Planning Application Status

PL2023002




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023002
HCA Lee's Summit Medical Center ASC - Sanitary Sewer Relocation and Water Main Abandonment
Engineering Plan Review
Engineering Plan Review
Approved
01/05/2023
MIDWEST DIVISION LSH LLC
Locations
Contacts
MIDWEST DIVISION LSH LLC, Address:PO BOX 80610  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 09/25/2024 09/11/2024
Sue Pyles, P.E.
Record Drawings Review Corrections 08/28/2024 08/29/2024
Sue Pyles, P.E.
Corrective Action Required
08/29/2024

Please submit the complete set of plans, with the record drawing certification stamp on the cover sheet. Note any changes made in the field on the drawings. All elevations require as-built information. This included structure top elevations and all flowlines. In addition, revised slopes on the Profile view need to match the revised flowlines.
Engineering Review No Comments 02/16/2023 02/16/2023
Sue Pyles, P.E.
Engineering Review Corrections 01/24/2023 01/24/2023
Gene Williams, P.E.
Corrective Action Required
01/24/2023

Please refer to the supplemental diagram showing the general schematic of the desired sanitary sewer alignment. In additiion, please see supplemental plan sheet 15 from the City of Lee's Summit Capital Improvement Project to upgrade the sanitary sewer lines in this area. This sheet should be used to set flowlines for the relocated line and to ensure the crown of the new 12 inch sanitary line is at or below the incoming 8 inch line serving this project.
Corrective Action Required
01/24/2023

Details shall be required for sealing the existing manhole in the form of a note (i.e., the manhole just south of manhole A1). Is this City manhole number #68-101? If so, please label this manhole with the City manhole number.
Corrective Action Required
01/24/2023

A trenching and backfill detail appeared to be missing. Please provide a trenching and backfill detail, and ensure it shows the 12 inches of aggregate over the top of pipe.
Corrective Action Required
01/24/2023

The standard detail for sanitary sewer service connections (i.e., wye connections) was missing. Please provide the standard detail in the plans.
Corrective Action Required
01/24/2023

North arrow appears incorrect on Sheet 3.
Hearings

There are no hearings for this planning application.

Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home