Summary
PRCOM20222729
Building Permit - Commercial
Certificate of Occupancy
2641 LLC
CHANGE OF TENANT
TENANT FINISH FOR ANTI-AGING SPA
06/17/2022
07/27/2022
12/25/2022
06/20/2023
Locations
Contacts
2641 LLC, Address:2641 NE MCBAINE DR  
Miller Custom Homes, LLC, Address:17812 Rock Island Rd  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
MR ROOTER OF KANSAS CITY, Address:3690 MAIN STREET, Phone:(816) 800-9171  
GUY GRONBERG ARCHITECTS, Address:113 SE 3RD ST, Phone:(816) 524-0878  
PAUL@BELLAHHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 06/08/2022 07/26/2022
Joe Frogge
LC - General Contractor
Resolved
07/26/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent. 7/1/22 - acknowledged in letter.
LC - MEP Subs
Resolved
07/26/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/1/22 - acknowledged in letter.
Fire Plan Review Approved 07/08/2022 07/06/2022
Jim Eden
Miscellaneous Correction
Resolved
07/06/2022

504.2 Maintenance of exterior doors and openings. Exterior doors and their function shall not be eliminated without prior approval. Exterior doors that have been rendered nonfunctional and that retain a functional door exterior appearance shall have a sign affixed to the exterior side of the door with the words THIS DOOR BLOCKED. The sign shall consist of letters having a principal stroke of not less than 3/4 inch (19.1 mm) wide and not less than 6 inches (152 mm) high on a contrasting background. Required fire department accessdoors shall not be obstructed or eliminated. Exit and exit access doors shall comply with Chapter 10. Access doors for high-piled combustible storage shall comply with Section 3206.7. Action required-
Address numbers required
Resolved
07/06/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Remove any additional addressing or suite numbering besides the 6.
Building Plan Review Approved 07/08/2022 07/01/2022
Joe Frogge
IPC 403.1 Minimum number of fixtures
Resolved
07/01/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
Building Plan Review Rejected 06/29/2022 06/24/2022
Joe Frogge
IPC 403.1 Minimum number of fixtures
Corrective Action Required
06/24/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
Licensed Contractors Rejected 06/29/2022 06/24/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/24/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/24/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 06/29/2022 06/23/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
06/23/2022

504.2 Maintenance of exterior doors and openings. Exterior doors and their function shall not be eliminated without prior approval. Exterior doors that have been rendered nonfunctional and that retain a functional door exterior appearance shall have a sign affixed to the exterior side of the door with the words THIS DOOR BLOCKED. The sign shall consist of letters having a principal stroke of not less than 3/4 inch (19.1 mm) wide and not less than 6 inches (152 mm) high on a contrasting background. Required fire department accessdoors shall not be obstructed or eliminated. Exit and exit access doors shall comply with Chapter 10. Access doors for high-piled combustible storage shall comply with Section 3206.7. Action required-
Address numbers required
Corrective Action Required
06/23/2022

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required- Remove any additional addressing or suite numbering besides the 6.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $900.00 $900.00 Paid 07/26/2022
8331507-Sewer Connection Fee $270.00 $270.00 Paid 07/26/2022
7232302-Commercial License Tax Fee $5,791.50 $5,791.50 Paid 07/07/2022
$5,791.50
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 06/16/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Partial 9/8/2022 9/8/2022 09/08/2022
Misc
Informational
09/08/2022
PARTIAL PASS - MAIN TRUNK LINE THROUGH CENTER OF BLDG & STUB OUTS, CLEAN OUT -
Underslab Plumbing Inspection - Commercial Passed 9/15/2022 9/15/2022 09/15/2022
Misc
Informational
09/08/2022
PARTIAL PASS - MAIN TRUNK LINE THROUGH CENTER OF BLDG & STUB OUTS, CLEAN OUT -
Water Service Inspection Partial 9/20/2022 (8:00) 9/20/2022 09/20/2022
Misc
Informational
09/20/2022
09/20/22 Tuesday JMJ Visual saw that copper was pulled to the inside of building suite 103. No connection made inside or outside.
Footing Inspection - Commercial Passed 9/23/2022 09/23/2022
Misc
Informational
09/23/2022
8 column pads at (4) @ exterior walls (4) @ hallway detail F!,F2, per plan 5 footings at load bearing walls per plan
Piers/Caissons Inspection - Commercial Passed 10/24/2022 10/24/2022
Misc
Informational
10/24/2022
(8) SCH 40 COLUMNS HAVE ANCHOR BOLTS INSTALLED DETAIL F1, F2, OK TO POUR SLAB
Water Service Inspection Passed 10/24/2022 10/25/2022
Misc
Informational
09/20/2022
09/20/22 Tuesday JMJ Visual inspected copper that was pulled to the inside of building suite 103. No connection made inside or outside.
Misc
Informational
10/25/2022
10/25/22 Tuesday JMJ Visual inspected connection of 1” water line on the outside of building suite 103.
Underslab Electrical Inspection - Commercial Passed 11/7/2022 11/7/2022 11/07/2022
Above Ceiling Inspection Failed 1/5/2023 1/5/2023 01/05/2023
Misc
Corrective Action Required
01/05/2023
-Complete corrections on All Rough Inspection for hard lids
In-wall Inspection Failed 1/5/2023 1/5/2023 01/05/2023
Miscellaneous Correction
Corrective Action Required
01/05/2023
-Cap off old/ unused dwv in storage closet -Address electrical specifications for conductors, raceways and compliance with NEC article 517 (see notes 5-7 on E0) and Health Care Facility notes on E0 -Tighten all nuts on all hold downs -Fireblock all wall spaces at hard lids,- Fireblocking must comply with 2018 IBC 718.2 -Protect all dwv less than 1.25” to face of framing 2” above and below plates -Provide midpoint strap at all 2” and smaller dwv -Fireblock dead space at chase north east corner -Seal all top plate penetrations-treatment room 2, treatment room 3, treatment room 4, injection room 2 etc.- all penetrations should comply with 2018 IBC 718.2-FOAM IS NOT APPROVED FOR USE IN COMMERCIAL APPLICATIONS -Provide joist hangers at 4’ joists in treatment room 2 -Address holes bored greater than 40% at loading bearing studs in both bathrooms -Address stud notched greater than 25% at both bathroom -Cap off old vtr at bath and seal plate penetration -Add stud near column in treatment room 2 where spacing is over 24” -Address over bored studs in treatment rooms 2-4 -Protect dwv and address over bored at treatment 4 -Replace stud cut short at electrical panels -Solid block between joist at shearwall openings at hallway-see detail 11 on S200
In-wall Inspection Failed 1/11/2023 1/11/2023 01/11/2023
Miscellaneous Correction
Corrective Action Required
01/05/2023
**Submit revised plans showing changes from medical grade electrical to non medical facility wiring and devices and changes to electrical service detail shown on plans -Protect all dwv less than 1.25” to face of framing 2” above and below plates-SEE TOP PLATES IN INJECTION ROOMS -Address stud notched greater than 25% at both bathroom-REPLACE OVER BORED,OVER NOTCHED STUD DAMAGED FURTHER BY CORRECTIONS. STUDS CAN BE NOTCHED 25% MAX -Replace stud cut short at electrical panels-THIS NEEDS TO BE A FULL LENGTH , FULL DEPTH STUD
In-wall Inspection Partial 1/17/2023 1/17/2023 01/17/2023
Miscellaneous Correction
Corrective Action Required
01/11/2023
**Submit revised plans showing changes from medical grade electrical to non medical facility wiring and devices and changes to electrical service detail shown on plans -OK FOR ROCK
Electrical Service Inspection Failed 2/10/2023 2/10/2023 02/10/2023
Miscellaneous Correction
Corrective Action Required
02/10/2023
Land service conductors
Electrical Service Inspection Passed 2/16/2023 2/16/2023 02/16/2023
Miscellaneous Correction
Resolved
02/16/2023
Land service conductors
Sewer Service Inspection Partial 2/23/2023 (10:30) 2/23/2023 02/28/2023
Misc
Informational
02/28/2023
02/28/23 Tuesday JMJ 6" Sanitary clean-out was installed on the Eastside of building.
In-wall Inspection Passed 04/13/2023
Miscellaneous Correction
Resolved
04/13/2023
**Submit revised plans showing changes from medical grade electrical to non medical facility wiring and devices and changes to electrical service detail shown on plans -OK FOR ROCK
Gas Piping Inspection - Commercial Failed 4/20/2023 4/20/2023 04/20/2023
Misc
Corrective Action Required
04/20/2023
-Paint all exterior gas piping with corrosion resistant paint
Above Ceiling Inspection Passed 4/21/2023 4/21/2023 04/21/2023
Misc
Resolved
04/21/2023
-Complete corrections on All Rough Inspection for hard lids
Gas Piping Inspection - Commercial Passed 4/26/2023 4/26/2023 04/26/2023
Misc
Resolved
04/26/2023
Occupancy Inspection - Codes Commercial Failed 5/22/2023 5/22/2023 05/22/2023
Misc
Corrective Action Required
05/22/2023
-Complete all corrections for LSFD -Provide ladder for access to rooftop not inspected-LIST MAY NOT BE COMPLETE -Threshold at entry door can not be over 3/4" and must comply with IBC 1010.7 -Countertop space, and point of service counters in lobby to be 34" max and comply with 2009 A117.1 -Sink in lobby needs to be at 34" max and comply with 2009 A117.1 for reach, manuverability, and Knee clearance -Provide plumbing protection at restroom sinks per IPC 404.3 -Water closets to be 16"-18" to center-see west restroom -Flush control to be on open side of water closet-see East restroom -Restroom mirrors to be max 40" to reflective surface -Restroom walls and baseboard within 2' of water closets or sinks to be of non absorbent finishes to a height of min 4' -Label all electrical panels and provide panel schedules throughout -Provide min air gap fo 1.5 x diameter of pipe at hot water heater blow off -Remove paint from ground clamp and copper water line to provide direct metal to metal connection -Address lack of working space of 30" wide by 36" in front of electrical panel in room 2 -Receptacles in rooms 5 and 7 within 6' of sink are required to be GFCI protected -Insulate hot water lines -Counter tops at patient refreshment area to be max 34" aff for accessibility -Sink in refreshment are needs to be at 34" max and comply with 2009 A117.1 for reach, manuverability, and Knee and toe clearance -Provide hammer arrestors at patient refreshment dishwasher -Provide hammer arrestors at cloths washers -Provide combustion air methods per code at all gas furnaces and appliances -Secure dishwasher discharge line above bowl of sink -Exterior gaurdrail height to be min 42" -Provide code compliant handrail at stairs per IBC 1014 -Provide 36" clearance at walkway on north side where gaurdrail encroaches on egress path -Provide lockout for breaker on sign circuit -Provide lockout breakers for all hardwired appliances without a disconnect
Occupancy Inspection - Codes Commercial Ready for Temp CO 6/16/2023 6/16/2023 06/16/2023
Misc
Corrective Action Required
05/22/2023
-Update plans to show employee only use of "patient refreshment area"
Occupancy Inspection - Codes Commercial Full C of O 06/20/2023
Misc
Resolved
06/20/2023
-Update plans to show employee only use of "patient refreshment area"
Documents & Images
Date Uploaded File Type Document Name
06/17/2022 Application Form application
06/17/2022 Plans AAC Full Set 06-16-2022
06/17/2022 Engineer Report/Study AAC Structural Calculations 06-15-2022
06/28/2022 Letter DS P/R Corrections Document
06/30/2022 Letter AAC City Review Response 06-30-2022
06/30/2022 Plans AAC Full Set 06-30-2022
07/07/2022 Approved Plans approved - AAC Full Set 06-30-2022
07/21/2022 Letter Fire Building Plan Review
07/26/2022 Application Form AAC Permit App 06-16-2022
07/26/2022 Letter License Tax Bill
07/26/2022 Receipt Receipt for transaction:2022-006124
08/02/2022 Letter DS Building Permit
09/08/2022 Letter INSPECTION SUMMARY
09/15/2022 Letter INSPECTION SUMMARY
09/20/2022 1” Copper Water Pipe Inside Building
09/20/2022 1” Copper Water Pipe Outside Building
09/20/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
10/24/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
10/25/2022 Letter INSPECTION SUMMARY
11/07/2022 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/05/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/17/2023 Letter INSPECTION SUMMARY
02/06/2023 Drawing AAC Electrical Service As Built
02/06/2023 Approved Plans approved - AAC Electrical Service As Built
02/10/2023 Letter INSPECTION SUMMARY
02/16/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
02/28/2023 Letter INSPECTION SUMMARY
04/11/2023 Letter Electrical EOR Letter
04/11/2023 Plans AAC - Revised Electrical Plans
04/12/2023 Letter AAC Non-medical Letter
04/12/2023 Approved Plans approved - AAC - Revised Electrical Plans
04/13/2023 Letter INSPECTION SUMMARY
04/20/2023 Letter INSPECTION SUMMARY
04/21/2023 Letter INSPECTION SUMMARY
04/26/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
06/13/2023 Email email with architect's notes
06/13/2023 Letter Advanced Aesthetic Center owner letter
06/16/2023 Certificate/License Codes Temporary Certificate of Occupancy
06/16/2023 Receipt Receipt for transaction:2023-004498
06/20/2023 Approved Plans approved - AAC A3 06-20-2023
06/20/2023 Letter Codes Final Certificate of Occupancy
06/20/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home