Planning Application Status

PL2025102




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2025102
Q39 - Oldham Village
Commercial Final Development Plan
Commercial Final Development Plan
Approved
05/07/2025
OLDHAM INVESTORS LLC
8,335 square foot dine-in and take-out restaurant.
Locations
Contacts
OLDHAM INVESTORS LLC, Address:1700 132ND ST STE 150  
BHC RHODES, Address:7101 COLLEGE BLVD, SUITE 400, Phone:(816) 898-6607  
Scott Tanner, Address:7101 College Blvd, Phone:(913) 663-1900  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 10/29/2025 10/29/2025
Erin Ralovo
Building Codes Review No Comments 10/29/2025 10/29/2025
Joe Frogge
Fire Review No Comments 10/29/2025 10/28/2025
Jim Eden
Engineering Review No Comments 10/29/2025 10/27/2025
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
10/22/2025

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee, water tap, meter setup, and sanitary impact fee) have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $69,699.24
DE Contact Field Eng. Inspector
Corrective Action Required
10/22/2025

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to schedule a project coordination meeting with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
10/22/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 10/29/2025 10/27/2025
Hector Soto Jr.
Engineering Review Approved with Conditions 07/31/2025 07/31/2025
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
07/31/2025

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee, water tap, meter setup, and sanitary impact fee) have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $69,699.24
DE Contact Field Eng. Inspector
Corrective Action Required
07/31/2025

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to schedule a project coordination meeting with the assigned Field Engineering Inspector.
DE Future Repair Work
Corrective Action Required
07/31/2025

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review Approved with Conditions 07/31/2025 07/28/2025
Hector Soto Jr.
Corrective Action Required
07/28/2025

RECORDING OF PLAT. In accordance with the City's UDO, no building permit shall be issued for the subject development until such time as the associated plat is approved by City Council, recorded with the County, and the required number of recorded copies are returned to the City. The applicant has acknowledged the previously made comment above. The comment is being kept for documentation purposes. No further response to the comment is required.
Engineering Review Corrections 07/10/2025 07/10/2025
Gene Williams, P.E.
Corrective Action Required
07/10/2025

Sheet C401: a. remove the "wings" on the ADA-accessible ramps. Provide grading rather than providng "wings" for the transition. b. plans werre missing the ADA-accessible route dimensions and slope callouts across the new commercial entrances. These shall be a minimum of 5 feet wide with 1.5% max. design cross-slope.
Corrective Action Required
07/10/2025

Sheet C800: a. 6 inch PVC line is called-out for note W04, W06, W08, W10, W12, W13, W14, and W25. These callouts should be C900 DR18 line, not PVC. b. C900 2 inch domestic water service pipe is called-out beyond the copper line. Confirm this pipe material meets building code, as I have not seen this used. c. An extra valve is shown on W03. Only one valve is desired, and should be placed just prior to the backflow valve, but after the water meter tap. Remove the extra valve. d. 6 inch line shall be connected to the 8 inch line across Oldham Crossing rather than as shown (i.e., it shall not be connected to the 6 inch fire hydrant assembly as shown, it shall be a separate tee on the 8 inch main and crossing Oldham Crossing). Please contact me if there are any questions on the geometry needed.
Corrective Action Required
07/10/2025

Sheet C901: a. KCMMB mix is required for asphaltic and PCC concrete mixes. Revise with the word "KCMMB" rather than the KCAPWA mix design. It should also be noted KCMMB minimum thickness in one lift is 2 inches, so you may wish to decrease the subsequent base course by one half inch, and increase the surface course by a half inch.
Corrective Action Required
07/10/2025

I could not find any detail showing the subgrade design extending a minimum of one (1) foot beyond the back of curb. Typically we have seen others incorporate this detail into the typical pavement section view. Currently, the City has no standard detail for this item, so it will need to be created either by a drawing, or a very concise note. The note should say something as follows: "...aggregate layer and geogrid shall extend a minimum of 1 foot beyonod the back of curb" or equivalent language.
Corrective Action Required
07/10/2025

An itemized and sealed cost estimate is required prior to formal approval. It shall include the following: 1) pavement, 2) curb and gutter, 3) sidewalk, 4) commercial entrances, 5) subgrade, including the area one (1) foot beyond the back of curb, 5) pavement marking, 6) grading of site, 7) compaction of site, 8) storm lines greater than 10 inches diameter, 9) storm structures including inlets, junction boxes, etc., 10) water lines, 11) sanitary sewer lines, 12) fire hydrants, 13) backflow vault, 14) water valves, 15) erosion and sediment control, 16) final restoration including sodding, seeding, fertilizer, mulch, and topsoil.
Building Codes Review Approved with Conditions 07/10/2025 07/09/2025
Joe Frogge
Miscellaneous Correction
Resolved
07/09/2025

Specify sanitary sewer and water pipe materials. (Note: Water piping from main to 10' past meter is required to be type K copper)
Miscellaneous Correction
Resolved
07/09/2025

Specify size of water meter.
Miscellaneous Correction
Corrective Action Required
07/02/2025

This review is only for site work. Arch & MEP will be reviewed under permit PRCOM20251957 7/9/2025 - Acknowledged in letter.
Planning Review Corrections 07/10/2025 07/08/2025
Hector Soto Jr.
Corrective Action Required
07/08/2025

MECHANICAL SCREENING. As described on the comment response letter and shown on the landscape plan, the north side of the transformer is proposed to be left open for the intended purpose of maintaining access to the equipment. To comply with City ordinance, ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Balancing the requirement for full screening of the transformer at the NE building corner and the need to maintain access to said transformer, additional shrubs shall be planted along the north side of the transformer by coming off the row of shrubs along the east side of the transformer so as to provided an L-shaped row of shrubs that terminates at the NW corner of the transformer. This will provide additional screening along the north (which is oriented and visible from the US 50 Hwy right-of-way) and leave an opening off of the NW corner of the transformer to maintain needed access.
Corrective Action Required
07/08/2025

RECORDING OF PLAT. In accordance with the City's UDO, no building permit shall be issued for the subject development until such time as the associated plat is approved by City Council, recorded with the County, and the required number of recorded copies are returned to the City. The applicant has acknowledged the previously made comment above. The comment is being kept for documentation purposes. No further response to the comment is required.
Fire Review Approved with Conditions 07/10/2025 07/02/2025
Jim Eden
Misc.
Informational
07/02/2025

All roads and hydrants shall be installed prior to staging or going vertical with combustible materials.
Hydrants
Resolved
07/02/2025

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Show public and private hydrants for the site.
FDC
Resolved
07/02/2025

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC and hydrant within 100 feet.
Imposed Loads
Resolved
07/02/2025

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. All drive aisles shall support the weight of fire apparatus (75,000-pounds).
Fire Lanes - Marking
Resolved
07/02/2025

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Provide No Parking Fire Lane signage along the north side of the building and lane to the NW exit.
Planning Review Corrections 05/28/2025 05/28/2025
Grant White
Corrective Action Required
05/27/2025

LEGAL DESCRIPTION. List on the plans the project site's legal description as it will be known once the associated plat is recorded. The site is Lot 5 (building site) and Lot 5A (satellite parking site) of the pending Oldham Village, 1st Plat, Lots 1-13 & Tracts A-D.
Corrective Action Required
05/27/2025

LAND AREA. The listed land area in acreage and in square footage in the site data table on Sheet C200 do not agree. The listed 2.49 acres does not include the area for both Lots 5 and 5A. Also, the listed square footage of 127,793 sq. ft. does not equal the listed square footage of the same two lots as shown on the most current version of the associated plat going through the approval process. Revise and reconcile the listed site areas for Lots 5 and 5A.
Corrective Action Required
05/28/2025

STREETS. 1) Correct the name of the private street along the south side of Lot 5 from SW Fieldhouse Drive to SW Oldham Crossing. 2) Label the ROW widths for the abutting SW Oldham Parkway and US 50 Hwy (variable width ROW can be labeled as such). Also label the tract width along the south side of Lot 5 that contains the private street (SW Oldham Crossing).
Corrective Action Required
05/28/2025

EASEMENTS. 1) Label the U/E widths on both Lots 5 and 5A. 2) The associated plat shows a 10' U/E along the north-south property line at the SE corner of Lot 5. No such U/E is shown on the site plan. Add the missing U/E.
Corrective Action Required
05/28/2025

DRIVEWAYS/DRIVE AISLES. Driveways and drive aisle widths accommodating two-way traffic shall have a minimum 24' of pavement width (excluding curb and gutter). The minimum pavement width requirement applies to all areas where driveways/drive aisles are flanked by curbed areas on one or both sides, not just areas with striped parking spaces on both sides of the drive areas. Various areas are dimensioned as have 25' of width, but those areas include curb and gutter on one or both sides and thus only have 21' or 23' of actual driveable pavement width. Revise the driveway/drive aisle width to comply with the minimum 24' of pavement width that excludes curb and gutter.
Corrective Action Required
05/28/2025

PARKING. 1) The "Parking Required" information included in the Site Data table on Sheet C200 incorrectly lists 126 required parking spaces based on a calculation of 14 spaces per 1,000 sq. ft. of gross floor area. The proposed 8,335 sq. ft. building actually has a calculated minimum parking requirement of 117 spaces. 2) Federal ADA parking space standards require that accessible parking spaces be calculated and provided for each separate parking facility that serves a site, not just that the minimum number of accessible spaces are provided for the combined total of parking spaces serving a site. This means that the separate parking facility composed of the 27 parking spaces across the street to the south on Lot 5A must also provide accessible parking spaces based on the number of parking spaces provided by that facility. An accessible route is then required to be provided from the satellite parking facility on Lot 5A to the building they serve on Lot 5. Revise the parking data as needed in the site data table resulting from changes in response to this comment. 3) Ensure that any changes on the civil site plan (Sheet C200) are also made to the architectural site plan (Sheet A100).
Corrective Action Required
05/28/2025

LOT BOUNDARY INFORMATION. Label the property line dimensions and bearings for both Lots 5 and 5A.
Corrective Action Required
05/28/2025

OIL AND GAS WELLS. Add a note on the plans regarding the presence or absence of all oil and/or gas wells within the subject property. Cite the source of information used to make this determination. The MoDNR maintains on online database of wells that can be sourced and cited.
Corrective Action Required
05/28/2025

PHOTOMETRIC PLAN. What are the parking lot pole fixture heights? The plan doesn't list the information. Pole mounted fixture heights are limited to no taller than 28' above finished grade.
Corrective Action Required
05/28/2025

MODULAR WALL. The plans show a modular wall extending along the north-south property line at the east end of Lot 5. The proposed modular wall conflicts with the location of a 10' U/E per the proposed associated final plat. The City's Encroachment Policy does not allow modular retaining walls to be located within public utility easements. Its doesn't appear from the plans that any public utility lines (i.e., water, sanitary or storm) are proposed within the impact U/E, so it may be possible to eliminate said easement from the final plat that has yet to receive final approval and be recorded. Private utilities (i.e., gas, electric, phone, etc.) may or may not need to keep the easement in place, so the applicant should confer with the private utilities to determine the actual need.
Corrective Action Required
05/28/2025

MECHANICAL SCREENING. It appears that there will be an electrical transformer box behind the proposed building (NE side). Said box shall have landscaping planted on the sides where access is not needed to minimize its appearance.
Corrective Action Required
05/28/2025

ADA SIGN DETAIL. Provide a detail of the ADA sign to be posted at the head of each accessible space. Signs shall be mounted a minimum 5' above finished grade, measured to the bottom of the sign.
Corrective Action Required
05/28/2025

RECORDING OF PLAT. In accordance with the City's UDO, no building permit shall be issued for the subject development until such time as the associated plat is approved by City Council, recorded with the County, and the required number of recorded copies are returned to the City.
Engineering Review Corrections 05/28/2025 05/28/2025
Gene Williams, P.E.
Corrective Action Required
05/28/2025

Sheet C901: a. Typical pavement sections for asphaltic concrete do not meet the Unified Development Ordinance (UDO) in terms of geogrid/chemically stablized subgrade requirement. However, the thickness is greater than that shown in the standard UDO design standards. If this alternative design is desired, a geotechnical report may be substituted in lieu of the standard design, but must be based on specific parameters provided by the City, and should be based on actual field samples. b. KCMMB asphaltic and portland cement concrete shall be specified regardless of the pavement design.
Corrective Action Required
05/28/2025

Sheet C800: a. water meter size and type (i.e., displacement or compound) shall be called-out. b. domestic line type shall be specified on this sheet. c. an external backflow vault and backflow device shall be required on the fire protection line. This vault shall be placed outside any easement and just after the gate valve, and should be placed on the north side of the street on the project side. d. a gate valve shall be installed immediately prior to the backflow vault. e. the water tap shall be made immediately prior to the gate valve described in item d above. f. a 2 inch tee is called out for domestic water service, but this shall be a threaded corporation stop rather than a tee. g. the pipe type for the fire line shall be called-out. h. water meter should be located within the limits of the general utility easement. i. plans shall callout copper from the fire protection line to the meter, and a minimum of 10 feet beyond the meter. j. sanitary sewer lateral line shall include material callouts and SDR number. SDR 26 is required at a minimum.
Corrective Action Required
05/28/2025

Sheet C700: a. profile view shall include the word "PRIVATE".
Corrective Action Required
05/28/2025

Sheet C701: a. profile views shall include the word "PRIVATE".
Corrective Action Required
05/28/2025

A site-specific plan for ADA-accessible ramps at each new commercial entrance were missing. A detailed ADA-accessible ramp plan shall be presented, along with slope callouts and elevations. The ADA-accessible route across each commercial entrance shall also be shown with a minimum 5 feet width a maximum design cross slope of 1.5%.
Corrective Action Required
05/28/2025

A detailed ADA-accessible stall plan was missing from the plans. This includes the ADA-accessible parking stalls within the parking lot. Maximum slopes shall be called out, along with elevations. Maximum design slope is 1.5% in any direction.
Corrective Action Required
05/28/2025

A typical section view was missing for the area one (1) foot minimum beyond the back of curb. This area shall include proper subgrade and geogrd/chemically stabilized subgrade.
Corrective Action Required
05/28/2025

Sheet C200: a. commercial driveway entrances shall be KCMMB from the sawcut on the street to the property line.
Corrective Action Required
05/28/2025

Sheet C400: a. it appears the retaining wall is close to MoDOT right of way, and the elements of the retaining wall will extend into the right of way. MoDOT will likely reject any encroachment of retaining wall elements into their right of way. b. a rendering of the retaining wall should be provided with bottom and top of wall. c. if geogrid is used in the retaining wall design, this will further increase the likelihodd of encroachment into MoDOT right of way. d. any encroachment into MoDOT right of way shall require MoDOT approval.
Informational
05/28/2025

Cost estimate for the sitework (including erosion and sediment control) required prior to formal approval.
Traffic Review No Comments 05/28/2025 05/27/2025
Erin Ralovo
Fire Review Corrections 05/28/2025 05/27/2025
Jim Eden
Misc.
Corrective Action Required
05/27/2025

All roads and hydrants shall be installed prior to staging or going vertical with combustible materials.
Hydrants
Corrective Action Required
05/27/2025

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Show public and private hydrants for the site.
FDC
Corrective Action Required
05/27/2025

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC and hydrant within 100 feet.
Imposed Loads
Corrective Action Required
05/27/2025

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. All drive aisles shall support the weight of fire apparatus (75,000-pounds).
Fire Lanes - Marking
Corrective Action Required
05/27/2025

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Provide No Parking Fire Lane signage along the north side of the building and lane to the NW exit.
Building Codes Review Corrections 05/28/2025 05/22/2025
Joe Frogge
Miscellaneous Correction
Corrective Action Required
05/22/2025

Specify sanitary sewer and water pipe materials. (Note: Water piping from main to 10' past meter is required to be type K copper)
Miscellaneous Correction
Corrective Action Required
05/22/2025

Specify size of water meter.
Miscellaneous Correction
Corrective Action Required
05/22/2025

This review is only for site work. Arch & MEP will be reviewed under permit PRCOM20251957
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 07/31/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home