Planning Application Status

PL2022165




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022165
Lakewood Business Center on I-470 Plat S - Mass Grading and Erosion and Sediment Control
Engineering Plan Review
Engineering Plan Review
Approved
04/22/2022
NORTH OAK SAFETY STORAGE LLC
Locations
Contacts
POWELL CWM INC, Address:3200 S STATE ROUTE 291 BLDG 1, Phone:(816) 373-4800  
NORTH OAK SAFETY STORAGE LLC, Address:1120 NW EAGLE RIDGE BLVD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 08/11/2023 08/11/2023
Gene Williams, P.E.
Engineering Review No Comments 03/07/2023 03/07/2023
Gene Williams, P.E.
Engineering Review Corrections 02/03/2023 02/02/2023
Gene Williams, P.E.
Corrective Action Required
02/02/2023

Sheet 054 "Erosion Control Mass Grading" was missing from the index sheet on the cover sheet. Please list this sheet on the index shown on the cover sheet.
Corrective Action Required
02/02/2023

In keeping with the mass grading aspect of this plan, please re-title the plans as "Mass Grading and Erosion and Sediment Control".
Corrective Action Required
02/02/2023

Mass grading did not appear to be shown on the engineer's estimate. Please include the costs associated with the mass grading. In addition, seeding only showed as 3 acres, but the plans show considerably more than 3 acres of seeding as shown on Sheet 054. Please evaluate and revise as appropriate.
Engineering Review Corrections 09/12/2022 09/14/2022
Gene Williams, P.E.
Corrective Action Required
09/14/2022

Please refer to previous applicant letter. A SWPPP shall be required prior to formal approval. Please submit a SWPPP for this project.
Corrective Action Required
09/14/2022

A cost estimate was missing, and shall include all erosion and sediment control, mass grading, and final restoration of disturbed areas. Please submit an itemized and sealed cost estimate.
Corrective Action Required
09/14/2022

According to the response to comments, wetland delineation and jurisdictional determination is still ongoing. The City shall require documentation that all wetland issues have been addressed to the satisfaction of the U.S. Fish and Wildlife Service.
Engineering Review Corrections 05/06/2022 05/08/2022
Gene Williams, P.E.
Corrective Action Required
05/08/2022

The erosion and sediment control plan was not submitted in a standalone format, but rather, appear to be a submittal of the Street and Stormwater plans with the erosion and sediment control and mass grading. Is a separate permit being sought for the erosion and sediment control with mass grading? If so, please break it down to erosion and sediment control, along with any mass grading to be performed with the erosion and sediment control. If a separate permit is not being sought for erosion and sediment control and mass grading, then it will becoma a part of the Street and Stormwater plans already submitted.
Corrective Action Required
05/08/2022

A SWPPP is required prior to formal approval of any plans on this project.
Corrective Action Required
05/08/2022

Are there any wetlands on this project?
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
04/22/2022 Plans 2022-04-01 Street & Storm Plans
05/08/2022 Letter DE-Comment Letter (Engineering Plans)
08/25/2022 Plans 2022-08-24 21-1883 Lakewood Businesss Park Erosion Control
08/25/2022 Letter Signed Lakewood Business Park ESC Comment Response Letter
09/14/2022 Letter DE-Comment Letter (Engineering Plans)
01/20/2023 Letter Erosion and Sediment Control and Mass Grading Comment Response Letter
01/20/2023 Engineer Report/Study SWPPP
01/20/2023 Plans 21-1883 Lakewood Businesss Park Erosion Control
01/20/2023 Engineers Estimate ESC Cost Estimate
02/02/2023 Letter DE-Comment Letter (Engineering Plans)
02/17/2023 Plans 21-1883 Lakewood Businesss Park Erosion Control
02/17/2023 Letter Erosion, Sediment Control, and Mass Grading Comment Response Letter -2-17-23
02/17/2023 Engineers Estimate ESC Cost Estimate
02/22/2023 Activity Document 21-1883 Corp Response Letter
03/07/2023 Email STKY APPROVAL
08/04/2023 Engineers Estimate Rev ESC Cost Estimate
08/14/2023 Activity Document FEE WORKSHEET
09/06/2023 Approved Plans MASS GRADING AND ESC STAMPED PLANS - CONSTR
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home