Review Type |
Outcome |
Est. Completion Date |
Completed |
Engineering Review
|
Approved with Conditions
|
02/23/2021
|
02/23/2021
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Planning Review
|
No Comments
|
02/23/2021
|
02/21/2021
|
|
Shannon McGuire
|
|
|
GIS Review
|
No Comments
|
02/23/2021
|
02/19/2021
|
|
Kathy Kraemer
|
|
|
GIS Review
|
No Comments
|
01/28/2021
|
01/27/2021
|
|
Kathy Kraemer
|
|
|
Engineering Review
|
Approved with Conditions
|
01/28/2021
|
01/27/2021
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Traffic Review
|
No Comments
|
01/28/2021
|
01/26/2021
|
|
Michael Park
|
|
|
Planning Review
|
No Comments
|
01/28/2021
|
01/26/2021
|
|
Shannon McGuire
|
|
|
Fire Review
|
No Comments
|
01/28/2021
|
01/22/2021
|
|
Jim Eden
|
|
|
Fire Review
|
No Comments
|
08/24/2019
|
08/26/2019
|
|
Jim Eden
|
|
|
Engineering Review
|
Approved with Conditions
|
08/26/2019
|
08/26/2019
|
|
Gene Williams, P.E.
|
|
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
|
|
DE C&O #02 Master Drainage Plan
Corrective Action Required
A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
|
|
DE C&O #05 As-Graded MDP
Corrective Action Required
The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #07 Easements
Corrective Action Required
All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
|
|
DE C&O #08 Changes to MDP
Corrective Action Required
A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
|
|
|
Traffic Review
|
No Comments
|
07/26/2019
|
08/22/2019
|
|
Michael Park
|
|
|
GIS Review
|
Corrections
|
08/24/2019
|
08/21/2019
|
|
Kathy Kraemer
|
|
Corrective Action Required
Ownership on plat is listed as Clayton Properties, but ownership at Jackson Co is CMH Parks. Please file a Corporate Certificate of name change with the recorders office.
|
|
|
Planning Review
|
No Comments
|
08/26/2019
|
08/20/2019
|
|
Shannon McGuire
|
|
|
Traffic Review
|
No Comments
|
07/26/2019
|
07/29/2019
|
|
Michael Park
|
|
|
GIS Review
|
Corrections
|
07/26/2019
|
07/26/2019
|
|
Kathy Kraemer
|
|
Corrective Action Required
Dedication is missing.
|
|
Corrective Action Required
Ownership on plat is listed as Clayton Properties, but ownership at Jackson Co is CMH Parks.
|
|
Corrective Action Required
Please add address table or addresses to lots.
|
|
|
Engineering Review
|
No Comments
|
07/26/2019
|
07/26/2019
|
|
Gene Williams, P.E.
|
|
|
Planning Review
|
Corrections
|
07/26/2019
|
07/22/2019
|
|
Shannon McGuire
|
|
Corrective Action Required
Please update the Planning Commissioner’s signature block to reflect the current secretary, Carla Dial.
|
|
Corrective Action Required
The plat dedication paragraph is missing the plat title.
|
|
Corrective Action Required
Please check the stated scale on sheets 2 & 3. It is shown as 1-100 but looks to be drawn as 1-50
|
|
Corrective Action Required
Please label the lots with their respective street number as follows:
Lot # = Street #
101 = 3101
102 = 3105
103 = 3109
104 = 3113
105 = 3117
106 = 3121
107 = 3125
108 = 3129
109 = 3201
110 = 3205
111 = 3209
112 = 3213
113 = 3217
114 = 3221
115 = 3225
116 = 3229
117 = 3233
118 = 3237
119 = 3241
120 = 3245
121 = 3249
122 = 1601
123 = 3244 (SW Arborway Ter) 3221 (SW Arborridge Dr.)
124 = 3236
125 = 3216
126 = 3212
127 = 3208
128 = 3204
129 = 3200
130 = 3128
131 = 3124
132 = 3120
133 = 3116
134 = 3112
135 = 3108
136 = 3104
137 = 3109
138 = 3113
139 = 3117
140 = 3121
141 = 3125
142 = 3129
143 = 3201
144 = 3205
145 = 3209
146 = 3213
147 = 3217
148 = 1600 (SW Arborway Ter) 3444 (SW Arborridge Dr.)
149 = 3220
150 = 3216
151 = 3212
152 = 3208
153 = 3204
154 = 3200
155 = 1602 (SW Buckthorn St) 3120 (SW Arboridge Dr)
156 = 3116
157 = 3112
158 = 3108
159 = 3104
|
|
|
Assign Reviewers
|
Complete
|
07/12/2019
|
07/22/2019
|
|
Shannon McGuire
|
|
|
Fire Review
|
No Comments
|
|
07/17/2019
|
|
Jim Eden
|
|
|