Planning Application Status

PL2017205




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2017205
OAKVIEW STORAGE - SUP
Special Use Permit
Special Use Permit
Approved
09/22/2017
UNIVERSITY OF MASSACHUSETTS FOND INC
SUP for climate controlled storage use
Locations
Contacts
OAKVIEW CAPITAL PARTNERS, LLC, Address:201 HAWKS RIDGE TRAIL, Phone:(214) 460-8442  
SCHLAGEL & ASSOCIATES, Address:14920 W 107TH ST, Phone:(913) 492-5158  
TEVIS ARCHITECTS, Address:8725 ROSEHILL ROAD #400, Phone:(913) 599-3003  
UNIVERSITY OF MASSACHUSETTS FOND INC, Address:1 BEACON ST 32ND FL  
Reviews
Review Type Outcome Est. Completion Date Completed
Traffic Review Approved with Conditions 11/07/2017 11/07/2017
Michael Park
Informational
11/07/2017

The southbound right-turn lane required along Douglas in compliance with the Access Management Code will be a condition of Final Development Plan. No comments on the SUP.
Informational
11/07/2017

The driveway from Douglas is illustrated with a south offset and will be reviewed with the Final Development Plan. No comments on the SUP.
Engineering Review No Comments 11/07/2017 11/07/2017
Gene Williams, P.E.
Fire Review Approved with Conditions 11/07/2017 11/03/2017
Jim Eden
Code Statement
Corrective Action Required
11/03/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Planning Review No Comments 11/07/2017 11/03/2017
Christina Stanton
Traffic Review Corrections 10/06/2017 10/06/2017
Michael Park
Corrective Action Required
10/06/2017

Limit the proposed plan to the subject development application (SUP), storage facility. The plan should also include associated infrastructure (e.g. driveway and turn lane from Douglas and driveway connection to shared access/Polytainers). It is my understanding re-zoning and concept plan are not a part of this application and the presentation of a concept for the remaining property is informational only, as needed and upon request, to address potential questions as the SUP proceeds through the public hearing process. Presenting a concept plan as part of the application may be misleading and no review of the concept plan has been performed from a transportation/traffic perspective. If a concept plan is proposed as part of the application, a traffic study will be required to assess its impact prior to recommendation for approval of any such concept by the governing body.
Engineering Review Corrections 10/06/2017 10/03/2017
Gene Williams, P.E.
Corrective Action Required
10/03/2017

Please be aware that a full engineering review of the site utilities, stormwater detention, grading, sidewalks, and other aspects of the project will be reviewed during the Final Development Plan phase.
Corrective Action Required
10/03/2017

The detention basin serving Lot 2 shows an outlet structure within a public easement. Please move the outlet structure outside the limits of the easement.
Planning Review Corrections 10/06/2017 09/29/2017
Christina Stanton
Corrective Action Required
09/29/2017

Staff recommends revising the application in the following ways: A) Do not rezone at this time since the storage/mini-warehouse use is permitted in PI with a special use permit; B) Apply for a special use permit with conceptual plan; C) Show all conceptual elements either in greyscale or hatched so it is easily discernable what is conceptual.
Corrective Action Required
09/29/2017

Conditions and restrictions for a special use permit for mini-warehouse facility (Section 10.420 of the UDO) include: A) In any non-industrial district, a mini-warehouse facility must be enclosed on all sides by a wall or earthen berm that shields the development from view; B) Colors selected must be of muted shades; and C) Roof pitch shall be 1:3. A is not applicable since this property is zoned PI (Planned Industrial), and B is good since the building is earth-tone(s), but C must either be meet or a modification requested for those conditions with justification(s) as to why.
Corrective Action Required
09/29/2017

Is the total building area for Lot 1 76,599.56 (per Overall Site Data table) or 76,559.55 (per the site plan)? Correct plans accordingly.
Corrective Action Required
09/29/2017

Lot 1 is missing its required 1 van accessible space.
Corrective Action Required
09/29/2017

Minimum Drive Aisle Width. Per Section 12.120.E.4 of the UDO the minimum required drive aisle width is 24' plus curb and gutters which totals 28'. Correct plan as needed.
Corrective Action Required
09/29/2017

Miscellaneous Corrections for Sheet C1.0: A) "Total Building Footprint Area" under the overall site data is missing an "n". B) The required parking calculation for Lot 1 is missing the #2 at the beginning of the calculation. C) Note #3 is missing the word "be" after "An easement of license will...". D) Note #3 also references the plan as "this plat" (revise accordingly). E) Note #5 is missing the word "be" after "...or setback lines will..." and the word "the" before "...street right-of-way.". F) Remove or revise note #19, as it currently reads it appears to be more of a reminder for the developer.
Corrective Action Required
09/29/2017

Provide a detail of the modular block wall. Walls over 4' in height (including footing) are required to be designed by a structural engineer.
Corrective Action Required
09/29/2017

Revise detail 7.0-10, handicap signage, to reflect the R7-8 standard sign found in the MUTCD (minus the double arrow). In addition, the height dimensions need to be revised from 60" - 72" to 36" - 60" (per Section 12.080.I of the UDO).
Corrective Action Required
09/29/2017

Trash Enclosure Gates. Per Section 7.180.G of the UDO, trash enclosure gates shall be steel and painted to be compatible with the color of the masonry walls and building it is to serve.
Corrective Action Required
09/29/2017

Landscaping, Open Yard Areas. The calculation for the trees and shrubs should be the same except there are 2 shrubs per every 5,000 square feet of lot area.
Corrective Action Required
09/29/2017

Landscaping, Parking Lot Screening. Per Section 12.120.C of the UDO screening for a parking lot may be provided in 1 of 4 ways: A) A hedge consisting of 12 shrubs per 40 linear feet; or B) An earthen berm constructed to a height of 2.5 feet above the adjacent elevation of the street or parking/loading area, whichever is highest, shall not exceed a slope of 3:1 and shall have a crown of at least 2 feet; or C) A wall of brick, stone, PVC plastic fencing or finished and textured concrete may be constructed to a height of 2.5 feet and 100% opacity and landscaped with plant material to achieve a decorative effect; or D) Any combination of hedge, berm or wall that effectively provides a visual screen of the parking lot or loading area to a height of 2.5 feet and achieves a decorative effect through appropriate use of landscaping and plant material.
Corrective Action Required
10/06/2017

Provide a list of building materials.
Fire Review Corrections 10/06/2017 09/27/2017
Jim Eden
Code Statement
Corrective Action Required
09/27/2017

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code.
Fire Lanes
Corrective Action Required
09/27/2017

IFC 503.2.1 - Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm), exclusive of shoulders, except for approved security gates in accordance with Section 503.6, and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) D105.1 Where required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. D105.3 Proximity to building. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 feet (9144 mm) from the building, and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Action required: The fire lanes to and along the building shall have a minimum width (drivable surface) of 26 feet.
Misc.
Corrective Action Required
09/27/2017

D104.1 Buildings exceeding three stories or 30 feet in height. Buildings or facilities exceeding 30 feet (9144 mm) or three stories in height shall have at least two means of fire apparatus access for each structure. Action required: ThIs building shall have two approved remote accesses.
Hydrants
Corrective Action Required
09/27/2017

IFC 507.5.1- Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Provide a hydrant plan.
FDC
Corrective Action Required
09/27/2017

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC on the building.
Imposed Loads
Corrective Action Required
09/27/2017

IFC 503.2.3 -Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. For information only.
Fire Lanes - Marking
Corrective Action Required
09/27/2017

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. For information only.
Corrective Action Required
09/27/2017

Fees
Paid Fees Amount Paid Owing Date Paid
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 03/02/2018
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 03/02/2018
9110077-Special Use Permit fee $900.00 $900.00 Paid 03/02/2018
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 11/14/2017 05:00 PM Council Chambers 11/14/2017 05:00 PM
Public Hearing Review
Approved
City Council Public Hearing 12/07/2017 06:15 PM Council Chambers 12/07/2017 06:15 PM
Public Hearing Review
Pending
City Council Ordinance 12/21/2017 06:15 PM Council Chambers 12/21/2017 06:15 PM
Public Hearing Review
Pending
Documents & Images
Date Uploaded File Type Document Name
09/22/2017 Receipt Receipt for transaction: 2017-006482
09/22/2017 Plans 17-135-PDP-DETAILS-TRASH
09/22/2017 Plans 2017.09.21-17-135 PDP
09/22/2017 Plans 2017.09.22-17-135 PDP
09/22/2017 Plans REZONING LEGAL DESCRIPTION
09/22/2017 Plans 01 - Front Elevation Colored Rendering
09/22/2017 Plans 17-135 PDP SP
09/22/2017 Letter Routing Sheet
10/06/2017 Letter Applicant Letter - Dev. Apps (DRCP)
10/24/2017 Letter Resubmittal Routing Sheet
10/24/2017 Plans 2017.10.24-17-135 PDP SP storage only
10/24/2017 Plans 2017.10.24-17-135-PDP-DETAILS
10/24/2017 Plans 2017.10.24-17-135-PDP-DETAILS-TRASH
10/24/2017 Plans 2017.10.24-17-135 PDP ALL
10/24/2017 Plans 2017.10.24-17-135 PDP GP
10/24/2017 Plans 2017.10.24-17-135 PDP LP storage only
11/10/2017 Letter PL2017-205 SUP Oakview Storage PC
11/28/2017 Ordinance PL2017-205 SUP Oakview Storage
03/02/2018 Receipt Receipt for transaction: 2018-000766
03/09/2018 Ordinance Signed Ordinance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home