Planning Application Status

PL2020206




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020206
Saint Luke's East - NE Parking Lot Expansion and Generator
Commercial Final Development Plan
Commercial Final Development Plan
Approved
07/21/2020
SAINT LUKES EAST HOSPITAL
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
ACI BOLAND, Address:1421 EAST 104TH ST; SUITE 100, Phone:(816) 763-9600  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 09/01/2020 09/09/2020
Loic Nguinguiri, E.I.
DE Contact Field Eng. Inspector
Corrective Action Required
09/09/2020

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE C&O #11 Pavement Thickness
Corrective Action Required
09/09/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Future Repair Work
Corrective Action Required
09/09/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE Engineers Estimate
Corrective Action Required
09/10/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $17,602.28
Planning Review No Comments 09/01/2020 08/31/2020
Shannon McGuire
Traffic Review No Comments 09/01/2020 08/27/2020
Michael Park
Building Codes Review No Comments 09/01/2020 08/26/2020
Joe Frogge
Fire Review No Comments 09/01/2020 08/25/2020
Jim Eden
Code Statement
Corrective Action Required
08/25/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
08/25/2020

The enclosure shall have the appropriate NFPA 704 placards and signage.
Engineering Review Corrections 08/19/2020 08/19/2020
Loic Nguinguiri, E.I.
Corrective Action Required
08/19/2020

Sheet C701: Please revise the note 5 to say “The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200”; or remove since it is already shown on cover sheet.
Corrective Action Required
08/19/2020

Regarding the EOOPCC, please coordinate with the construction contractor to provide Engineer’s estimate breakout(s) as mentioned in the comment response letter.
Corrective Action Required
08/19/2020

Please submit an updated SWPPP that matches the (current) proposed scope of work.
Corrective Action Required
08/19/2020

Please remove the to-be-removed rip rap from landscape sheet L102.
Corrective Action Required
08/19/2020

Please label Flared End Section information for storm line 3 as shown for storm line 1 FES on page C902.
Corrective Action Required
08/19/2020

Please only show hatching in the areas between existing grade and 18” above the top of the pipe where the existing grade is lower than 18” above the top of the pipe.
Building Codes Review No Comments 08/19/2020 08/13/2020
Joe Frogge
Traffic Review No Comments 08/19/2020 08/12/2020
Michael Park
Planning Review No Comments 08/19/2020 08/12/2020
Shannon McGuire
Building Codes Review No Comments 08/05/2020 08/05/2020
Joe Frogge
Engineering Review Corrections 08/05/2020 08/05/2020
Loic Nguinguiri, E.I.
Corrective Action Required
08/05/2020

Sheet C700: Please show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
08/05/2020

Sheet C701: It appears that some general notes are either misleading or not applicable. Please revise. Make sure to remove the ones that are not applicable.
Corrective Action Required
08/05/2020

Sheet C703: As shown in ESC-03, J-hooks are required within the land disturbance setup. Given the silt fence 100’ maximum runs for J-hooks, please locate the needed J-hooks.
Corrective Action Required
08/05/2020

Sheet C703: Since the proposed grading will direct the storm water runoff flow southeast instead of northeast, please provide curb inlet sediment barrier protection(s) to the two curb inlets along the access road as secondary ESC measures.
Corrective Action Required
08/05/2020

Sheet C802: Please revise overlapping text(s).
Corrective Action Required
08/05/2020

Sheet C902 & C903 : When pipe is to be installed in embankment or fill, the embankment shall be constructed in accordance with APWA Section 2102.6 and shall be built up to a plane at least 18 inches above the top of the pipe prior to the excavation of the pipe trench. Please include the following note on any applicable sheet: “Compacted fill shall be placed to a minimum of 18” above the top of the pipe prior to installation”. Also, make sure to show/label the limits of the compacted fill placement in the profile view(s). Use hatching for clarity.
Corrective Action Required
08/05/2020

Sheet C902: Storm line 1 profile view appears to be incomplete. Line 1 proposed grade leader doesn’t point to anything. Please revise to show complete drawing with 10/100-year hydraulic grade lines and flared end section. We require the design HGL to be shown.
Corrective Action Required
08/05/2020

Sheet C705: Please remove the to-be-removed rip rap, shown on sheet C705, from other sheets since not relevant nor applicable.
Corrective Action Required
08/05/2020

Sheet C903: Please show flared end section with flow line, on storm line 3 profile view. Also, make sure to label the pipe info upstream of Structure 3-1.
Corrective Action Required
08/05/2020

Please label/show crossing sanitary main elevations within storm lines profile views, as applicable. As required by the City, please maintain an 18” minimum vertical separation between the sanitary main pipe and the proposed storm lines pipe.
Corrective Action Required
08/05/2020

Sheet L102: Two (2) scale measurements are shown here. Is the actual scale 1” = 20 feet (from scale bar) or 1” = 30 feet (from overall landscape plan)? Please revise on to the sheet.
Corrective Action Required
08/05/2020

Please provide an Engineer’s Opinion of Probable Construction Cost (EOOPCC) sheet.
Corrective Action Required
08/05/2020

Please show/label the existing 8” water main and 12” sanitary main lines within the set of plans. Also, make sure to include a note about the proximity of those lines. The proposed scope of work should not interfere with the surrounding mains. Please acknowledge that a horizontal minimum separation of 5 feet is required from the edge of the sanitary main to the back of (new) curb or any structure.
Corrective Action Required
08/05/2020

Sheet C806 appears to be missing from the set of plans. Please include or revise the civil index of sheets.
Corrective Action Required
08/05/2020

Please provide information regarding the connection point source of storm line 3 (past STA 13+87). What is storm line 3 connected to?
Corrective Action Required
08/05/2020

Is structure 3-1 a junction box or curb inlet? Plan and profile conflict.
Corrective Action Required
08/05/2020

Flowlines don’t make sense at Structure 4-1. Please revise.
Corrective Action Required
08/05/2020

More clearly show existing storm sewer and proposed storm sewer. It is not currently clear how they will combine to form the proposed overall system.
Corrective Action Required
08/05/2020

Please provide a SWPPP along with the resubmittal.
Corrective Action Required
08/05/2020

Please add/show construction standard details for concrete sidewalk and retaining wall as mentioned on page C801.
Planning Review Corrections 08/05/2020 08/05/2020
Shannon McGuire
Corrective Action Required
08/05/2020

Please show the location of all oil and/or gas wells within the subject property. If none are present please add a note stating such and cite your source of information.
Corrective Action Required
08/05/2020

Please provide a note indicating the height of the proposed light poles.
Corrective Action Required
08/05/2020

Please provide the manufacturer’s specification sheets for proposed exterior lighting. The specification sheets shall indicate the exact fixture to be used.
Corrective Action Required
08/05/2020

If any new signs are to be installed they must comply with the sign requirements as outlined in the sign section of the ordinance and will be permitted by separate application.
Traffic Review No Comments 08/05/2020 07/28/2020
Michael Park
Fire Review Approved with Conditions 08/05/2020 07/22/2020
Jim Eden
Code Statement
Corrective Action Required
07/22/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
07/22/2020

The enclosure shall have the appropriate NFPA 704 placards and signage.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 07/30/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home