Summary


PRSUBD20224091
Public Infrastructure
Substantial Completion
DEVELOPMENT COMPLETE
PUBLIC SANTARY SEWER EXTENSION
08/24/2022
10/05/2022
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Seidworx Excavation LLC, Address:39108 E 179th St  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/24/2022 10/05/2022
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $795.71 $795.71 Paid 10/05/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Partial 11/29/2022
Misc
Informational
11/29/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road
Sanitary Sewer Construction Inspection Partial 11/29/2022
Misc
Informational
11/29/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement
Sanitary Sewer Construction Inspection Partial 12/06/2022
Misc
Informational
11/29/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe
Sanitary Sewer Construction Inspection Partial 12/12/2022
Misc
Informational
12/06/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO
Sanitary Sewer Construction Inspection Partial 12/12/2022
Misc
Informational
12/12/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO
Sanitary Sewer Construction Inspection Partial 3/2/2023 3/2/2023 03/02/2023
Misc
Informational
12/12/2022
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO 3-2-23 DP. Randy is preparing to pour encasement with in the next week and also expecting delivery of the final Manhole this week.
Sanitary Sewer Construction Inspection Partial 3/3/2023 3/3/2023 03/03/2023
Misc
Informational
03/02/2023
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO 3-2-23 DP. Randy is preparing to pour encasement with in the next week and also expecting delivery of the final Manhole this week. 3-3-23 DP Randy is exposing sewer to pour 50' encasement just south of MH S-3
Sanitary Sewer Construction Inspection Partial 3/3/2023 3/3/2023 03/06/2023
Misc
Informational
03/03/2023
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO 3-2-23 DP. Randy is preparing to pour encasement with in the next week and also expecting delivery of the final Manhole this week. 3-3-23 DP Randy is exposing sewer to pour 50' encasement just south of MH S-3 3-3-23 DP Contractor finished 50' encasement on sewer just south of MH S-3
Sanitary Sewer - Mandrel Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 DP. Mandrel test passed from MH A-1 to MH S-3
Sanitary Sewer - Air Test Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 DP. Air pressure test passed from MH A-1 to MH S-3
Sanitary Sewer - Mandrel Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 DP. Mandrel test passed from MH S-2 to MH S-3--- CORRECTION (Not A-1)
Sanitary Sewer - Air Test Partial 3/6/2023 3/6/2023 03/06/2023
Misc
Informational
03/06/2023
3-6-23 DP. Air pressure test passed from MH S-2 to MH S-3 **CORRECTION (Not A-1)
Sanitary Sewer Construction Inspection Partial 04/14/2023
Misc
Informational
03/06/2023
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO 3-2-23 DP. Randy is preparing to pour encasement with in the next week and also expecting delivery of the final Manhole this week. 3-3-23 DP Randy is exposing sewer to pour 50' encasement just south of MH S-3 3-3-23 DP Contractor finished 50' encasement on sewer just south of MH S-3 4-14-23 NS Contractors are not working today.
Grading/Excavation/Fill Inspection Partial 5/23/2023 05/23/2023
Misc
Informational
05/23/2023
5-23-23 NS Site visited I told the contractor a couple weeks ago to get a third party tester to do a compaction test. Jeff from kissic wanted me to do a proof roll and I told him I will come out and look at it and tell him what failed and they had some places that failed and they will dig up the dirt and putmore gravel down. Once they put the gravel down I will do a proof roll.
Erosion Control Inspection Partial 6/1/2023 06/01/2023
Misc
Informational
06/01/2023
6-1-23 NS No erosion control issues
Sanitary Sewer - Vacuum Partial 7/3/2023 7/3/2023 07/05/2023
Misc
Informational
07/05/2023
7-3-23 DP. Randy came out and did the vacuum test on MH A-1. The test passed. The invert is not poured. I talked to the new development today and if they end up tying into the MH they are fine pouring the invert monolithically. If they tie in below the MH, Randy with SideWorx will need to come back and pour the invert.
Sanitary Sewer - Air Test Passed 7/3/2023 7/3/2023 07/05/2023
Misc
Informational
03/06/2023
3-6-23 DP. Air pressure test passed from MH S-2 to MH S-3 **CORRECTION (Not A-1) 7-3-23 DP. Air pressure test passed from MH S-3 to MH A-1.
Sanitary Sewer - Mandrel Passed 7/3/2023 7/3/2023 07/05/2023
Misc
Informational
03/06/2023
3-6-23 DP. Mandrel test passed from MH S-2 to MH S-3--- CORRECTION (Not A-1) 7-3-23 DP. Mandrel test passed from MH S-3 to MH A-1
Erosion Control Inspection Failed 07/05/2023
Misc
Corrective Action Required
10/25/2023
6-1-23 NS No erosion control issues 10-25-23 NS Site visited and there was mud on the road from traffic driving in and out of the work site. I contacted be and told him to clean it up and he told me he was going to get it cleaned up today.
Grading/Excavation/Fill Inspection Passed 07/05/2023
Misc
Informational
05/23/2023
5-23-23 NS Site visited I told the contractor a couple weeks ago to get a third party tester to do a compaction test. Jeff from kissic wanted me to do a proof roll and I told him I will come out and look at it and tell him what failed and they had some places that failed and they will dig up the dirt and putmore gravel down. Once they put the gravel down I will do a proof roll.
Sanitary Sewer Construction Inspection Passed 4/28/2023 5/17/2023 07/05/2023
Misc
Informational
04/14/2023
9-26-22 AN. Wait for plans to be approved for the sewer extension and possibly redo part of the sewer main to get more flow 11-9-22 AN. Crew has Ben working on redoing the sewer line changes and extension 11-14-22 AN. Crew is not working 11-21-22 AN. Crew is starting to install the rebar for the sewer encasement in the roadway 11-22-22 AN. Crew still installing rebar for encasement of sewer main in road 11-29-22 AN concrete encasement is completed under the road of 120’. Still need the 50’ encasement 12-6-22 AN spoke with city engineer about sanitary between station 6 - 7 and it does need the 50’ encasement because it sits on top of the storm pipe 12-12-22 AN. If the sanitary is not encased we will not be able to issue a TCO 3-2-23 DP. Randy is preparing to pour encasement with in the next week and also expecting delivery of the final Manhole this week. 3-3-23 DP Randy is exposing sewer to pour 50' encasement just south of MH S-3 3-3-23 DP Contractor finished 50' encasement on sewer just south of MH S-3 4-14-23 NS Contractors are not working today.
Sanitary Sewer - Vacuum Passed 08/03/2023
Misc
Informational
07/05/2023
7-3-23 DP. Randy came out and did the vacuum test on MH A-1. The test passed. The invert is not poured. I talked to the new development today and if they end up tying into the MH they are fine pouring the invert monolithically. If they tie in below the MH, Randy with SideWorx will need to come back and pour the invert.
Documents & Images
Date Uploaded File Type Document Name
10/05/2022 Receipt Receipt for transaction:2022-008042
10/05/2022 Approved Plans TOWN CENTRE OFFSITE SS - Aproved 10.5.22
10/05/2022 Letter DE-Permit
11/29/2022 Letter INSPECTION SUMMARY
11/29/2022 Letter INSPECTION SUMMARY
12/06/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
12/12/2022 Letter INSPECTION SUMMARY
03/02/2023 Letter INSPECTION SUMMARY
03/03/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 DBAT 50' Sewer encasement
03/06/2023 DBAT 50' Sewer encasement0
03/06/2023 DBAT 50' Sewer encasement
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
03/06/2023 Letter INSPECTION SUMMARY
04/14/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/05/2023 Letter INSPECTION SUMMARY
07/07/2023 Letter INSPECTION SUMMARY
08/03/2023 Letter INSPECTION SUMMARY
10/25/2023 Letter INSPECTION SUMMARY
02/29/2024 Letter DE-Certificate of Substantial Completion Single Lot
02/29/2024 Letter DE-Punch List
12/20/2024 Plans Sanitary As-builts 241220
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home