Planning Application Status

PL2021017




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2021017
Hook Farms 2nd Plat - Streets, Storm and Master Drainage Plan
Engineering Plan Review
Engineering Plan Review
Complete
01/14/2021
HUNT MIDWEST REAL ESTATE DEV INC
Locations
Address
2107 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2111 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2115 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2119 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2123 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2127 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2131 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2135 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2139 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2143 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2147 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2203 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2207 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2211 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2215 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2219 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2210 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2206 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2202 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2630 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2626 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2622 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2618 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2614 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2610 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2602 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2506 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2502 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2503 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2144 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2137 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2607 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2611 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2615 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2619 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2623 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2627 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2631 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2635 SW TRACKER LN, LEES SUMMIT, MO 64082

Address
2136 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2626 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2622 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2618 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2614 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2610 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2606 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2133 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2136 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2132 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2128 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2124 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2120 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2116 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2112 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2108 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2103 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2107 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2111 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2121 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2125 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2129 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2603 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2607 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2611 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2615 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2619 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2623 SW FIREFLY LN, LEES SUMMIT, MO 64082

Address
2116 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2618 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2614 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2610 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2606 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2607 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2611 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2615 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2619 SW BARLEY FIELD DR, LEES SUMMIT, MO 64082

Address
2110 SW HOOK FARM DR, LEES SUMMIT, MO 64082

Address
2140 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Address
2606 SW TRACKER LN, LEES SUMMIT, MO 64082

Property
268429

Property
268430

Property
268431

Property
268432

Property
268433

Property
268434

Property
268435

Property
268436

Property
268437

Property
268438

Property
268439

Property
268440

Property
268441

Property
268442

Property
268443

Property
268444

Property
268445

Property
268446

Property
268447

Property
268448

Property
268449

Property
268450

Property
268451

Property
268452

Property
268453

Property
268454

Property
268455

Property
268456

Property
268457

Property
268458

Property
268459

Property
268460

Property
268461

Property
268462

Property
268463

Property
268464

Property
268465

Property
268466

Property
268467

Property
268468

Property
268469

Property
268470

Property
268471

Property
268472

Property
268473

Property
268474

Property
268475

Property
268476

Property
268477

Property
268478

Property
268479

Property
268480

Property
268481

Property
268482

Property
268483

Property
268484

Property
268485

Property
268486

Property
268487

Property
268488

Property
268489

Property
268490

Property
268491

Property
268492

Property
268493

Property
268494

Property
268495

Property
268496

Property
268497

Property
268498

Property
268499

Property
268500

Property
268501

Property
268502

Property
268503

Property
268504

Property
268505

Property
268506

Property
268507

Property
268508

Address
2104 SW WHEATFIELD DR, LEES SUMMIT, MO 64082

Contacts
HUNT MIDWEST REAL ESTATE DEV INC, Address:8300 UNDERGROUND DR STE 200  
HUNT MIDWEST REAL EST DEV INC, Address:8300 NE UNDERGROUND DR  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
Nelson Willoughby, Address:Olsson Associates, Phone:(816) 361-1177  
Reviews
Review Type Outcome Est. Completion Date Completed
As-graded MDP Review No Comments 10/18/2022 10/18/2127
Gene Williams, P.E.
Record Drawings Review No Comments 12/15/2022 12/14/2022
Gene Williams, P.E.
Record Drawings Review Corrections 12/05/2022 12/05/2022
Gene Williams, P.E.
As-graded MDP Review No Comments 11/16/2022 11/02/2022
Gene Williams, P.E.
Record Drawings Review Corrections 10/18/2022 10/25/2022
Gene Williams, P.E.
As-graded MDP Review Corrections 10/14/2022 10/11/2022
Gene Williams, P.E.
Engineering Review No Comments 05/17/2021 05/17/2021
Gene Williams, P.E.
Engineering Review No Comments 05/06/2021 05/06/2021
Gene Williams, P.E.
Traffic Review No Comments 05/06/2021 05/03/2021
Michael Park
Traffic Review Corrections 04/08/2021 04/08/2021
Gene Williams, P.E.
Corrective Action Required
04/08/2021

Please see previous comment letter concerning street naming. Planning apparently attempted contacting Brock Worthley concerning an acceptable street name, and removing any reference to "Circle". The name shall be Hook Farm Dr.
Corrective Action Required
04/08/2021

Please provide justification for the offset ADA-accessible ramp shown on Sheet C124. Unless specific justification is provided, the City does not feel this offset ADA-accessible route across the street is warranted.
Engineering Review Corrections 04/08/2021 04/07/2021
Gene Williams, P.E.
Corrective Action Required
04/07/2021

Wings are shown on the ADA-accessible ramps. Please remove the wings, and either show grading to the sidewalk, or a straight curb which tapers to zero towards the top of the ramp. Nick Heiser is familiar what we need concerning this issue.
Corrective Action Required
04/07/2021

Sheet C128: A turning space with the minimum 4 by 4 foot dimension shall be provided at the top of the ramp on the east side of the street. A portion of the angled sidewalk may be designed as a turning space using the proposed geometry. Other geometries may be considered if grading will not allow.
Corrective Action Required
04/07/2021

Ensure the ADA-accessible ramp details show the extent of the construction. Suggest a lighter lineweight to denote ramp to be installed by homebuilder, along with a legend or notes denoting the lineweight representation.
Corrective Action Required
04/07/2021

The MBOE table was completely removed from the plans. Are there any lots that would require an MBOE(s) to be established, based on the engineer's recommendation?
Corrective Action Required
04/07/2021

It appears the storm system was not designed for gravity flow (i.e., at or below the crown of the pipe) for the 100 year event. Although not required to be designed to this standard, an overflow route would need to be established for any stormwater that surcharges out of the top of the inlet in such an event, and MBOEs established for affected lots. Please confirm no surcharging above the top of any structure occurs for the 100 year event. This may have a bearing on the MBOE issue discussed in the above comment.
Engineering Review Corrections 02/05/2021 02/05/2021
Gene Williams, P.E.
Corrective Action Required
02/05/2021

A stormwater report appeared to be missing for this phase of the project. In particular, the stormwater extended detention basin should be discussed, and calculations presented.
Corrective Action Required
02/05/2021

We would suggest a re-evaluation of MBOEs based on conversations and emails provided previously on MBOE guidance. Although MBOEs can be specified for each lot, it is not necessarily required.
Corrective Action Required
02/05/2021

We are assuming the extended detention basin after conversion from a sediment basin will not require any additional floodplain development permit? Will there be any additional grading within the floodplain which changes the ground elevations?
Corrective Action Required
02/05/2021

Hook Farm Circle: An ADA-accessible ramp was not shown entering the cul-de-sac bulb, but rather, terminating within the right of way. The City has been terminating these ADA-accessible ramps into cul-de-sacs, and the plans should be revised. One option is to design a 90 degree ADA-accessible ramp entering the cul-de-sac bulb.
Corrective Action Required
02/05/2021

Plan and Profile Views for Storm Lines: Please provide a light hatching and appropriate notes which specify that all pipe being installed in fill locations be backfilled and compacted, followed by tenching and pipe installation in the fill area.
Corrective Action Required
02/05/2021

Sheet C138, C139, and C140 appear to be missing a flowline out for the storm lines entering the creek.
Corrective Action Required
02/05/2021

Sheet C131 appears to show the storm line daylighting into the extended detention basin at 940.0. The bottom of the basin appears to be flat for a portion of the basin bottom, and it would appear it will not properly.
Corrective Action Required
02/05/2021

The extended detention basin does not appear to be designed in accordance with the Design and Construction Manual in terms of freeboard between the nominal 100 year water surface elevation, and the spillway. It also does not appear to meet the clogged condition freeboard requirements from the flow within the emergency spillway and the top of the dam. A minimum 0.5 feet freeboard is required between the nominal 100 year water surface elevation and the spillway elevation, and a 1.0 foot freeboard requirement for the 100 year clogged condition flow within the spillway to the lowest point on the dam.
Corrective Action Required
02/05/2021

There appears to be a discrepancy in the pipe size shown on the section view versus the profile view for the extended detention basin outlet pipe. The section view appears to show 9 inch diameter, and the profile view shows 12 inch.
Corrective Action Required
02/05/2021

Master Drainage Plan Comments: The City is ok with allowing side yard auxiliary swales to be installed by the homebuilder, as long as they are noted on the Master Drainage Plan (MDP). Other auxiliary swales such as those to be constructed on the rear property lines should be installed along with the public subdivision improvements.
Corrective Action Required
02/05/2021

Other Master Drainage Plan Considerations: The City is of the opinion that basement type should still be required for each lot, unlike the MBOE.
Traffic Review Corrections 02/05/2021 02/04/2021
Michael Park
Corrective Action Required
02/04/2021

Sidewalk Ramp missing across Hook Farm Cir. aligned with proposed ramp on Tracker Ln. on Layout Sheet. Sidewalk Ramp proposed near Lot 61/62 shall be moved to directly align with the proposed ramp on the southeast corner of the interesection. No unnecessary diagonal or angled roadway crossings.
Corrective Action Required
02/04/2021

Sidewalk Ramp proposed near Lot 77/76 shall be moved to directly align with the proposed ramp on the southeast corner of the interesection. No unnecessary diagonal or angled roadway crossings.
Corrective Action Required
02/04/2021

Sidewalk Ramp proposed near Lot 51/52 shall be moved to directly align with the proposed ramp on the southeast corner of the interesection. No unnecessary diagonal or angled roadway crossings.
Corrective Action Required
02/04/2021

Coordinate Street Name comment on Plat to Street Name Signs for Hook Farm Drive/Hook Farm Circle. Hook Farm Circle is not a Circle, but rather a Court. If acceptable by Planning, consider the portion of Hook Farm Drive continuing to the cul-de-sac without a name change.
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
01/14/2021 Application Form Hook Farms Second Plat - Final Plat Application
01/22/2021 Plans 2021-01-21_Hook_Farms_2nd_Street_&_Storm_Plans
02/05/2021 Letter DE-Comment Letter (Engineering Plans)
02/05/2021 Engineer Report/Study 2021-01-12_Stormwater Report_B194061
03/25/2021 Letter 2021-03-19_HF2 Street & Storm Comment Response Letter_B180833
03/25/2021 Engineer Report/Study 2021-03-19_Stormwater Report_B194061-Combined
03/25/2021 Plans 2021-03-23_Hook_Farms_2nd_Street_&_Storm_Plans
04/08/2021 Letter DE-Comment Letter (Engineering Plans)
04/21/2021 Letter Response Letter
04/21/2021 Plans StreetStormMDPPlansApr2021
08/04/2021 Activity Document Hook Farms No Rise Certification_SIGNED
10/05/2021 Letter DE-Engineering Plans Approval Letter
10/11/2022 Plans 2022_10_11_HookFarms2nd-MASTER DRAINAGE PLAN
10/11/2022 Plans 2022-10-11_HookFarms2ndSTREET & STORM
10/11/2022 Email EMAIL COMMENTS OCT2022
10/11/2022 Plans 22-10-11_HookFarms2nd_MasterDrainage_Asbuilts
10/11/2022 Plans 22-10-11_HookFarms2nd_Street&Storm_Asbuilts
10/25/2022 Email EMAIL STSTMMDPCOMMENTSOCT2022
11/28/2022 Plans 22-11-28_HookFarms2nd_Street&Storm_Asbuilts
12/14/2022 Accepted Record Drawings ACCEPTED RECORD DRAWINGS
12/07/2022 Plans 22-12-07_HookFarms2nd_Street&Storm_Asbuilts
12/05/2022 Email EMAIL COMMENT RECORD DWG DEC2022
11/02/2022 Plans ACCEPTED MASTER DRAINAGE PLAN
11/01/2022 Plans C144 MASTER DRAINAGE PLAN
10/18/2022 Accepted Record Drawings REJECTED MDP HOOK FARMS 2ND
10/04/2021 Approved Plans Hook Farms 2nd Street & Storm - Approved 10.4.21
08/03/2021 Activity Document Hook Farms No Rise CertificationSEALED
08/03/2021 Activity Document Community-Acknowledgment-Form_21-06-17
08/03/2021 Activity Document Combined_HookFarms_SubmittalsSEALED_21-06-17
06/17/2021 Activity Document RASModelNarrative_CLOMR-F_HookFarmsSIGNED
05/17/2021 Activity Document FeeWorksheet
05/17/2021 Email STKY APPROVAL STSTMMDP
05/10/2021 Engineers Estimate 2021_05_10_HF2_Public_Street&Storm_Cost_Estimate
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home