Review Type |
Outcome |
Est. Completion Date |
Completed |
GIS Review
|
No Comments
|
09/11/2019
|
09/11/2019
|
|
Kathy Kraemer
|
|
|
Engineering Review
|
Corrections
|
09/05/2019
|
09/05/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Engineering plans are required for the domestic water service to serve Lot 2B. The domestic water service installation should be completed prior to approval of the plat.
|
|
|
GIS Review
|
Corrections
|
09/05/2019
|
08/29/2019
|
|
Kathy Kraemer
|
|
Corrective Action Required
The plat's new coordinates are consistently off ~10 feet on the easting and ~5 feet on the northing, except when plotting the JA-25 monument, which remains off ~6ft on the easting and ~2ft on the northing.
|
|
|
Planning Review
|
Approved with Conditions
|
09/05/2019
|
08/28/2019
|
|
Shannon McGuire
|
|
Corrective Action Required
The owner’s names were added on the last revision on the plat, but the ownership of the property at the County is “Kingscrown Investments LLC”.
That ownership has to match exactly on the plat. It’s fine if they sign their names, but they should reflect that they are agents of Kingscrown Investments LLC.
|
|
|
Engineering Review
|
Corrections
|
08/23/2019
|
08/21/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Engineering plans are required for the domestic water service and pavement restoration for lot 2B. The domestic water service and pavement restoration should be completed prior to approval of the plat.
|
|
|
Planning Review
|
Approved with Conditions
|
08/23/2019
|
08/20/2019
|
|
Shannon McGuire
|
|
Corrective Action Required
Please include the total acreage and square feet in the lot description.
|
|
Corrective Action Required
Please remove the existing structures and physical impartments from the plat drawing.
|
|
|
GIS Review
|
Corrections
|
08/23/2019
|
08/20/2019
|
|
Kathy Kraemer
|
|
Corrective Action Required
The plat's coordinates are consistently off ~6 feet on the easting and ~2 feet on the northing, even when using grid factor listed. This puts plat into the ROW.
|
|
|
Planning Review
|
Corrections
|
07/30/2019
|
08/02/2019
|
|
Shannon McGuire
|
|
Corrective Action Required
Please provide the Coordinates, based on the Missouri Coordinate System 1983, on the corners of the plat boundary, the control station, station coordinates, and grid factor used in accordance with the regulations of the Missouri Department of Natural Resources.
|
|
Corrective Action Required
Please provide the total acreage of the proposed subdivision.
|
|
Corrective Action Required
Please label each lot with the area in square feet.
|
|
Corrective Action Required
Please show the location of any oil and/or gas wells. If none are present please add a note stating so and cite your source of information.
|
|
Corrective Action Required
Please show the exact location of the existing structures and physical improvements on or near the new lot 2B.
|
|
Corrective Action Required
Please update the city signature block to reflect the current city officials; Ryan A Elam, P.E., Director of Development Services; Trisha Fowler Arcuri, City Clerk, and; George M Binger, III, P.E., City Engineer.
|
|
Corrective Action Required
The City certification statement should read as fallows; This is to certify that the Minor Plat of Gano Addition – Replat Lots 2A and 2B was submitted to and duly approved by the City of Lee’s Summit, all in accordance with the provisions of Chapter 33, the Unified Development Ordinance of Lee’s Summit Code of Ordinances, for the City of Lee’s Summit, Missouri.
|
|
Corrective Action Required
Please remove the Easement Dedication, Streets and Building Line paragraphs from the plat notes as none are being proposed.
|
|
Corrective Action Required
Please update the plat title, and throughout the plat as needed, to reflect the correct title as a Minor Plat not a Minor Subdivision.
|
|
Corrective Action Required
Please remove the “Lot 2 Gano Addition” label from the plat drawing.
|
|
Corrective Action Required
Please “ghost” in the surrounding property information to show the relationship of the proposed lots to the surrounding properties.
|
|
Corrective Action Required
Please label each lot with their respective street numbers; Lot 2A = 308 SE Douglas St, Lot 2B = 13 SE 3rd St.
|
|
Corrective Action Required
Please provide a signature block for the owner, with the corresponding name typed beneath the signature line.
|
|
|
Engineering Review
|
Corrections
|
07/30/2019
|
07/24/2019
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
Is it possible to dedicate a ten (10) foot general utility easement along Douglas St. and along the alley, without encroaching upon the buildings?
|
|
Corrective Action Required
Please add a drainage note stating "...individual lot owners shall not change or obstruct the drainage flow lines or paths on the lots, unless specific application is made and approved by the City Engineer."
|
|
Corrective Action Required
Engineering plans are required for the domestic water service and pavement restoration for lot 2B. The domestic water service and pavement restoration should be completed prior to approval of the plat.
|
|
Corrective Action Required
A floodplain note was missing.
|
|
Corrective Action Required
An abandoned oil and gas well note was missing. Please cite the reference that was used to make this determination (e.g., Missouri Dept. of Natural Resources Division of Geology and Land Survey database, or the report at City Hall).
|
|
Corrective Action Required
Sidewalk location along Douglas St. appeared to be missing from the plat.
|
|
|
GIS Review
|
Corrections
|
07/30/2019
|
07/17/2019
|
|
Kathy Kraemer
|
|
Corrective Action Required
Plat is missing State Plane coordinates.
|
|
Corrective Action Required
Plat is missing ownership under owners certification.
|
|
Corrective Action Required
Plat is missing addresses.
|
|
|