| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Planning Review
|
No Comments
|
03/03/2026
|
03/03/2026
|
|
|
Adair Bright
|
|
|
|
|
Engineering Review
|
Approved with Conditions
|
02/26/2026
|
02/24/2026
|
|
|
Scott Ready
|
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
|
|
|
Planning Review
|
Corrections
|
02/26/2026
|
02/24/2026
|
|
|
Adair Bright
|
|
|
Corrective Action Required
Staff was planning on combining all the renderings into one file so it is easier to view in Legistar. Because of that, I was hoping that the map could be added to maybe the bottom lefthand corner of each sheet showing which direction that rendering is from. Right now, the map has the names of the files, but it won't be uploaded like that. If this doesn't make sense please call or email to talk it through.
|
|
|
|
|
Traffic Review
|
No Comments
|
02/26/2026
|
02/23/2026
|
|
|
Erin Ralovo
|
|
|
|
|
Fire Review
|
Approved with Conditions
|
02/26/2026
|
02/23/2026
|
|
|
Jim Eden
|
|
|
Misc.
Plans and specifications for the inflatable structure shall be submitted for building permit review and approval. The structure shall meet the requirements of the 2018 International Fire Code and other code documents adopted by the City of Lee's Summit.
|
|
|
Misc.
This project was reviewed as a soccer facility only, and is not to be used as an assembly occupancy for other events without previous approval.
|
|
|
|
|
Fire Review
|
Approved with Conditions
|
10/29/2025
|
10/30/2025
|
|
|
Jim Eden
|
|
|
Misc.
Plans and specifications for the inflatable structure shall be submitted for building permit review and approval. The structure shall meet the requirements of the 2018 International Fire Code and other code documents adopted by the City of Lee's Summit.
|
|
|
Misc.
This project was reviewed as a soccer facility only, and is not to be used as an assembly occupancy for other events without previous approval.
|
|
|
|
|
Planning Review
|
No Comments
|
10/29/2025
|
10/24/2025
|
|
|
Adair Bright
|
|
|
Miscellaneous Correction
Corrective Action Required
The modification request letter should include justification for the request that explains why the dome cannot meet the code.
|
|
|
Miscellaneous Correction
Corrective Action Required
The section appears to be out of scale and should be revised.
|
|
|
Miscellaneous Correction
Corrective Action Required
Overall, staff is having a difficult time supporting this project based on the information provided and the height of the dome. The mitigation proposed, the existing trees, does not seem to be like it will do the job of lessening the visual impact since those trees will be bare during the time of year which the dome will be inflated.
|
|
|
|
|
Traffic Review
|
No Comments
|
10/29/2025
|
10/24/2025
|
|
|
Scott Ready
|
|
|
|
|
Engineering Review
|
Approved with Conditions
|
10/29/2025
|
10/24/2025
|
|
|
Scott Ready
|
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
|
|
|
Planning Review
|
Corrections
|
10/21/2025
|
10/21/2025
|
|
|
Adair Bright
|
|
|
Miscellaneous Correction
Corrective Action Required
The modification request letter should include justification for the request that explains why the dome cannot meet the code.
|
|
|
Miscellaneous Correction
Corrective Action Required
The section appears to be out of scale and should be revised.
|
|
|
Miscellaneous Correction
Corrective Action Required
Overall, staff is having a difficult time supporting this project based on the information provided and the height of the dome. The mitigation proposed, the existing trees, does not seem to be like it will do the job of lessening the visual impact since those trees will be bare during the time of year which the dome will be inflated.
|
|
|
|
|
Fire Review
|
Approved with Conditions
|
10/21/2025
|
10/16/2025
|
|
|
Jim Eden
|
|
|
Misc.
Plans and specifications for the inflatable structure shall be submitted for building permit review and approval. The structure shall meet the requirements of the 2018 International Fire Code and other code documents adopted by the City of Lee's Summit.
|
|
|
Fire Lanes
3103.8.1 Access.
Fire apparatus access roads shall be provided in accordance with Section 503.
Extend the south fire lane to the southeast edge of the dome and provide a turn around.
|
|
|
Fire Lanes - Marking
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
The entire fire lane shall be posted no parking.
|
|
|
Misc.
This project was reviewed as a practice facility only, and is not to be used as an assembly occupancy for games or other events without previous approval.
|
|
|
|
|
Engineering Review
|
Approved with Conditions
|
10/21/2025
|
10/16/2025
|
|
|
Sue Pyles, P.E.
|
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
|
|
|
Traffic Review
|
No Comments
|
10/21/2025
|
10/15/2025
|
|
|
Erin Ralovo
|
|
|
|
|
Planning Review
|
Corrections
|
09/26/2025
|
09/26/2025
|
|
|
Scott Ready
|
|
|
Corrective Action Required
Provide sight line drawings.
|
|
|
Corrective Action Required
Update sheets to reference both the SUP and the PDP
|
|
|
Corrective Action Required
Provide a modification request letter for the height and building design. The letter should also provide justification.
Our architecture and building design standards code update is now available through Municode. It is Article 8, Division 1, Subdivision 2.
The code update did not take into account temporary structures such as this inflatable dome. This structure type would fall into the commercial/retail building type.
|
|
|
Corrective Action Required
What color is the dome proposed to be?
|
|
|
Corrective Action Required
Will there be signage on the dome?
|
|
|
Corrective Action Required
Why does the dome need to be 80-ft. tall?
I looked on Arizon's website and it looks like they have done a few other domes for similar size fields and they were not 80-ft. tall. Specifically, the Edmonton Soccer Dome and the University of Wisconsin domes.
|
|
|
Corrective Action Required
How is the visual impact proposed to be mitigated?
|
|
|
|
|
Engineering Review
|
Approved with Conditions
|
09/26/2025
|
09/24/2025
|
|
|
Sue Pyles, P.E.
|
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
|
|
|
Traffic Review
|
No Comments
|
09/26/2025
|
09/24/2025
|
|
|
Erin Ralovo
|
|
|
|
|
Fire Review
|
Corrections
|
09/26/2025
|
09/18/2025
|
|
|
Jim Eden
|
|
|
Misc.
Corrective Action Required
Plans and specifications for the inflatable structure shall be submitted for building permit review and approval. The structure shall meet the requirements of the 2018 International Fire Code and other code documents adopted by the City of Lee's Summit.
|
|
|
Fire Lanes
Corrective Action Required
3103.8.1 Access.
Fire apparatus access roads shall be provided in accordance with Section 503.
Extend the south fire lane to the southeast edge of the dome and provide a turn around.
|
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
The entire fire lane shall be posted no parking.
|
|
|
Misc.
This project was reviewed as a practice facility only, and is not to be used as an assembly occupancy for games or other events.
|
|
|
|