ADJACENT TO NE & SE CORNERS OF NORTH ELEVATOR PIT SLAB; H/5.3 TO H/6.8; H/6.8 TO H/7.6 TO COMPLETE PARKING GARAGE PERIMETER
Misc
Resolved
02/21/2017
OK TO POUR WHEN READY PARKING GARAGE ISOLATED FOOTINGS AT FOLLOWING LOCATIONS: C/1; C/2; B/2; B/3; F/6; F/7; F/8; G/5; F/9; F/10; G/10; G/6; G/7; G/8; G/9;
Misc
Partial Correction
02/21/2017
OK TO POUR WHEN READY GRADE BEAM CONNECTOR FROM BLDG "B" NE TOWARD BLDG "A" PARKING GARAGE.
Misc
Partial Correction
02/21/2017
OK TO POUR WHEN READY GRADE BEAM FROM POINT "Z" 334' CCW TO "Y";
Footing Inspection - Commercial Partial 2/22/2017 (10:00) 2/22/2017 02/22/2017
Misc
Partial Correction
02/21/2017
OK TO POUR WHEN READY GRADE BEAM CONNECTOR FROM BLDG "B" NE TOWARD BLDG "A" PARKING GARAGE.
Misc
Partial Correction
02/21/2017
OK TO POUR WHEN READY GRADE BEAM FROM POINT "Z" 334' CCW TO "Y"; FROM "Y" (EXCEPT CONSTR ACCESS) TO "X" AT PARKING GARAGE WALL; GB-1'S ON 2.6 AND 3.0 FROM A.3 WEST ~15'
Misc
Partial Correction
02/22/2017
OK TO POUR WHEN READY ALL ISOLATED FOOTINGS EXCEPT ON F3.0 NW OF (X);
Footing Inspection - Commercial Partial 2/23/2017 02/23/2017
Misc
Partial Correction
02/22/2017
OK TO POUR WHEN READY GRADE BEAM CONNECTOR FROM BLDG "B" NE TOWARD BLDG "A" PARKING GARAGE.
Misc
Partial Correction
02/22/2017
OK TO POUR WHEN READY GRADE BEAM FROM POINT "Z" 334' CCW TO "Y"; FROM "Y", INCLUDING CONSTR ACCESS GAP, TO "X" AT PARKING GARAGE WALL; GB-1'S ON 2.6 AND 3.0 FROM A.3 WEST ~15'
Misc
Partial Correction
02/22/2017
OK TO POUR WHEN READY ALL ISOLATED FOOTINGS INCLUDING F3.0 NW OF (X)
Rough Electrical Inspection - Commercial Passed 3/3/2017 03/03/2017
Suspended Slab Inspection Passed 3/3/2017 03/03/2017
Underslab Plumbing Inspection - Commercial Partial 3/8/2017 3/8/2017 03/08/2017
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/08/2017
1st floor north side.
Underslab Plumbing Inspection - Commercial Partial 3/10/2017 3/10/2017 03/10/2017
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
03/08/2017
1st floor north side. south side ok
Underground Electrical Inspection - Commercial Passed 3/13/2017 03/13/2017
Electrical Service Inspection Partial 3/17/2017 03/17/2017
Misc
Partial Correction
03/17/2017
TEMPORARY ELECTRICAL SERVICE AT BLDG "A" PARKING GARAGE
Rough Electrical Inspection - Commercial Partial 3/31/2017 03/31/2017
Misc
Partial Correction
03/31/2017
OK TO COVER WHEN READY PVC ELECTRICAL CONDUIT TO BE ENCASED IN 30" WIDE CONCRETE SLAB IN-FILL BETWEEN PARKING GARAGE AND APARTMENT BUILDING SLABS POURED EARLIER.
Underslab Electrical Inspection - Commercial Partial 3/31/2017 4/10/2017 04/10/2017
Misc
Partial Correction
03/30/2017
NO ISSUES FOUND ON DEEP UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: TEN 4" PVC SECONDARY ELECTRICAL CONDUITS FROM [A109] SOUTHEAST TO F.2/12.5; TEN 4" PVC SECONDARY ELECTRICAL CONDUIT ACROSS WIDTH OF PARKING GARAGE NEAR (4);
Underslab Plumbing Inspection - Commercial Partial 4/10/2017 4/10/2017 04/10/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
1st floor north side. south side ok
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
OK TO COVER WHEN READY UNDER-SLAB SANITARY WASTE LINES AT PARKING GARAGE COMPLETE AND EXTENDED TO OUTSIDE SW BLDG LINE
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
OK TO COVER WHEN READY UNDER-SLAB STORM DRAIN PIPING FROM (4) SOUTH TO (6.5) AND EXTENDED TO OUTSIDE SW BLDG LINE;
Underslab Plumbing Inspection - Commercial Not Ready 4/11/2017 4/11/2017 04/11/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
1st floor north side. south side ok
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
OK TO COVER WHEN READY UNDER-SLAB SANITARY WASTE LINES AT PARKING GARAGE COMPLETE AND EXTENDED TO OUTSIDE SW BLDG LINE
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/10/2017
OK TO COVER WHEN READY UNDER-SLAB STORM DRAIN PIPING FROM (4) SOUTH TO (6.5) AND EXTENDED TO OUTSIDE SW BLDG LINE;
P3005 DRAINAGE SYSTEM
Corrective Action Required
04/11/2017
PERMIT PRINTS ARE DATED 1/10/16. CONTRACTOR'S WORKING SET IS REVISED THROUGH FEB 2017. NOT APPROVED TO COVER.
Underslab Plumbing Inspection - Commercial Not Ready 4/18/2017 4/18/2017 04/18/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/11/2017
1st floor north side. south side ok
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/11/2017
OK TO COVER WHEN READY UNDER-SLAB SANITARY WASTE LINES AT PARKING GARAGE COMPLETE AND EXTENDED TO OUTSIDE SW BLDG LINE
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/11/2017
OK TO COVER WHEN READY UNDER-SLAB STORM DRAIN PIPING FROM (4) SOUTH TO (6.5) AND EXTENDED TO OUTSIDE SW BLDG LINE;
P3005 DRAINAGE SYSTEM
Corrective Action Required
04/11/2017
4/11/17: PERMIT PRINTS ARE DATED 1/10/16. CONTRACTOR'S WORKING SET IS REVISED THROUGH FEB 2017. NOT APPROVED TO COVER. 4/18/17: COVERED WITHOUT APPROVAL
Underslab Plumbing Inspection - Commercial Partial 4/20/2017 4/20/2017 04/20/2017
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/18/2017
1st floor north side. south side ok
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/18/2017
OK TO COVER WHEN READY UNDER-SLAB SANITARY WASTE LINES AT PARKING GARAGE COMPLETE AND EXTENDED TO OUTSIDE SW BLDG LINE
THE FOLLOWING AREAS ARE APPROVED
Partial Correction
04/18/2017
OK TO COVER WHEN READY UNDER-SLAB STORM DRAIN PIPING COMPLETE
P3005 DRAINAGE SYSTEM
Resolved
04/20/2017
4/11/17: PERMIT PRINTS ARE DATED 1/10/16. CONTRACTOR'S WORKING SET IS REVISED THROUGH FEB 2017. NOT APPROVED TO COVER. 4/18/17: COVERED WITHOUT APPROVAL
Electrical Service Inspection Partial 4/21/2017 04/21/2017
Misc
Partial Correction
03/17/2017
TEMPORARY ELECTRICAL SERVICE AT BLDG "A" PARKING GARAGE
Misc
Partial Correction
04/21/2017
GROUND ROD FOUND DRIVEN WITH UFER GROUND JUMPER CONNECTED, TO BE EXTENDED TO GEAR AFTER POUR OF FLOOR SLAB
Underslab Electrical Inspection - Commercial Partial 4/25/2017 4/25/2017 04/25/2017
Misc
Partial Correction
04/10/2017
NO ISSUES FOUND ON DEEP UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: TEN 4" PVC SECONDARY ELECTRICAL CONDUITS FROM [A109] SOUTHEAST TO F.2/12.5; TEN 4" PVC SECONDARY ELECTRICAL CONDUIT ACROSS WIDTH OF PARKING GARAGE NEAR (4);
Misc
Partial Correction
04/25/2017
NO ISSUES FOUND ON PVC BRANCH CIRCUIT CONDUITS INSTALLED AND LEFT VISIBLE FOR INSPECTION AT SLAB SUBGRADE ELEVATION. COMPLETION OF SWEEPS AND CONNECTIONS IN PROGRESS AT ELECTRICAL ROOM.
All Rough Inspection - Commercial Partial 6/14/2017 6/15/2017 06/14/2017
Misc
Partial Correction
06/14/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER EXCEPT SE 10' OF SW WALL; FIRE-BLOCK HORIZONTAL AT TOP PLATE AND CALL FOR RE-INSPECTION
All Rough Inspection - Commercial Partial 6/19/2017 06/19/2017
Misc
Partial Correction
06/14/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Rated Assembly Inspection Partial 6/29/2017 06/29/2017
Misc
Partial Correction
06/29/2017
OK TO TAP, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK;
Concrete Walls and Columns Inspection Passed 7/10/2017 07/10/2017
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY C.I.P. CONCRETE WALL: ON (0.0) FROM (A.7) TO (C.6); TO PRINT MARK (5) TO (6) TO (7); FROM PRINT MARK (7) CCW TO (X) TO (Y); FROM PRINT MARK (4) CW TO (11); WALLS AT N STAIRWELL, N ELEVATOR SHAFT, SE TO PRINT MARK (12); PRINT MARK (8) TO (9); SE TO H/6.8; H/6.8 TO H/8.2
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY C.I.P. CONCRETE COLUMNS @ FOLLOWING LOCATIONS: B/2; B/3; C/1; C/2; F/3.6; F/4; F/5; F/6; F/7; F/8; F/9; F/10; G/4; G/5; G/6; G/7; G/8; G/9; G/10
Footing Inspection - Commercial Passed 2/23/2017 07/10/2017
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY GRADE BEAM CONNECTOR FROM BLDG "B" NE TOWARD BLDG "A" PARKING GARAGE.
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY GRADE BEAM FROM POINT "Z" 334' CCW TO "Y"; FROM "Y", INCLUDING CONSTR ACCESS GAP, TO "X" AT PARKING GARAGE WALL; GB-1'S ON 2.6 AND 3.0 FROM A.3 WEST ~15'
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY ALL ISOLATED FOOTINGS INCLUDING F3.0 NW OF (X)
Foundation Inspection - Commercial Passed 1/12/2017 07/10/2017
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY PIT WALLS AT: SOUTH ELEVATOR @ F.8/11-12; NORTH ELEVATOR PIT
Misc
Resolved
07/10/2017
OK TO POUR WHEN READY FOUNDATION WALL ~8' LONG ON (13) PER SECTION 1/S3.4
Rough Framing Inspection - Commercial Not Ready 7/11/2017 07/11/2017
Misc
Corrective Action Required
07/11/2017
EXTERIOR WALL SHEATHING NOT FLUSH NAILED.
Rough Framing Inspection - Commercial Partial 7/17/2017 07/17/2017
Misc
Partial Correction
07/17/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: 1ST LEVEL;
Rough Framing Inspection - Commercial Partial 7/21/2017 7/21/2017 07/21/2017
Misc
Partial Correction
07/17/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: 2ND FLOOR; 3RD FLOOR;
Rough Framing Inspection - Commercial Partial 7/25/2017 7/25/2017 07/25/2017
Misc
Partial Correction
07/21/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR
Rough Framing Inspection - Commercial Failed 7/28/2017 07/28/2017
Misc
Partial Correction
07/25/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING:
Rough Framing Inspection - Commercial Failed 8/3/2017 8/3/2017 08/03/2017
Misc
Partial Correction
07/28/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; 3RD FLOOR NOT APPROVED
Rough Framing Inspection - Commercial Failed 8/8/2017 08/08/2017
Misc
Corrective Action Required
08/08/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; 3RD FLOOR NOT APPROVED
Rough Framing Inspection - Commercial Partial 8/10/2017 8/10/2017 08/10/2017
Misc
Partial Correction
08/10/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; [3RD FLOOR;
Rough Framing Inspection - Commercial Partial 8/11/2017 8/11/2017 08/11/2017
Misc
Partial Correction
08/10/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; 3RD FLOOR; [4TH FLOOR
Rough Framing Inspection - Commercial Partial 8/15/2017 8/15/2017 at 10:55 AM 08/15/2017
Misc
Partial Correction
08/11/2017
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR; [5TH FLOOR
All Rough Inspection - Commercial Not Ready 7/11/2017 8/15/2017 at 11:40 AM 08/15/2017
Misc
Partial Correction
06/19/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Corrective Action Required
08/15/2017
2ND FLOOR UNITS: 203; 204; 232; 233 NOT APPROVED TO COVER - FASTEN SILL PLATES PER DRAWINGS - FASTEN DOUBLE, TRIPLE AND PACKED STUDS PER DRAWINGS - INSTALL STUD SHOES WHERE REQUIRED FOR PLUMBING BORES - INSTALL BOCA PLATES WHERE REQUIRED BY IPC
All Rough Inspection - Commercial Partial 8/16/2017 8/16/2017 at 3:50 PM 08/16/2017
Misc
Partial Correction
08/15/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR;
Misc
Partial Correction
08/16/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233;
Rated Assembly Inspection Partial 7/28/2017 8/18/2017 at 10:15 AM 08/18/2017
Misc
Partial Correction
06/29/2017
OK TO TAP, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK;
Misc
Partial Correction
08/18/2017
OK TO TAPE, MUD, SIRE-STOP AND COVER PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233;
Rated Assembly Inspection Partial 8/22/2017 8/22/2017 at 11:20 AM 08/22/2017
Misc
Partial Correction
08/18/2017
OK TO TAP, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK;
Misc
Partial Correction
08/18/2017
OK TO TAPE, MUD, SIRE-STOP AND COVER PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233;
Misc
Partial Correction
08/22/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELL AT: 203; 204; 232;
All Rough Inspection - Commercial Partial 8/22/2017 8/22/2017 at 10:40 AM 08/22/2017
Misc
Partial Correction
08/16/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; [CORR 305;
Misc
Partial Correction
08/16/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; [3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; [OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
All Rough Inspection - Commercial Partial 8/24/2017 at 2:25 PM 08/24/2017
Misc
Partial Correction
08/22/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
08/22/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; [4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Rated Assembly Inspection Partial 8/25/2017 8/24/2017 at 2:35 PM 08/24/2017
Misc
Partial Correction
08/22/2017
OK TO TAP, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK;
Misc
Partial Correction
08/22/2017
OK TO TAPE, MUD, SIRE-STOP AND COVER PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433;
Misc
Partial Correction
08/22/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELL AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433;
All Rough Inspection - Commercial Partial 8/25/2017 at 7:45 AM 08/25/2017
Misc
Partial Correction
08/24/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
08/24/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; [4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
08/25/2017
[FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: [201; 301; 401; 234; 334; 434;
Rated Assembly Inspection Partial 8/25/2017 at 8:20 AM 08/25/2017
Misc
Partial Correction
08/24/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; [CORR 205 WALLS + LID; CORR 305 LID ONLY;
Misc
Partial Correction
08/24/2017
OK TO TAPE, MUD, FIRE-STOP AND COVER PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433;
Misc
Partial Correction
08/24/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; [303; 304; 332;
Rated Assembly Inspection Partial 8/29/2017 8/29/2017 at 3:15 PM 08/29/2017
Misc
Partial Correction
08/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; [CORR A-305 LID & WALLS; UNITS [203; 204; 232; 233;
Misc
Partial Correction
08/25/2017
OK TO TAPE, MUD, FIRE-STOP AND COVER PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433;
Misc
Partial Correction
08/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; [303; 304; 332;
Rated Assembly Inspection Partial 8/31/2017 8/31/2017 at 3:25 PM 08/31/2017
Misc
Partial Correction
08/29/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; [CORR 405; UNITS 203; 204; 232; 233;
Misc
Partial Correction
08/29/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433; [201; 234; 301; 334; 401; 434;
Misc
Partial Correction
08/29/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; 303; 304; 332;
All Rough Inspection - Commercial Partial 8/31/2017 at 3:45 PM 08/31/2017
Misc
Partial Correction
08/25/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
08/25/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
08/25/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; [217; 218; 221; 222; 225; 226; 227; 228;
Rated Assembly Inspection Partial 9/1/2017 9/1/2017 at 2:00 PM 09/01/2017
Misc
Partial Correction
08/31/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; [CORR 405; UNITS 203; 204; 232; 233;
Misc
Partial Correction
08/31/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433; 201; 234; 301; 334; 401; 434; [201; 234;
Misc
Partial Correction
08/31/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; 303; 304; 332;
All Rough Inspection - Commercial Partial 9/1/2017 at 2:25 PM 09/01/2017
Misc
Partial Correction
08/31/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
08/31/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
08/31/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; [217; 218; 221; 222; 225; 226; 227; 228; [217; 218;
Rated Assembly Inspection Partial 9/6/2017 9/6/2017 at 10:35 AM 09/06/2017
Misc
Partial Correction
09/01/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; [CORR 405; UNITS 203; 204; 232; 233;
Misc
Partial Correction
09/01/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433; 201; 234; 301; 334; 401; 434; 201; 234; [217; 218; 221; 222; 225; 226; 227; 228;
Misc
Partial Correction
09/01/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; 303; 304; 332;
All Rough Inspection - Commercial Partial 9/6/2017 at 11:00 AM 09/06/2017
Misc
Partial Correction
09/01/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
09/01/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; [NORTH WALL AT 216; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/01/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; [217; 218; 221; 222; 225; 226; 227; 228; [217; 218;
Gas Piping Inspection - Commercial Partial 9/6/2017 at 10:00 AM 09/06/2017
Misc
Partial Correction
09/06/2017
TRENCHED FEEDER PIPE FROM SITE DISTRIBUTION LINE TO BLDG "A" OK TO COVER WHEN READY. PRESSURE TEST HALD STEADY AT >100 PSI FOR > 20 MINUTES. NO ISSUES ON VISUAL INSPECTION.
Misc
Corrective Action Required
09/06/2017
INTERIOR GAS PIPING PRESSURE TEST: GAUGE RANGE EXCEEDS 5X 15 PSI TEST PRESSURE
Rated Assembly Inspection Partial 9/7/2017 at 2:00 PM 09/07/2017
Misc
Partial Correction
09/06/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; UNITS: 203; 204; 232; 233; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433;
Misc
Partial Correction
09/06/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 203; 204; 232; 233; 303; 304; 332; 333; 403; 404; 432; 433; 201; 234; 301; 334; 401; 434; 201; 234; [217; 218; 221; 222; 225; 226; 227; 228;
Misc
Resolved
09/07/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB ABOVE CEILING AT BACKSIDE OF STAIRWELLS AT: 203; 204; 232; 303; 304; 332; 333; 403; 404; 432; 433; 303; 304; 332;
Gas Piping Inspection - Commercial Partial 9/8/2017 9/8/2017 at 11:45 AM 09/08/2017
Misc
Partial Correction
09/06/2017
TRENCHED FEEDER PIPE FROM SITE DISTRIBUTION LINE TO BLDG "A" OK TO COVER WHEN READY. PRESSURE TEST HALD STEADY AT >100 PSI FOR > 20 MINUTES. NO ISSUES ON VISUAL INSPECTION.
Misc
Corrective Action Required
09/06/2017
INTERIOR GAS PIPING PRESSURE TEST: GAUGE RANGE EXCEEDS 5X 15 PSI TEST PRESSURE
Gas Piping Inspection - Commercial Partial 9/8/2017 at 2:55 PM 09/08/2017
Misc
Partial Correction
09/08/2017
TRENCHED FEEDER PIPE FROM SITE DISTRIBUTION LINE TO BLDG "A" OK TO COVER WHEN READY. PRESSURE TEST HALD STEADY AT >100 PSI FOR > 20 MINUTES. NO ISSUES ON VISUAL INSPECTION.
Misc
Partial Correction
09/08/2017
INTERIOR GAS PIPING PRESSURE TEST HELD STEADY FOR >60 MINUTES AT ~30 PSI.
All Rough Inspection - Commercial Partial 9/12/2017 9/12/2017 at 1:55 PM 09/12/2017
Misc
Partial Correction
09/06/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4;
Misc
Partial Correction
09/06/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; [217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/06/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; [217; 218; 221; 222; 225; 226; 227; 228; 217; 218;
All Rough Inspection - Commercial Partial 9/13/2017 9/13/2017 at 1:25 PM 09/13/2017
Misc
Partial Correction
09/12/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; [CORR 219;
Misc
Partial Correction
09/12/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; [221*; 222*; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/12/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; 217; 218; 221; 222; 225; 226; 227; 228; 217; 218; [318; 321; 322; 325; 326; 327; 328; 418; 421; 422; 425; 426; 427; 428;
All Rough Inspection - Commercial Partial 9/15/2017 9/15/2017 at 8:40 AM 09/15/2017
Misc
Partial Correction
09/13/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/13/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; [226*; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/13/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; 217; 218; 221; 222; 225; 226; 227; 228; 217; 218; 318; 321; 322; 325; 326; 327; 328; 418; 421; 422; 425; 426; 427; 428;
All Rough Inspection - Commercial Partial 9/18/2017 9/18/2017 at 8:00 AM 09/18/2017
Misc
Partial Correction
09/15/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/15/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; [225*; 227*; 228* AFTER HOLD-DOWN INSTALLATION IS APPROVED BY 3RD PARTY INSPECTOR]; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/15/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 301; 401; 234; 334; 434; 217; 218; 221; 222; 225; 226; 227; 228; 217; 218; 318; 321; 322; 325; 326; 327; 328; 418; 421; 422; 425; 426; 427; 428;
Rated Assembly Inspection Partial 9/18/2017 9/18/2017 at 8:55 AM 09/18/2017
Misc
Partial Correction
09/07/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; UNITS: 203; 204; 232; 233; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT STAIRWELL WALL AT: [201; 222;
Misc
Partial Correction
09/07/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 332; 333; 334; [318; 321; 322; 325; 326; 327; 328; 401; 403; 404; 432; 433; 434; [418; 421; 422; 425; 427; 428;
Rated Assembly Inspection Partial 9/19/2017 9/19/2017 at 9:20 AM 09/19/2017
Misc
Partial Correction
09/18/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; UNITS: 203; 204; 232; 233; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT STAIRWELL WALL AT: 201; 222;
Misc
Partial Correction
09/18/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 418; 421; 422; 425; 427; 428; 432; 433; 434; [426;
All Rough Inspection - Commercial Partial 9/19/2017 9/19/2017 at 8:50 AM 09/19/2017
Misc
Partial Correction
09/18/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/18/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; [228*; *AFTER HOLD-DOWN INSTALLATION IS APPROVED BY 3RD PARTY INSPECTOR]; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/18/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 217; 218; 221; 222; 225; 226; 227; 228; 234; [206; 208; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
All Rough Inspection - Commercial Partial 9/20/2017 9/20/2017 at 3:50 PM 09/20/2017
Misc
Partial Correction
09/19/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/19/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; 228*; [208; *AFTER HOLD-DOWN INSTALLATION IS APPROVED BY 3RD PARTY INSPECTOR]; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/19/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 217; 218; 221; 222; 225; 226; 227; 228; 234; [206; 208; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
Rated Assembly Inspection Partial 9/20/2017 at 4:00 PM 09/20/2017
Misc
Partial Correction
09/19/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; UNITS: 203; 204; 232; 233; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT STAIRWELL WALL AT: 201; 222;
Misc
Partial Correction
09/19/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 418; 421; 422; 425; 427; 428; 432; 433; 434; [426;
All Rough Inspection - Commercial Partial 9/22/2017 9/22/2017 at 3:00 PM 09/22/2017
Misc
Partial Correction
09/20/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/20/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 208; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; 228*; [201; 234; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/20/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 217; 218; 221; 222; 225; 226; 227; 228; 234; [206; 208; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
All Rough Inspection - Commercial Partial 9/27/2017 9/27/2017 at 2:00 PM 09/27/2017
Misc
Partial Correction
09/22/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/22/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 208; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; 228*; [201; 234; A207; A209; A219; ROOMS 232; 229 *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/22/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 217; 218; 221; 222; 225; 226; 227; 228; 234; [206; 208; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
All Rough Inspection - Commercial Partial 10/5/2017 10/9/2017 at 12:20 PM 10/09/2017
Misc
Partial Correction
09/27/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
09/27/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS/SPACES: 203; 204; 208; 232; 233; NORTH WALL AT 216; 217*; 218*; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; 228*; 201; 234; A207; A209; A219; ROOMS 232; 229; [212; 213; 214; 216; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+ 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Misc
Partial Correction
09/27/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
Rated Assembly Inspection Partial 10/9/2017 10/9/2017 at 12:45 PM 10/09/2017
Misc
Partial Correction
09/20/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; UNITS: 203; 204; 232; 233; [217; 218; 221; 222; 225; 226; 227; 228; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT STAIRWELL WALL AT: 201; 222;
Misc
Partial Correction
09/20/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 418; 421; 422; 425; 427; 428; 432; 433; 434; [426;
All Rough Inspection - Commercial Partial 10/11/2017 10/11/2017 at 7:45 AM 10/11/2017
Misc
Partial Correction
10/09/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
10/09/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [108; 109; 2ND FLOOR UNITS/SPACES: 203; 204; 208; 212; 213; 214; 216; 217*; 218*; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 226*; 225*; 227*; 228*; 201; 234; A207; A209; A219; 232; 229; [224; 3RD FLOOR UNITS/SPACES: UNITS 303, 304, 332, 333; [301; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/09/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
All Rough Inspection - Commercial Partial 10/12/2017 10/12/2017 at 11:10 AM 10/12/2017
Misc
Partial Correction
10/11/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219;
Misc
Partial Correction
10/11/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 332, 333; 334; [322; 326; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/11/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; 401; 418; 421; 422; 425; 426; 427; 428; 434;
Rated Assembly Inspection Partial 10/12/2017 10/12/2017 at 11:55 AM 10/12/2017
Misc
Partial Correction
10/09/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; UNITS: 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; [201; 234; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT STAIRWELL WALL AT: 201; 222;
Misc
Partial Correction
10/09/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434;
All Rough Inspection - Commercial Partial 10/13/2017 10/13/2017 at 8:20 AM 10/13/2017
Misc
Partial Correction
10/12/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/12/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/12/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
All Rough Inspection - Commercial Partial 10/17/2017 at 10:05 AM 10/17/2017
Misc
Partial Correction
10/13/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/13/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; [ 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 325; 326; 332, 333; 334; [306; 308; 318; 321; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/13/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Rated Assembly Inspection Partial 10/13/2017 10/17/2017 at 11:00 AM 10/17/2017
Misc
Partial Correction
10/12/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; UNITS: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; [301; 322;
Misc
Partial Correction
10/12/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; [206; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; [306; 308; 401; 403; 404; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; [406; 408;
Rated Assembly Inspection Partial 10/18/2017 at 4:00 PM 10/18/2017
Misc
Partial Correction
10/17/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; UNITS: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; [206;
Misc
Partial Correction
10/17/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; [206; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; [306; 308; 401; 403; 404; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; [406; 408;
All Rough Inspection - Commercial Partial 10/18/2017 at 4:25 PM 10/18/2017
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 307/319;
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 318; 321; 322; 325; 326; 332, 333; 334; [307; 309; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
All Rough Inspection - Commercial Partial 10/19/2017 10/19/2017 at 2:50 PM 10/19/2017
Misc
Partial Correction
10/18/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319;
Misc
Partial Correction
10/18/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; [206; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 318; 321; 322; 325; 326; 332, 333; 334; [327; 328; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/18/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 306; 308; 318; 321; 322; 325; 326; 327; 328; 334; 401; 406; 408; 418; 421; 422; 425; 426; 427; 428; 434; 506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Rated Assembly Inspection Partial 10/19/2017 10/19/2017 at 3:25 PM 10/19/2017
Misc
Partial Correction
10/18/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; [CORR 207; LOBBY 205; CORR 219; LOBBY 224; UNITS: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; [209; 210; 212; 229; 231; UNITS: 303; 304; 332; 333; UNITS: 403; 404; 432; 433; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Partial Correction
10/18/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; [206; 301; 303; 304; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; [306; 308; 401; 403; 404; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; [406; 408;
All Rough Inspection - Commercial Partial 10/23/2017 at 3:05 PM 10/23/2017
Misc
Partial Correction
10/19/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; [LOBBY 409;
Misc
Partial Correction
10/19/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 318; 321; 322; 325; 326; 327; 328; 332, 333; 334; [310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 329; 331; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; [406; 408; 417/418; 421; 422; 425; 426; 427; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Resolved
10/23/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 306; 308; 318; 321; 322; 325; 326; 327; 328; 334; 401; 406; 408; 418; 421; 422; 425; 426; 427; 428; 434; 506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Rated Assembly Inspection Partial 10/23/2017 at 4:30 PM 10/23/2017
Misc
Partial Correction
10/19/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; UNITS/ROOMS: 201; 203; 204; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 303; 304; 332; 333; [301; 334; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Partial Correction
10/19/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 206; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 306; 308; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 406; 408; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; [506; 508; 517/518; 520; 521; 522; 525; 526; 527;
Above Ceiling Inspection Partial 10/19/2017 10/23/2017 at 5:05 PM 10/23/2017
Misc
Resolved
10/23/2017
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
WALLS AND CEILING AT LINK CORRIDOR A111 OK TO COVER;
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Resolved
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 2ND FLOOR UNITS: 203; 204; 232; 233
Misc
Partial Correction
10/23/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Rated Assembly Inspection Partial 10/25/2017 10/25/2017 at 10:55 AM 10/25/2017
Misc
Partial Correction
10/23/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; [LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 303; 304; 332; 333; 301; 334; [322; 325; 326; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Partial Correction
10/23/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 206; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 306; 308; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 406; 408; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; 506; 508; 517/518; 520; 521; 522; 525; 526; 527;
Rated Assembly Inspection Partial 10/26/2017 10/26/2017 at 2:55 PM 10/26/2017
Misc
Partial Correction
10/25/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; [LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 303; 304; 332; 333; 301; 334; [322; 325; 326; [308; 321; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Partial Correction
10/25/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 206; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 306; 308; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 406; 408; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; 506; 508; 517/518; 520; 521; 522; 525; 526; 527;
All Rough Inspection - Commercial Partial 10/27/2017 10/27/2017 at 2:35 PM 10/27/2017
Misc
Partial Correction
10/23/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409;
Misc
Partial Correction
10/23/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 417/418; 421; 422; 425; 426; 427; 432; 433; [428; 431; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Rated Assembly Inspection Partial 10/27/2017 10/27/2017 at 2:55 PM 10/27/2017
Misc
Partial Correction
10/26/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; [206; UNITS/ROOMS: 303; 304; 308; 321; 322; 325; 326; 332; 333; 301; 334; [306; 328; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Resolved
10/27/2017
OK TO TAPE, MUD, AND FIRE-STOP PRE-ROCK AT SHOWERS/TUBS AT: 201; 203; 204; 206; 217; 218; 221; 222; 225; 226; 227; 228; 232; 233; 234; 301; 303; 304; 306; 308; 318; 321; 322; 325; 326; 327; 328; 332; 333; 334; 401; 403; 404; 406; 408; 418; 421; 422; 425; 426; 427; 428; 432; 433; 434; 506; 508; 517/518; 520; 521; 522; 525; 526; 527;
Rated Assembly Inspection Partial 10/31/2017 10/31/2017 at 9:35 AM 10/31/2017
Misc
Partial Correction
10/27/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 303; 304; 306; 308; 321; 322; 325; 326; 328; 332; 333; 301; 334; [310; 312; 313 EXCLUDING CHASE; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
All Rough Inspection - Commercial Partial 11/1/2017 at 3:30 PM 11/01/2017
Misc
Partial Correction
10/27/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; [CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL;
Misc
Partial Correction
10/27/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; [410; 412; 413; 414; 416; 434; 5TH FLOOR UNITS/SPACES: [522 EXCLUDING S WALL; 525; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Rated Assembly Inspection Partial 11/1/2017 at 4:30 PM 11/01/2017
Misc
Partial Correction
10/31/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 303; 304; 306; 308; 321; 322; 325; 326; 328; 332; 333; 301; 334; [310; 312; 313 EXCLUDING CHASE; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS: ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206;
Misc
Partial Correction
11/01/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS;
All Rough Inspection - Commercial Partial 11/3/2017 11/3/2017 at 9:50 AM 11/03/2017
Misc
Partial Correction
11/01/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL;
Misc
Partial Correction
11/01/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 416; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; 434; [415; 429; 5TH FLOOR UNITS/SPACES: 522 EXCLUDING S WALL; 525; [521; 526; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Rated Assembly Inspection Partial 11/3/2017 11/3/2017 at 10:35 AM 11/03/2017
Misc
Partial Correction
11/01/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 432; 433; UNITS/ROOMS:
Misc
Partial Correction
11/01/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; [401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/6/2017 11/6/2017 at 8:40 AM 11/06/2017
Misc
Partial Correction
11/03/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL;
Misc
Partial Correction
11/03/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 416; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; 434; [415; 429; (corridor-407,409,419) 5TH FLOOR UNITS/SPACES: 522 EXCLUDING S WALL; 525; [521; 526; 527 (corridor -507,509,519.) OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
All Rough Inspection - Commercial Partial 11/8/2017 11/8/2017 at 8:20 AM 11/08/2017
Misc
Partial Correction
11/06/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; [CORR 419 @ WINDOWS SHEATHING & RC CHANNEL OK TO COVER;
Misc
Partial Correction
11/06/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; [401; 5TH FLOOR UNITS/SPACES: 521; 522 EXCLUDING S WALL; 525; 526; 527; [508; 528; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Rated Assembly Inspection Partial 11/8/2017 11/8/2017 at 9:05 AM 11/08/2017
Misc
Partial Correction
11/03/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 432; 433; [417/418; 421; 422; 425; 426; 427; UNITS/ROOMS: 5...
Misc
Partial Correction
11/03/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/9/2017 11/9/2017 at 1:15 PM 11/09/2017
Misc
Partial Correction
11/08/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; [CORR 419 @ WINDOWS SHEATHING & RC CHANNEL OK TO COVER;
Misc
Partial Correction
11/08/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; 5TH FLOOR UNITS/SPACES: 508; 521; 522 EXCLUDING S WALL; 525; 526; 527; 528; [506; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
All Rough Inspection - Commercial Partial 11/10/2017 at 10:15 AM 11/10/2017
Misc
Partial Correction
11/09/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; [LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/09/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; [TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508; 521; 522 EXCLUDING S WALL; 525; 526; 527; 528; [514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332;
Rated Assembly Inspection Partial 11/10/2017 at 11:25 AM 11/10/2017
Misc
Partial Correction
11/08/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 417/418; 421; 422; 425; 426; 427; 432; 433; [406; 408; 428; 431; UNITS/ROOMS: 5...
Misc
Partial Correction
11/08/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/13/2017 11/13/2017 at 3:25 PM 11/13/2017
Misc
Partial Correction
11/10/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; [LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/10/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; [413 AT CHASE; 5TH FLOOR UNITS/SPACES: 506; 508; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 521; 522 EXCLUDING S WALL; 525; 526; 527; 528; [513;
Rated Assembly Inspection Partial 11/13/2017 11/13/2017 at 3:35 PM 11/13/2017
Misc
Partial Correction
11/10/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 403; 404; 406; 408; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; [401; 410; 412; 413 1ST LAYER; 415; 416; 434; UNITS/ROOMS: 5...
Misc
Partial Correction
11/10/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/15/2017 11/15/2017 at 10:35 AM 11/15/2017
Misc
Partial Correction
11/13/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/13/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 521; 522; 525; 526; 527; 528; [510; 512; 513; 517/518;
Rated Assembly Inspection Partial 11/15/2017 11/15/2017 at 11:20 AM 11/15/2017
Misc
Partial Correction
11/13/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; [CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; [213 CHASE 1ST LAYER; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; [313 CHASE 1ST LAYER; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; 434; [429; UNITS/ROOMS: [CHASE AT 513 1ST LAYER; 522 ABOVE CEILING AT S WALL;
Misc
Partial Correction
11/13/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Failed 11/16/2017 11/16/2017 at 11:25 AM 11/16/2017
Misc
Partial Correction
11/15/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/15/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 521; 522; 525; 526; 527; 528; [510; 512; 513; 517/518;
Rated Assembly Inspection Partial 11/16/2017 11/16/2017 at 11:35 AM 11/16/2017
Misc
Partial Correction
11/15/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; [LOBBY 424; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; [213 CHASE 1ST LAYER; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; [313 CHASE 1ST LAYER; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 431; 432; 433; 434; [429; UNITS/ROOMS: [CHASE AT 513 1ST LAYER; 522 ABOVE CEILING AT S WALL;
Misc
Partial Correction
11/15/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/20/2017 11/20/2017 at 10:10 AM 11/20/2017
Misc
Partial Correction
11/16/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/16/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 525; 526; 527; 528; [524;
Rated Assembly Inspection Partial 11/20/2017 11/20/2017 at 10:30 AM 11/20/2017
Misc
Partial Correction
11/16/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; [LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: CHASE AT 513 1ST LAYER; 522 ABOVE CEILING AT S WALL; [508 INCL "ATTIC" LEVEL; 521; 522; 525 ; 526; 527;
Misc
Partial Correction
11/16/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
Above Ceiling Inspection Partial 11/21/2017 at 11:10 AM 11/21/2017
Misc
Partial Correction
10/23/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: [TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219;
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Rated Assembly Inspection Partial 11/21/2017 11/21/2017 at 11:30 AM 11/21/2017
Misc
Partial Correction
11/20/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; [LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: 508 INCL "ATTIC" LEVEL; CHASE AT 513 1ST LAYER; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; [506; 510; 512; 513 INCL 2ND LAYER AT CHASE; 514; 515; 516; 517/518; 528;
Misc
Partial Correction
11/20/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
Rated Assembly Inspection Partial 11/22/2017 at 9:40 AM 11/22/2017
Misc
Partial Correction
11/21/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; [LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; [CORR 507; CORR 519; LOBBY 509; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: 508 INCL "ATTIC" LEVEL; CHASE AT 513 1ST LAYER; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; [506; 510; 512; 513 INCL 2ND LAYER AT CHASE; 514; 515; 516; 517/518; 528;
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
Above Ceiling Inspection Partial 11/22/2017 at 10:00 AM 11/22/2017
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY GWB CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; [TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319;
Misc
Partial Correction
11/21/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Rated Assembly Inspection Partial 11/27/2017 11/27/2017 at 2:10 PM 11/27/2017
Misc
Partial Correction
11/22/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; [224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; [213 CHASE 2ND LAYER AT REAR WALL; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; [313 CHASE 2ND LAYER AT REAR WALL; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; [413 CHASE 2ND LAYER AT REAR WALL; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528; [513 CHASE 2ND LAYER AT REAR WALL;
Misc
Partial Correction
11/22/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422;
All Rough Inspection - Commercial Partial 11/27/2017 11/27/2017 at 2:55 PM 11/27/2017
Misc
Partial Correction
11/20/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/20/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104; 105; 107; 108; 109; TO BE ADDRESSED BY A/E BEFORE WALLS ARE CLOSED.] 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 524; 525; 526; 527; 528;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AND WALLS AT STAIRWELLS: [STAIRWELL @2;
Rated Assembly Inspection Partial 11/28/2017 11/29/2017 at 11:10 AM 11/29/2017
Misc
Partial Correction
11/27/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; [2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: [#1; #2; #3 PARTIAL;
All Rough Inspection - Commercial Partial 12/1/2017 at 3:20 PM 12/01/2017
Misc
Partial Correction
11/27/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: [WOOD FRAMING AT 104, 105, 107, 108, 109 FIRE-PROTECTED & INSPECTED BY 3RD PARTY INSPECTOR 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 524; 525; 526; 527; 528;
Misc
Partial Correction
11/27/2017
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AND WALLS AT STAIRWELLS: STAIRWELL #2; [STAIRWELL #3;
Rated Assembly Inspection Partial 12/1/2017 at 3:35 PM 12/01/2017
Misc
Partial Correction
11/29/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; [FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528;
Misc
Partial Correction
11/29/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: [#1 COMPLETE; #2 & #3 PARTIAL;
Above Ceiling Inspection Partial 12/1/2017 at 2:55 PM 12/01/2017
Misc
Partial Correction
11/22/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; [UNITS 201, 234, 301, 334;
Misc
Partial Correction
11/22/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Above Ceiling Inspection Partial 12/5/2017 at 1:25 PM 12/05/2017
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; [PERIM SOFFIT @ 229; PERIM SOFFIT @ 429;
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Rated Assembly Inspection Partial 12/5/2017 12/5/2017 at 1:45 PM 12/05/2017
Misc
Partial Correction
12/01/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; [1ST LAYER 5/8" TYPE X AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528;
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: #1 COMPLETE; #2 & #3 PARTIAL; [STAIRWELL #2 FULL HEIGHT;
Above Ceiling Inspection Partial 12/6/2017 at 2:20 PM 12/06/2017
Misc
Partial Correction
12/05/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; [SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519;
Misc
Partial Correction
12/05/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
All Rough Inspection - Commercial Partial 12/12/2017 12/12/2017 at 2:20 PM 12/07/2017
Misc
Partial Correction
12/01/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE; [CORR 207; LOBBY 209;
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: WOOD FRAMING AT 104, 105, 107, 108, 109 FIRE-PROTECTED; INSPECTED BY 3RD PARTY INSPECTOR 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 524; 525; 526; 527; 528;
Misc
Partial Correction
12/01/2017
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AND WALLS AT STAIRWELLS: STAIRWELL #2; STAIRWELL #3; OK TO COVER WHEN READY [FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AT EAST ELEVATOR SHAFT;
Electrical Service Inspection Passed 12/7/2017 at 2:35 PM 12/07/2017
Misc
Resolved
12/07/2017
TEMPORARY ELECTRICAL SERVICE AT BLDG "A" PARKING GARAGE
Misc
Resolved
12/07/2017
GROUND ROD FOUND DRIVEN WITH UFER GROUND JUMPER CONNECTED, TO BE EXTENDED TO GEAR AFTER POUR OF FLOOR SLAB
Above Ceiling Inspection Partial 12/7/2017 at 1:45 PM 12/07/2017
Misc
Partial Correction
12/06/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; [SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
12/06/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4';
Rated Assembly Inspection Partial 12/12/2017 12/12/2017 at 7:15 AM 12/12/2017
Misc
Partial Correction
12/05/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; [1ST LAYER 5/8" TYPE X AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; [213 CHASE FRAMING & LINER BOARD AT FRONT WALL; 216 CHASE FRAMING & LINER BOARD AT FRONT WALLS; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; [313 CHASE FRAMING & LINER BOARD AT FRONT WALL; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; [413 CHASE FRAMING & LINER BOARD AT FRONT WALL; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528; [513 CHASE FRAMING & LINER BOARD AT FRONT WALL;
Misc
Partial Correction
12/05/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: #1 COMPLETE; #2 & #3 PARTIAL; STAIRWELL #2 FULL HEIGHT; [STAIRWELL #3 FULL HEIGHT;
Misc
Partial Correction
12/12/2017
RATED ASSEMBLY AT ELEVATOR SHAFT LIDS: ELEVATOR #1: [FRAMING + SHAFT LINER BOARD; ELEVATOR #2: [FRAMING + SHAFT LINER BOARD;
In-wall Inspection Partial 9/7/2017 12/12/2017 at 7:50 AM 12/12/2017
Misc
Partial Correction
12/12/2017
OK TO COVER WHEN READY FRAMING AND IN-WALL SYSTEMS AT: [102; 112; 113 (L.G. STEEL FRAME WITH WOOD DOOR BUCKS TREATED WITH APPROVED FIRE-RESISTANT SPRAY);
Rated Assembly Inspection Partial 12/13/2017 at 1:10 PM 12/13/2017
Misc
Partial Correction
12/12/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; 1ST LAYER 5/8" TYPE X AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; 213 CHASE FRAMING & LINER BOARD AT FRONT WALL; 216 CHASE FRAMING & LINER BOARD AT FRONT WALLS; [213 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; 216 CHASE 1ST LAYER 5/8" TYPE X AT TWO FRONT WALLS; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; 313 CHASE FRAMING & LINER BOARD AT FRONT WALL; [313 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 413 CHASE FRAMING & LINER BOARD AT FRONT WALL; [413 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528; 513 CHASE FRAMING & LINER BOARD AT FRONT WALL; [513 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL;
Misc
Partial Correction
12/12/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: #1 COMPLETE; #2 & #3 PARTIAL; STAIRWELL #2 FULL HEIGHT; [STAIRWELL #3 FULL HEIGHT;
Misc
Partial Correction
12/12/2017
RATED ASSEMBLY AT ELEVATOR SHAFT LIDS: ELEVATOR #1: [FRAMING + SHAFT LINER BOARD; [1ST LAYER 5/8" TYPE X ELEVATOR #2: [FRAMING + SHAFT LINER BOARD;
Rated Assembly Inspection Partial 12/14/2017 12/14/2017 at 11:25 AM 12/14/2017
Misc
Partial Correction
12/13/2017
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; 1ST LAYER 5/8" TYPE X AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; 213 CHASE FRAMING & LINER BOARD AT FRONT WALL; 216 CHASE FRAMING & LINER BOARD AT FRONT WALLS; 213 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; 216 CHASE 1ST LAYER 5/8" TYPE X AT TWO FRONT WALLS; [213 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; 216 CHASE 2ND LAYER 5/8" TYPE X AT TWO FRONT WALLS; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; 313 CHASE FRAMING & LINER BOARD AT FRONT WALL; 313 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [313 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 413 CHASE FRAMING & LINER BOARD AT FRONT WALL; 413 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [413 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528; 513 CHASE FRAMING & LINER BOARD AT FRONT WALL; 513 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [513 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL;
Misc
Resolved
12/14/2017
OK TO COVER WHEN READY COMPONENTS OF RATED ASSEMBLIES AT STAIRWELLS: STAIR 103/202/302/402: FRAMING & ENCLOSED SYSTEMS AT WELL FACE EXCEPT AT ATTIC ACCESS; ABOVE CEILING AT BACKSIDE OF STAIRWELL WALL AT: 201; 222; 301; 322; 206; 401; 405/431; 406; 408; 422; ONE LAYER 5/8" TYPE X AT WELL FACE AT STAIRWELLS: #1 COMPLETE; #2 & #3 PARTIAL; STAIRWELL #2 FULL HEIGHT; STAIRWELL #3 FULL HEIGHT;
Misc
Partial Correction
12/13/2017
RATED ASSEMBLY AT ELEVATOR SHAFT LIDS: ELEVATOR #1: FRAMING + SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X; [2ND LAYER 5/8" TYPE X ELEVATOR #2: FRAMING + SHAFT LINER BOARD; [1ST LAYER 5/8" TYPE X; 2ND LAYER 5/8" TYPE X
All Rough Inspection - Commercial Partial 12/21/2017 12/21/2017 at 3:40 PM 12/21/2017
Misc
Partial Correction
12/07/2017
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE; [CORR 207; LOBBY 209;
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: WOOD FRAMING AT 104, 105, 107, 108, 109 FIRE-PROTECTED; INSPECTED BY 3RD PARTY INSPECTOR 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 524; 525; 526; 527; 528;
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AND WALLS AT STAIRWELLS: STAIRWELL #2; STAIRWELL #3; OK TO COVER WHEN READY [FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AT EAST ELEVATOR SHAFT; LOBBY 107 APPROVED
Above Ceiling Inspection Partial 12/28/2017 at 11:10 AM 12/28/2017
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
12/07/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219;
Above Ceiling Inspection Partial 12/29/2017 at 11:15 AM 12/29/2017
Misc
Partial Correction
12/28/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
12/28/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; [3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY;
Above Ceiling Inspection Not Ready 1/2/2018 1/2/2018 at 10:50 AM 01/02/2018
Misc
Partial Correction
12/29/2017
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
12/29/2017
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; [3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY;
Above Ceiling Inspection Partial 1/3/2018 1/3/2018 at 7:45 AM 01/03/2018
Misc
Partial Correction
01/02/2018
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
01/02/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; 3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY; [ELEVATOR LOBBY 324;
Above Ceiling Inspection Partial 1/4/2018 1/4/2018 at 10:55 AM 01/04/2018
Misc
Partial Correction
01/03/2018
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
01/03/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; 3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY; ELEVATOR LOBBY 324; [RM 229; ELEVATOR LOBBY 224;
Above Ceiling Inspection Not Ready 1/5/2018 1/5/2018 at 3:00 PM 01/05/2018
Misc
Partial Correction
01/04/2018
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
01/04/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; 3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY; ELEVATOR LOBBY 324; [RM 229; ELEVATOR LOBBY 224;
Above Ceiling Inspection Partial 1/8/2018 at 3:00 PM 01/08/2018
Misc
Partial Correction
01/05/2018
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
01/05/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; 3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY; ELEVATOR LOBBY 324; RM 229; ELEVATOR LOBBY 224; [CORR 405; CORR 407; CORR 409; CORR 419; LOBBY 424; LOUNGE 424;
Above Ceiling Inspection Partial 1/9/2018 1/9/2018 at 1:30 PM 01/09/2018
Misc
Resolved
01/09/2018
OK TO COVER WHEN READY GWB DROP CEILING / SOFFIT / BULKHEAD FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: TWO SOFFITS @ CORR 205; THREE SOFFITS @ CORR 219; TWO SOFFITS @ CORR 305; THREE SOFFITS @ CORR 319; UNITS 201, 234, 301, 334; PERIM SOFFIT @ 229; PERIM SOFFIT @ 429; SOFFITS AT 307/309, 407/409 & 507/509; PERIMETER SOFFIT AT 329; SOFFITS AT CORR 519; SOFFITS AT LOBBIES 224, 324, 424, 524;
Misc
Partial Correction
01/08/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS @ FOLLOWING SPACES: LINK CORRIDOR A111 EXCEPT N 4'; CORRIDORS 205, 207, 219; 3RD FLOOR CORRIDORS & CENTRAL ELEVATOR LOBBY; ELEVATOR LOBBY 324; RM 229; ELEVATOR LOBBY 224; CORR 405; CORR 407; CORR 409; CORR 419; LOBBY 424; LOUNGE 424; [209; 239; 329; 507; 509; 519; 524;
Above Ceiling Inspection Partial 1/10/2018 at 2:20 PM 01/10/2018
Misc
Partial Correction
01/09/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT FOR 1ST (PARKING GARAGE) LEVEL
Miscellaneous Inspection Partial 1/11/2018 at 8:25 AM 01/11/2018
Sprinkler - Hydrostatic Test Passed 1/11/2018 01/11/2018
Miscellaneous Inspection Partial 1/12/2018 at 2:35 PM 01/12/2018
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
10/17/2017
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Above Ceiling Inspection Passed 1/16/2018 1/16/2018 at 2:25 PM 01/16/2018
Misc
Resolved
01/16/2018
OK TO COVER WHEN READY ACT CEILING FRAMING + ABOVE-CEILING SYSTEMS THROUGHOUT EXCEPT FOR 1ST (PARKING GARAGE) LEVEL
Miscellaneous Inspection Partial 1/16/2018 at 3:05 PM 01/16/2018
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/12/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/12/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/12/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Miscellaneous Inspection Partial 1/18/2018 at 1:50 PM 01/18/2018
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/16/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/16/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/16/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Miscellaneous Inspection Partial 1/19/2018 at 7:10 AM 01/19/2018
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/18/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/18/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/18/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Sprinkler - Flow Test Passed 1/22/2018 01/22/2018
Alarm Test Partial 1/22/2018 01/22/2018
All Rough Inspection - Commercial Passed 12/21/2017 01/22/2018
Misc
Resolved
01/22/2018
OK TO COVER CORRIDOR/LOBBY WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; CORR 307/319; LOBBY 409; CORR 507 SHEATHING & RC CHANNEL; CORR 519 SHEATHING & RC CHANNEL; CORR 419 @ WINDOWS OK TO SHEATH & APPLY RC CHANNEL; CORR 407/409/419; CORR 507/509/519; CORR 419 @ WINDOWS SHEATHING & RC CHANNEL; LOBBIES 324 & 424 AFTER FIRE-BLOCKING IS COMPLETE; [CORR 207; LOBBY 209;
Misc
Resolved
01/22/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: WOOD FRAMING AT 104, 105, 107, 108, 109 FIRE-PROTECTED; INSPECTED BY 3RD PARTY INSPECTOR 2ND FLOOR UNITS/SPACES: 201; 203; 204; 206; 207; 208; 209; 212; 213; 214; 216; 217; 218; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221; 222; 224; 225; 226; 227; 228; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 306; 308; 307; 309; 310; 312; 313 EXCLUDING SHAFT; 314; 315; 316; 318; 321; 322; 325; 326; 327; 328; 329; 331; 332, 333; 334; 4TH FLOOR UNITS/SPACES: 403; 404; 406; 408; 410; 412; 413; 413 AT CHASE; 414; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 401; TRUSS REPAIR @ 408; 5TH FLOOR UNITS/SPACES: 506; 508;510; 512; 513; 514; 515; 516(WALL SHEATHING + RC CHANNEL NOT INCLUDED); 517/518; 521; 522; 524; 525; 526; 527; 528;
Misc
Resolved
01/22/2018
OK TO COVER WHEN READY FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AND WALLS AT STAIRWELLS: STAIRWELL #2; STAIRWELL #3; OK TO COVER WHEN READY [FRAMING & SYSTEMS TO BE CONCEALED AT CEILING AT EAST ELEVATOR SHAFT; LOBBY 107 APPROVED
Gas Piping Inspection - Commercial Passed 9/8/2017 01/22/2018
Misc
Resolved
01/22/2018
TRENCHED FEEDER PIPE FROM SITE DISTRIBUTION LINE TO BLDG "A" OK TO COVER WHEN READY. PRESSURE TEST HALD STEADY AT >100 PSI FOR > 20 MINUTES. NO ISSUES ON VISUAL INSPECTION.
Misc
Resolved
01/22/2018
INTERIOR GAS PIPING PRESSURE TEST HELD STEADY FOR >60 MINUTES AT ~30 PSI.
In-wall Inspection Passed 12/12/2017 01/22/2018
Misc
Resolved
01/22/2018
OK TO COVER WHEN READY FRAMING AND IN-WALL SYSTEMS AT: [102; 112; 113 (L.G. STEEL FRAME WITH WOOD DOOR BUCKS TREATED WITH APPROVED FIRE-RESISTANT SPRAY);
Miscellaneous Inspection Passed 1/22/2018 at 3:25 PM 01/22/2018
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Misc
Partial Correction
01/19/2018
OK TO COVER CORRIDOR WALLS AND CEILINGS AT: LINK CORRIDOR A111; NW CORRIDOR; CORR 305; CORR LVL 4; CORR 219; [CORR 319;
Misc
Partial Correction
01/19/2018
OK TO COVER WHEN READY WALL AND CEILING FRAMING + SYSTEMS TO BE ENCLOSED AT: 1ST FLOOR SPACES: 108; 109; 2ND FLOOR UNITS/SPACES: 201; 203; 204; 207; 208; 209; 212; 213; 214; 216; 217*; 218*; 219; 232; 233; ABOVE CEILING AT STAIRWELL COMMON WALL AT 201 & 222; 221*; 222*; 224; 225*; 226*; 227*; 228*; 229; 232; 234; 3RD FLOOR UNITS/SPACES: 301; 303, 304, 322; 326; 332, 333; 334; [325; 4TH FLOOR UNITS/SPACES: 403; 404; 432; 433; OK FOR 5/8" TYPE X GWB AT WALL ABOVE CEILING AT BACKSIDE OF STAIRWELL AT 303, 304, 332; *: FLOORS TO BE CORED FOR PLUMBING CORRECTIONS AT SHOWER PANS+
Misc
Partial Correction
01/19/2018
FRAMING & ENCLOSED SYSTEMS OK TO COVER AT SHOWER/TUB PRE-ROCK LOCATIONS AT: 201; 206; 208; 217; 218; 221; 222; 225; 226; 227; 228; 234; 301; 318; 321; 322; 325; 326; 327; 328; 334; [306; 308; 401; 418; 421; 422; 425; 426; 427; 428; 434; [406; 408; [506; 508; 517/518; 521; 522; 525; 526; 527; 528;
Rated Assembly Inspection Passed 12/14/2017 01/22/2018
Misc
Resolved
01/22/2018
OK TO TAPE, MUD AND FIRE-STOP 5/8" TYPE X GWB AT CEILING AND WALLS AT: LINK CORRIDOR A111 SOUTH 36' + "B"-TO-COMMONS LINK; CORR 205 WALLS + LID; CORR A-305 LID & WALLS; CORR 405; CORR 219; CORR 207; LOBBY 205; CORR 219; LOBBY 224; LOBBY 309; CORR 305 S; CORR 307; CORR 319; CORR 405; CORR 419; CORR 407; LOBBY 409; ELEV LOBBY 324 1ST LAYER; LOBBY 424 EXCEPT CHASE; 524 INCL "ATTIC" LEVEL; CORR 507; CORR 519; LOBBY 509; 224 SE & SW CORNERS ONE LAYER; 324 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 424 CHASES AT SE & SW CORNERS 1ST LAYER; 2ND LAYER 5/8" TYPE X AT TWO INNER WALLS AT SE & SW CORNER CHASES AT 524, 424, 324, 424; FRAMING + SHAFT LINER AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; 1ST LAYER 5/8" TYPE X AT TWO OUTER WALLS AT SE & SW CORNER CHASES AT 524, 424; 324, 224; UNITS/ROOMS: 201; 203; 204; 206; 209; 210; 212; 213 CHASE 1ST LAYER; 213 CHASE 2ND LAYER AT REAR WALL; 217; 218; 221; 222; 225; 226; 227; 228; 229; 231; 232; 233; 234; 213 CHASE FRAMING & LINER BOARD AT FRONT WALL; 216 CHASE FRAMING & LINER BOARD AT FRONT WALLS; 213 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; 216 CHASE 1ST LAYER 5/8" TYPE X AT TWO FRONT WALLS; [213 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; 216 CHASE 2ND LAYER 5/8" TYPE X AT TWO FRONT WALLS; UNITS/ROOMS: 301; 303; 304; 306; 308; 310; 312; 313 EXCLUDING CHASE; 313 CHASE 1ST LAYER; 313 CHASE 2ND LAYER AT REAR WALL; 321; 322; 325; 326; 328; 332; 333; 334; 314; 315 EXCLUDING CHASE; 316; 317/318; 327; 329; 331; 313 CHASE FRAMING & LINER BOARD AT FRONT WALL; 313 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [313 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 401; 403; 404; 406; 408; 410; 412; 413 1ST LAYER; 413 CHASE 2ND LAYER AT REAR WALL; 415; 416; 417/418; 421; 422; 425; 426; 427; 428; 429; 431; 432; 433; 434; 413 CHASE FRAMING & LINER BOARD AT FRONT WALL; 413 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [413 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL; UNITS/ROOMS: 506; 508 INCL "ATTIC" LEVEL; 510; 512; CHASE AT 513 1ST LAYER; 513 INCL 2ND LAYER AT CHASE; 513 CHASE 2ND LAYER AT REAR WALL; 514; 515; 516; 517/518; 521; 522 ABOVE CEILING AT S WALL; 522; 525 ; 526; 527; 528; 513 CHASE FRAMING & LINER BOARD AT FRONT WALL; 513 CHASE 1ST LAYER 5/8" TYPE X AT FRONT WALL; [513 CHASE 2ND LAYER 5/8" TYPE X AT FRONT WALL;
Misc
Resolved
01/22/2018
RATED ASSEMBLY AT ELEVATOR SHAFT LIDS: ELEVATOR #1: FRAMING + SHAFT LINER BOARD; 1ST LAYER 5/8" TYPE X; [2ND LAYER 5/8" TYPE X ELEVATOR #2: FRAMING + SHAFT LINER BOARD; [1ST LAYER 5/8" TYPE X; 2ND LAYER 5/8" TYPE X
Rough Electrical Inspection - Commercial Passed 1/22/2018 3/31/2017 01/22/2018
Misc
Resolved
01/22/2018
OK TO COVER WHEN READY PVC ELECTRICAL CONDUIT TO BE ENCASED IN 30" WIDE CONCRETE SLAB IN-FILL BETWEEN PARKING GARAGE AND APARTMENT BUILDING SLABS POURED EARLIER.
Rough Framing Inspection - Commercial Passed 10/18/2017 8/15/2017 01/22/2018
Misc
Resolved
01/22/2018
OK TO COVER EXTERIOR WALL SHEATHING WHEN READY AT: NW WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR SE WING: 2ND FLOOR; 3RD FLOOR; 4TH FLOOR; [5TH FLOOR
Underslab Electrical Inspection - Commercial Passed 4/25/2017 01/22/2018
Misc
Resolved
06/30/2017
NO ISSUES FOUND ON DEEP UNDER-SLAB ELECTRICAL CONDUIT MATERIAL & WORKMANSHIP: TEN 4" PVC SECONDARY ELECTRICAL CONDUITS FROM [A109] SOUTHEAST TO F.2/12.5; TEN 4" PVC SECONDARY ELECTRICAL CONDUIT ACROSS WIDTH OF PARKING GARAGE NEAR (4);
Misc
Resolved
06/30/2017
NO ISSUES FOUND ON PVC BRANCH CIRCUIT CONDUITS INSTALLED AND LEFT VISIBLE FOR INSPECTION AT SLAB SUBGRADE ELEVATION. COMPLETION OF SWEEPS AND CONNECTIONS IN PROGRESS AT ELECTRICAL ROOM.
Underslab Plumbing Inspection - Commercial Passed 4/20/2017 01/22/2018
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/30/2017
1st floor north side. south side ok
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/30/2017
OK TO COVER WHEN READY UNDER-SLAB SANITARY WASTE LINES AT PARKING GARAGE COMPLETE AND EXTENDED TO OUTSIDE SW BLDG LINE
THE FOLLOWING AREAS ARE APPROVED
Resolved
06/30/2017
OK TO COVER WHEN READY UNDER-SLAB STORM DRAIN PIPING COMPLETE
Occupancy Inspection - Codes Commercial Not Ready 1/23/2018 1/23/2018 at 7:30 AM 01/23/2018
Occupancy Inspection - Planning Temporary C of O 01/23/2018
Corrective Action Required
01/23/2018
Complete building exterior per the approved architectural drawings.
Occupancy Inspection - Fire Temporary C of O 1/23/2018 01/23/2018
Alarm Test Passed 1/23/2018 01/23/2018
Occupancy Inspection - Codes Commercial Temporary C of O 1/23/2018 at 12:25 PM 01/23/2018
Misc
Corrective Action Required
01/23/2018
FIRE DEPARTMENT ISSUES TO BE RESOLVED NLT 1/29.
Misc
Corrective Action Required
01/23/2018
AREAS/COMPONENTS YET TO BE INSPECTED INCLUDE BUT ARE NOT NECESSARILY LIMITED TO: - ATTIC - STAIRWELLS - ELECTRICAL ROOMS & EQUIPMENT - PARKING GARAGE - BUILDING EXTERIOR - SITEWORK
Occupancy Inspection - Codes Commercial Partial 1/25/2018 at 2:40 PM 01/25/2018
Misc
Corrective Action Required
01/23/2018
FIRE DEPARTMENT ISSUES TO BE RESOLVED NLT 1/29.
Misc
Corrective Action Required
01/23/2018
AREAS/COMPONENTS YET TO BE INSPECTED INCLUDE BUT ARE NOT NECESSARILY LIMITED TO: - PARKING GARAGE - BUILDING EXTERIOR - SITEWORK
Occupancy Inspection - Codes Commercial Temporary C of O 2/5/2018 at 4:00 PM 02/05/2018
Misc
Corrective Action Required
01/25/2018
FIRE DEPARTMENT ISSUES TO BE RESOLVED NLT 1/29.
Misc
Corrective Action Required
01/25/2018
AREAS/COMPONENTS YET TO BE INSPECTED/RE-INSPECTED INCLUDE BUT ARE NOT NECESSARILY LIMITED TO: - PARKING GARAGE: LOOSE RECEPTS; EXT WALL PENS;.. - BUILDING EXTERIOR - SITEWORK
Occupancy Inspection - Codes Commercial Temporary C of O 2/15/2018 at 3:00 PM 02/21/2018
Misc
Corrective Action Required
02/05/2018
FIRE DEPARTMENT ISSUES TO BE RESOLVED NLT 3/8
Misc
Corrective Action Required
02/05/2018
AREAS/COMPONENTS YET TO BE INSPECTED/RE-INSPECTED INCLUDE BUT ARE NOT NECESSARILY LIMITED TO: - PARKING GARAGE: LOOSE RECEPTS; EXT WALL PENS;.. - BUILDING EXTERIOR - SITEWORK
Occupancy Inspection - Codes Commercial Not Ready 3/9/2018 at 4:00 PM 03/09/2018
Misc
Corrective Action Required
02/21/2018
FIRE DEPARTMENT ISSUES TO BE RESOLVED NLT 3/8
Misc
Corrective Action Required
02/21/2018
AREAS/COMPONENTS YET TO BE INSPECTED/RE-INSPECTED INCLUDE BUT ARE NOT NECESSARILY LIMITED TO: - PARKING GARAGE: LOOSE RECEPTS; EXT WALL PENS;.. - BUILDING EXTERIOR - SITEWORK
Occupancy Inspection - Codes Commercial Partial 3/12/2018 at 8:45 AM 03/12/2018
Misc
Corrective Action Required
03/09/2018
CODES ISSUES: - PARKING GARAGE: LOOSE RECEPTS - TEST EXTERIOR RECEPTACLES - CUT SANITARY CLEANOUT RISERS TO GRADE; CAP - UNFINISHED MASONRY AT EAST ELEVATION? - SEAL EXTERIOR WALL PENETRATIONS - PAINT EXPOSED STEEL GAS PIPE - SECURE CONDENSER ELECTRICAL WHIPS TO WALL - EROSION CONTROL REQUIRED AT DOWNSPOUTS -
Misc
Corrective Action Required
03/09/2018
- DEPARTMENT ISSUES TO BE RESOLVED: - WATER UTILITIES - FIRE DEPARTMENT - FIELD ENGINEERING - PLANNING
Occupancy Inspection - Codes Commercial Temporary C of O 3/13/2018 at 8:40 AM 03/13/2018
Misc
Corrective Action Required
03/12/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SPACE UNDER EAST WALL OF A-B LINK? - CUT SANITARY CLEANOUT RISERS TO GRADE; CAP - UNFINISHED MASONRY AT EXTERIOR WALLS - SPLASH BLOCKS OR EQUIVALENT EROSION CONTROL REQUIRED AT BOTTOMS OF DOWNSPOUTS - REPAIR/REPLACE DAMAGED SHROUDS AT BASES OF LIGHT POLES; CLOSE WIRING ACCESS OPENINGS - SEAL ALL PENETRATIONS OF BLDG EXTERIOR WALLS - PAINT EXPOSED STEEL GAS PIPE - SECURE CONDENSER ELECTRICAL WHIPS TO WALLS WITHIN 12" OF DISCONNECTS AND WHERE NEEDED TO PREVENT GROUND CONTACT.
Misc
Corrective Action Required
03/12/2018
CODES ISSUES WITHIN PARKING GARAGE: - LOOSE RECEPT EAST OF DOOR A107A - ENSURE ALL OPENINGS IN SUSPENDED CONCRETE DECK ABOVE ARE FIRE-STOPPED
Corrective Action Required
03/13/2018
OTHER DEPARTMENT ISSUES TO BE RESOLVED: - FIRE DEPARTMENT - FIELD ENGINEERING - PLANNING
Occupancy Inspection - Codes Commercial Partial 3/14/2018 at 9:45 AM 03/14/2018
Misc
Corrective Action Required
03/13/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SPACE UNDER EAST WALL OF A-B LINK? - CUT SANITARY CLEANOUT RISERS TO GRADE; CAP - UNFINISHED MASONRY AT EXTERIOR WALLS - SPLASH BLOCKS OR EQUIVALENT EROSION CONTROL REQUIRED AT BOTTOMS OF DOWNSPOUTS - REPAIR/REPLACE DAMAGED SHROUDS AT BASES OF LIGHT POLES; CLOSE WIRING ACCESS OPENINGS - SEAL ALL PENETRATIONS OF BLDG EXTERIOR WALLS - PAINT EXPOSED STEEL GAS PIPE - SECURE CONDENSER ELECTRICAL WHIPS TO WALLS WITHIN 12" OF DISCONNECTS AND WHERE NEEDED TO PREVENT GROUND CONTACT.
Occupancy Inspection - Fire Temporary C of O 4/2/2018 04/02/2018
Alarm Test Passed 4/2/2018 04/02/2018
Occupancy Inspection - Codes Commercial Partial 4/2/2018 at 9:05 AM 04/02/2018
Misc
Corrective Action Required
03/14/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - CUT SANITARY CLEANOUT RISERS TO GRADE; CAP - UNFINISHED SIDING & TRIM AT EXTERIOR WALLS - SPLASH BLOCKS OR EQUIVALENT EROSION CONTROL REQUIRED AT BOTTOMS OF DOWNSPOUTS - REPAIR/REPLACE DAMAGED SHROUDS AT BASES OF LIGHT POLES; CLOSE WIRING ACCESS OPENINGS
Occupancy Inspection - Codes Commercial Temporary C of O 4/3/2018 at 2:40 PM 04/03/2018
Misc
Corrective Action Required
04/02/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL OPENINGS/PENETRATIONS @ EXTERIOR WALLS - CUT SANITARY CLEANOUT RISERS TO GRADE; CAP - UNFINISHED SIDING & TRIM AT EXTERIOR WALLS - SPLASH BLOCKS OR EQUIVALENT EROSION CONTROL REQUIRED AT BOTTOMS OF DOWNSPOUTS - REPAIR/REPLACE DAMAGED SHROUDS AT BASES OF LIGHT POLES; CLOSE WIRING ACCESS OPENINGS
Miscellaneous Correction
Corrective Action Required
04/03/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL PLANNING
Occupancy Inspection - Codes Commercial Partial 4/26/2018 4/3/2018 04/24/2018
Misc
Corrective Action Required
04/03/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - CLAMP LIQUIDTIGHT ELECTRIC WHIPS TO WALL AT ALL GROUND-MOUNTED CONDENSERS; EXAMPLE AT BLDG A SOUTH WING SW CORNER - SEAL OPENINGS/PENETRATIONS @ EXTERIOR WALLS; EXAMPLE AT GAS LINE ENTRY - CUT ALL SANITARY CLEANOUT RISERS TO GRADE, INCLUDING N OF BLDG "B" AND AT GRASS AREA WEST OF BUILDINGS; TERMNATE WITH THREADED CAPS - SPLASH BLOCKS OR EQUIVALENT EROSION CONTROL REQUIRED AT BOTTOMS OF DOWNSPOUTS - CHECK EDGE GUARD AT PATIO ABOVE GARAGE DOORS; WEST SECTION MAY NOT BE SECURED; TOP RAIL APPEARS TO BE DISCONTINUOUS - IS FOUNDATION WALL WATERPROOFING COMPLETE? SHEET MEMBRANE APPEARS TO BE PEELING OFF AT EAST ELEVATION
Miscellaneous Correction
Corrective Action Required
04/03/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL PLANNING
Occupancy Inspection - Codes Commercial Temporary C of O 4/26/2018 at 2:15 PM 04/26/2018
Misc
Corrective Action Required
04/24/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL OPENINGS/PENETRATIONS @ EXTERIOR WALLS; EXAMPLE AT GAS LINE ENTRY
Miscellaneous Correction
Corrective Action Required
04/24/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL PLANNING
Occupancy Inspection - Planning Passed 4/26/2018 05/01/2018
Occupancy Inspection - Codes Commercial Partial 5/1/2018 at 2:10 PM 05/01/2018
Misc
Corrective Action Required
04/26/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL OPENINGS/PENETRATIONS @ EXTERIOR WALLS; EXAMPLE AT GAS LINE ENTRY - LOWER G.C.O.s TO FINISH GRADE - SECURE ELECT WHIP TO WALL AT GROUND-MOUNTED UNIT AT SW CORNER OF 201 - GUARD AT EDGE OF PATIO ABOVE GARAGE DOORS -- SECURE?
Miscellaneous Correction
Corrective Action Required
04/26/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL PLANNING
Occupancy Inspection - Codes Commercial Partial 5/2/2018 at 8:55 AM 05/02/2018
Misc
Corrective Action Required
05/01/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL PENETRATIONS OF EXTERIOR WALL: ABOVE GAS ENTRY - LOWER G.C.O.s TO FINISH GRADE - SECURE ELECT WHIP TO WALL AT GROUND-MOUNTED UNIT AT SW CORNER OF 201 - GUARD AT EDGE OF PATIO ABOVE GARAGE DOORS -- TOP RAIL DISCONTINUOUS - PLACE SPLASH BLOCKS AT ALL DOWNSPOUTS NOT PIPED TO STORM DRAIN
Miscellaneous Correction
Corrective Action Required
05/01/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL PLANNING
Occupancy Inspection - Codes Commercial Partial 5/8/2018 at 9:15 AM 05/08/2018
Misc
Corrective Action Required
05/02/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL PENETRATIONS OF EXTERIOR WALL: ABOVE GAS ENTRY - LOWER G.C.O.s TO FINISH GRADE - SECURE ELECT WHIP TO WALL AT GROUND-MOUNTED UNIT AT SW CORNER OF 201 - GUARD AT EDGE OF PATIO ABOVE GARAGE DOORS -- TOP RAIL DISCONTINUOUS - PLACE SPLASH BLOCKS AT ALL DOWNSPOUTS NOT PIPED TO STORM DRAIN
Miscellaneous Correction
Corrective Action Required
05/02/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL
Investigation Inspection Complete 5/8/2018 05/08/2018
Occupancy Inspection - Codes Commercial Partial 5/11/2018 at 11:10 AM 05/11/2018
Misc
Corrective Action Required
05/08/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL PENETRATIONS OF EXTERIOR WALL: ABOVE GAS ENTRY - LOWER G.C.O.s TO FINISH GRADE - SECURE ELECT WHIP TO WALL AT GROUND-MOUNTED UNIT AT SW CORNER OF 201 - GUARD AT EDGE OF PATIO ABOVE GARAGE DOORS -- TOP RAIL DISCONTINUOUS - PLACE SPLASH BLOCKS AT ALL DOWNSPOUTS NOT PIPED TO STORM DRAIN
Miscellaneous Correction
Corrective Action Required
05/08/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD CIVIL
Occupancy Inspection - Codes Commercial Temporary C of O 5/15/2018 at 2:15 PM 05/15/2018
Misc
Resolved
05/15/2018
CODES ISSUES AT BUILDING EXTERIOR & SITE: - SEAL PENETRATIONS OF EXTERIOR WALL: ABOVE GAS ENTRY - LOWER G.C.O.s TO FINISH GRADE - SECURE ELECT WHIP TO WALL AT GROUND-MOUNTED UNIT AT SW CORNER OF 201 - GUARD AT EDGE OF PATIO ABOVE GARAGE DOORS -- TOP RAIL DISCONTINUOUS - PLACE SPLASH BLOCKS AT ALL DOWNSPOUTS NOT PIPED TO STORM DRAIN
Miscellaneous Correction
Corrective Action Required
05/11/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD
Occupancy Inspection - Codes Commercial Partial 6/18/2018 at 11:10 AM 06/18/2018
Miscellaneous Correction
Corrective Action Required
05/15/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE
Occupancy Inspection - Codes Commercial Partial 6/20/2018 at 10:15 AM 06/20/2018
Miscellaneous Correction
Partial Correction
06/20/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Partial 6/21/2018 at 10:40 AM 06/21/2018
Miscellaneous Correction
Partial Correction
06/20/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Not Ready 6/25/2018 at 9:05 AM 06/25/2018
Miscellaneous Correction
Partial Correction
06/21/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Partial 6/27/2018 at 3:25 PM 06/27/2018
Miscellaneous Correction
Partial Correction
06/25/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Partial 6/28/2018 at 10:50 AM 06/28/2018
Miscellaneous Correction
Partial Correction
06/27/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Water Service Inspection Passed 07/02/2018
Occupancy Inspection - Codes Commercial Partial 7/9/2018 at 3:35 PM 07/09/2018
Miscellaneous Correction
Partial Correction
06/28/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Partial 7/12/2018 at 10:50 AM 07/12/2018
Miscellaneous Correction
Partial Correction
07/09/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Codes Commercial Partial 7/19/2018 at 3:05 PM 07/19/2018
Miscellaneous Correction
Partial Correction
07/12/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Occupancy Inspection - Fire Passed 7/30/2018 07/30/2018
Occupancy Inspection - Codes Commercial Full C of O 7/30/2018 07/30/2018
Miscellaneous Correction
Resolved
07/30/2018
OTHER DEPARTMENTS DIVISIONS TO APPROVE: LSFD: 6/18: FOUND FD-REQUIRED CURB BEING INSTALLED AT FIRE LANE; 6/20: CURB COMPLETED AT WEST SIDE OF FIRE LANE, NORTH END STARTED AT EAST SIDE;
Driveway Inspection Passed 07/31/2018
Sewer Service Inspection Passed 07/31/2018
Miscellaneous Inspection Passed 8/6/2018 at 8:10 AM 08/06/2018
Boiler State Inspection Complete 2/6/2017 (1:00) 10/04/2018
Misc
Partial Correction
01/12/2017
OK TO POUR WHEN READY PIT WALLS AT: SOUTH ELEVATOR @ F.8/11-12; NORTH ELEVATOR PIT
Misc
Partial Correction
01/12/2017
OK TO POUR WHEN READY FOUNDATION WALL ~8' LONG ON (13) PER SECTION 1/S3.4
Documents & Images
Date Uploaded File Type Document Name
06/03/2016 Letter Codes P/R Corrections Document
11/22/2016 Receipt Receipt for transaction: 2016-006927
12/22/2016 Letter Inspection Summary
12/29/2016 Letter Inspection Summary
01/06/2017 Letter Inspection Summary
01/10/2017 Letter Inspection Summary
01/13/2017 Letter Inspection Summary
01/20/2017 Letter Inspection Summary
02/03/2017 Letter Inspection Summary
02/10/2017 Letter Inspection Summary
02/21/2017 Letter Inspection Summary
02/23/2017 Letter Inspection Summary
03/03/2017 Letter Inspection Summary
03/08/2017 Letter Inspection Summary
03/17/2017 Letter Inspection Summary
03/31/2017 Letter Inspection Summary
03/13/2017 Letter Inspection Summary
03/10/2017 Letter Inspection Summary
04/20/2017 Letter Inspection Summary
04/21/2017 Letter Fire (Sprinkler) Plan Review
02/22/2017 Letter Inspection Summary
02/15/2017 Letter Inspection Summary
02/13/2017 Letter Inspection Summary
06/14/2017 Letter Inspection Summary
02/06/2017 Letter Inspection Summary
02/01/2017 Letter Inspection Summary
01/26/2017 Letter Inspection Summary
01/23/2017 Letter Inspection Summary
01/18/2017 Letter Inspection Summary
01/12/2017 Letter Inspection Summary
01/11/2017 Letter Inspection Summary
12/27/2016 Letter Inspection Summary
12/15/2016 Letter Inspection Summary
12/13/2016 Letter Inspection Summary
08/11/2017 Letter Inspection Summary
12/06/2016 Letter Inspection Summary
12/05/2016 Letter Inspection Summary
08/18/2017 Letter Inspection Summary
11/23/2016 Letter Inspection Summary
11/21/2016 Letter Inspection Summary
11/21/2016 Letter Codes Plan Review Conditions
11/21/2016 Receipt Receipt for transaction: 2016-006899
11/21/2016 Letter Codes Building Permit
06/24/2016 Letter Fire Building Plan Review
06/01/2016 Letter Fire Building Plan Review
04/10/2017 Letter Inspection Summary
04/11/2017 Letter Inspection Summary
09/07/2017 Letter Inspection Summary
09/12/2017 Letter Inspection Summary
04/21/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
04/25/2017 Letter Inspection Summary
06/19/2017 Letter Inspection Summary
06/29/2017 Letter Inspection Summary
06/30/2017 Letter Inspection Summary
09/27/2017 Letter Inspection Summary
10/09/2017 Letter Inspection Summary
07/11/2017 Letter Inspection Summary
10/12/2017 Letter Inspection Summary
07/17/2017 Letter Inspection Summary
07/21/2017 Letter Inspection Summary
10/18/2017 Letter Inspection Summary
10/19/2017 Letter Inspection Summary
07/25/2017 Letter Inspection Summary
08/03/2017 Letter Inspection Summary
08/08/2017 Letter Inspection Summary
08/10/2017 Letter Inspection Summary
08/15/2017 Letter Inspection Summary
11/03/2017 Letter Inspection Summary
11/06/2017 Letter Inspection Summary
11/08/2017 Letter Inspection Summary
08/16/2017 Letter Inspection Summary
08/22/2017 Letter Inspection Summary
11/13/2017 Engineer Report/Study DOC111317-005
08/24/2017 Letter Inspection Summary
08/25/2017 Letter Inspection Summary
08/29/2017 Letter Inspection Summary
09/01/2017 Letter Inspection Summary
11/21/2017 Letter Inspection Summary
09/06/2017 Letter Inspection Summary
11/27/2017 Letter Inspection Summary
11/29/2017 Letter Inspection Summary
09/13/2017 Letter Inspection Summary
09/08/2017 Letter Inspection Summary
12/05/2017 Letter Inspection Summary
09/15/2017 Letter Inspection Summary
09/18/2017 Letter Inspection Summary
09/19/2017 Letter Inspection Summary
09/20/2017 Letter Inspection Summary
09/22/2017 Letter Inspection Summary
10/17/2017 Letter Inspection Summary
08/31/2017 Letter Inspection Summary
09/01/2017 Letter Inspection Summary
10/11/2017 Letter Inspection Summary
10/13/2017 Letter Inspection Summary
10/23/2017 Letter Inspection Summary
01/09/2018 Letter Inspection Summary
10/25/2017 Letter Inspection Summary
10/26/2017 Letter Inspection Summary
01/23/2018 Letter Codes Temporary Certificate of Occupancy
10/27/2017 Letter Inspection Summary
02/05/2018 Letter Codes Temporary Certificate of Occupancy
02/21/2018 Letter Codes Temporary Certificate of Occupancy
10/31/2017 Letter Inspection Summary
03/29/2018 Letter Codes 10 Day Letter
12/01/2017 Letter Inspection Summary
11/09/2017 Letter Inspection Summary
05/15/2018 Letter Codes Temporary Certificate of Occupancy
11/10/2017 Letter Inspection Summary
11/13/2017 Letter Inspection Summary
11/15/2017 Letter Inspection Summary
11/16/2017 Letter Inspection Summary
11/20/2017 Letter Inspection Summary
11/22/2017 Letter Inspection Summary
12/01/2017 Letter Inspection Summary
12/06/2017 Letter Inspection Summary
12/07/2017 Letter Inspection Summary
12/12/2017 Letter Inspection Summary
12/13/2017 Letter Inspection Summary
12/14/2017 Letter Inspection Summary
01/16/2018 Letter Inspection Summary
05/02/2018 Letter Inspection Summary
12/21/2017 Letter Inspection Summary
01/04/2018 Letter Inspection Summary
01/08/2018 Letter Inspection Summary
12/28/2017 Letter Inspection Summary
01/10/2018 Letter Inspection Summary
01/29/2018 Letter DOC012918-011
03/13/2018 Letter Codes Temporary Certificate of Occupancy
04/03/2018 Letter Codes Temporary Certificate of Occupancy
07/31/2018 Letter Codes Final Certificate of Occupancy
12/29/2017 Letter Inspection Summary
01/03/2018 Letter Inspection Summary
07/30/2018 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home