Planning Application Status

PL2015158




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2015158
Summit Church, The
Commercial Final Development Plan
Commercial Final Development Plan
Approved
10/20/2015
THE UNITED METHODIST CHURCH OF LEES SUMM
Locations
Contacts
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:114 SE DOUGLAS ST  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 06/13/2016 06/07/2016
Ron Seyl
Code Statement
Corrective Action Required
06/06/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Planning Review No Comments 06/13/2016 06/07/2016
Ron Seyl
Traffic Review Approved with Conditions 06/13/2016 06/06/2016
Michael Park
Corrective Action Required
06/06/2016

Provide plan details for the pavement markings (lane lines and arrows). The arrows and stop line (24" solid white) shall be preformed thermoplastic material and located in accordance with City Standard Details for Pavement Marking. The lane lines (4" solid white, 4" solid double yellow) shall be high-build paint. Only a centerline is needed for the approach to View High Drive.
Engineering Review Approved with Conditions 06/13/2016 06/06/2016
Gene Williams, P.E.
DE Contact Field Eng. Inspector
Corrective Action Required
06/06/2016

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
06/06/2016

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
06/06/2016

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
06/06/2016

If ground breaking will take place prior to issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist.
DE C&O #12 Cut & Fill
Corrective Action Required
06/06/2016

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Engineering Review Approved with Conditions 05/19/2016 05/19/2016
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
05/19/2016

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Public Works Review and Inspection Fee of $30,788.24 (which is based on 3% of the total infrastructure cost plus a water test inspection fee) must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit from the Codes Administration Department.
DE Contact Field Eng. Inspector
Corrective Action Required
05/19/2016

Contact Public Works Inspections at (816) 969-1800 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
05/19/2016

Contact a Right-of-Way Inspector at (816) 969-1800 prior to any land disturbance within the right-of-way. These activities may require a permit.
DE Future Repair Work
Corrective Action Required
05/19/2016

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
PW Submit Land Disturbance (DELETE)
Corrective Action Required
05/19/2016

If ground breaking will take place prior to issuance of a building permit, please submit a Land Disturbance Permit application and the required attachments to the Erosion Control Specialist.
DE C&O #12 Cut & Fill
Corrective Action Required
05/19/2016

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Planning Review No Comments 05/19/2016 05/19/2016
Ron Seyl
Fire Review Approved with Conditions 05/19/2016 05/18/2016
Jim Eden
Code Statement
Corrective Action Required
05/18/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Traffic Review Corrections 05/19/2016 05/17/2016
Michael Park
Corrective Action Required
05/17/2016

The northbound roadway/driveway approach to Chipman Road shall have separate left and right-turn lanes with a taper that begins at the church entrance per the conditions of approval on the PDP.
Corrective Action Required
05/17/2016

Suggest the roadway approaching View High also be constructed with a pavement width that can accommodate three lanes (separate left and right turn west bound lanes at the intersection). Although separate turn lanes are not required with this phase of development, they are required with the next phase of developent and only need some additional pavement now compared to reconstruction later.
Traffic Review Corrections 04/20/2016 04/20/2016
Michael Park
Corrective Action Required
04/21/2016

The northbound roadway/driveway approach to Chipman Road shall have separate left and right-turn lanes with a taper that begins at the church entrance per the conditions of approval on the PDP.
Engineering Review Corrections 04/20/2016 04/20/2016
Gene Williams, P.E.
Corrective Action Required
04/20/2016

Please see comments provided by the Fire Department. It appears a sheet has reverted back to the incorrect version.
Corrective Action Required
04/20/2016

Please be aware that a half size set of the FDP is required. We did not receive a half size set on the latest submittal package.
Planning Review Corrections 04/20/2016 04/20/2016
Ron Seyl
Corrective Action Required
04/20/2016

Per the Applicant's Letter's dated November 4, 2015, and March 25, 2016, please provide spec sheets for all proposed pole mounted and wall mounted lighting. Ensure that the spec sheets indicate the wattage for each proposed fixture.
Corrective Action Required
04/20/2016

Per the Applicant's Letter dated November 4, 2015, and March 25, 2016, provide details for parking lot pole light pedestals/bases. The response letter from Engineering Solutions states that this information is contained in the resubmitted plans, but I do not see it on the plans.
Corrective Action Required
04/20/2016

Per the Applicant's Letter's dated November 4, 2015, and March 25, 2016, please provide spec sheets for the dimmable parking lot light fixtures.
Fire Review Corrections 04/20/2016 04/19/2016
Jim Eden
Code Statement
Corrective Action Required
04/19/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code. For information only.
Misc.
Corrective Action Required
04/19/2016

Relocate the fire hydrants along the south side of the building to the builing side of the fire lane. This was corrected on a previous resubmittal, but they have moved back to the original location on the current submittal.
Water Supply
Corrective Action Required
04/19/2016

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Provide documentation that the facility has enough water to meet fire flow requirements per IFC Table B105.1
Fire Review Corrections 03/25/2016 04/19/2016
Jim Eden
Code Statement
Corrective Action Required
03/24/2016

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Water Supply
Corrective Action Required
03/24/2016

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action required: Provide a water model showing available fire flow and building fire flow demand per IFC Table B105.1. Upsize water main sizes as needed to achieve adequate fire flow.
Traffic Review No Comments 03/25/2016 03/29/2016
Michael Park
Engineering Review Corrections 03/25/2016 03/25/2016
Gene Williams, P.E.
Corrective Action Required
03/25/2016

Sheet C.600: The previous applicant letter requested that the pavement detail be updated to meet the current Unified Development Ordinance (UDO) Article 12 in terms of pavement thickness, base, and subgrade. Although the asphalt thickness is acceptable, the detail does not show either subgrade stabilization or geogrid. Please revise the detail.
Corrective Action Required
03/25/2016

A gate valve was requested in the previous applicant letter prior to the backflow vault. It does not appear this was shown. Please revise.
Corrective Action Required
03/25/2016

Sheet C.100: Please review the parking lot paving plan. The Unified Development Ordinance (UDO) makes no distinction between drive aisles and parking stalls, hence it might be beneficial to revise this sheet. The fire access lane, however, should be shown. The pavement thickness requirements for the fire access lane is thicker than the driving aisles and parking stalls.
Corrective Action Required
03/25/2016

A monument sign appears to be located within an easement. This is a non-allowed use of the easement. Please revise.
Corrective Action Required
03/25/2016

The private sanitary service is shown being conneced to the manhole. A separate wye connection should be shown.
Corrective Action Required
03/25/2016

The Engineer's Estimate of Probable Construction Costs dated March 18, 2016 should be broken down into costs associated with the Final Development Plan, and a separate estimate provided for the off-site sanitary sewer. Comments on the off-site sanitary sewer plans will be submitted separately.
Corrective Action Required
03/25/2016

The Engineer's Estimate of Probable Construction Costs dated March 18, 2016 appears to be missing the following items: 1) geogrid for the parking lot, including the area one (1) foot beyond the back of curb, 2) construction of BMP facility within the detention basin, 3) two (2) additional gate valves for fire line, 4) sediment basin appurtenances (Faircloth Skimmer and related items).
Corrective Action Required
03/25/2016

Concurrence from the City of Kansas City shall be obtained for the new commercial entrance on View High.
Corrective Action Required
03/25/2016

United States Army Corps of Engineers (USACE) permits shall be obtained as necessary prior to approval.
Corrective Action Required
03/25/2016

Right of way and easements shall be dedicated as appropriate.
Planning Review Corrections 03/25/2016 03/24/2016
Ron Seyl
Corrective Action Required
03/24/2016

Per the Applicant's Letter dated November 4, 2015, please provide spec sheets for all proposed mechanical units.
Corrective Action Required
03/24/2016

Per the Applicant's Letter dated November 4, 2015, each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve. Sheet A5 calls out western red cedar face boards being used for the trash enclosure gates. This material will not meet the City's development ordinance for trash enclosure gates. Also, please indicate the color of the trash enclosure gates on Sheet A5.
Corrective Action Required
03/24/2016

Please label the color of the trash enclosure walls.
Corrective Action Required
03/24/2016

Per the Applicant's Letter dated November 4, 2015, please provide spec sheets for all proposed pole mounted and wall mounted lighting. Ensure that the spec sheets indicate the wattage for each proposed fixture. Per UDO requirements, parking lot lighting shall utilize flat lens fixtures with full cut-offs and be mounted to the parking lot light pole at 90 degrees (horizontal to the ground) and shall be non-adjustable.
Corrective Action Required
03/24/2016

Per the Applicant's Letter dated November 4, 2015, provide details for parking lot pole light pedestals/bases. The response letter from Engineering Solutions states that this information is contained in the resubmitted plans, but I do not see it on the plans. The UDO requires that concrete pedestals/bases shall not exceed three (3) feet in height and shall be included in the maximum overall height.
Corrective Action Required
03/24/2016

Per the Applicant's Letter dated November 4, 2015, please show the location of all wall-mounted lighting on the building elevations. The response letter from Engineering Solutions states that this information is contained in the resubmitted plans, but I do not see it on the plans.
Corrective Action Required
03/25/2016

The applicant shall install dimmable parking lot light fixtures. The fixtures shall comply with the lighting standards of the Unified Development Ordinance. The fixtures shall comply with the lighting standards of the Unified Development Ordinance. Please provide spec sheets for the dimmable parking lot light fixtures.
Corrective Action Required
03/25/2016

The van-accessible parking space shall be clearly marked with a sign indicating that the space is “van accessible”.
Corrective Action Required
03/25/2016

The monument sign that is included in the resubmitted information will need to be relocated outside of the easement.
Corrective Action Required
03/25/2016

Please review and revise accordingly: 1. The information on the Plant Schedule, Landscape Worksheet and Landscape Map does not match. 2. Correct the calculations on the Landscape Worksheet. No landscape modifications were granted as part of the approved preliminary development plan, so the landscaping shall meet or exceed the UDO minimum requirements. 3. A Landscape Worksheet has been attached to assist the applicant in providing the correct minimum landscaping required for the project. 4. If any existing vegetation is to be counted towards the required landscaping, it shall meet the requirements of UDO Section 14.050.C and be specifically identified on the Landscape Plan.
Corrective Action Required
03/25/2016

Include a photometric plan with the resubmitted information. Refer to UDO Section 7.230 for photometric plan requirements.
Corrective Action Required
03/25/2016

The accessible sign detail on Sheet C.600 is not the correct detail for R7-8 signage. Revise.
Corrective Action Required
03/25/2016

The number of standard parking spaces on Sheets C.001 and C.101 do not match. Revise.
Engineering Review Corrections 11/03/2015 11/03/2015
Gene Williams, P.E.
Corrective Action Required
11/03/2015

Right of way for the future Chipman Road project should be shown. It should be dedicated by separate document. Please contact Public Works for more information regarding the right of way needed for the future project.
Corrective Action Required
11/03/2015

Right of way for Ashurst Drive should be shown and dedicated by separate document.
Corrective Action Required
11/03/2015

Right of way for the north/south leg of the access road should be shown and dedicated by separate document.
Corrective Action Required
11/03/2015

The water line beneath the proposed View High Drive entrance may need to be lowered. Has there been any potholing done to establish it's vertical and horizontal location?
Corrective Action Required
11/03/2015

Sheet C.051: Should the east detention basin be used for a temporary sediment trap? It would appear this is warranted.
Corrective Action Required
11/03/2015

Sheet C.100: Specify exactly what is going to be paved in this phase of the project. A typical section, in graphical style, should be shown. Please note the new Unified Development Ordinance (UDO) Article 12 standards for pavement thickness and base.
Corrective Action Required
11/03/2015

Sheet C.200: The north detention basin appears to be flat on the bottom. Will this be a drainage issue?
Corrective Action Required
11/03/2015

Sheet C.200: There appears to be two (2) different shades of gray for the parking lot. What does this mean?
Corrective Action Required
11/03/2015

Sheet C.201: There appears to be two (2) different shades of gray for the parking lot. What does this mean?
Corrective Action Required
11/03/2015

Sheet C.202: Please label existing and proposed grades on the profile view.
Corrective Action Required
11/03/2015

Sheet C.202: Provide a typical section, in graphical format, for the north/south drive. It should be based on Table LS-2, Residential Local.
Corrective Action Required
11/03/2015

Sheet C.203: Where is the water main in relation to the new driveway in the southwest corner of the project? It was not shown on the profile view.
Corrective Action Required
11/03/2015

Sheet C.203: A typical paving section should be provided, in graphical format, for Ashurst Drive. It should be constructed to City standards, and will be based on Table LS-2, Residental Collector.
Corrective Action Required
11/03/2015

Sheet C.204: Cross slopes are shown at 2:1 on the "Bio Swale Detail". The grading plan shows a significant difference in slope.
Corrective Action Required
11/03/2015

Sheet C.204: The scale appears incorrect.
Corrective Action Required
11/03/2015

Sheet C.205 A sanitary sewer line is shown to the south of the northern detention basin, and then is directed to the north. Why is a sanitary sewer shown in this location?
Corrective Action Required
11/03/2015

Sheet C.205: The scale appears to be incorrect.
Corrective Action Required
11/03/2015

Sheet C.300: Storm Line 5 appears to show an existing field inlet being removed and replaced. Is this what is proposed? If so, then please label on the plans.
Corrective Action Required
11/03/2015

Sheet C.300: Two (2) different shades of gray are used to denote the parking area and driveways. Provide a legend showing what this means.
Corrective Action Required
11/03/2015

Sheet C.301: Two (2) different shades of gray are used to denote the parking areas. Provide a legend describing what this means.
Corrective Action Required
11/03/2015

Is rip rap being proposed at the end of the flared end sections? If so, please show on the plans.
Corrective Action Required
11/03/2015

Sheet C.302: The profile view for Storm Line 3 is missing the proposed grade line.
Corrective Action Required
11/03/2015

Sheet C.303: Label Storm Line 7 in the plan view.
Corrective Action Required
11/03/2015

Sheet C.303: An elevation of 929.0 appears to be called out in the stormwater report for the downstream portion of a 36" pipe. The detail view appears to show 931.5. Please reconcile.
Corrective Action Required
11/03/2015

Sheet C.303: The plan view shows a 15" RCP pipe for Storm Line 7, but the profile view shows an 18" HDPE. The report, however, appears to show a 36". Please reconcile.
Corrective Action Required
11/03/2015

Sheet C.303: Where is the typical section view for the outlet structure for the east detention basin? Please ensure it either follows the elevations shown in the stormwater report, or provide an updated stormwater report to reflect the changes.
Corrective Action Required
11/03/2015

Sheet C.303: Storm Line 5 appear to show the outlet of the eastern detention basin connected to the existing field inlet. Previous sheets showed this field inlet being replaced. Please reconcile.
Corrective Action Required
11/03/2015

Sheet C.303: Storm Line 5 profile appears to be missing a portion of the proposed grading.
Corrective Action Required
11/03/2015

Sheet C.303: What elevations are planned for the underdrain network in the north detention basin? How will they be connected to the detention basin outlet structure? As shown, it does not appear the bio swale underdrain network has the ability to drain properly.
Corrective Action Required
11/03/2015

Sheet C.304: The underdrain network for the bio swale does not appear constructable given the information presented. It appears the underdrains are connected to the detention basin outlet structure, but the outlet is higher than the underdrains.
Corrective Action Required
11/03/2015

Separate sanitary sewer plans will be required for the public sanitary sewer along Ashurst.
Corrective Action Required
11/03/2015

Sheet C.400: The sanitary sewer line is shown near the southwest corner of the eastern detention basin with an alignment that is unclear. The manhole is shown offset, but the sewer intersects with another manhole within a few feet. Please reconcile.
Corrective Action Required
11/03/2015

Sheet C.401: The proposed alignment for the sanitary sewer near the connection point at manhole #27-033 (i.e., the existing manhole) does not appear constructable. Easements do not appear to exist on Lot 11, Edgewood Trail, and should be a minimum of 15 feet from the property line.
Corrective Action Required
11/03/2015

Sheet C.401: Installation of the new sanitary sewer beneath Ashurst and Edgewood Drive should be specified as bored and cased.
Corrective Action Required
11/03/2015

Please label the existing City manhole as #27-033.
Corrective Action Required
11/03/2015

Sheet C.500: The backflow vault should be located outside any easement and outside the right of way. Please move the backflow vault so it is completely outside these limits. In addition, please show a valve prior to the backflow vault.
Corrective Action Required
11/03/2015

Sheet C.500: Please show an additional valve on the public main on the east side of the cut-in tee feeding the fire line.
Corrective Action Required
11/03/2015

Sheet C.501: Please label the fire line as private.
Corrective Action Required
11/03/2015

Sheet C.600: Please show the new asphalt pavement standards specified in the UDO Article 12.
Corrective Action Required
11/03/2015

Please note the entrance to View High Drive will require the City of Kansas City approval.
Corrective Action Required
11/03/2015

Are there any wetlands issues in the existing pond?
Corrective Action Required
11/03/2015

An Engineer's Estimate of Probable Construction Costs should accompany your final submittal drawings. The Engineering Plan Review and Inspection Fee is based on this estimate, and calculated at 3% of the total. Items to include in the estimate are: 1) water lines greater than 2", 2) fire hydrants, 3) fittings, thrust blocks, valves, valve boxes, valve box covers, tees, bends, 4) storm lines greater than 6", 5) storm inlets, structures, flared end sections, toe walls, 6) rip rap, 7) grading for detention basin, 8) grading for parking lot, 9) subgrade preparation either geogrid or stabilized subgrade, including the area one (1) foot beyond the back of curb, 10) aggregate base including the area one (1) foot beyond the back of curb, 11) pavement, 12) curb and gutter, 13) sanitary sewer lines, 14) sanitary sewer manholes, 15) casing carrier pipe, 16) boring for sanitary sewer, 17) wye connectio to sanitary sewer, 18) erosion and sediment control devices, 19) final restoration, including seeding, sodding, fertilizer, mulch, and topsoil.
Traffic Review Corrections 11/03/2015 11/03/2015
Michael Park
Corrective Action Required
11/03/2015

Pending Development Agreement for off-site improvements and Easements/Right-of-Ways for the N-S Street, Chipman Road, and Ashurst Drive. No comments regarding the on-site FDP submittal.
Corrective Action Required
11/03/2015

Planning Review Corrections 11/03/2015 10/28/2015
Ron Seyl
Corrective Action Required
10/28/2015

As a general note, any retaining wall greater than 4 feet shall be engineered and will require a separate building permit.
Corrective Action Required
11/03/2015

Please include a dashed line indicating the roof line and rooftop mechanical equipment on the elevation. Also, provide the manufacturer's specifications for the proposed mechanical units.
Corrective Action Required
11/03/2015

Label all exterior building material colors on Sheets A2.10, A2.20 and A2.30.
Corrective Action Required
11/03/2015

Is any ground mounted mechanical equipment proposed? Per UDO requirements, ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened.
Corrective Action Required
11/03/2015

Provide a detail of the trash enclosure and screening method. All exterior trash storage containers shall be screened so that they are not visible from off the property. Each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve.
Corrective Action Required
11/03/2015

Provide a detail of the trash enclosure and screening method. All exterior trash storage containers shall be screened so that they are not visible from off the property. Each trash enclosure shall be constructed of masonry walls with a steel gate painted to be compatible with the color of the masonry walls and building it is to serve.
Corrective Action Required
11/03/2015

Provide manufacturers specification sheets for all proposed exterior lighting. Also, provide the wattage for all proposed exterior lighting.
Corrective Action Required
11/03/2015

Per UDO requirements, parking lot lighting shall utilize flat lens fixtures with full cut-offs and be mounted to the parking lot light pole at 90 degrees (horizontal to the ground) and shall be non-adjustable.
Corrective Action Required
11/03/2015

Provide details for parking lot pole light pedestals/bases. Per UDO requirements, concrete pedestals/bases shall not exceed three (3) feet in height and shall be included in the maximum overall height.
Corrective Action Required
11/03/2015

As a general note, the total aggregate wattage for multiple headed fixtures mounted on a single pole shall be limited to 800-Watts maximum.
Corrective Action Required
11/03/2015

Light Source. Metal halide or light emitting diodes (LED’s) shall be the approved light source for all outdoor lighting. These outdoor lighting fixtures are color-correct types to ensure true-color at night for security purposes and support CPTED principles. Design of Fixtures/Prevention of Spillover Glare. All outdoor light fixtures shall use full cut-off lenses, as classified by the Illuminating Engineering Society of North America (IESNA), to prevent glare and light spill from the project site onto adjacent properties, buildings and roadways. All lights shall be International Dark-Sky Association (IDA) approved fixtures.
Corrective Action Required
11/03/2015

A. Wall mounted lighting is defined as any light fixture mounted to the building wall excluding accent lighting, canopy lighting, and excepted lights, as identified in this Division. B. Full Cut-Offs. Wall-mounted lights shall utilize full cut-off fixtures. C. Maximum Wattage. Wall-mounted fixtures shall be metal halide and not exceed 150-Watts. D. Mounting Height. Wall-mounted/building-mounted fixtures shall be attached only to walls, and the top of the fixture shall not exceed the height of the parapet or roof, whichever is greater. For structures within 100 feet of a residential use and/or district, the mounting height of these fixtures shall not exceed 15 feet measured from the top of the fixture to grade.
Corrective Action Required
11/03/2015

The applicant shall provide dimmable light fixtures subject to Planning Commission requirements per the September 22, 2015 meeting. The fixtures shall comply with UDO requirements.
Corrective Action Required
11/03/2015

The parking space depth for the eastern most parking spaces is shown as 17 feet. Per the UDO, standard parking space dimensions shall not be less than nine (9) feet wide by nineteen (19) feet long.
Corrective Action Required
11/03/2015

Periodically display the width of the standard and ADA accessible parking spaces. Standard and ADA accessible parking space dimensions shall not be less than nine (9) feet wide.
Corrective Action Required
11/03/2015

Is the information on the FDP's landscape table correct as it differs from what was presented for the PDP? For example, on the PDP's landscape table the total building area in the open yard tree calculation was 78,168 square feet after Phase I and II build out. A square building square footage calculation of 78,250 is what was presented to the Planning Commission and City Council. However, on the FDP's landscape table the total building area is shown as 223,223 square feet. Other information varies from what was presented in the PDP landscape table as well. Please ensure that the information in the table is correct for this project as this is what staff will base landscaping requirements on.
Corrective Action Required
11/03/2015

The scale on the landscape plan appears to be off. Please correct.
Corrective Action Required
11/03/2015

In the landscape table, please revise the Chipman Road street frontage calculations for trees and shrubs to include only the area east of Chipman Road. The area west of Chipman Road will be considered a separate project.
Corrective Action Required
11/03/2015

As a general note, all project signage will need to be approved by separate sign permit application.
Corrective Action Required
11/03/2015

The Developer shall execute a mutually satisfactory development agreement with the City, which addresses, at a minimum, the road improvements recommended in the Transportation Impact Analysis form dated September 15, 2015. No building permits shall be issued for any structure in the development until written proof is provided to the City that the development agreement has been recorded in the Jackson County Recorders’ Office.
Corrective Action Required
11/03/2015

Easements as shown on the preliminary development plan for public access similar to right-of-ways for public streets (i.e. 50 and 60 foot typical widths or larger as may be required for necessary turn lanes) shall be provided along the proposed north-south private road and the proposed east-west private road. The easement along the east-west private road shall extend to and align with the existing right-of-way for Ashurst Drive. These easements shall be donated as public right-of-way when surrounding development occurs and the public streets are constructed.
Corrective Action Required
11/04/2015

At least one van-accessible parking space with an adjacent 8 foot aisle shall be provided. The detail on sheet C.600 shows one, but the site plan has all 5 foot spaces.
Corrective Action Required
11/04/2015

A temporary asphalt curb shall be provided at the south end of the north-south drive connection to Chipman Rd where the drive will eventually extend south to connect with Ashurst Dr.
Corrective Action Required
11/04/2015

Street trees and shrubs shall be provided along Chipman Rd in the area between the driveway and the detention basin. Parking lot screening shall also be provided for the portion of the parking lot in this area.
Fire Review Corrections 11/03/2015 10/28/2015
Jim Eden
FDC
Corrective Action Required
10/28/2015

IFC 903.3.7- Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the FDC and a hydrant within 100 feet.
Water Supply
Corrective Action Required
10/28/2015

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Action Required: Provide a water flow study for the site.The 6" main may need to be upsized to an 8" per City Design and Construction Manual.
Misc.
Resolved
03/24/2016

Relocate the fire hydrants along the south side of the building to the builing side of the fire lane.
Fire Lanes - Marking
Partial Correction
03/24/2016

IFC 503.3- Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Action required: The building side of the fire lanes around the building shall be posted.
Code Statement
Corrective Action Required
10/28/2015

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2012 International Fire Code .
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $1,000.00 $1,000.00 Paid 10/20/2015
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
10/20/2015 Letter Routing Sheet - FDP
10/20/2015 Receipt Receipt for transaction: 2015-005845
11/04/2015 Letter Applicant Letter - FDP (DFDP)
03/18/2016 Letter Resubmittal Routing Sheet - FDP
03/25/2016 Letter Applicant Letter - FDP (DFDP)
04/14/2016 Letter Resubmittal Routing Sheet - FDP
04/20/2016 Letter Applicant Letter - FDP (DFDP)
05/12/2016 Letter Resubmittal Routing Sheet - FDP
05/19/2016 Letter Applicant Letter - FDP (DFDP)
06/06/2016 Letter Resubmittal Routing Sheet - FDP
06/07/2016 Letter Applicant Letter - FDP (DFDP)
11/10/2017 Activity Document Fee WorksheetUpdatedDevCenterOnSiteFDP
01/29/2025 Letter FDP Archived Documents_Part 1 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 2 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 3 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 4 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 5 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 6 of 7_PL2015158
01/29/2025 Letter FDP Archived Documents_Part 7 of 7_PL2015158
01/29/2025 Approved Plans Approved Construction Plans_11x17_Part 1 of 2_PL2015158
01/29/2025 Approved Plans Approved Construction Plans_11x17_Part 2 of 2_PL2015158
01/30/2025 Plans FDP A1_PL2015158
01/30/2025 Plans FDP A2_PL2015158
01/30/2025 Plans FDP A3_PL2015158
01/30/2025 Plans FDP A4_PL2015158
01/30/2025 Plans FDP A5_PL2015158
01/30/2025 Plans FDP C.001_PL2015158
01/30/2025 Plans FDP C.002_PL2015158
01/30/2025 Plans FDP C.010_PL2015158
01/30/2025 Plans FDP C.052_PL2015158
01/30/2025 Plans FDP C.100_PL2015158
01/30/2025 Plans FDP C.101_PL2015158
01/30/2025 Plans FDP C.200_PL2015158
01/30/2025 Plans FDP C.201_PL2015158
01/30/2025 Plans FDP C.205_PL2015158
01/30/2025 Plans FDP C.207_PL2015158
01/30/2025 Plans FDP C.600_PL2015158
01/30/2025 Plans FDP ES1_PL2015158
01/30/2025 Plans FDP L.100_PL2015158
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home