Review Type |
Outcome |
Est. Completion Date |
Completed |
Redesign Review
|
No Comments
|
11/21/2022
|
11/17/2022
|
|
Sue Pyles, P.E.
|
|
|
Engineering Review
|
Approved with Conditions
|
06/21/2022
|
06/28/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $6,221.80 (which is based on 3% of the total infrastructure cost plus a water test inspection fee(s)) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Building Codes Review
|
No Comments
|
06/21/2022
|
06/22/2022
|
|
Mike Weisenborn
|
|
|
Planning Review
|
No Comments
|
06/21/2022
|
06/21/2022
|
|
Shannon McGuire
|
|
|
Fire Review
|
Approved with Conditions
|
06/21/2022
|
06/21/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Action required- The fire department access to the south building shall be capable of supporting a 75,000- pound fire apparatus. Confirm constructon type.
|
|
Knox Locks
IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Action required- Knox box and gate locks shall be provided.
|
|
|
Traffic Review
|
No Comments
|
06/21/2022
|
06/20/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Corrections
|
06/09/2022
|
06/07/2022
|
|
Shannon McGuire
|
|
Corrective Action Required
The proposed embossed texture on the prefinished metal siding does not meet the UDO minimum requirement for rough textured metal. The rough textured metal will need to be of a texture that is similar to that of a stucco finish.
|
|
|
Traffic Review
|
No Comments
|
06/09/2022
|
06/06/2022
|
|
Brad Cooley, P.E., RSPI
|
|
|
Building Codes Review
|
No Comments
|
06/09/2022
|
06/03/2022
|
|
Joe Frogge
|
|
|
Engineering Review
|
Corrections
|
06/09/2022
|
06/02/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $6,221.80
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
Misc.
Corrective Action Required
Please submit a revised estimate that includes the additional work. Once this estimate is submitted, a new fee based, on the entire project (original submission plus this added work), will be calculated.
|
|
|
Fire Review
|
Approved with Conditions
|
06/09/2022
|
05/31/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Action required- The fire department access to the south building shall be capable of supporting a 75,000- pound fire apparatus. Confirm constructon type.
|
|
Knox Locks
Corrective Action Required
IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Action required- Knox box and gate locks shall be provided.
|
|
|
Fire Review
|
Approved with Conditions
|
01/04/2022
|
01/04/2022
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Action required- The fire department access to the south building shall be capable of supporting a 75,000- pound fire apparatus. Confirm constructon type.
|
|
|
Engineering Review
|
Approved with Conditions
|
01/04/2022
|
01/04/2022
|
|
Sue Pyles, P.E.
|
|
DE Contact Field Eng. Inspector
Corrective Action Required
Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
|
|
DE Engineers Estimate
Corrective Action Required
The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee of $4,293.62 (which is based on 3% of the total infrastructure cost plus a water test inspection fee(s)) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit.
|
|
DE Future Repair Work
Corrective Action Required
Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
|
|
|
Planning Review
|
No Comments
|
01/04/2022
|
12/28/2021
|
|
Shannon McGuire
|
|
|
Building Codes Review
|
No Comments
|
01/04/2022
|
12/27/2021
|
|
Mike Weisenborn
|
|
|
Traffic Review
|
No Comments
|
01/04/2022
|
12/27/2021
|
|
Mike Weisenborn
|
|
|
Planning Review
|
Corrections
|
11/03/2021
|
11/03/2021
|
|
Shannon McGuire
|
|
Corrective Action Required
Please show the location of all oil and/or gas wells within the subject property. If none are present please add a note stating such and cite the source of your information.
|
|
Corrective Action Required
Will there be any wall mounted lights? If so please provide the manufacturer’s specification sheets for proposed wall mounted fixtures.
|
|
Corrective Action Required
All rooftop mechanical equipment shall be screened by a parapet wall to the height of the proposed RTUs. The north and east elevations show the RTU will be taller then the parapet wall. Please increase the height of the wall to meet the UDO’s minimum standards.
|
|
Corrective Action Required
In the Building & Lot Data table please provide the number of required/proposed parking spaces and impervious coverage.
|
|
Corrective Action Required
The minimum standard for deciduous trees is 3”. Please update the landscaping plans to reflect this UDO standard.
|
|
Corrective Action Required
Informational only - All signs must comply with the sign requirements as outlined in the sign section of the ordinance.
|
|
|
Engineering Review
|
Corrections
|
11/03/2021
|
11/03/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
Submit an Engineer's Estimate of Probable Construction Costs.
|
|
Corrective Action Required
Sheet C1:
• Please add a note stating: “The contractor shall contact the City’s Development Services Engineering Inspection to schedule a pre-construction meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.”
• Show location of all oil/gas wells, or indicate none are present, and cite the source.
|
|
Corrective Action Required
Sheet C1.1: Please include the type of 6” curb and 2’ curb & gutter and make sure standard details are of the same type.
|
|
Corrective Action Required
Sheet C3:
• Connection to public water main is by cut-in tee. Please revise.
• A restrained valve is required on the fire line where it connects to the public main. Please add.
• Notes indicate the BFPD is interior to the building, but the drawing seems to indicate a vault. Please clarify. If in a vault, please locate it outside of the public easement as required by Design and Construction Manual Section 6901.H.3.
• Private fire hydrants shall be installed after the building’s BFPD when located inside the building.
• Is the W7 keynote near the sand/oil separator actually indicating a private FH assembly? Please clarify.
|
|
Corrective Action Required
Sheet C4.1: Please remove the sediment trap detail and add the inlet protection detail.
|
|
Corrective Action Required
Sheet C5:
• Please revise “AB-3” to KDOT AB-3” in General Paving Note 3.
• Please add a 6” curb detail.
|
|
Corrective Action Required
Sheet C5.2:
• Please replace the vault detail with the City’s standard detail or remove if not required.
• Please revise the Trench Bedding notes to match the City’s requirements.
|
|
|
Traffic Review
|
No Comments
|
11/03/2021
|
11/02/2021
|
|
Brad Cooley, P.E., RSPI
|
|
|
Fire Review
|
Approved with Conditions
|
11/03/2021
|
11/02/2021
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Imposed Loads
Corrective Action Required
IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Action required- The fire department access to the south building shall be capable of supporting a 75,000- pound fire apparatus. Confirm constructon type.
|
|
|
Building Codes Review
|
No Comments
|
11/03/2021
|
10/27/2021
|
|
Joe Frogge
|
|
|