Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
08/26/2022
|
08/26/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Engineering Review
|
Approved with Conditions
|
08/26/2022
|
08/26/2022
|
|
Nikia Chapman-Freiberger
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
Misc.
Corrective Action Required
For informational purposes, the following items were not shown/resolved on the PDP and should be corrected on the FDP.
C103 Utility Plan:
- Include a detail of the turf system with plan detail sheets and review aggregate base; if this system is supposed to collect/convey stormwater, the base should be drainable with no fines.
C104 Grading Plan:
- Identify/label retaining walls on the plans.
|
|
|
Fire Review
|
Approved with Conditions
|
08/26/2022
|
08/25/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
The existing automatic sprinkler system shall be extended into the new addition.
|
|
|
Planning Review
|
Approved with Conditions
|
08/26/2022
|
08/25/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide details for the proposed retaining wall adjacent to SE Douglas St. This can be deferred to the FDP if final design has not been completed.
|
|
|
Engineering Review
|
Corrections
|
06/24/2022
|
06/24/2022
|
|
Nikia Chapman-Freiberger
|
|
Corrective Action Required
C102 Site Plan:
a) Specify the 10’ water easement as private and include the easement document id number.
b) Show the private water line in the private easement.
c) The canopy cannot be built on/in/over the private water easement, unless the City is provided with documentation of an agreement with all parties involved with the easement.
d) Under SITE NOTES, is the impervious area being increased? If so, include existing impervious area.
|
|
Corrective Action Required
C103 Utility Plan:
a) Floor drains cannot be connected to the storm drain.
b) Provide a detail of the turf system.
|
|
Corrective Action Required
C104 Grading Plan:
a) Show drainage arrows.
b) Provide curb elevations along Douglas to verify elevations are adequate for drainage out of the underdrains.
c) Will there be a retaining wall along the west turf area? If so, call it out and specify top and bottom elevations.
|
|
Corrective Action Required
Drainage Report:
a) The report must be signed and sealed by a PE licensed in the state of Missouri.
b) How is the project disturbing more than one acre when the entire site is less than 0.4 acres?
c) Correct scale on the proposed watershed map.
d) Both drainage areas are labeled as “east area” on both the existing and proposed watershed maps.
e) Express drainage area acreage out to the hundredth to accurately show change in drainage area size.
|
|
|
Planning Review
|
Corrections
|
06/24/2022
|
06/24/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
On the cover sheet, please add a vicinity map with north arrow indicating the location of the property within the City.
|
|
Corrective Action Required
On sheet C102 please add the following information to the site notes
• Total floor area (existing & proposed)
• Floor Area Ratio (FAR)
|
|
Corrective Action Required
Please provide details on how you will be closing off the existing curb cut. It is staff’s expectation that the driveway entrance be removed, cubing installed and the street scape be extended.
|
|
Corrective Action Required
Please provide details on the proposed architectural elements above the bar. Are these illuminated? What material are the characters made of? How are the attached to the wall?
|
|
Corrective Action Required
On sheet SD201 please label the proposed material on the east and south elevations.
|
|
Corrective Action Required
Please provide details on the proposed fencing materials.
|
|
Corrective Action Required
During hours of non-operation how will the bar area be secured?
|
|
Corrective Action Required
Will there be any new ground or roof mounted mechanical equipment?
|
|
Corrective Action Required
What kind of lighting is proposed to illuminate the area?
|
|
|
Traffic Review
|
Corrections
|
06/24/2022
|
06/23/2022
|
|
Brad Cooley, P.E., RSPI
|
|
Corrective Action Required
Please provide documentation on how the on-site parking stalls (including ADA) will be accommodated.
|
|
|
Fire Review
|
Approved with Conditions
|
06/24/2022
|
06/21/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Misc.
Corrective Action Required
The existing automatic sprinkler system shall be extended into the new addition.
|
|
|