Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
06/21/2021
|
06/21/2021
|
|
Dawn Bell
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Planning Review
|
No Comments
|
06/21/2021
|
06/21/2021
|
|
Dawn Bell
|
|
|
Fire Review
|
No Comments
|
06/21/2021
|
06/21/2021
|
|
Dawn Bell
|
|
|
Traffic Review
|
No Comments
|
06/21/2021
|
06/21/2021
|
|
Dawn Bell
|
|
|
GIS Review
|
No Comments
|
06/21/2021
|
06/16/2021
|
|
Kathy Kraemer
|
|
|
GIS Review
|
Corrections
|
12/28/2020
|
12/28/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Please provide the return radius on both sides of the "eyebrow" cul-de-sac between Arbor Sound Dr and Arborway Ter.
|
|
Corrective Action Required
The segment from Arboridge Cir to edge of plat along Arborway Ter should be 157, not 325.42
|
|
|
Engineering Review
|
Approved with Conditions
|
12/28/2020
|
12/28/2020
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Traffic Review
|
No Comments
|
12/28/2020
|
12/22/2020
|
|
Michael Park
|
|
|
Fire Review
|
No Comments
|
12/28/2020
|
12/21/2020
|
|
Jim Eden
|
|
|
Planning Review
|
No Comments
|
12/28/2020
|
12/17/2020
|
|
Shannon McGuire
|
|
|
Fire Review
|
No Comments
|
10/16/2020
|
10/22/2020
|
|
Jim Eden
|
|
|
GIS Review
|
Corrections
|
10/16/2020
|
10/19/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Ownership at county is CMH Parks, and not Clayton Properties or Summit Homes. Please change DBA statement.
|
|
|
Planning Review
|
Corrections
|
10/16/2020
|
10/16/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
There is a dashed line on the rear property lines of lots 189-191 & 201-204. What is this depicting?
|
|
Corrective Action Required
Please add a statement establishing ownership and maintenance responsibility for all common area tracts, private easements, or other non-public areas.
|
|
Corrective Action Required
Please update the City signature block to reflect the current Planning Commission Secretary, John Lovell.
|
|
Corrective Action Required
Please label each lot with it street number (see attached document).
|
|
Corrective Action Required
There is an invalid street type on the plat. The suffix “Sound” is not valid. Please update "SW Arbor Sound" with a street type that meets the UDO requirement. An example could be Arbor Sound DR.
|
|
|
Engineering Review
|
Corrections
|
10/16/2020
|
10/16/2020
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Please add the title "Drainage Note" above the section concerning the Master Drainage Plan. This makes it easier for City staff to determine whether a Master Drainage Plan is applicable to this subdivision during plot plan reviews.
|
|
|
Traffic Review
|
No Comments
|
10/16/2020
|
10/07/2020
|
|
Michael Park
|
|
|