Planning Application Status

PL2019392




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019392
SUMMIT VIEW FARMS 4TH PLAT - MASS GRADING, ESC, PAVING AND STORM SEWER PLANS
Engineering Plan Review
Engineering Plan Review
Approved
11/20/2019
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
Locations
Address
3104 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3108 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3112 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3116 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3120 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3124 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3128 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3132 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
2317 SW MORRIS DR, LEES SUMMIT, MO 64082

Address
3107 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3111 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3115 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3119 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3133 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3137 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
3141 SW SUMMIT VIEW TRL, LEES SUMMIT, MO 64082

Address
2302 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2306 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2310 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2314 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2323 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2319 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2315 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2311 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2307 SW SERENA PL, LEES SUMMIT, MO 64082

Address
2303 SW SERENA PL, LEES SUMMIT, MO 64082

Address
3203 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3207 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3211 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3215 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3219 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3223 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3202 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3206 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3210 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3214 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3218 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3222 SW ENOCH ST, LEES SUMMIT, MO 64082

Address
3205 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3209 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3213 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3217 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3221 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3204 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3208 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3212 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Address
3216 SW SADDLEBRED TER, LEES SUMMIT, MO 64082

Property
69520053700000000

Property
69520053600000000

Property
69520053500000000

Property
69520090100000000

Property
69520099900000000

Property
69520099800000000

Property
69520099700000000

Property
69520099600000000

Property
69520080600000000

Property
69520080700000000

Property
69520080800000000

Property
69520080900000000

Property
69520081000000000

Property
69520081100000000

Property
69520081200000000

Property
69520081300000000

Property
69520082100000000

Property
69520082200000000

Property
69520082300000000

Property
69520082000000000

Property
69520081900000000

Property
69520081800000000

Property
69520081700000000

Property
69520081600000000

Property
69520081500000000

Property
69520081400000000

Property
69520120100000000

Property
69520120200000000

Property
69520120300000000

Property
69520120400000000

Property
69520120500000000

Property
69520120600000000

Property
69520110100000000

Property
69520111100000000

Property
69520111000000000

Property
69520110900000000

Property
69520110800000000

Property
69520110700000000

Property
69520110200000000

Property
69520110300000000

Property
69520110400000000

Property
69520110500000000

Property
69520110600000000

Property
69520100100000000

Property
69520109900000000

Property
69520109800000000

Property
69520109700000000

Contacts
LAMP RYNEARSON, Address:9001 STATE LINE RD STE 200, Phone:(402) 496-2498  
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:PO BOX 291, Phone:(816) 838-0552  
BURGSTAHLER JOEL & JANNA, Address:3104 SW SUMMIT VIEW TRL  
PETERSON TRUST DATED 05/22/2024, Address:3108 SW SUMMIT VIEW TRL  
SPELLERBERG ENTERPRISES LLC, Address:613 NE VIEWPARK DR  
WOOD BROTHERS CONSTRUCTION INC, Address:512 NE LYNDONWOOD DR  
KELLY DEDERICK D, Address:3120 SW SUMMIT VIEW TRL  
HARDT DANIEL, Address:3124 SW SUMMIT VIEW TRL  
CORDELL BRIAN & AMBER, Address:3128 SW SUMMIT VIEW TRL  
SUMMIT VIEW FARMS HOME OWNERS ASSOCIATION LLC, Address:PO BOX 291  
WALKER CUSTOM HOMES LLC, Address:PO BOX 247  
WELSH ERNEST E & DONNA L, Address:3107 SW SUMMIT VIEW TRL  
JW THOMAS LLC, Address:14706 S HUTT RD  
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
BILL KENNEY HOMES INC, Address:13450 E STATE ROUTE 150 HWY  
WOODS BROTHERS CONSTRUCTION INC, Address:512 NE LYNDONWOOD DR  
PEMBRICK ALFRED G JR & SHANNON, Address:2306 SW SERENA PL  
COON JEREMY & MICHELLE, Address:2323 SW SERENA PL  
NZC HOMES LLC, Address:1009 INDUSTRIAL DR  
STEWART BUILDERS LLC, Address:12 SEQUOYAH PT  
SHEDD KEVIN C & KATHERINE E, Address:2311 SW SERENA PL  
FOSTER SHANE A & POLLY A, Address:3219 SW ENOCH ST  
RUDMAN SHANE A & MINKA A, Address:3223 SW ENOCH ST  
SWAIN JON P & CARALYNN M, Address:3202 SW ENOCH ST  
MCCOMBS ALVIN & VERLANA, Address:3206 SW ENOCH ST  
FINNEGAN LISA M, Address:3210 SW ENOCH ST  
THORESON NATHAN R & HEATHER B, Address:3214 SW ENOCH ST  
HELLER MARK, Address:3218 SW ENOCH ST  
ENECHUKWU DILIBE, Address:3213 SW SADDLEBRED TER  
O'NEAL STACIE, Address:3204 SW SADDLEBRED TER  
HILL DANIEL S & ASHLEY E, Address:3208 SW SADDLEBRED TER  
SANDERS STEPHEN & CINDY, Address:3212 SW SADDLEBRED TER  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review No Comments 07/12/2022 07/12/2022
Sue Pyles, P.E.
Record Drawings Review Corrections 05/31/2022 06/02/2022
Sue Pyles, P.E.
As-graded MDP Review No Comments 01/28/2022 01/28/2022
Sue Pyles, P.E.
As-graded MDP Review Corrections 01/21/2022 01/21/2022
Sue Pyles, P.E.
Engineering Review No Comments 10/12/2020 10/07/2020
Sue Pyles, P.E.
Traffic Review No Comments 10/12/2020 10/06/2020
Michael Park
Engineering Review No Comments 04/02/2020 04/02/2020
Sue Pyles, P.E.
Traffic Review No Comments 04/02/2020 04/01/2020
Michael Park
Engineering Review Corrections 01/22/2020 01/22/2020
Sue Pyles, P.E.
Corrective Action Required
01/22/2020

Sheet 6: • The area north of proposed SW Kline Ave and east of proposed SW Summit View Trl is a long steep slope. Consider additional erosion control measures along the slope, not just at the downhill base of the slope. • Is proposed Swale 1 being utilized for erosion and sediment control at all?
Corrective Action Required
01/22/2020

Sheet 12: • Revise General Note 5 to reflect that all lot elevations are proposed elevations. • Revise the font for the Lot 92 elevations along SW Morris Dr. to match the elevations throughout the sheet and label as existing for clarity if appropriate. • Proposed elevations are missing in the following locations: o Rear corners of Lots 79/80, 80/81, 81/82, 113/114, 114/115, 115/116. o SE corners of Lots 75, 105, 106, 117. • Include MBOE for Tract D. • Revise “(SS)” to “(SW)” in the Lot 97 MBOE label. • Label proposed elevations as “Top of Berm” where appropriate.
Corrective Action Required
01/22/2020

Sheet 13: • Lots 85-91 are adjacent to Swale 1 and require MBOEs to be set 2’ above the 100-year WSE. The topography makes meeting this requirement unrealistic. If the berm placed along the west side of the swale is 2’ above the 100-year WSE, the MBOEs for Lots 85-91 do not have to be based on the 100-year WSE within the swale. Verify the berm meets this requirement at ALL rear property corners of Lots 78-82 and 85-91. • The use of ditch checks within Swale 1 are going to pond water on the upstream side of the ditch check. Since the swale is in a residential area, ponding isn’t desired. Please revise to eliminate the ponding. • The drainage thru the swale will likely wash the mulch away. Please revise to eliminate the mulch. • Provide landscape easements to contain the swales, with maintenance responsibility to the Homes Association.
Corrective Action Required
01/22/2020

Sheets 15-22: Include ADA-accessible route details, using the City of Lee’s Summit design standards, across intersections under stop control. In addition, the profile view of the roadway sections must be updated to clearly show the locations of these stop controlled intersections.
Corrective Action Required
01/22/2020

Sheet 25: Extend the existing grade line to the upstream end of Line 4-10 in the Profile view.
Corrective Action Required
01/22/2020

Does Estimate Item 10, Native Swale Seeding, include the plantings in the swale? Please clarify.
Traffic Review No Comments 01/22/2020 01/22/2020
Sue Pyles, P.E.
Engineering Review Corrections 12/06/2019 12/12/2019
Sue Pyles, P.E.
Corrective Action Required
12/12/2019

General: • Many of the proposed contours tie back into existing contours at very sharp angles. Please review the grading to smooth out the transition from proposed back into existing contours. Revise throughout the plan set. • Please include a Summary of Quantities table. • Submit an Engineer's Estimate of Probable Construction Costs. • Submit the SWPPP and a copy of the MDNR Land Disturbance Permit. • This project is unique in that it is so closely aligned with the Summit View Farms 5th Plat project in KCMO. Please provide confirmation from KCMO that they approve of detaining water from this project and for sharing the proposed sediment basin.
Corrective Action Required
12/12/2019

Sheet 1: The information in the Index of Sheets does not match the title blocks for sheets 20, 21, and 27. Please revise as needed.
Corrective Action Required
12/12/2019

Sheet 5: • What is the heavy dashed line around or thru parts of the project? • The project area is labeled as “Future Development.” Please revise. • Please clarify whether or not construction of the sediment basin within the plat boundry will be performed with this project. • Will SVF 4th and SVF 5th be constructed at the same time? Please provide a projected sequencing, emailed is fine, of how these 2 projects will work together. • Is the offsite temporary diversion berm to be installed with this project?
Corrective Action Required
12/12/2019

Sheet 6: • The sheet name in the title block is incorrect, please revise. • When will the sediment basin be removed? Please include specific requirements.
Corrective Action Required
12/12/2019

Sheet 8: Please replace the Sediment Trap standard detail with the Sediment Basin standard detail.
Corrective Action Required
12/12/2019

Sheet 12: • Include a typical cross-section with design information for each swale. • Clearly indicate a start and stop location for each swale typical section. • Include calculations showing the native grasses planned for the swales are adequate for the proposed velocities. • Why is there no east side slope specified for Swale 2? • Is there a berm along the west side of Swale 1? If so, please include design requirements. • Include 100-year WSE at every lot corner adjacent to a swale. MBOE must be 2 feet above 100-year WSE. • Include a note regarding the limits of the swale IF that will help to clarify the required location of the typical section. o Example Note: Swale sections extend the entire length between upstream and downstream structures with the exception of a transition at each structure. • As-Graded Plot Plan requirements will now be designated on the MDP. Please designate, in tabular form, which lots have this requirement based on the following: o Lots that include or are adjacent to engineered swales designed for stormwater conveyance. o Lots adjacent to stormwater conveyances or features, such as drainage ways, detention basins, retention basins, etc. o Lots that contain berms designed to direct stormwater runoff as a part of the overall stormwater design. o Lots that require specific grading that is a part of the overall stormwater design.
Corrective Action Required
12/12/2019

Sheets 14-17: Show and label underdrain where required.
Corrective Action Required
12/12/2019

Sheet 14: • Remove “SW National Ave” from the title block, it is not on this sheet. • Relocate overlapping text near Sta. 18+50 in the Profile view for clarity.
Corrective Action Required
12/12/2019

Sheet 15: Please extend the existing grade line the entire length of the street.
Corrective Action Required
12/12/2019

Sheets 18-19: Sign designations are included in General Note 1, but not included in the Plan view. Please add.
Corrective Action Required
12/12/2019

Sheet 20: Some text appears to be cut off in the bottom of the top right section. Please revise.
Corrective Action Required
12/12/2019

Sheet 22: • What does “(Piped)” refer to in the Tract D drainage area? • It appears that Tract A drains to FI 4-11A, but the calculations include it in the drainage area for Line 4-13. Please clarify.
Corrective Action Required
12/12/2019

Sheets 24-26: • Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” • Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity. • Storm sewer structures greater than 7’ deep require a special design. Please provide in the plan set. • Please label vertical separations that are 2’ or less from outside of pipe to outside of pipe. If required separation isn’t provided, please revise so the requirement is met.
Corrective Action Required
12/12/2019

Sheet 24: • Include removal of existing end section at CC 4-10J in Plan view and flowline in Profile view. • Relocate the Line 4-10 1% HGL label leader so it clearly points to just the appropriate line. • Please revise Lines 4-10 and 4-11 to contain the design HGL within the pipe system.
Corrective Action Required
12/12/2019

Sheet 25: Please label the horizontal separation between the sanitary MH and Line 4-13 near Sta. 3+50. If the required separation isn’t provided, please revise so the requirement is met.
Corrective Action Required
12/12/2019

Sheet 26: • Include the sanitary crossing just upstream of JB 4-13B in the Line 4-15 Profile view. • Please reverse the flowline information at JB 4-13B and CI 4-15B in the Profile views.
Corrective Action Required
12/12/2019

Sheet 27: Provide detailed information in the plans regarding the native plantings required for the swales.
Traffic Review Corrections 12/06/2019 12/05/2019
Michael Park
Corrective Action Required
12/05/2019

End of Pavement OM's needed at the end of National not Serena
Corrective Action Required
12/05/2019

The K value for Saddlebred does not meet minimum criteria near Sta. 13+00. Saddlebred and Enoch will both be streets extended south in the future as adjacent properties are subdivided.
Corrective Action Required
12/05/2019

Plans need to show the locations of stop signs and street name signs (e.g. post locations and noted signing on each post). The suffix TERR should be TER.
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/20/2019 Letter Routing Sheet
12/12/2019 Letter DE-Comment Letter (Engineering Plans)
01/08/2020 Letter Resubmittal Routing Sheet
01/09/2020 Activity Document 0318050.02 SVF4 PAV STM COMBINED Cert
01/17/2020 Activity Document SVF 4th Plat Stormwater Memo 01.17.2020
01/22/2020 Letter DE-Comment Letter (Engineering Plans)
03/26/2020 0318050.02 SVF4 MGESCPAVST Estimate 03.25.2020
03/26/2020 2020 03 25 SVF4 Street Storm Response Letter
03/26/2020 0318050.02 - SVF4 - PAV-STM- 03.25.2020 cert signed
04/05/2020 Activity Document Fees PL2019392 Summit View Farms 4th Plat Street Storm
07/20/2020 PL2019392 Summit View Farms 4th Plat Street & Storm Pending Items
10/02/2020 10.2.20 SVF 4TH MASS GRADING, PAVING, STORM
10/02/2020 10.2.20 SVF4 MGESCPAVST Estimate
10/07/2020 Fees PL2019392 Summit View Farms 4th Plat Street Storm
03/10/2021 PM_Permit_Infrastructure_09-03-2021_15-43-10
03/10/2021 (CPLD-PR-WS) Infrastructure_09-03-2021_15-37-39
03/11/2021 Approved Plans Summit View Farms, 4th plat - ESC, Mass Grade, Paving and Storm Approved 3.11.21
03/12/2021 Letter DE-Engineering Plans Approval Letter
01/12/2022 As-Graded MDP_Revision 0_01-12-2022
01/12/2022 As-Graded Swale_Revision 0_01-12-2022
01/21/2022 Email PL2019392 Summit View Farms 4th Plat As-Graded MDP_Swale Review Comments
01/24/2022 As-Graded MDP_Revision 1_01-24-2022
01/24/2022 As-Graded Swale_Revision 1_01-24-2022
01/24/2022 2022_01_24 MDP Response Letter
01/26/2022 As-Graded MDP_Revision 2_01-26-2022
02/17/2022 Approved Plans Summit View Farms 4th Plat Accepted As-Graded MDP
05/13/2022 MG ESC PAV STM Set_SVF4_As-Build_05-13-2022
06/02/2022 Email Summit View Farms 4th Plat Record Drawing Review Comments
06/29/2022 Recorded Amended CCRs SVF 4th Storm
07/05/2022 2022_07_05 Record Drawing Response Letter
07/12/2022 Accepted Record Drawings Summit View Farms 4th Street Storm MDP ESC AsBuilts Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home