Planning Application Status

PL2023086




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023086
Lee's Summit Medical Office Building 2
Commercial Final Development Plan
Commercial Final Development Plan
Void
04/17/2023
MMPF III LEES SUMMIT MO LLC
New 30,000 square foot, 2 story stand alone medical office building.
Locations
Contacts
MMPF III LEES SUMMIT MO LLC, Address:3807 CLEGHORN AVE STE 903  
LSMOB OWNER LLC, Address:488 TERRINGTON DR  
MCCLURE ENGINEERING, Address:1700 SWIFT, SUITE 100, Phone:(913) 522-2786  
ACI BOLAND ARCHITECTS, Address:1710 WYANDOTTE ST, Phone:(816) 595-9513  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/31/2023 05/31/2023
Mike Weisenborn
Corrective Action Required
05/31/2023

Please revise the estimate to include a breakdown that includes quantity, units, unit price, and total for each line item. Only site related items should be included. The estimate shall be signed/sealed by the engineer.
Corrective Action Required
05/31/2023

Relocate the backflow vault to be outside of the public utility easement as required by Design and Construction Manual Section 6901.H.3.a.
Corrective Action Required
05/31/2023

The method of draining the backflow vault sump shall be shown. We have seen the following methods used in the past: 1) daylighting with a small diameter pipe, 2) connection to a storm box, or 3) construction of an infiltration gallery in the form of a 2 foot diameter hole lined with permeable geotextile and filled with clean 3/4 inch rock. In lieu of the above, a sump pump could be installed. Please evaluate and revise as appropriate.
Corrective Action Required
05/31/2023

Please revise to provide adequate drop across structures as required by Design and Construction Manual Section 5604.5.
Planning Review No Comments 05/31/2023 05/31/2023
Mike Weisenborn
Fire Review Approved with Conditions 05/31/2023 05/29/2023
Jim Eden
Code Statement
Corrective Action Required
05/31/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review No Comments 06/01/2023 05/24/2023
Mike Weisenborn
Traffic Review No Comments 06/01/2023 05/24/2023
Mike Weisenborn
Building Codes Review No Comments 05/01/2023 05/01/2023
Joe Frogge
Traffic Review No Comments 05/01/2023 05/01/2023
Mike Weisenborn
Engineering Review Corrections 05/01/2023 05/01/2023
Susan Nelson, P.E.
Corrective Action Required
05/01/2023

General - Please provide Engineer’s Estimate of Probable Costs. - Please provide MDNR Land Disturbance Permit. - Please provide SWPPP. - Add more information to the Stormwater Management Memo indicating that the proposed increase in parking area in this project was already included in the previous stormwater study.
Corrective Action Required
05/01/2023

C00 Overview Sheet - Please specifically state the “City of Lee’s Summit’” Design and Construction Manual. - Verify that oil – gas wells are not within the property and add a note regarding the specific study used as reference. - Please show and label right-of-way limits and utility easements here and throughout plan set. - Existing sidewalk and ramps not consistently shown. Arrows appear to be floating. - Proposed monument sign cannot be located within the utility easement. Please relocate.
Corrective Action Required
05/01/2023

C05/06 Erosion Control Details - Sheets appear blurry.
Corrective Action Required
05/01/2023

C10 Utility Plan - Install new 8” tee with 2 – 8” gate valves at fire line connection to water main. - Install backflow device vault for fire line. - Please label material for domestic line and the fire line. - Use new 2” tap and meter for the domestic water - Install cut-in wye for sanitary sewer connection. - Keynote 5 points to two unrelated locations.
Corrective Action Required
05/01/2023

C12 Storm Sewer Profiles - Please add HGL. - FL in and out of each drain basin is needed.
Corrective Action Required
05/01/2023

C14/15 Details - Sheets appear blurry. - Add detail WAT-12 Vault for Double Check Detector Check. - Add details for pipe trench and backfill.
Corrective Action Required
05/01/2023

C16 Details - On pavement sections, please show that the gravel base extends 1’ min. behind back of curb.
Planning Review Corrections 05/01/2023 05/01/2023
Jalen Ford
Corrective Action Required
05/01/2023

Is there any visual representation of the monument sign?
Corrective Action Required
05/01/2023

(C00) Please mention that oil and gas wells were looked into. Also provide citation for the findings as well.
Fire Review Corrections 05/01/2023 04/26/2023
Jim Eden
Code Statement
Corrective Action Required
04/26/2023

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Miscellaneous Correction
Corrective Action Required
04/26/2023

The scale is incorrect on drawing C10
FDC
Corrective Action Required
04/26/2023

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required- Show the location of the FDC and a hydrant within 100 feet.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 04/17/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
04/17/2023 Application Form LEE_S SUMMIT MOB 2 FINAL DEVELOPMENT PLAN APPLICATION_04142023
04/17/2023 Plans LEE_S SUMMIT MOB 2 FINAL DEVELOPMENT PLAN DRAWING SET_04142023
04/17/2023 Engineer Report/Study LEE_S SUMMIT MOB 2 STORM LETTER_04142023
04/17/2023 Receipt Receipt for transaction:2023-002129
05/01/2023 Letter Applicant Letter - FDP (DFDP)
05/23/2023 Plans LEE'S SUMMIT MOB FSD REVISED 5-12-23
05/23/2023 Engineer Report/Study Lee's Summit MOB II Storm Letter Rev 051223
05/23/2023 Activity Document LS MOB 2 MDNR Land Disturbance Permit
05/23/2023 Engineers Estimate Site_FDP Summary of Cost OMP_5_11_2023
05/23/2023 Engineer Report/Study SWPPP-LS MOB
05/23/2023 Letter Applicant Letter - FDP (DFDP)
05/31/2023 Letter Applicant Letter - FDP (DFDP)
07/17/2023 Application Form MMPF III Lee's Summit MO, LLC - Final Development Plan Application (executed), 4886-7522-8272, 1
03/26/2024 Drawing LEE'S SUMMIT MOB 2 _ARCH CONCEPT_03252024
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home