Planning Application Status

PL2019390




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019390
Saint Luke's East - Flex Facility Pre Utility Work
Engineering Plan Review
Engineering Plan Review
Approved
11/18/2019
SAINT LUKES EAST HOSPITAL
Locations
Contacts
SAINT LUKES EAST HOSPITAL, Address:901 E 104TH ST MAILSTOP 900N  
MCCLURE ENGINEERING COMPANY, Address:705 1ST AVE NORTH, Phone:(515) 576-7155  
Matt Eblen, Address:McClure, Phone:(816) 756-0444  
Reviews
Review Type Outcome Est. Completion Date Completed
Record Drawings Review Approved with Conditions 11/10/2021 11/11/2021
Kent Monter
Record drawings are acceptable; ready for acceptance stamp and upload into LaserFiche.
Engineering Review No Comments 09/24/2020 09/23/2020
Loic Nguinguiri, E.I.
Engineering Review No Comments 04/10/2020 04/09/2020
Loic Nguinguiri, E.I.
Engineering Review No Comments 02/26/2020 02/19/2020
Loic Nguinguiri, E.I.
Engineering Review No Comments 02/13/2020 02/10/2020
Loic Nguinguiri, E.I.
Engineering Review Corrections 02/07/2020 02/03/2020
Loic Nguinguiri, E.I.
Corrective Action Required
02/03/2020

General: While tree(s) removal is acceptable, Please consider replacing or relocating tree(s) for environmental and landscape beautification purposes. Discussion or correction regarding this topic can also occur during the FDP stage.
Corrective Action Required
02/03/2020

General: Please update cost estimate to match summary of quantities shown of the set of plans. Items 6-10 should be listed as L.S. (Lump Sum)
Corrective Action Required
02/03/2020

Water: Please add vertical and horizontal scales on profile view on pages C302, C303 and C401.
Corrective Action Required
02/03/2020

Water: The water line profile seems to exceed the 1 degree angle allowed for vertical deflection at joints. Please verify and revise. Running an overall straight pipe line with horizontal bends only could also be an option.
Corrective Action Required
02/03/2020

Water: Include the following note on any profile sheet applicable: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.”
Corrective Action Required
02/03/2020

Water: Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Corrective Action Required
02/03/2020

Water: From STA 2+70 to STA 4+70, there appears to be 5 bends. Numerous bends along a section of the pipe line comes with a greater risk of leaking and an upper maintenance cost. Please consider reducing the number of bends.
Traffic Review No Comments 02/07/2020 02/03/2020
Michael Park
Traffic Review No Comments 01/28/2020 01/28/2020
Michael Park
Engineering Review Corrections 01/28/2020 01/24/2020
Loic Nguinguiri, E.I.
Corrective Action Required
01/24/2020

General: Please include the building edge line and the helipad footprint in the legend.
Corrective Action Required
01/24/2020

General: The FEMA floodplain information is outdated. Please update the FEMA flood note.
Corrective Action Required
01/24/2020

General: Please include the general note: The contractor shall contact the City’s Development Services Engineering Inspectors 48 hours prior to any land disturbance work at (816) 969-1200.
Corrective Action Required
01/24/2020

General: Sanitary and Storm (private) pipes appear to be less than 5’ from tree(s). Please consider increasing the distance.
Corrective Action Required
01/24/2020

General: Before resubmittal, Please revise (or update) quantities for 15" RCP, 45 degree horizontal bend and 22.5 degree horizontal bend.
Corrective Action Required
01/24/2020

Water: It looks like the water pipe, to be disconnected and removed, runs from STA 0+00 to STA 3+75.29. Please revise.
Corrective Action Required
01/24/2020

Water: The City’s minimum cover for water main is 3.5’. Despite being mentioned in general note 6, the depth does not appear to meet the minimum requirement at several stations on the profile view. Please adjust.
Corrective Action Required
01/24/2020

Water: Please revise on profile view the following concern: From STA 1+07 to STA 1+50, the difference of elevation between the edge of water pipe and existing ground appears to be less than 18 inches. According to section 2102.4 of the Design and Construction manual: o When pipe is to be installed in embankment or fill, the embankment shall be constructed in accordance with APWA Section 2102.6 and shall be built up to a plane at least 18 inches above the top of the pipe prior to the excavation of the pipe trench.
Corrective Action Required
01/24/2020

Water: Utilities, such as electric conduit or fiber optic, appear to be within the 6 inches space reserved for bedding aggregate. Please provide clarification or explanation regarding the concern.
Corrective Action Required
01/24/2020

Water: The two parallel water lines at STA 2+46.45 and STA 2+66.96 appear to be domestic service lines. Please disregard the previous comment issued and just make sure that they connect to the new water main. However, those shall not be labeled as FPW (Fire Protection Water) lines.
Corrective Action Required
01/24/2020

Water: The City does not recommend 90 degree bends on water mains. Please revise to (2) 45 degree bends.
Engineering Review Corrections 12/04/2019 12/04/2019
Loic Nguinguiri, E.I.
Corrective Action Required
12/04/2019

General: Please combine water, sanitary and storm plans.
Corrective Action Required
12/04/2019

General: Please add direct phone number or email address to the Design Engineer's contact information.
Corrective Action Required
12/04/2019

General: Please include a legend that best defines the abbreviations used in the (plan view) plans.
Corrective Action Required
12/04/2019

Water: Please include a note regarding the disconnect and removal of the existing water pipe running directly from STA 0+00 to STA 2+62.82.
Corrective Action Required
12/04/2019

Water: Please specify PVC C900 rather than DIP.
Corrective Action Required
12/04/2019

Water: Please label footprint of existing easement to be vacated.
Corrective Action Required
12/04/2019

Water: Immediately north of curb inlet 103, minimum distance requirement for separation between public water main and edge of building (expansion) must be 15 feet.
Corrective Action Required
12/04/2019

Water: There appears to be a (private) private fire hydrant line aligned generally north-south. Is this line expected to be removed or relocated ? [Details are missing]
Corrective Action Required
12/04/2019

Water: The two (2) private water lines, next to STA 2+62.82, do not appear to have backflow vaults.Are the backflow vaults located within the building ? What is the plan for these water lines in regard to modifications ? [Proposed building expansion appears to encroach to these water lines]
Corrective Action Required
12/04/2019

Water: Please provide standard details for backflow vault and backflow assembly; and for standard water meter and vault.
Corrective Action Required
12/04/2019

Water: Please explain why the four (4) public fire hydrants are showned in the midlle of pavement and/or driveways. We need to know the final layout and final plan before reviewing. Recommend sheet for future plan.
Corrective Action Required
12/04/2019

Water: Please add the note "public", in profile view headline, when referring to public infrastructure.
Corrective Action Required
12/04/2019

Sanitary: Flowline elevations at existing manhole (STA 0+00) appear to be incorrect. FLowline IN vs Flowline OUT must be at least 0.2 foot.
Corrective Action Required
12/04/2019

Sanitary: Please add the note "private", in profile view headline, when referring to private infrastructure.
Corrective Action Required
12/04/2019

Storm: Please include hydraulic grade line of design storm, in profile view.
Corrective Action Required
12/04/2019

Storm: Please include utility crossing of existing water main located next to new curb inlet 103, in profile view.
Corrective Action Required
12/04/2019

Storm: Top of junction box 102 is shown below finish grade. Please reconcile.
Corrective Action Required
12/04/2019

Storm: Please provide standard details for junction box.
Corrective Action Required
12/04/2019

Storm: Please provide appropriate call-outs for storm sewer structures. [e.g. replace 1.05 by 105]
Corrective Action Required
12/04/2019

Storm: Please cite "Lines 1,2 and 3" instead of "Line 1" in profile view headline on sheet C303.
Corrective Action Required
12/04/2019

Storm: Please provide in-flow elevations for adjacent connected storm sewer pipes, in profile view, for structures 102, 106 and 108.
Corrective Action Required
12/04/2019

Storm: Flowline elevations at existing storm inlet 108 appear to be incorrect. FLowline IN vs Flowline OUT must be at least 0.2 foot.
Corrective Action Required
12/04/2019

Storm: Flowline elevations at new curb inlet 106 appear to be incorrect. FLowline IN vs Flowline OUT must be at least 0.5 foot.
Corrective Action Required
12/04/2019

Storm: Please add the note "private", in profile view headline, when referring to private infrastructure.
Traffic Review No Comments 12/04/2019 11/18/2019
Mike Weisenborn
Hearings

There are no hearings for this planning application.

Documents & Images
Date Uploaded File Type Document Name
11/18/2019 Letter Routing Sheet
12/04/2019 Letter DE-Comment Letter (Engineering Plans)
01/21/2020 Letter 2020-01-20---Response Letter--City of Lee's Summit
01/21/2020 Plans 2020-01-20---SLE FLEX FACILITY EXPANSION--SITE UTILITY MAIN RELOCATIONS
01/21/2020 Letter Resubmittal Routing Sheet
01/21/2020 Letter Resubmittal Routing Sheet
01/24/2020 Letter DE-Comment Letter (Engineering Plans)
01/31/2020 2020-01-31---SLE FLEX FACILITY EXPANSION--SITE UTILITY MAIN RELOCATIONS
01/31/2020 2020-01-31---Comment Response Letter
01/31/2020 2020-01-31---SLE FLEX FACILITY EXPANSION--PROBABLE COST
02/03/2020 Letter DE-Comment Letter (Engineering Plans)
02/06/2020 Plans 2020-02-06---SLE FLEX FACILITY EXPANSION--SITE UTILITY MAIN RELOCATIONS
02/06/2020 Letter 2020-02-06---Comment Response Letter
02/06/2020 Letter 2020-02-06---SLE FLEX FACILITY EXPANSION--PROBABLE COST
02/06/2020 Letter Resubmittal Routing Sheet
02/10/2020 Activity Document Fees PL2019390 Saint Lukes Flex Utilities
02/13/2020 Letter DE-Engineering Plans Approval Letter
02/19/2020 Letter Resubmittal Routing Sheet
02/19/2020 Plans 2020-02-18---SLE FLEX FACILITY EXPANSION--SITE UTILITY MAIN RELOCATIONS
04/09/2020 Approved Plans Approved revisions 2020-04-08--UTILITY UPDATE--Sheets C302 & C303
04/15/2020 Approved Plans Approved Saint Luke's Flex Utility Relocate C401
09/22/2020 Plans Revised - C401 Fire hydrant relocation
09/24/2020 Approved Plans SLE Flex Facility Pre-Utility Work Revised FH Location Approved 9.24.20
11/03/2021 Plans 1212_UTILITY AS BUILTS_20211103
11/03/2021 Plans 1212_Final COLS Comments_20211103
11/11/2021 Public Water Line Record Drawings @ St. Luke's Hospital
10/12/2022 Accepted Record Drawings St Lukes Water AsBuilt Accepted RD
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home