Summary
PL2019234
HAWTHORN RIDGE, 2ND PLAT
Final Plat
Final Plat
Recorded
07/12/2019
CMH PARKS INC
Locations
Property
69620990100000000

Address
3104 SW ARBORIDGE DR, LEES SUMMIT, MO 64082

3104 SW ARBORIDGE DR
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
OLSSON ASSOCIATES, Address:1301 BURLINGTON, SUITE 100, Phone:(816) 361-1171  
CMH PARKS INC, Address:5000 CLAYTON RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 02/23/2021 02/23/2021
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
02/18/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
02/18/2021

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
02/18/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
02/18/2021

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
02/18/2021

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
02/18/2021

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
02/18/2021

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
02/18/2021

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
Planning Review No Comments 02/23/2021 02/21/2021
Shannon McGuire
GIS Review No Comments 02/23/2021 02/19/2021
Kathy Kraemer
GIS Review No Comments 01/28/2021 01/27/2021
Kathy Kraemer
Engineering Review Approved with Conditions 01/28/2021 01/27/2021
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
01/21/2021

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
01/21/2021

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
01/21/2021

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
01/21/2021

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
01/21/2021

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
01/21/2021

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
01/21/2021

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
01/21/2021

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
Traffic Review No Comments 01/28/2021 01/26/2021
Michael Park
Planning Review No Comments 01/28/2021 01/26/2021
Shannon McGuire
Fire Review No Comments 01/28/2021 01/22/2021
Jim Eden
Fire Review No Comments 08/24/2019 08/26/2019
Jim Eden
Engineering Review Approved with Conditions 08/26/2019 08/26/2019
Gene Williams, P.E.
DE C&O #01 Eng Plans – FP/PP
Corrective Action Required
09/04/2019

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final plat and approved prior to the approval of the final plat. All public infrastructure must be substantially complete, prior to the issuance of any building permits.
DE C&O #02 Master Drainage Plan
Corrective Action Required
09/04/2019

A Master Drainage Plan (MDP) shall be submitted and approved in accordance with the City’s Design and Construction Manual for all areas of the development, including all surrounding impacted areas, along with the engineering plans for the development. The MDP shall address drainage level of service issues on an individual lot basis.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
09/04/2019

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
09/04/2019

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 16.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Section 1000 of the City's Design and Construction Manual.
DE C&O #05 As-Graded MDP
Corrective Action Required
09/04/2019

The As-graded Master Drainage Plan shall be submitted to and accepted by the City prior to the issuance of a Certificate of Substantial Completion and prior to the issuance of any building permits for the development.
DE C&O #06 Land Disturbance
Corrective Action Required
09/04/2019

A Land Disturbance Permit shall be obtained from the City if ground breaking will take place prior to the issuance of an infrastructure permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
09/04/2019

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to the issuance of a Certificate of Substantial Completion or approval of the final plat. A certified copy shall be submitted to the City for verification.
DE C&O #08 Changes to MDP
Corrective Action Required
09/04/2019

A restriction note shall be included on the final plat stating: “Individual lot owner(s) shall not change or obstruct the drainage flow paths on the lots, as shown on the Master Drainage Plan, unless specific application is made and approved by the City Engineer."
Traffic Review No Comments 07/26/2019 08/22/2019
Michael Park
GIS Review Corrections 08/24/2019 08/21/2019
Kathy Kraemer
Corrective Action Required
08/21/2019

Ownership on plat is listed as Clayton Properties, but ownership at Jackson Co is CMH Parks. Please file a Corporate Certificate of name change with the recorders office.
Planning Review No Comments 08/26/2019 08/20/2019
Shannon McGuire
Traffic Review No Comments 07/26/2019 07/29/2019
Michael Park
GIS Review Corrections 07/26/2019 07/26/2019
Kathy Kraemer
Corrective Action Required
07/26/2019

Dedication is missing.
Corrective Action Required
07/26/2019

Ownership on plat is listed as Clayton Properties, but ownership at Jackson Co is CMH Parks.
Corrective Action Required
07/26/2019

Please add address table or addresses to lots.
Engineering Review No Comments 07/26/2019 07/26/2019
Gene Williams, P.E.
Planning Review Corrections 07/26/2019 07/22/2019
Shannon McGuire
Corrective Action Required
07/22/2019

Please update the Planning Commissioner’s signature block to reflect the current secretary, Carla Dial.
Corrective Action Required
07/22/2019

The plat dedication paragraph is missing the plat title.
Corrective Action Required
07/22/2019

Please check the stated scale on sheets 2 & 3. It is shown as 1-100 but looks to be drawn as 1-50
Corrective Action Required
07/22/2019

Please label the lots with their respective street number as follows: Lot # = Street # 101 = 3101 102 = 3105 103 = 3109 104 = 3113 105 = 3117 106 = 3121 107 = 3125 108 = 3129 109 = 3201 110 = 3205 111 = 3209 112 = 3213 113 = 3217 114 = 3221 115 = 3225 116 = 3229 117 = 3233 118 = 3237 119 = 3241 120 = 3245 121 = 3249 122 = 1601 123 = 3244 (SW Arborway Ter) 3221 (SW Arborridge Dr.) 124 = 3236 125 = 3216 126 = 3212 127 = 3208 128 = 3204 129 = 3200 130 = 3128 131 = 3124 132 = 3120 133 = 3116 134 = 3112 135 = 3108 136 = 3104 137 = 3109 138 = 3113 139 = 3117 140 = 3121 141 = 3125 142 = 3129 143 = 3201 144 = 3205 145 = 3209 146 = 3213 147 = 3217 148 = 1600 (SW Arborway Ter) 3444 (SW Arborridge Dr.) 149 = 3220 150 = 3216 151 = 3212 152 = 3208 153 = 3204 154 = 3200 155 = 1602 (SW Buckthorn St) 3120 (SW Arboridge Dr) 156 = 3116 157 = 3112 158 = 3108 159 = 3104
Assign Reviewers Complete 07/12/2019 07/22/2019
Shannon McGuire
Fire Review No Comments 07/17/2019
Jim Eden
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Plat fee $877.00 $877.00 Paid 07/12/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 09/12/2019 05:00 PM Council Chambers 09/12/2019 05:00 PM
Public Hearing Review
Approved
09/12/2019
City Council Ordinance 10/01/2019 06:15 PM Council Chambers 10/01/2019 06:15 PM
Public Hearing Review
Approved
City Council Ordinance 2nd Reading 02/23/2021 06:00 PM Council Chambers 02/23/2021 06:00 PM
Public Hearing Review
Approved
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home