Lee's Summit Logistics, Lots 1-3
Final Plat
Final Plat
Recorded
10/13/2021
LOWKAP LLC
Locations
Contacts
LOWKAP LLC, Address:12709 WOODWARD ST  
Mike Weisenborn, Address:220 GREEN ST  
OLSSON ASSOCIATES, Address:7301 W 133RD ST #200, Phone:(913) 634-0903  
SCANNELL PROPERTIES #603 LLC, Address:8801 RIVER CROSSING BLVD STE 300  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 02/08/2022 02/08/2022
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
02/01/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/08/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/08/2022

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
02/08/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #12 Cut & Fill
Corrective Action Required
02/08/2022

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Planning Review No Comments 02/08/2022 02/02/2022
Shannon McGuire
GIS Review No Comments 02/08/2022 02/01/2022
Mike Weisenborn
Fire Review No Comments 02/08/2022 02/01/2022
Mike Weisenborn
Traffic Review No Comments 02/08/2022 02/01/2022
Mike Weisenborn
Planning Review Approved with Conditions 01/28/2022 01/28/2022
Shannon McGuire
Corrective Action Required
01/28/2022

Please label each lot with its respective street number. • Lot 1 = 1120 NW Main St • Lot 2 = 1220 NW Main St • Lot 3 = 1231 NW Main St
Corrective Action Required
01/28/2022

Please remove the “Unplatted” labels from Lot 3.
Engineering Review Corrections 01/28/2022 01/28/2022
Sue Pyles, P.E.
Corrective Action Required
01/19/2022

Please show the sidewalk along the entire east frontage, all the way south to NE Tudor Road. It is currently shown stopping approximately 200' north of NE Tudor Road.
Traffic Review No Comments 01/28/2022 01/24/2022
Brad Cooley, P.E., RSPI
Fire Review No Comments 01/28/2022 01/19/2022
Jim Eden
GIS Review No Comments 01/28/2022 01/19/2022
Kathy Kraemer
GIS Review No Comments 12/22/2021 12/22/2021
Kathy Kraemer
Fire Review No Comments 12/22/2021 12/21/2021
Jim Eden
Planning Review No Comments 12/22/2021 12/21/2021
Shannon McGuire
Engineering Review Corrections 12/22/2021 12/21/2021
Sue Pyles, P.E.
Corrective Action Required
12/21/2021

Please show the sidewalk along the entire east frontage, all the way south to NE Tudor Road.
Traffic Review No Comments 12/22/2021 12/20/2021
Brad Cooley, P.E., RSPI
Fire Review No Comments 10/29/2021 11/01/2021
Jim Eden
Planning Review Corrections 10/29/2021 10/29/2021
Shannon McGuire
Corrective Action Required
10/29/2021

Please include a plat note stating Lot 1 shall not have direct vehicular access to NE Tudor Road.
Corrective Action Required
10/29/2021

Please label the location of any oil and/or gas wells. If none are present please include a plat note stating such and cite the source of your information.
Corrective Action Required
10/29/2021

Sidewalks are required on both sides of NW Main Street. Please shoe the location and width of proposed sidewalks. Easements shall be provided if public sidewalks are to be located on private property. Minimum sidewalk width shall be five (5) feet. Construction standards shall be in accordance with the “Design and Construction Manual”.
Corrective Action Required
10/29/2021

Please show the required building setback lines on the front of all lots and the side streets of corner lots, including dimensions.
Corrective Action Required
10/29/2021

The certifications for city approval shall be repeated on each sheet, in approximately the same location on each sheet.
Engineering Review Corrections 10/29/2021 10/29/2021
Sue Pyles, P.E.
Corrective Action Required
10/27/2021

Please add easement dedication language for each type of easement. Water and Electric are currently missing.
Corrective Action Required
10/27/2021

There is dedication language for "Drainage Easement" included, but I didn't see it in the drawing. There is an easement shown as a "Storm Easement" in the drawing. Are these referring to the same thing? Please reconile and/or revise as needed.
Corrective Action Required
10/28/2021

Please remove the proposed 60' Sanitary Easement associated with the proposed public sanitary sewer extension. That extension will be private, so the easement is not needed.
Corrective Action Required
10/29/2021

Please show and label the required stream corridor easement boundary and include the following language on the plat: “In the areas designated as “Stream Buffer Easement” there is hereby granted to the City an easement for the purpose of prohibiting any development of any kind and prohibiting the erection, construction, placement or maintenance of any structures upon such land, as the term “structure” shall be defined in the City’s Unified Development Ordinance in Chapter 33 of the City Code of Ordinances, and prohibiting any change in the grade and elevation of such land, and prohibiting the alteration of the natural course and flow of the water in the stream, and prohibiting the damming or stoppage of the water in the stream, and to require the owners of such land to keep and maintain such land in its natural vegetative state and to tend, maintain and mow such land as required by the City’s Property Maintenance Code in Chapter 16 of the City Code of Ordinances, which easement shall constitute a servitude upon the land so encumbered and which shall run with the land in perpetuity and be binding upon the land owners, their successors and assigns and all other parties claiming under them, and shall remain in full force and effect forever. A waiver or modification to this Stream Buffer Easement, or a release of this Stream Buffer Easement, may be granted by the City Engineer on behalf of the City as to any or all areas so designated on this Plat, which waiver, modification or release shall be recorded in the land records for Jackson County.”
Corrective Action Required
10/29/2021

Please include the following detention language (choose the appropriate option in italics in each set of brackets): All storm water conveyance, retention, or detention facilities to be located on common property shall be owned and maintained by the {property owners’ association, homeowners’ association} in accordance with the standards set forth in the covenants, conditions, and restrictions. These stormwater detention facilities shall be inspected by the {property owners’ association, homeowners association, or owner, as appropriate} on the frequency specified in the current City of Lee’s Summit Design and Construction Manual, to assure that all inlet and outlet structures are fully-functional, the detention basin has full storage capacity and all landscaping, vegetation and structural improvements are being maintained in accordance with the current City of Lee’s Summit Property Maintenance Code.
GIS Review Corrections 10/29/2021 10/27/2021
Kathy Kraemer
Corrective Action Required
10/27/2021

Please provide the ITB on NW Main St centerline, located between coodinates 12 and 13.
Corrective Action Required
10/27/2021

I cannot really see the lot line between lots 1 and 2. Is it in the sewer easement? Please make a clearer delineation.
Traffic Review Corrections 10/29/2021 10/26/2021
Brad Cooley, P.E., RSPI
Corrective Action Required
10/26/2021

Please show the proposed sidewalk on the plat.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $850.00 $850.00 Paid 10/21/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 02/24/2022 5:00 PM Council Chambers 02/24/2022 05:00 PM
Public Hearing Review
Approved
02/24/2022
City Council Ordinance 1st Reading 03/08/2022 06:00 PM Council Chambers 03/08/2022 06:00 PM
Public Hearing Review
Approved
City Council Ordinance 2nd Reading 03/15/2022 06:00 PM Council Chambers 03/15/2022 06:00 PM
Public Hearing Review
Approved
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home