Summary


PRSUBD20231351
Public Infrastructure
Issued
RESIDENCES AT BLACKWELL LLC
DEVELOPMENT COMPLETE
BLACKWELL RESERVE - PUBLIC INFRASTRUCTURE ASSOCIATED WITH THE CONSTRUCTION OF THE RESIDENTIAL DEVELOPMENT. THIS INCLUDES SANITARY, WATER, STREET AND STORM. REVIEW APPLICATIONS PL2023049, PL2023050 AND PL2023051 Mike Weisenborn 08/13/2024 8:26 AM - PERMITTED ITEMS ARE WATER, SANITARY SEWER, GRADING AND STORM
03/31/2023
10/16/2024
Locations
Contacts
RESIDENCES AT BLACKWELL LLC, Address:21 SE 29TH TER  
Selby Excavating LLC, Address:16212 Cameron Road  
Jake McClung, Address:16212 Cameron Road, Phone:(816) 820-0956  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/31/2023 11/15/2023
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110072-Water Test Fee $600.00 $600.00 Paid 11/14/2023
91100C9-Water Insp Fee $6,843.90 $6,843.90 Paid 11/14/2023
91100C8-Sanitary Sewer Insp Fees $6,383.85 $6,383.85 Paid 06/05/2024
9110081-Paved Surface Inspection Fee $14,903.49 $14,903.49 Paid 10/15/2024
9110068-Storm Fee $5,523.60 $5,523.60 Paid 08/12/2024
9110071-Site Grading Fee $162.00 $162.00 Paid 08/12/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Pending
Water Line - Construction Inspection Pending
Misc
Informational
09/18/2024
9-18-24 BR Contractor (Selby Excavation) installed 250' of 8'' water main on line G from Sta. 4+55 - Sta. 2+00. At Sta. 4+20 contractor installed 11.25' bend to get water main back on center line do to when 8'' gate was installed it was 3' off center line.
Water Line - Construction Inspection Pending
Misc
Informational
10/01/2024
9-18-24 BR Contractor (Selby Excavation) installed 250' of 8'' water main on line G from Sta. 4+55 - Sta. 2+00. At Sta. 4+20 contractor installed 11.25' bend to get water main back on center line do to when 8'' gate was installed it was 3' off center line. 9-19-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line G from Sta. 2+00 - Sta. 0+00. With 100' on water line A from Sta. 2+20 - 3+00. 9-25-24 BR Contractor (Selby Excavation) installed 500' of 8'' water main on line A from Sta. 3+00 - Sta. 9+00. 2nd crew installed 200' of 8'' water main on line A from Sta. 15+18 - Sta. 14+00. 9-26-24 BR Contractor (Selby Excavation) installed 400' of 8'' water main on line A from Sta, 9+00 - Sta. 13+00. Also contractor installed 300' of 6'' pipe with fire hydrants on water line A. 9-30-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line a from Sta. 13+00 - Sta. 14+00 & Sta. 2+46 - Sta. 1+53 to fire hydrant assembly. 10-1-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line A from Sta, 1+53 - Sta. 0+00. Both 8x8 tees are installed for water line C & water line B.
Grading/Excavation/Fill Inspection Pending
Water Line - Construction Inspection Pending
Sanitary - Material Verification Pending
Sanitary Sewer Construction Inspection Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Water Line - Hydrostatic Test Pending
Misc
Informational
10/18/2024
10-18-24 BR Contractor (Selby Excavation) preformed hydrostatic test on water line A, line B, line G at 150 psi which pass.
Water Line - Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Install Street and Stop Signs Pending
Storm Sewer Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Water Line - Coliform Test 2 Pending
Misc
Informational
11/07/2024
11-7-24 BR Contractor 2nd sample on water line A, line G, line B, & line C coliform test.
Sanitary Sewer - Mandrel Pending
Misc
Informational
11/26/2024
11/26/24 Tuesday JMJ (Selby Excavating) Private Sanitary sewer mandrel, B1 to A3, G1 to C2, & New alley private street Public Sanitary sewer mandrel, A3 to A4, A4 to C1, C1 to C2, & C2 to C3.
Sanitary Sewer - Air Test Pending
Misc
Informational
11/27/2024
11/26/24 Tuesday JMJ (Selby Excavating) B2 to B1, B1 to A3, A3 to A4, A4 to C1, & C1 to C2 passed air test. 11/27/24 Wednesday JMJ (Selby Excavating) A10 to A9, A9 to A8, A8 to A7, passed air test. Contractor stopped testing due to rainy weather.
Pavement-Curb Construction Pending
Misc
Informational
11/27/2024
11/27/24 Wednesday JMJ (Secon Paving) Contractor installed approximately 2,500 feet of curb on the project on 11/26/24 Tuesday. Cure was spray on curbs. Contractor came back on Wednesday and covered newly installed curbs with tarps due to inclement weather condition.
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Water Line - Coliform Test 1 Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Sanitary Sewer - Camera Test Pending 1/15/2025
Water Line - Construction Inspection Partial 10/25/2024 10/25/2024 10/25/2024
Misc
Informational
09/18/2024
9-18-24 BR Contractor (Selby Excavation) installed 250' of 8'' water main on line G from Sta. 4+55 - Sta. 2+00. At Sta. 4+20 contractor installed 11.25' bend to get water main back on center line do to when 8'' gate was installed it was 3' off center line. 9-19-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line G from Sta. 2+00 - Sta. 0+00. With 100' on water line A from Sta. 2+20 - 3+00. 9-25-24 BR Contractor (Selby Excavation) installed 500' of 8'' water main on line A from Sta. 3+00 - Sta. 9+00. 2nd crew installed 200' of 8'' water main on line A from Sta. 15+18 - Sta. 14+00. 9-26-24 BR Contractor (Selby Excavation) installed 400' of 8'' water main on line A from Sta, 9+00 - Sta. 13+00. Also contractor installed 300' of 6'' pipe with fire hydrants on water line A. 9-30-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line a from Sta. 13+00 - Sta. 14+00 & Sta. 2+46 - Sta. 1+53 to fire hydrant assembly. 10-1-24 BR Contractor (Selby Excavation) installed 300' of 8'' water main on line A from Sta, 1+53 - Sta. 0+00. Both 8x8 tees are installed for water line C & water line B. 10-22-24 BR Contractor (Selby Excavation) preformed a chlorination/disinfection test on water line A, line G, line B, line C which is a pass. 10-25-24 BR Contractor flush water line A, line G, line B, & line C ready for bacteriological test.
Water Line - Coliform Test 1 Passed 11/4/2024 11/4/2024 11/04/2024
Misc
Informational
11/04/2024
10-30-24 BR Contractor 1st sample on water line A, line G, line B, & line C coliform test. 11-4-24 BR 1st sample for coliform test on water line A, line G, line B. & line C pass.
Pavement-Stabilized Subgrade Partial 11/19/2024 11/19/2024 11/19/2024
Misc
Informational
11/19/2024
11-19-24 BR Contractor installed 9'' subgrade aggregate base on Lindberg Ln., Golden Ln., 5th Terr., 6th St., Highland Park Dr., wood Ln.
Pavement-Curb Construction Partial 11/22/2024 11/22/2024 11/22/2024
Misc
Informational
11/22/2024
11-22-24 BR Contractor poured curbs on east & west side of SE Wood Lane.
Pavement-Curb Construction Partial 11/27/2024 11/27/2024 11/27/2024
Misc
Informational
11/27/2024
11/27/24 Wednesday JMJ (Secon Paving) Contractor installed approximately 2,500 feet of curb on the project on 11/26/24 Tuesday. Cure was spray on curbs. Contractor came back on Wednesday and covered newly installed curbs with tarps due to inclement weather condition.
Sanitary Sewer - Air Test Passed 12/2/2024 12/2/2024 12/02/2024
Misc
Informational
11/27/2024
11/26/24 Tuesday JMJ (Selby Excavating) B2 to B1, B1 to A3, A3 to A4, A4 to C1, & C1 to C2 passed air test. 11/27/24 Wednesday JMJ (Selby Excavating) A10 to A9, A9 to A8, A8 to A7, passed air test. Contractor stopped testing due to rainy weather. 12-2-24 BR Contractor preformed air test on MH A-7 to MH A-6, MH A-6 to MH A-5, MH A-5 to MH A-4. Pas
Sanitary Sewer - Air Test Passed 11/27/2024 11/27/2024 12/02/2024
Misc
Informational
11/26/2024
11/26/24 Tuesday JMJ (Selby Excavating) B2 to B1, B1 to A3, A3 to A4, A4 to C1, & C1 to C2 passed air test. 11/27/24 Wednesday JMJ (Selby Excavating) A10 to A9, A9 to A8, A8 to A7, A7 to A6, A6 to A5, & A5 to A4 passed air test.
Sanitary Sewer - Air Test Passed 11/26/2024 11/26/2024 12/02/2024
Misc
Informational
11/26/2024
11/26/24 Tuesday JMJ (Selby Excavating) B2 to B1, B1 to A3, A3 to A4, A4 to C1, & C1 to C2 passed air test.
Sanitary Sewer - Mandrel Passed 11/26/2024 11/26/2024 12/02/2024
Misc
Informational
11/26/2024
11/26/24 Tuesday JMJ (Selby Excavating) Private Sanitary sewer mandrel, B1 to A3, G1 to C2, & New alley private street Public Sanitary sewer mandrel, A3 to A4, A4 to C1, C1 to C2, & C2 to C3. A10 to A9, A9 to A8, A8 to A7, 11/27/24 Wednesday JMJ (Selby Exavating) Public sanitary sewer mandrel A7 to A6, & A6 to A5.
Sanitary Sewer Construction Inspection Passed 11/12/2024 11/12/2024 12/02/2024
Misc
Informational
06/14/2024
6-14-24 BR Contractor (Selby Excavation) installed MH A-5 structure and 35' of 8'' PVC pipe heading to MH A-6. 6-17-24 BR Contractor ( Selby Excavation) installed 190' of 8'' PVC pipe to MH A-6. MH A-6 structure is installed along with 60' of service wyes. 6-18-24 BR Contractor (Selby Excavation) installed 210' of 8'' PVC pipe from MH A-6. MH A-7 structure is installed plus 25' of service wyes. 6-19-24 BR Contractor (Selby Excavation) installed 120' of 8'' PVC pipe from MH A-7 heading to MH A-8 plus 50' of service wyes. 6-20-24 BR Contractor (Selby Excavation) installed 110' of 8'' PVC pipe heading to MH A-8. 6-24-24 BR Contractor (Selby Excavation) installed 180' of 8'' PVC pipe to MH A-8. MH A-8 structure is installed. 7-10-24 BR Contractor (Selby Excavation) installed 250' of 8'' PVC pipe from MH A-8 heading to MH A-9. 7-11-24 BR Contractor (Selby Excavation) installed 215' of 8'' PVC pipe from MH A-9 to MH A-10. MH A-10 structure is installed. 7-12-24 BR Contractor (Selby Excavation) installed 110' of service wyes between MH A-10 & MH A-8. 7-15-24 BR Contractor (Selby Excavation) installed 100' of service wyes between MH A-8 & MHA-7. 7-17-24 BR Contractor (Selby Excavation) installed 55' of service wyes between MH A-8 & MH A-7. 8-22-24 BR Contractor (Selby Excavation) installed MH 65-162 on existing sanitary main for A-line. 8-27-24 BR Contractor (Selby Excavation) installed 150' of 12'' PVC pipe from MH 65-162 to MH A-1 with structure installed. 8-29-24 BR Contractor (Selby Excavation) installed 100' of 12'' PVC pipe from MH A-1 heading to MH A-2. 9-10-24 BR Contractor (Selby Excavation) installed 110' f 12'' PVC pipe from MH A-1 to MH A-2. 9-12-24 BR Contractor (Selby Excavation) installed 40' of 12'' PVC pipe heading to MH A-2. 9-16-24 BR Contractor (Selby Excavation) installed 150' of 12'' PVC pipe to MH A-2 with structure installed. 9-18-24 BR Contractor (Selby Excavation) installed 170' of 12'' DIP pipe from MH A-2 heading to MH A-3. 9-25-24 BR Contractor (Selby Excavation) installed 200' of 12'' DIP pipe under creek to MH A-3. 9-26-24 BR Contractor (Selby Excavation) installed concrete encasement on 12'' DIP pipe that under creek bed. 10-1-24 BR Contractor (Selby Excavation) installed 300' of 12'' PVC pipe from MH A-3 heading to MH A-4 with MH A-3 structure installed. 10-4-24 BR Contractor (Selby Excavation) installed 250' of 12'' PVC pipe from MH A-3 before coming into rock heading to MH A-4. 10-9-24 BR Contractor (Selby Excavation) had to replace 25' of 8'' PVC pipe from MH A-9 to MH-10 do to collapse pipe when doing mandrel test. 10-15-24 BR Contractor (Selby Excavation) installed 110' of 12'' PVC pipe to and from MH A-4 with MH A-4 structure installed. 10-29-24 BR Contractor (Selby Excavation) had to excavate MH A-8 do to flow line was installed in wrong direction and turn MH A-8 in the right direction. 11-7-24 BR Contractor (Selby Excavation) installed 225' of 12'' PVC pipe from MH A-4 to MH A-6. MH A-5 structure is installed with 125' from connecting to MH A-6. 11-12-24 BR Contractor (Selby Excavation) installed connected 12'' PVC pipe to MH A-6. Now sanitary sewer is on 30 days settlement.
Water Line - Coliform Test 2 Passed 12/3/2024 12/3/2024 12/03/2024
Misc
Informational
11/07/2024
11-7-24 BR Contractor 2nd sample on water line A, line G, line B, & line C coliform test. 11-12-24 BR 2nd sample came back with 2 out of 3 samples has pass. 1 sample spot needs the taking again do to not passing. 12-2-24 BR 3rd sample on water line A, line G, line B, & line C has pass.
Water Line - Hydrostatic Test Passed 10/18/2024 10/18/2024 12/03/2024
Misc
Informational
10/18/2024
10-18-24 BR Contractor (Selby Excavation) preformed hydrostatic test on water line A, line B, line G at 150 psi which pass.
Sanitary Sewer - Vacuum Passed 12/12/2024 12/12/2024 12/12/2024
Misc
Informational
12/12/2024
12-11-24 BR Contractor preformed vacuum test on MH A-10, MH A-9, MH A-8, MH A-7, MH A-6, MH A-5.
Sanitary Sewer - Vacuum Partial 12/13/2024 12/13/2024 12/13/2024
Misc
Informational
12/13/2024
12/13/24 Friday JMJ (Shelby) Manholes that passed B4, F1, E1, E2, E3, E4, A2 & A1 on 12/12/24 Thursday. Manholes that passed D1, B3 & B4 on 12/13/24 Friday. Manhole B5 failed 12/13/24 Friday.
Sanitary Sewer - Vacuum Passed 12/13/2024 12/13/2024 12/13/2024
Misc
Informational
12/13/2024
12/13/24 Friday JMJ (Shelby) Manholes that passed B4, F1, E1, E2, E3, E4, A2 & A1 on 12/12/24 Thursday. Manholes that passed D1, B3 & B4 on 12/13/24 Friday. Manhole B5 failed 12/13/24 Friday.
Sanitary Sewer Construction Inspection Passed 12/13/2024 12/13/2024 12/16/2024
Misc
Informational
06/14/2024
12-12-24 BR Contractor installed MH B-2 with 100' of 24'' PVC from MH B-2 heading to MH B-1. 12-13-24 BR Contractor installed 200' of 24'' PVC pipe heading to MH B-1.
Pavement-Aggregate Base Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
03/26/2025
3-21-25 DP/BR Contactor (Seal-o-Matic) 4'' type 5 on Wood Ln. & 1/2 of 5th Ter. Contractor did have 3rd party tester on site and base compaction was 95%. 3-26-25nBR Contractor (Seal-o-Matic) laid 4'' type 5 on the reminder roads Wood Ln.,5th ter., 6th st., Bradfree St., Golden Ln., Shenandoah Dr., & Lindberg Ln. 3 party tester on and asphalt base was 95% compaction.
Documents & Images
Date Uploaded File Type Document Name
11/14/2023 Receipt Receipt for transaction:2023-008496
09/08/2023 Engineers Estimate WATER 22-097 - PUBLIC WATER - EOPC 2023_09_06
09/21/2023 Activity Document WATER FeeWorksheetReserveBlackwellWater
11/14/2023 Approved Plans WATER STAMPED PLANS
11/15/2023 Letter SUBD Building Permit
05/09/2024 Receipt Receipt for transaction:2024-003192
06/05/2024 Receipt Receipt for transaction:2024-004406
09/21/2023 Approved Plans SANITARY STAMPED PLANS APPROVED
06/05/2024 Letter SUBD Building Permit
06/14/2024 Letter INSPECTION SUMMARY
06/17/2024 Letter INSPECTION SUMMARY
06/18/2024 Letter INSPECTION SUMMARY
06/19/2024 Letter INSPECTION SUMMARY
06/20/2024 Letter INSPECTION SUMMARY
06/24/2024 Letter INSPECTION SUMMARY
07/10/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/12/2024 Letter INSPECTION SUMMARY
07/15/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
07/17/2024 Letter INSPECTION SUMMARY
08/12/2024 Receipt Receipt for transaction:2024-006810
08/13/2024 Letter DE-Permit
08/26/2024 Letter INSPECTION SUMMARY
08/26/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/27/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
08/29/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/10/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/12/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/16/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/18/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/19/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/26/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
09/30/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/01/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/09/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/15/2024 Receipt Receipt for transaction:2024-008352
10/16/2024 Letter SUBD Building Permit
10/18/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
10/25/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
10/29/2024 Letter INSPECTION SUMMARY
11/04/2024 Letter INSPECTION SUMMARY
11/07/2024 Letter INSPECTION SUMMARY
11/08/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/19/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
11/27/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/02/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/03/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/13/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home