Planning Application Status

PL2023151




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023151
STREETS OF WEST PRYOR LOTS 11 AND 13- WATERWAY AND 30HOPS
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
06/09/2023
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review No Comments 09/15/2023 09/18/2023
Susan Barry, P.E.
Planning Review No Comments 09/15/2023 09/15/2023
Hector Soto Jr.
Planning Review Corrections 08/04/2023 09/11/2023
Hector Soto Jr.
Corrective Action Required
09/11/2023

CIRCULATION. With the gas pump islands available to the general public (and not limited to carwash customers only), staff continues to have concerns regarding vehicular circulation associated with the pump island area and the car wash entrance and tunnel queue area. The UDO requires a minimum 2-vehicle queue measured from the gas pump. As layed out, the queuing space for a second vehicle from each pump station conflicts with the tunnel queue and may cause vehicles to back up to the adjacent drive aisle that provides access to Lot 12, 13 and 14. Generally speaking, siting the gas pump islands in close proximity to the tunnel queue as proposed in a confined area appears to create unneccessary conflicts.
Corrective Action Required
09/11/2023

DIMENSIONS. Dimension the distances from the end of the each pump station to the curb at the north end of the adjacent exit lane.
Traffic Review Approved with Conditions 09/08/2023 09/11/2023
Susan Barry, P.E.
Corrective Action Required
09/12/2023

I don't see that anything was changed other than adding turning radii and a crosswalk. Internal circulation is not great. The gas pumps will probably be blocked by the car wash lines frequently. You are limiting certain types of vehicles (trailers, box trucks, etc) and if they try to get in they will be stuck. There's also not a good way to let these vehicles know that they should find another gas station. But none of this traffic is expected to back onto Pryor Road. All of this goes towards customer experience and customer satisfaction. If customers are frustrated by the backups, it will affect them returning.
Planning Review Corrections 08/01/2023 08/03/2023
Hector Soto Jr.
Corrective Action Required
08/01/2023

LOT BOUNDARIES. The configurations of both lots depicted on the site plans do not match the recorded plat. The property will need to be re-platted to match the proposed lot configurations. The previously made comment above is informational at this stage, but will require the re-plat to be approved and recorded prior to the issuance of a building permit on either of the affected lots.
Corrective Action Required
08/01/2023

EASEMENTS. The proposed locations for the two buildings on the separate lots conflict with the locations of existing sanitary sewer lines and easements. The sewer lines shall be relocated and the conflicting easements vacated prior to the issuance of any building permits on the subject lots as depicted on the site plan. The comment above was previously made and noted by the applicant. It will remain a comment for informational purposes.
Corrective Action Required
08/01/2023

TRASH ENCLOSURES. A detail of the proposed dumpster enclosure(s) shall be provided at the time of final development plan application. Enclosures shall be constructed of masonry walls and solid steel gates of a color compatible to the buiding the enclosures serve.
Corrective Action Required
08/01/2023

SIGNAGE. Lot 13: - Staff can support a request for 3 signs on the end cap space given the facade exposure on three sides. - Staff will not support any wall signage with a letter/image height greater than the 6' maximum allowed under the sign code. This includes the mural/applied graphic for "30 hop". Lot 11: - As shown on the elevations, there are a total of seven (7) wall signs made up by the following: 2 Waterway w/ waves logo wall signs on the vertical architectural feature on the east elevation; 1 Waterway w/ waves logo wall sign on the west elevation; 1 Waterway waves logo (and no copy) on the east elevation; 1 Waterway w/ waves logo on the south elevation; and 2 changeable banner graphics panels on the north elevation. As previously stated, staff can support a total of four (4) wall sign (one per facade). - To determine the sign area square footage for the wall signs on the architectural feature, provide a scaled drawing of the building elevations. - How far back is the vertical architectural element recessed from the north building facade? If recessed no more than 5' from the north building facade, the facade area of the north elevation may be able to be used in making the allowable sign area calculation. - The City's sign ordinance defines all logos as signs whether or not they are accompanied by text. When the logo and copy are in close proximity to one another, we will consider the group a single sign rather than count each element separately. - A maximum of three (3) signs are permitted by right on the canopy, but staff can similarly support one sign per facade.
Corrective Action Required
08/01/2023

EXTERIOR MATERIALS. - Provide photos of all elevations of an existing Waterway Car Wash that uses the proposed ACM and wood look panel system to provide a realistic portrayal of the building. This would be the first car wash in the city to be considered with the extent of metal exterior currently proposed. It would be helpful to the Planning Commission and City Council to provide a real world visual as they consider the proposed use of material. - Provide a photo of the metal panel with reveals proposed for the Lot 13 building in order to visually represent the architectural relief the reveals will provide.
Traffic Review Approved with Conditions 08/01/2023 08/01/2023
Mike Weisenborn
Miscellaneous Correction
Corrective Action Required
07/27/2023

Staff has completed the review of the updated TIA and will provide information for discussion prior to finalization.
Fire Review Approved with Conditions 08/02/2023 07/26/2023
Mike Weisenborn
Code Statement
Corrective Action Required
07/26/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. The use of the building on Lot 13 will determine if additional fire protection is required.
Hydrants
Corrective Action Required
07/26/2023

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. The distance to a hydrant on Lot 13 exceeds 300 feet. Provide an additioanl hydrant.
UST's
Corrective Action Required
07/26/2023

The installation of underground fuel storage tanks (UST’s) shall comply with the 2018 International Fire Code and the requirements of the Missouri Department of Natural Resources.
FDC
Corrective Action Required
07/26/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. If sprinklered, the building on Lot 13 will need to have the FDC within 100 feet of a hydrant.
Engineering Review Approved with Conditions 08/02/2023 07/26/2023
Mike Weisenborn
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/26/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy. Please note: Sanitary sewer relocation plans will be required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/26/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
07/26/2023

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/26/2023

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review Approved with Conditions 07/18/2023 07/20/2023
Jim Eden
Code Statement
Corrective Action Required
07/20/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. The use of the building on Lot 13 will determine if additional fire protection is required.
Hydrants
Corrective Action Required
07/11/2023

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. The distance to a hydrant on Lot 13 exceeds 300 feet. Provide an additioanl hydrant.
Fire Lanes
Resolved
07/20/2023

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) The lane in front of lthe car wash on Lot 11 shall be a full 20 feet.
UST's
Corrective Action Required
07/20/2023

The installation of underground fuel storage tanks (UST’s) shall comply with the 2018 International Fire Code and the requirements of the Missouri Department of Natural Resources.
FDC
Corrective Action Required
07/20/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. If sprinklered, the building on Lot 13 will need to have the FDC within 100 feet of a hydrant.
Traffic Review Corrections 07/18/2023 07/17/2023
Erin Ralovo
Corrective Action Required
07/17/2023

A fully updated Traffic Impact Study is required. Please submit.
Planning Review Corrections 07/18/2023 07/17/2023
Hector Soto Jr.
Corrective Action Required
07/17/2023

SCALE. The listed scale for Sheet C3.0 is incorrectly listed as 1"=30. It should be 50' scale.
Corrective Action Required
07/17/2023

LOT BOUNDARIES. The configurations of both lots depicted on the site plans do not match the recorded plat. The property will need to be re-platted to match the proposed lot configurations. The previously made comment above is informational at this stage, but will require the re-plat to be approved and recorded prior to the issuance of a building permit on either of the affected lots.
Corrective Action Required
07/17/2023

EASEMENTS. The proposed locations for the two buildings on the separate lots conflict with the locations of existing sanitary sewer lines and easements. The sewer lines shall be relocated and the conflicting easements vacated prior to the issuance of any building permits on the subject lots as depicted on the site plan. The comment above was previously made and noted by the applicant. It will remain a comment for informational purposes.
Corrective Action Required
07/17/2023

TRASH ENCLOSURES. A detail of the proposed dumpster enclosure(s) shall be provided at the time of final development plan application. Enclosures shall be constructed of masonry walls and solid steel gates of a color compatible to the buiding the enclosures serve.
Corrective Action Required
07/17/2023

SIGNAGE. - Provide a narrative requesting the additional end cap signage (i.e. 3 signs vs. 2 signs) and justication for the additional signage. - As shown on the elevations, there are a total of seven (7) wall sign. Staff can support a total of four (4) wall sign (one per facade), but is not likely to support all seven signs depicted on the elevations. Clarify how many signs for the car wash the applicant chooses to pursue. Provide a narrative outlining the request and justification for any requested signage over the 3 that are allowed by right under the City's sign ordinance.
Corrective Action Required
07/17/2023

SITE PLAN CONSISTENCY. The architectural site plans for both lots do not match the civil site plans as it relates to parking lot configuration, the presence of trash dumpster enclosure, lanscape island configurations, etc. Reconcile the site plans to all match. The applicant response letter states that the plans have been coordinated related to the previously made comment above. However, no new architectural site plan (Sheet A-100) has been provided for Lot 13, nor has a new architectural site plan (unlabeled sheet from the original Lot 11 architectural plan set) been submitted to reflect that all site plans match.
Corrective Action Required
07/17/2023

MECHANICAL EQUIPMENT SCREENING. - Dash in the location of all roof-mounted mechanical equipment on the building elevations. The mechanical equipment shall be fully screened from view by raising building parapets to a height at least equal to the height of the units being screened. Take note to account for the additional height from the curbs on which the mechanical equipment will sit. The revised renderings of the Lot 13 building continue to show visible RTUs. Revise the parapet heights to at least equal the heights of the units being screened. Similar to the comment above, no revised elevations for Lot 11 indicating that the RTUs will be fully screened from view using taller parapet walls have been provided. - Ground mounted mechanical equipment is required to be fully screened from view by using evergreen landscaping or masonry walls of a height at least equal to the height of the units being screened. If using landscaping, the landscaping shall be at least as tall as the units at the time of planting. Lot 13 appears to be using a screened mechanical yard with perhaps a composite wood fence material, which doesn't comply with the two listed screening options. The previously made comment above has not been addressed on the resubmittal.
Corrective Action Required
07/17/2023

BUILDING ELEVATIONS. List the % make-up of the proposed metal paneling for each individual facade for both the Lot 11 and 13 buildings. The previously made comment above has not been addressed.
Corrective Action Required
07/17/2023

EXTERIOR MATERIALS. - Provide manufacturer specifications for the proposed vertical metal panel; wood veneer product; and the galvanized mesh proposed on Lot 13. - Provide manufacturer specifications for the proposed metal panel and wood look panel system proposed on Lot 11. - Revise the reference to Lee's Summit, IL on the Lot 11 car wash architectural elevations to read Lee's Summit, MO.
Engineering Review Approved with Conditions 07/18/2023 07/12/2023
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
07/11/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy. Please note: Sanitary sewer relocation plans will be required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
07/11/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
07/11/2023

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/11/2023

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Planning Review Corrections 06/23/2023 06/26/2023
Hector Soto Jr.
Corrective Action Required
06/25/2023

LOT BOUNDARIES. - The configurations of both lots depicted on the site plans do not match the recorded plat. The property will need to be re-platted to match the proposed lot configurations. - Label the property boundary dimensions and bearings for both lots. -
Corrective Action Required
06/25/2023

STREETS. Label the right-of-way widths for NW Pryor Rd and I-470. I-470 can be labeled as having a variable width.
Corrective Action Required
06/25/2023

EASEMENTS. - Label and dimension all existing easements on the subject lots. The site plans are missing easements dedicated on the current plat of record. - The proposed locations for the two buildings on the separate lots conflict with the locations of existing sanitary sewer lines and easements. The sewer lines shall be relocated and the conflicting easements vacated prior to the issuance of any building permits on the subject lots as depicted on the site plan.
Corrective Action Required
06/25/2023

SIDEWALKS. Show and label, including width, the existing sidewalk along NW Pryor Rd.
Corrective Action Required
06/25/2023

BUILDING LINES. Show and label, include width, of the platted building lines along the NW Pryor Rd and I-470 frontages.
Corrective Action Required
06/25/2023

DRIVE AISLE WIDTH. Is the drive aisle just north of the NW corner of the building on Lot 11 intended to be two-way or one-way? There appears to only be approximately 14'-9" of aisle width in the area south of the landscape aisle. A minimum of 24' of pavement width (not including curb and gutter) is required for a two-way aisle.
Corrective Action Required
06/25/2023

BUILDING FOOTPRINTS. Label the proposed building footprint dimensions.
Corrective Action Required
06/25/2023

LIGHTING. - Show the proposed location of all parking lot pole lights on the site plan and all wall-mounted light fixtures on the building elevations. - Provide manufacturer specifications for all proposed exterior light fixtures for review. Light fixtures shall comply with the standards under UDO Sections 8.220, 8.250, 8.260 and 8.270, as applicable. Also provide a photometric plan in compliance with UDO Section 8.230.
Corrective Action Required
06/25/2023

SITE DATA TABLE. - Add the Floor Area Ratio (FAR) for each lot. - List the number of required parking spaces and the number of proposed parking spaces.
Corrective Action Required
06/26/2023

TRASH ENCLOSURES. Are any trash dumpster proposed to be used on either lot? If so, provide a detail of the proposed dumpster enclosure(s). Enclosures shall be constructed of masonry walls and solid steel gates of a color compatible to the buiding the enclosures serve.
Corrective Action Required
06/26/2023

LANDSCAPE ISLAND WIDTH. Islands planted with trees shall be no less than 10' in width. Further, no tree shall be located less than 4' from the back of curb.
Corrective Action Required
06/26/2023

PARKING LOT SCREENING. Please note that parking lot screening via a hedge consisting of at least 12 evergreen shrubs per 40 linear feet shall be provided for the parking lot along NW Pryor Rd.
Corrective Action Required
06/26/2023

PARKING LOT SETBACK. Parking lots are required to be set back a minimum 20' from the public right-of-way. It appears that the parking lot is set back only 18' from the I-470 right-of-way.
Corrective Action Required
06/26/2023

SIGNAGE. - Submit the proposed sign package for each lot for staff to review. The City's sign ordinance allows single-tenant buildings a maximum of three (3) wall signs by right and multi-tenant buildings a maximum of two (2) wall signs by right per tenant. Additional signage may be requested as part of the subject application. - Provide dimension information for all proposed signs for review. - As shown on the elevations, there are a total of seven (7) wall sign. Staff can support a total of four (4) wall sign (one per facade), but is not likely to support all seven signs depicted on the elevations. - Staff will similarly recommend to reduce the number of gas pump canopy signage from what is depicted on the elevations to no more than three (3). - Please note that attached signage is limited to no more than 10% of the area of the facade onto which the signage is mounted.
Corrective Action Required
06/26/2023

SITE PLAN CONSISTENCY. The architectural site plans for both lots do not match the civil site plans as it relates to parking lot configuration, the presence of trash dumpster enclosure, lanscape island configurations, etc. Reconcil the site plans to all match.
Corrective Action Required
06/26/2023

MECHANICAL EQUIPMENT SCREENING. - Dash in the location of all roof-mounted mechanical equipment on the building elevations. The mechanical equipment shall be fully screened from view by raising building parapets to a height at least equal to the height of the units being screened. Take note to account for the additional height from the curbs on which the mechanical equipment will sit. - Ground mounted mechanical equipment is required to be fully screened from view by using evergreen landscaping or masonry walls of a height at least equal to the height of the units being screened. If using landscaping, the landscaping shall be at least as tall as the units at the time of planting. Lot 13 appears to be using a screened mechanical yard with perhaps a composite wood fence material, which doesn't comply with the two listed screening options.
Corrective Action Required
06/26/2023

BUILDING ELEVATIONS. - The leaders with labeled building materials for Lot 13 do not all point to the intended material. Correct. - List the % make-up of the proposed metal paneling for each individual facade for both the Lot 11 and 13 buildings.
Corrective Action Required
06/26/2023

EXTERIOR MATERIALS. - Provide manufacturer specifications for the proposed vertical metal panel; wood veneer product; and the galvanized mesh proposed on Lot 13. - Provide manufacturer specifications for the proposed metal panel and wood look panel system proposed on Lot 11. - Revise the reference to Lee's Summit, IL on the Lot 13 architectural elevations to Lee's Summit, MO.
Fire Review Corrections 06/23/2023 06/23/2023
Jim Eden
Code Statement
Corrective Action Required
06/23/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. The use of the building on Lot 13 will determine if additional fire protection is required.
Hydrants
Corrective Action Required
06/23/2023

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. The distance to a hydrant on Lot 13 exceeds 300 feet. Provide an additioanl hydrant.
Fire Lanes
Corrective Action Required
06/23/2023

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) The lane in front of lthe car wash on Lot 11 shall be a full 20 feet.
UST's
Informational
06/23/2023

The installation of underground fuel storage tanks (UST’s) shall comply with the 2018 International Fire Code and the requirements of the Missouri Department of Natural Resources.
Engineering Review Approved with Conditions 06/23/2023 06/22/2023
Susan Nelson, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
06/22/2023

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy. Please note: Sanitary sewer relocation plans will be required.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
06/22/2023

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
06/22/2023

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
06/22/2023

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Traffic Review Corrections 06/23/2023 06/22/2023
Erin Ralovo
Corrective Action Required
06/20/2023

Check the square footage of the car wash building. 111k SF seems like an error.
Corrective Action Required
06/20/2023

Applicant needs to provide a traffic memo comparing trips with the new uses to the previous traffic study. Please address assumptions for the gas pumps (Are these expected to be the same trips as the car wash patrons, or can you just get gas and skip the wash?)
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $2,900.00 $2,900.00 Paid 08/10/2023
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 08/10/2023
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 08/10/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 08/24/2023 5:00 PM Council Chambers 08/24/2023 05:00 PM
Agenda Item
Continued
08/24/2023
Planning Commission Meeting 09/28/2023 5:00 PM Council Chambers 09/28/2023 05:00 PM
Agenda Item
Approved
09/28/2023
City Council Public Hearing 10/10/2023 6:00 PM Council Chambers 10/10/2023 06:00 PM
Agenda Item
Approved
10/10/2023
City Council Ordinance 2nd Reading 10/24/2023 6:00 PM Council Chambers 10/24/2023 06:00 PM
Agenda Item
Pending
Documents & Images
Date Uploaded File Type Document Name
06/30/2023 Public Notice Document Neighborhood Meeting Notification - Lots 11 & 13
06/30/2023 Public Notice Document Certified Mail Receipts 6.27.23
06/30/2023 Public Notice Document Streets of West Pryor Adjacent Property List
07/20/2023 Letter Applicant Letter - Dev. Apps (DRCP)
07/28/2023 Plans Waterway Lee's Summit Materials
07/28/2023 Plans Waterway Building Elevations Lee's Summit 7-27-23
07/26/2023 Letter Response to Applicant Letter - Dev. Apps (DRCP)0 (2)
07/25/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 7-25-23
07/25/2023 Plans Signage Request 072523 Binder
07/25/2023 Plans Physical Material Samples
07/25/2023 Plans MEP-West Pryor - Lot 13-ME101
07/25/2023 Plans 235008 SOWP Lot 13_Product Sheets
07/25/2023 Plans 235008 SOWP Lot 13_Overall
07/13/2023 Engineer Report/Study Traffic Memo
06/26/2023 Letter Applicant Letter - Dev. Apps (DRCP)
06/14/2023 Public Notice Document Streets of West Pryor Adjacent Property List
06/09/2023 Application Form Lot 11 and 13 Signed Owner Affidavit
06/09/2023 Application Form Lot 11 and 13 Signed Application
08/18/2023 Plans Waterway Lee Summit Renderings 230817
08/18/2023 Plans Waterway Lee Summit Scaled Elevations 230817
08/18/2023 Plans Waterway Photometrics
08/18/2023 Plans 20190731_CarWashMagazine_Chicago___71A5705
08/18/2023 Plans 20190731_CarWashMagazine_Chicago___71A5706
08/18/2023 Plans 20190731_CarWashMagazine_Chicago___71A5814
06/09/2023 Plans Waterway Lee's Summit 6-7-23
06/09/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 6-8-23
08/25/2023 Activity Document Neighborhood Meeting 071123 Binder
06/09/2023 Plans 235008 SOWP Lot 13_V23
09/06/2023 Plans SOWP LOT 11 Truck and Car Turning Exhibit 9-6-23
09/07/2023 Public Notice Document LEGAL PL2023-151 PDP
08/03/2023 Public Notice Document Affidavit of Notice to Property Owners
07/28/2023 Engineer Report/Study Draft_2023 West Pryor TIS Update Memo_07272023_sealed
09/21/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 9-21-23
08/03/2023 Public Notice Document Certified Mail Receipts 8_2_23
08/03/2023 Letter Applicant Letter - Dev. Apps (DRCP)
08/04/2023 Public Notice Document Notice to Property Owners PC CC 8.3.23
08/04/2023 Public Notice Document Streets of West Pryor Adjacent Property List
07/11/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 7-11-23
07/11/2023 Letter Responses to Applicant Letter - Dev_ Apps (DRCP)
07/11/2023 Plans MEP-West Pryor - Lot 13-ME101
07/11/2023 Plans 235008 SOWP Lot 13_Rendered Elevation
08/07/2023 Public Notice Document Posting 2 8.7.2023
08/07/2023 Public Notice Document Posting 1 8.7.2023
08/10/2023 Receipt Receipt for transaction:2023-006197
08/18/2023 Engineer Report/Study PL2023151 Streets of West Pryor Lot 11 and 13 TIA
08/18/2023 Plans 000000-SK108- Overall Development Site Plan 10-25-22-Model (2)
08/18/2023 Plans 235008 SOWP Lot 13_V23
08/18/2023 Drawing Location Map
09/19/2023 Engineer Report/Study PL2023151 Streets of West Pryor Lot 11 and 13 TIA_updated
10/09/2023 Public Notice Document LEGAL PL2023-151 PDP
10/10/2023 Public Notice Document LEGAL PL2023-151 PDP
08/20/2023 Drawing 235008 SOWP Lot 13_Overall_updated
09/05/2023 Engineer Report/Study West Pryor TIS Update Memo_Final_08302023
09/05/2023 Plans SOWP LOT 11 Truck and Car Turning Exhibit
09/06/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 9-6-23
09/12/2023 Letter Applicant Letter - Dev. Apps (DRCP)
09/13/2023 Plans Streets of W Pryor Lot 11 & 13 PUD 9-13-23 (1)
10/04/2023 Presentation Lot 11 and 13 City Council Presentation 101023
11/16/2023 Public Notice Document LEGAL PL2023-151 PDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents