Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
03/08/2021
|
03/08/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
|
|
DE C&O #14 Common Area Sidewalks
Corrective Action Required
All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
|
|
|
Planning Review
|
No Comments
|
03/08/2021
|
03/05/2021
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Street Prefix. Please add the SW Prefix on SW Longview Blvd.
|
|
Miscellaneous Correction
Tract J language. Please add this language “TRACT J IS COMMON AREA TO BE OWNED AND MAINTAINED BY THE HIGHLAND MEADOWS HOMES ASSOCIATION, INCLUSIVE OF THE PRIVATE SIDEWALK AND ANY OTHER IMPROVEMENTS LOCATED ON SAID TRACT THAT PROVIDES A CONNECTION BETWEEN SW LONGVIEW BLVD AND SW 11TH TERR. THE CITY OF LEE’S SUMMIT SHALL HAVE NO OWNERSHIP OR MAINTENANCE RESPONSIBILITIES OVER THE PRIVATE IMPROVEMENTS ON TRACT J.”
|
|
Miscellaneous Correction
With the revised Common Area dedication language above that covers the private sidewalk, please delete the current sidewalk easement paragraph dedicating the sidewalk across Tract J to the City that you have on it and replace with the languge from correction #7.
|
|
Miscellaneous Correction
Please delete the easement detail for Tract J since there is no longer any sidewalk easement being granted to the City because it is a private improvement owned and maintained by the HOA.
|
|
|
Fire Review
|
No Comments
|
03/08/2021
|
03/04/2021
|
|
Jim Eden
|
|
|
GIS Review
|
No Comments
|
03/08/2021
|
03/03/2021
|
|
Kathy Kraemer
|
|
|
Traffic Review
|
No Comments
|
03/08/2021
|
03/02/2021
|
|
Michael Park
|
|
|
GIS Review
|
Corrections
|
02/09/2021
|
02/11/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please label the distances on each side of the "eyebrow" centerline: 171.88 and 89.19
|
|
|
Engineering Review
|
Approved with Conditions
|
02/09/2021
|
02/09/2021
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #13 ADA Sidewalk Ramps
Corrective Action Required
All ADA sidewalk ramps shall be constructed by the developer at the time the street is constructed.
|
|
DE C&O #14 Common Area Sidewalks
Corrective Action Required
All sidewalks adjacent to a common area tract, unplatted land or any land where no structure is intended to be built, and is required, shall be constructed by the developer at the time the street is constructed.
|
|
|
Traffic Review
|
No Comments
|
02/09/2021
|
02/08/2021
|
|
Michael Park
|
|
|
Fire Review
|
No Comments
|
02/09/2021
|
02/08/2021
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
02/09/2021
|
02/08/2021
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Vicinity Map. Please show a north arrow on the vicinity map
|
|
Miscellaneous Correction
Street names. Please show the names of the streets
|
|
Miscellaneous Correction
Name on Dept Signature. Jackson County prefers not to have a name listed for the Assessor/GIS Dept signature line, just the department name.
|
|
Miscellaneous Correction
Easement detail. Please add a note to the ingress/easement easement across Tract J to make it clear to where it applies. The easement needs to be defined on the plat and dedicated.
|
|
Miscellaneous Correction
Addresses. Please see the attached Addressed document for addresses.
|
|
Miscellaneous Correction
Corrective Action Required
Street Prefix. Please add the SW Prefix on SW Longview Blvd.
|
|
Miscellaneous Correction
Corrective Action Required
Tract J language. Please add this language “TRACT J IS COMMON AREA TO BE OWNED AND MAINTAINED BY THE HIGHLAND MEADOWS HOMES ASSOCIATION, INCLUSIVE OF THE PRIVATE SIDEWALK AND ANY OTHER IMPROVEMENTS LOCATED ON SAID TRACT THAT PROVIDES A CONNECTION BETWEEN SW LONGVIEW BLVD AND SW 11TH TERR. THE CITY OF LEE’S SUMMIT SHALL HAVE NO OWNERSHIP OR MAINTENANCE RESPONSIBILITIES OVER THE PRIVATE IMPROVEMENTS ON TRACT J.”
|
|
Miscellaneous Correction
Corrective Action Required
With the revised Common Area dedication language above that covers the private sidewalk, please delete the current sidewalk easement paragraph dedicating the sidewalk across Tract J to the City that you have on it and replace with the languge from correction #7.
|
|
Miscellaneous Correction
Corrective Action Required
Please delete the easement detail for Tract J since there is no longer any sidewalk easement being granted to the City because it is a private improvement owned and maintained by the HOA.
|
|
|
Engineering Review
|
Corrections
|
01/22/2021
|
01/22/2021
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
The plat references a Drainage Easement (D/E). but I don't see one shown. If not used, please remove the language from the plat.
|
|
Corrective Action Required
Please provide an easement along Longview Blvd.
|
|
Corrective Action Required
It appears that there are some storm sewer not centered in easements, which is required. Please revise either the easement of the storm sewer alignment.
|
|
Corrective Action Required
Please label the street names.
|
|
|
GIS Review
|
Corrections
|
01/22/2021
|
01/20/2021
|
|
Kathy Kraemer
|
|
Corrective Action Required
Legal description has errors on the northwest part of plat.
Dimension for bearing S26-56-00E; drawing shows 28.37, but legal says 38.37
Bearing S44-53-00E; drawing shows 71.49, but legal lacks any length.
Drawing shows the following bearing to be
S33-57-00W/distance 170.06; there is no bearing listed in legal.
|
|
Corrective Action Required
What is the return radius on the cul-de-sac on 11th Terr?
|
|
Corrective Action Required
Need distances on SW Fiord and bearing/distance on 11th St at that intersection of Fiord and 11th St.
|
|
|
Fire Review
|
No Comments
|
01/22/2021
|
01/11/2021
|
|
Jim Eden
|
|
|
Planning Review
|
Corrections
|
01/22/2021
|
01/11/2021
|
|
Victoria Nelson
|
|
Miscellaneous Correction
Corrective Action Required
Vicinity Map. Please show a north arrow on the vicinity map
|
|
Miscellaneous Correction
Corrective Action Required
Street names. Please show the names of the streets
|
|
Miscellaneous Correction
Corrective Action Required
Name on Dept Signature. Jackson County prefers not to have a name listed for the Assessor/GIS Dept signature line, just the department name.
|
|
Miscellaneous Correction
Corrective Action Required
Easement detail. Please add a note to the ingress/easement easement across Tract J to make it clear to where it applies. The easement needs to be defined on the plat and dedicated.
|
|
Corrective Action Required
Addresses. Please see the attached Addressed document for addresses.
|
|
Miscellaneous Correction
Corrective Action Required
Street name. Please change abbreviation for Terrace to TER, not TERR.
|
|
Miscellaneous Correction
Corrective Action Required
Tract J. “TRACT J IS COMMON AREA TO BE OWNED AND MAINTAINED BY THE HIGHLAND MEADOWS HOMES ASSOCIATION, INCLUSIVE OF THE PRIVATE SIDEWALK AND ANY OTHER IMPROVEMENTS LOCATED ON SAID TRACT THAT PROVIDES A CONNECTION BETWEEN SW LONGVIEW BLVD AND SW 11TH TERR. THE CITY OF LEE’S SUMMIT SHALL HAVE NO OWNERSHIP OR MAINTENANCE RESPONSIBILITIES OVER THE PRIVATE IMPROVEMENTS ON TRACT J.”
|
|
|
Traffic Review
|
No Comments
|
01/22/2021
|
01/08/2021
|
|
Michael Park
|
|
|