Planning Review
|
Corrections
|
06/12/2025
|
06/12/2025
|
|
Hector Soto Jr.
|
|
Corrective Action Required
LOT INFORMATION. 1) The total site acreage listed on Sheet C1 shows 47,045 sq. ft., but the most recent draft version of the associated minor plat shows a site/lot area of 47,242 sq. ft. Revise to match the plat. 2) The labeled lot line dimensions for the east property line and the two long boundary segments on the north and south sides of the lot do not match the most recent draft version of the associated plat. Revise to match the plat. 3) The curve radius listed for the east property line (Curve C1) does not match the most recent draft version of the associated plat, nor do the seconds for the bearing listed for Line Segment L1. Revise.
|
|
Corrective Action Required
|
|
Corrective Action Required
STREETS. SW Jefferson Crossing is labeled as a public roadway with 60' of right-of-way throughout the plan set. SW Jefferson Crossing is actually a private street within a 60' private common area tract, so it is neither a public street nor is it located within public right-of-way. Revise.
|
|
Corrective Action Required
SIDEWALKS. Label the 5' sidewalk along SW Jefferson Crossing on Sheet C3.
|
|
Corrective Action Required
OIL AND GAS WELLS. Add a note to the plans regarding the presence of any active, inactive or capped oil and/or gas wells on the property. Cite the source of information used to make this determination. MoDNR maintains an online well database that can be sourced and cited for this information.
|
|
Corrective Action Required
BUILDING ELEVATIONS. No architectural building elevations were included in the application submittal for review. Submit color elevations that includes a material and color schedule for all exterior building materials.
|
|
Corrective Action Required
MECHANICAL SCREENING. Show the location of all RTUs and ground-mounted equipment on the building elevations or site plan as appropriate. RTUs shall be fully screened from view by extending parapet walls to a height at least equal to the height of the units being screened. Ground-mounted equipment shall be fully screened from view up the height of the units by using evergreen landscaping or masonry walls.
|
|
Corrective Action Required
SITE DATA TABLE. For centralized and easy reference, add the lot area and proposed building area information to the list of development information provided at the bottom right corner of Sheet C3.
|
|
Corrective Action Required
TRASH ENCLOSURE. The dumpster enclosure detail on Sheet C12 shows the enclosure gates to be vinyl. City ordinance requires the gates to be either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve, or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier. The proposed vinyl gates do not comply with the enclosure design requirements.
|
|
Corrective Action Required
PARKING LOT BOUNDARY. Temporary asphalt curbing shall be provided where the parking lot drive will be extended in the future when the abutting lot to the south is developed. Curb blocks/wheel stops or the like cannot be used to satisfy this temporary curbing requirement.
|
|
Corrective Action Required
ADA ACCESSIBLE ROUTE. Show the accessible path from the ADA space to the building entrance. Label the slopes and cross-slopes of said accessible path.
|
|
Corrective Action Required
PLAT. The final plat for the Oldham Village development has yet to be recorded. No building permit shall be issued until such time as the approved final plat has been recorded with the County and the requisite number of recorded copies have been submitted to the City.
|
|
|
Engineering Review
|
Corrections
|
06/12/2025
|
06/12/2025
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Sheet C3: a. site-specific design for the new ADA-accessible ramps and ADA-accessible route across the commercial entrance is required. It is not sufficient to call-out a standard detail. At a minimum, elevations and slope callouts shall be provided for the site specific ramp and accessible route design across the commercial entrance. b. eliminate the "wings" on the ADA-accessible ramp if possible, and grade to provide the needed transition.
|
|
Corrective Action Required
Sheet C4: a. private domestic water line from the public main to the meter shall be copper. Copper line shall also be required a minimum of 10 feet beyond the meter.
|
|
Corrective Action Required
Profile View Sheets of Stormwater Pipes: HGL is called-out without the design storm. Provide the design storm callout, otherwise "HGL" by itself is meaningless.
|
|
Corrective Action Required
Sheet C13: a. revise the ADA-accessible route and ramps to include slope callouts in addition to elevations.
|
|
Corrective Action Required
A cost estimate is required prior to formal approval.
|
|
|
Building Codes Review
|
Corrections
|
06/12/2025
|
06/11/2025
|
|
Joe Frogge
|
|
Miscellaneous Correction
Corrective Action Required
Specify type of water tap at main.
|
|
Miscellaneous Correction
Corrective Action Required
Water piping from main to meter and from meter to 10' towards building must be 2" copper.
|
|
|
Fire Review
|
Corrections
|
06/12/2025
|
06/10/2025
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Hydrants
Corrective Action Required
IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official.
The building exceeds 300 feet from a hydrant as measured around the building.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
The drive lane along the north side of the building shall be capable of supporting the weight of a fire apparatus (75,000-pounds).Confirm construction.
|
|
|
Traffic Review
|
No Comments
|
06/12/2025
|
06/02/2025
|
|
Erin Ralovo
|
|
|