Summary


PRSITE20220445
Development - Site
Final Acceptance
STREETS OF WEST PRYOR OWNERS ASSOCIATION INC
DEVELOPMENT COMPLETE
LOT 7B STREETS OF WEST PRYOR PRIVATE INFRASTRUCTURE
02/04/2022
03/15/2022
02/29/2024
Locations
Contacts
STREETS OF WEST PRYOR OWNERS ASSOCIATION INC, Address:7200 W 132ND ST STE 150  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 02/04/2022 02/04/2022
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
9110071-Site Grading Fee $731.22 $731.22 Paid 02/15/2022
91100C8-Sanitary Sewer Insp Fees $3,218.10 $3,218.10 Paid 02/15/2022
91100C9-Water Insp Fee $8,062.50 $8,062.50 Paid 02/15/2022
9110072-Water Test Fee $400.00 $400.00 Paid 02/15/2022
9110068-Storm Fee $3,708.15 $3,708.15 Paid 02/15/2022
9110081-Paved Surface Inspection Fee $7,490.37 $7,490.37 Paid 02/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer Construction Inspection Partial 03/17/2022
Misc
Informational
03/17/2022
Tyler’s crew was working on sanitary line B from manhole B-1 to manhole B-2, had installed ~98’ of SDR26 pipe. 3/16/22 ES
Storm Sewer Construction Inspection Partial 03/17/2022
Misc
Informational
03/17/2022
Rudy’s crew started on storm line B. Only a couple sticks of pipe in the ground. 3/17/22 ES
Sanitary Sewer Construction Inspection Partial 03/17/2022
Misc
Corrective Action Required
03/17/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Sanitary Sewer Construction Inspection Partial 03/22/2022
Misc
Corrective Action Required
03/17/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
03/22/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Storm Sewer Construction Inspection Partial 03/22/2022
Misc
Informational
03/22/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Site Visit Partial 03/22/2022
Misc
Informational
03/22/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Erosion Control Inspection Partial 03/23/2022
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Erosion Control Inspection Partial 03/24/2022
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Storm Sewer Construction Inspection Partial 3/24/2022 3/24/2022 03/28/2022
Misc
Informational
03/22/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
03/28/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Sanitary Sewer Construction Inspection Partial 3/24/2022 3/24/2022 03/28/2022
Misc
Corrective Action Required
03/22/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
03/22/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Misc
Informational
03/28/2022
Tyler’s crew laid 100 feet of sanitary pipe today. RP 3-28-22
Storm Sewer Construction Inspection Partial 3/29/2022 3/29/2022 03/29/2022
Misc
Informational
03/28/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
03/28/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
03/29/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Sanitary Sewer Construction Inspection Partial 3/29/2022 3/29/2022 03/29/2022
Misc
Corrective Action Required
03/28/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
03/28/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Misc
Informational
03/28/2022
Tyler’s crew laid 100 feet of sanitary pipe today. RP 3-28-22
Misc
Informational
03/29/2022
Tyler’s crew laid the last 60 feet of sanitary pipe and set manhole B-5. RP 3-29-22
Storm Sewer Construction Inspection Partial 3/30/2022 3/30/2022 04/04/2022
Misc
Informational
03/29/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
03/29/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
03/29/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/04/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Storm Sewer Construction Inspection Partial 4/5/2022 4/5/2022 04/05/2022
Misc
Informational
04/04/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/04/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/04/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/04/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/05/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Site Visit Partial 3/23/2022 3/23/2022 04/06/2022
Misc
Informational
03/22/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22
Storm Sewer Construction Inspection Partial 4/6/2022 4/6/2022 04/07/2022
Misc
Informational
04/05/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/05/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/05/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/05/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/05/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
04/07/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Storm Sewer Construction Inspection Partial 4/8/2022 4/8/2022 04/08/2022
Misc
Informational
04/07/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/07/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/07/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/07/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/07/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
04/07/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Misc
Informational
04/08/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They also set curb inlets D-2 and G-1. RP 4-8-22
Storm Sewer Construction Inspection Partial 4/9/2022 4/9/2022 04/11/2022
Misc
Informational
04/08/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/08/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/08/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/08/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/08/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
04/08/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Misc
Informational
04/08/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They also set curb inlets D-2 and G-1. RP 4-8-22
Misc
Informational
04/11/2022
Rudy’s crew laid 100 feet of 18 inch HDPE storm pipe for line D. RP 4-9-22
Misc
Informational
04/11/2022
Rudy’s crew laid 110 feet of 18 inch HDPE storm pipe and 35 feet of 15 inch HDPE storm pipe for line D. They also set curb inlets D-3 and D-4. RP 4-11-22
Water Line - Construction Inspection Partial 4/11/2022 4/11/2022 04/11/2022
Misc
Informational
04/11/2022
Rudy’s crew started working on water line A. They laid 50 feet of C 900 pipe. RP 4-11-22
Storm Sewer Construction Inspection Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/11/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/11/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/11/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/11/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/11/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
04/11/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Misc
Informational
04/11/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They also set curb inlets D-2 and G-1. RP 4-8-22
Misc
Informational
04/11/2022
Rudy’s crew laid 100 feet of 18 inch HDPE storm pipe for line D. RP 4-9-22
Misc
Informational
04/11/2022
Rudy’s crew laid 110 feet of 18 inch HDPE storm pipe and 35 feet of 15 inch HDPE storm pipe for line D. They also set curb inlets D-3 and D-4. RP 4-11-22
Misc
Informational
04/12/2022
Rudy’s crew laid 34 feet of 18 inch RCP storm pipe and set curb inlet H-1. RP 4-12-22
Water Line - Construction Inspection Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/12/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Grading/Excavation/Fill Inspection Partial 04/12/2022
Misc
Informational
04/12/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Water Line - Construction Inspection Partial 4/13/2022 4/13/2022 04/13/2022
Misc
Informational
04/12/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/13/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Water Line - Construction Inspection Partial 4/14/2022 4/14/2022 04/14/2022
Misc
Informational
04/13/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/13/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/14/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Water Line - Construction Inspection Partial 4/15/2022 4/15/2022 04/15/2022
Misc
Informational
04/14/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/14/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/14/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/15/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Water Line - Construction Inspection Partial 4/18/2022 4/18/2022 04/18/2022
Misc
Informational
04/15/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/15/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/15/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/15/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/18/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Site Visit Partial 4/7/2022 4/7/2022 04/19/2022
Misc
Informational
04/06/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/19/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Water Line - Construction Inspection Partial 4/19/2022 4/19/2022 04/19/2022
Misc
Informational
04/18/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/18/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/18/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/18/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/18/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/19/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Water Line - Construction Inspection Partial 4/21/2022 4/21/2022 04/21/2022
Misc
Informational
04/19/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/19/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/19/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/19/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/19/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/19/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/21/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Water Line - Construction Inspection Partial 4/22/2022 4/22/2022 04/22/2022
Misc
Informational
04/21/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/21/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/21/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/21/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/21/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/21/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/21/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
04/22/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Water Line - Construction Inspection Partial 4/25/2022 4/25/2022 04/25/2022
Misc
Informational
04/22/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/22/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/22/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/22/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/22/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/22/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/22/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
04/22/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
04/25/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Water Line - Hydrostatic Test Passed 04/26/2022
Misc
Informational
04/26/2022
Jeremiah pressure tested the water line at 150psi. Started test at 12:45p and verified at 2:55p that pressure did not drop. 4/26/22 ES
Water Line - Construction Inspection Partial 4/26/2022 4/26/2022 04/26/2022
Misc
Informational
04/25/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/25/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/25/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/25/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/25/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/25/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/25/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
04/25/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
04/25/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
04/26/2022
Water stated they were not able to perform tab this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Water Line - Construction Inspection Partial 04/27/2022
Misc
Informational
04/26/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/26/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/26/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/26/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/26/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/26/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/26/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
04/26/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
04/26/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
04/26/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
04/27/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Water Line - Construction Inspection Partial 5/2/2022 5/2/2022 05/03/2022
Misc
Informational
04/27/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
04/27/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
04/27/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
04/27/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
04/27/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
04/27/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
04/27/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
04/27/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
04/27/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
04/27/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
04/27/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/03/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Water Line - Coliform Test 1 Partial 5/3/2022 (8:00) 5/3/2022 05/03/2022
Misc
Informational
05/03/2022
Pulled first set of samples 5/3/22. ES
Water Line - Coliform Test 1 Passed 05/06/2022
Misc
Informational
05/03/2022
Pulled first set of samples 5/3/22. ES
Misc
Informational
05/06/2022
First set of samples passed. 5/5/22 ES
Water Line - Coliform Test 2 Partial 05/06/2022
Misc
Informational
05/06/2022
Took 2nd set of samples and delivered to lab. 5/4/22 ES
Water Line - Coliform Test 2 Passed 05/06/2022
Misc
Informational
05/06/2022
Took 2nd set of samples and delivered to lab. 5/4/22 ES
Misc
Informational
05/06/2022
Second set of samples passed. 5/6/22 ES
Water Line - Construction Inspection Partial 5/6/2022 5/6/2022 05/06/2022
Misc
Informational
05/03/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/03/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/03/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/03/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/03/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/03/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/03/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/03/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/03/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/03/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/03/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/03/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/06/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Sanitary Sewer - Air Test Passed 5/11/2022 5/10/2022 05/10/2022
Misc
Informational
05/10/2022
Jeremiah was out today to complete sewer testing. Air tested all lines on private sanitary sewer and all lines passed air testing. 5/10/22 ES
Sanitary Sewer - Mandrel Passed 5/10/2022 05/10/2022
Misc
Informational
05/10/2022
Jeremiah was out performing sanitary sewer testing on Private lines. All lines passed Mandrel testing, he removed debris and strings from manholes as we completed testing. 5/10/22 ES
Sanitary Sewer - Vacuum Passed 5/11/2022 5/10/2022 05/10/2022
Misc
Informational
05/10/2022
Jeremiah was out performing sanitary sewer testing on Private lines. All Manholes passed vacuum testing. 5/10/22 ES
Water Line - Construction Inspection Partial 5/9/2022 05/10/2022
Misc
Informational
05/06/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/06/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/06/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/06/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/06/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/06/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/06/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/06/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/06/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/06/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/06/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/06/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/06/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
05/10/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Water Line - Construction Inspection Partial 05/12/2022
Misc
Informational
05/10/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/10/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/10/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/10/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/10/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/10/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/10/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/10/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/10/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/10/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/10/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/10/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/10/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
05/10/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued working on tap holes. They also began digging street crossings for water services and setting meter pits. 5/10/22 ES
Water Line - Construction Inspection Partial 05/12/2022
Misc
Informational
05/12/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/12/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/12/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/12/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/12/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/12/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/12/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/12/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/12/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/12/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/12/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
05/12/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Water Line - Construction Taps Removed Passed 05/12/2022
Misc
Informational
05/12/2022
Rudy put plug in saddle for construction tap on north side of lowenstein dr. 5/9/22 ES
Water Service Inspection Partial 05/12/2022
Misc
Informational
05/12/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Water Service Inspection Partial 05/12/2022
Misc
Informational
05/12/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Water Line - Construction Inspection Partial 05/12/2022
Misc
Informational
05/12/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/12/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/12/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/12/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/12/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/12/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/12/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/12/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/12/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/12/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/12/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
05/12/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Misc
Informational
05/12/2022
Rudy’s crew is setting meters for the servoIce lines. They are also backfilling the crossings. Water dept is also out doing Taps.
PW-Main inspection
Corrective Action Required
05/12/2022
A main inspection has uncovered the following problems.
Misc
Informational
05/12/2022
Rudy’s crew are installing meters.
Water Service Inspection Partial 05/17/2022
Misc
Informational
05/12/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
05/17/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side and connecting with compression fittings supplied by water utilities. 5/16/22 ES
Storm Sewer Construction Inspection Partial 4/13/2022 4/13/2022 05/17/2022
Misc
Informational
04/12/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
04/12/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
04/12/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
04/12/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
04/12/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
04/12/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Misc
Informational
04/12/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They also set curb inlets D-2 and G-1. RP 4-8-22
Misc
Informational
04/12/2022
Rudy’s crew laid 100 feet of 18 inch HDPE storm pipe for line D. RP 4-9-22
Misc
Informational
04/12/2022
Rudy’s crew laid 110 feet of 18 inch HDPE storm pipe and 35 feet of 15 inch HDPE storm pipe for line D. They also set curb inlets D-3 and D-4. RP 4-11-22
Misc
Informational
04/12/2022
Rudy’s crew laid 34 feet of 18 inch RCP storm pipe and set curb inlet H-1. RP 4-12-22
Misc
Informational
05/17/2022
Rudy’s crew installed HDPE pipe from box D-1 on private line to E-2 on permit 2021 5290 Lowenstein Dr improvements. Also poured collars and invert on box D-1. 5/17/22 ES
Site Visit Partial 4/20/2022 4/20/2022 05/18/2022
Misc
Informational
04/19/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
04/19/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
04/19/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES
Site Visit Partial 05/18/2022
Misc
Informational
05/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/18/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES
Site Visit Partial 05/18/2022
Misc
Informational
05/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/18/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES
Site Visit Partial 05/18/2022
Misc
Informational
05/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/18/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES
Site Visit Partial 05/18/2022
Misc
Informational
05/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/18/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES
Site Visit Partial 05/31/2022
Misc
Informational
05/18/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/18/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/18/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/18/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES
Grading/Excavation/Fill Inspection Partial 06/06/2022
Misc
Informational
04/12/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
06/06/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
05/31/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
05/31/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
05/31/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
05/31/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
06/06/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/06/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/06/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES
Site Visit Partial 06/06/2022
Misc
Informational
06/06/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/06/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/06/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES
Sanitary Sewer Construction Inspection Partial 06/06/2022
Misc
Corrective Action Required
03/29/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
03/29/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Misc
Informational
03/29/2022
Tyler’s crew laid 100 feet of sanitary pipe today. RP 3-28-22
Misc
Informational
03/29/2022
Tyler’s crew laid the last 60 feet of sanitary pipe and set manhole B-5. RP 3-29-22
Misc
Informational
06/06/2022
Miller plumbing did sanitary sewer tie in to 1001 NW Black Twig Cir. 6/6/22 ES
Water Service Inspection Partial 06/06/2022
Misc
Informational
05/17/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
05/17/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
05/17/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES
Grading/Excavation/Fill Inspection Partial 06/07/2022
Misc
Informational
06/06/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
06/06/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES
Pavement-Stabilized Subgrade Passed 06/07/2022
Misc
Informational
06/07/2022
ESS had a crew starting on grading the west side of Black Twig Cir in preparation for geogrid and aggregate. 6/7/22 ES
Site Visit Partial 06/07/2022
Misc
Informational
06/06/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/06/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/06/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/06/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES
Site Visit Partial 06/08/2022
Misc
Informational
06/07/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/07/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/07/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/07/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES
Site Visit Partial 06/14/2022
Misc
Informational
06/08/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/08/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/08/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/08/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES
Pavement-Stabilized Subgrade Partial 06/14/2022
Misc
Informational
06/14/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES
Pavement-Stabilized Subgrade Partial 06/14/2022
Misc
Informational
06/14/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES
Pavement-Stabilized Subgrade Partial 06/14/2022
Misc
Informational
06/14/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES
Site Visit Partial 06/14/2022
Misc
Informational
06/14/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/14/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/14/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/14/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES
Pavement-Aggregate Base Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES
Pavement-Curb Construction Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES
Pavement-Stabilized Subgrade Partial 06/15/2022
Misc
Informational
06/14/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES
Pavement-Curb Construction Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES
Pavement-Aggregate Base Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES
Pavement-Proof Roll Partial 06/15/2022
Misc
Corrective Action Required
06/15/2022
Performed proof roll with Cody from ESS, had one section ~100’ on East side of roadway from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES
Pavement-Curb Construction Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES
Pavement-Aggregate Base Partial 06/15/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES
Pavement-Curb Construction Partial 06/16/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES
Site Visit Partial 06/16/2022
Misc
Informational
06/14/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/14/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/14/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/14/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES
Site Visit Partial 06/16/2022
Misc
Informational
06/16/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/16/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/16/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/16/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES
Pavement-Curb Construction Partial 06/16/2022
Misc
Informational
06/16/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES
Pavement-Stabilized Subgrade Partial 06/16/2022
Misc
Informational
06/15/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES
Site Visit Partial 06/16/2022
Misc
Informational
06/16/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/16/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/16/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/16/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES
Pavement-Stabilized Subgrade Partial 06/20/2022
Misc
Informational
06/16/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed a proof roll on Black Twig Cir. Passed. 6/17/22 ES
Pavement-Aggregate Base Partial 06/20/2022
Misc
Informational
06/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
06/16/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/16/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/16/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/16/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES
Pavement-Aggregate Base Partial 06/20/2022
Misc
Informational
06/20/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES ESS laying and compacting aggregate. 6/20/22 ES
Pavement-Stabilized Subgrade Partial 06/20/2022
Misc
Informational
06/20/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed a proof roll on Black Twig Cir. Passed. 6/17/22 ES ESS laying and compacting aggregate on top of stabilized sub grade. 6/20/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
06/20/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/20/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/20/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/20/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Pavement-Proof Roll Partial 06/28/2022
Misc
Corrective Action Required
06/15/2022
Performed proof roll with Cody from ESS, had one section ~100’ on East side of roadway from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Performed proof roll; with 20.12 ton load, on parking lot on north side of apartments and Black Twig Cir. All areas were solid and passed. 6/17/22 ES Performed proof roll for curbs along Black Twig Cir and north side parking lot with a load of 19.85 tons. All areas were solid and passed. 6/27/22 ES
Pavement-Curb Construction Partial 06/28/2022
Misc
Informational
06/16/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES
Pavement-Curb Construction Partial 06/28/2022
Misc
Informational
06/28/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES
Pavement-Curb Construction Partial 06/30/2022
Misc
Informational
06/28/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES
Pavement-Curb Construction Partial 07/01/2022
Misc
Informational
06/30/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews continued working on curb, mostly working on parking stahl areas and curb inlets. 7/5/22 ES
Pavement-Curb Construction Partial 07/05/2022
Misc
Informational
07/01/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES
Pavement-Curb Construction Partial 07/07/2022
Misc
Informational
07/05/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES
Pavement-Curb Construction Partial 07/07/2022
Misc
Informational
07/07/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES Crew working on finishing curb sections. 7/7/22 ES
Pavement-Curb Construction Partial 07/11/2022
Misc
Informational
07/07/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES Crew working on finishing curb sections. 7/7/22 ES Crew working on framing up approach/entry to western Blacktwig Cir. 7/8/22 ES
Pavement-Curb Construction Partial 07/11/2022
Misc
Informational
07/11/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES Crew working on finishing curb sections. 7/7/22 ES Crew working on framing up approach/entry to western Blacktwig Cir. 7/8/22 ES Crew finished framing up lower Blacktwig Cir and Lowenstein area ready for curbing and valley gutter. 7/11/22 ES
Pavement-Stabilized Subgrade Partial 07/11/2022
Misc
Informational
06/20/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed a proof roll on Black Twig Cir. Passed. 6/17/22 ES ESS laying and compacting aggregate on top of stabilized sub grade. 6/20/22 ES ESS grading base preparing for base asphalt this week. Looking to proof roll tomorrow. 7/11/22 ES
Water Service Inspection Partial 07/11/2022
Misc
Informational
06/06/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
06/06/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
06/06/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES
Water Service Inspection Partial 07/11/2022
Misc
Informational
07/11/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
07/11/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
07/11/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
ESC - (Vegetation/Ground Cover) Partial 07/11/2022
Misc
Informational
07/11/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES
Erosion Control Inspection Partial 07/11/2022
Misc
Informational
03/24/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
07/11/2022
No noted erosion issues. 7/11/22 ES
Pavement-Curb Construction Partial 07/12/2022
Misc
Informational
07/11/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES Crew working on finishing curb sections. 7/7/22 ES Crew working on framing up approach/entry to western Blacktwig Cir. 7/8/22 ES Crew finished framing up lower Blacktwig Cir and Lowenstein area ready for curbing and valley gutter. 7/11/22 ES Had to remove a section of curb around a radius that was out of tolerance. Replacing that section and pouring the gutter valley and curbs on west side of Lowenstein and Black Twig Cir. 7/12/22
Grading/Excavation/Fill Inspection Partial 07/12/2022
Misc
Informational
06/07/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
06/07/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES
Water Service Inspection Partial 07/14/2022
Misc
Informational
07/11/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
07/11/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
07/11/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
Misc
Informational
07/14/2022
Spoke with Rudy, as they have started performing installs on the building service side any meters without 10’ of copper out the back side need to be replaced and a 10’ piece will need to come off the back side for the site plumbers to connect their poly to to run into building. 7/14/22 ES
Grading/Excavation/Fill Inspection Partial 07/14/2022
Misc
Informational
07/12/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
07/12/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES ESS crew working on final grading for Black Twig. 7/14/22 ES
Pavement-Stabilized Subgrade Partial 07/14/2022
Misc
Informational
07/11/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed a proof roll on Black Twig Cir. Passed. 6/17/22 ES ESS laying and compacting aggregate on top of stabilized sub grade. 6/20/22 ES ESS grading base preparing for base asphalt this week. Looking to proof roll tomorrow. 7/11/22 ES
Misc
Informational
07/14/2022
ESS grading base rock preparing for asphalt. Will proof roll 7/15 and then look to start paving 7/16. 7/14/22 ES
Grading/Excavation/Fill Inspection Partial 07/15/2022
Misc
Informational
07/14/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
07/14/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES ESS crew working on final grading for Black Twig. 7/14/22 ES ESS finish grading along Black Twig Cir. 7/15/22 ES
Pavement-Proof Roll Partial 7/16/2022 (9:00) 7/16/2022 07/15/2022
Misc
Corrective Action Required
06/28/2022
Performed proof roll with Cody from ESS, had one section ~100’ on East side of roadway from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Performed proof roll; with 20.12 ton load, on parking lot on north side of apartments and Black Twig Cir. All areas were solid and passed. 6/17/22 ES Performed proof roll for curbs along Black Twig Cir and north side parking lot with a load of 19.85 tons. All areas were solid and passed. 6/27/22 ES Scheduling proof roll for base asphalt 7/16/22 @ 9am. 7/15/22 ES
Pavement-Aggregate Base Partial 07/15/2022
Misc
Informational
06/20/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES ESS laying and compacting aggregate. 6/20/22 ES ESS working on final grading preparing for base asphalt. 7/15/22 ES
Pavement-Aggregate Base Partial 07/16/2022
Misc
Informational
07/15/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES ESS laying and compacting aggregate. 6/20/22 ES ESS working on final grading preparing for base asphalt. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES
Grading/Excavation/Fill Inspection Partial 07/16/2022
Misc
Informational
07/15/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
07/15/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES ESS crew working on final grading for Black Twig. 7/14/22 ES ESS finish grading along Black Twig Cir. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES
Pavement-Proof Roll Partial 07/16/2022
Misc
Corrective Action Required
07/15/2022
Performed proof roll with Cody from ESS, had one section ~100’ on East side of roadway from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Performed proof roll; with 20.12 ton load, on parking lot on north side of apartments and Black Twig Cir. All areas were solid and passed. 6/17/22 ES Performed proof roll for curbs along Black Twig Cir and north side parking lot with a load of 19.85 tons. All areas were solid and passed. 6/27/22 ES Scheduling proof roll for base asphalt 7/16/22 @ 9am. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES
Pavement-Surface Partial 07/16/2022
Misc
Informational
07/16/2022
Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES
Site Visit Partial 07/19/2022
Misc
Informational
06/20/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
06/20/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
06/20/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
06/20/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
07/19/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES
Pavement-Aggregate Base Partial 07/20/2022
Misc
Informational
07/16/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES ESS laying and compacting aggregate. 6/20/22 ES ESS working on final grading preparing for base asphalt. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES Seal-O-Matic laying 3” of Type 2 base asphalt on Black Twig. 7/20/22 ES
Pavement-Surface Partial 07/20/2022
Misc
Informational
07/16/2022
Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES Seal-O-Matic laying 3” of Type 2 R base asphalt on Black Twig. 7/20/22 ES
Pavement-Surface Partial 07/21/2022
Misc
Informational
07/20/2022
Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES Seal-O-Matic laying 3” of Type 2 R base asphalt on Black Twig. 7/20/22 ES Seal-O-Matic laying 2” of Type 2 R base asphalt on Black Twig. 7/21/22 ES
Pavement-Aggregate Base Passed 07/21/2022
Misc
Informational
07/20/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying aggregate, grading and compacting. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton load of rock. 6/15/22 ES Performed proof roll on remaining section of Black Twig Cir w/ 20.12 tons of rock. Passed 6/17/22 ES ESS laying and compacting aggregate. 6/20/22 ES ESS working on final grading preparing for base asphalt. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES Seal-O-Matic laying 3” of Type 2 base asphalt on Black Twig. 7/20/22 ES Seal-O-Matic laying 2” of Type 2 R base asphalt on Black Twig. 7/21/22 ES
Pavement-Stabilized Subgrade Passed 07/21/2022
Misc
Informational
07/14/2022
ESS was onsite grading Black Twig preparing for grid and aggregate sub base. 6/9/22 ES ESS continued work on Black Twig Cir. 6/10/22 ES ESS laid down geogrid and started covering with rock and grading. 6/13/22 ES ESS continued work on Black Twig Cir. 6/14/22 ES Performed proof roll with Cody from ESS, had one section ~100’ from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed a proof roll on Black Twig Cir. Passed. 6/17/22 ES ESS laying and compacting aggregate on top of stabilized sub grade. 6/20/22 ES ESS grading base preparing for base asphalt this week. Looking to proof roll tomorrow. 7/11/22 ES
Misc
Informational
07/14/2022
ESS grading base rock preparing for asphalt. Will proof roll 7/15 and then look to start paving 7/16. 7/14/22 ES Seal-O-Matic laying 3” of Type 2 R base asphalt on Black Twig. 7/20/22 ES Seal-O-Matic laying 2” of Type 2 R base asphalt on Black Twig. 7/21/22 ES
Pavement-Proof Roll Passed 07/21/2022
Misc
Informational
07/21/2022
Performed proof roll with Cody from ESS, had one section ~100’ on East side of roadway from station 20+40 to 21+40 proof rolled from station 17+50 to Lowenstein Dr and all other areas passed. 6/15/22 ES Performed proof roll; with 20.12 ton load, on parking lot on north side of apartments and Black Twig Cir. All areas were solid and passed. 6/17/22 ES Performed proof roll for curbs along Black Twig Cir and north side parking lot with a load of 19.85 tons. All areas were solid and passed. 6/27/22 ES Scheduling proof roll for base asphalt 7/16/22 @ 9am. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES East parking lot area was corrected and asphalt base has been laid. 7/21/22 ES
Pavement-Curb Construction Passed 07/22/2022
Misc
Informational
07/12/2022
ESS on site working on getting geogrid down and aggregate base on top. 6/13/22 ES ESS on site working on finishing laying rock, grading and compacting aggregate for curb and roadway. 6/14/22 ES Performed proof roll with Cody from ESS using 20.05 ton loaded truck. 6/15/22 ES Richard’s crew started on the curbs on the west side of Black Twig Cir. Installed almost 800’ of curb and coated with white cure. 6/16/22 ES Proofed rolled black twig cir and north parking lot of apartments again. 6/27/22 ES Crews started putting up stakes and string line for curbs. 6/28/22 ES Crews worked on finishing up string line for curbs. 6/28/22 ES Curbs were inspected and observation of cure being placed on curb occurred towards top of hill. More cure was needed on back side of curb and crew was informed. Crew will be leaving early today foreman informed. 7/1/22 RH Crews working on curbs again, mainly focusing on parking stalls and curb inlets. 7/5/22 ES Crews working on completing parking stalls and storm curb inlets. Only a few small sections incomplete at this point. 7/6/22 ES Crew working on finishing curb sections. 7/7/22 ES Crew working on framing up approach/entry to western Blacktwig Cir. 7/8/22 ES Crew finished framing up lower Blacktwig Cir and Lowenstein area ready for curbing and valley gutter. 7/11/22 ES Had to remove a section of curb around a radius that was out of tolerance. Replacing that section and pouring the gutter valley and curbs on west side of Lowenstein and Black Twig Cir. 7/12/22
Misc
Informational
07/22/2022
Curbing was completed along Black Twig Cir. Including approach to cell tower road and entrance to west. 7/22/22 ES
Erosion Control Inspection Partial 07/26/2022
Misc
Informational
07/11/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
07/11/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
07/11/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
07/26/2022
Rain day, no major erosion issues noted. 7/25/22 ES
Site Visit Partial 07/26/2022
Misc
Informational
07/19/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
07/19/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/19/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
07/19/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
07/19/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES
Erosion Control Inspection Partial 08/01/2022
Misc
Informational
07/26/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
07/26/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
07/26/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
07/26/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES
Site Visit Partial 08/01/2022
Misc
Informational
07/26/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
07/26/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
07/26/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
07/26/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
07/26/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES
Sanitary - Material Verification Passed 08/01/2022
Misc
Informational
08/01/2022
Sewer materials were SDR26 pipe w/ wye fittings.
Sidewalk Inspection Partial 08/01/2022
Misc
Informational
08/01/2022
JD Bishop poured small section of sidewalk along Black Twig Cir. 7/29/22 ES
Sidewalk Inspection Partial 08/03/2022
Misc
Informational
08/01/2022
JD Bishop poured small section of sidewalk along Black Twig Cir. 7/29/22 ES JD Bishop poured sidewalk along Black Twig. 8/3/22 ES
Site Visit Partial 08/04/2022
Misc
Informational
08/01/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
08/01/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/01/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
08/01/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
08/01/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES
Sidewalk Inspection Partial 08/05/2022
Misc
Informational
08/03/2022
JD Bishop poured small section of sidewalk along Black Twig Cir. 7/29/22 ES JD Bishop poured sidewalk along Black Twig. 8/3/22 ES JD Bishop finished pouring sidewalk using 4K KCMMB along the western edge of Black Twig Cir. 8/5/22 ES
Grading/Excavation/Fill Inspection Partial 08/08/2022
Misc
Informational
07/16/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
07/16/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES ESS crew working on final grading for Black Twig. 7/14/22 ES ESS finish grading along Black Twig Cir. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES ESS finished backfilling behind curbs and worked on getting straw wattles behind sidewalk. 8/8/22 ES
Erosion Control Inspection Partial 08/08/2022
Misc
Informational
08/01/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/01/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
08/01/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
08/01/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES
Erosion Control Inspection Partial 08/08/2022
Misc
Informational
08/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
08/08/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
08/08/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES
Site Visit Partial 08/08/2022
Misc
Informational
08/04/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
08/04/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/04/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
08/04/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
08/04/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES Miller plumbing working on digging out water services for a building. Concrete crews working on footings/pads and framers working on 4/5th buildings. 8/8/22 ES
Water Service Inspection Partial 08/10/2022
Misc
Informational
07/14/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
07/14/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
07/14/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
Misc
Informational
07/14/2022
Spoke with Rudy, as they have started performing installs on the building service side any meters without 10’ of copper out the back side need to be replaced and a 10’ piece will need to come off the back side for the site plumbers to connect their poly to to run into building. 7/14/22 ES Miller plumbing working on service tie ins to buildings. Copper out of meter pits is shorter than 10’ and ESS will need to come replace copper from back side of meet and extend at least 10’ out of meter pits. 8/10/22 ES
Water Service Inspection Partial 08/11/2022
Misc
Informational
08/10/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
08/10/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
08/10/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
Misc
Informational
08/10/2022
Spoke with Rudy, as they have started performing installs on the building service side any meters without 10’ of copper out the back side need to be replaced and a 10’ piece will need to come off the back side for the site plumbers to connect their poly to to run into building. 7/14/22 ES Miller plumbing working on service tie ins to buildings. Copper out of meter pits is shorter than 10’ and ESS will need to come replace copper from back side of meet and extend at least 10’ out of meter pits. 8/10/22 ES Miller working on service connections on town homes. 8/11/22 ES
Sanitary Sewer Construction Inspection Partial 08/11/2022
Misc
Corrective Action Required
06/06/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
06/06/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Misc
Informational
06/06/2022
Tyler’s crew laid 100 feet of sanitary pipe today. RP 3-28-22
Misc
Informational
06/06/2022
Tyler’s crew laid the last 60 feet of sanitary pipe and set manhole B-5. RP 3-29-22
Misc
Informational
06/06/2022
Miller plumbing did sanitary sewer tie in to 1001 NW Black Twig Cir. 6/6/22 ES Miller plumbing doing tie ins on town homes. 8/11/22 ES
ESC - (Vegetation/Ground Cover) Partial 08/17/2022
Misc
Informational
07/11/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES
Erosion Control Inspection Partial 08/23/2022
Misc
Informational
08/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
08/08/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
08/08/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES
Sidewalk Inspection Passed 08/23/2022
Misc
Informational
08/05/2022
JD Bishop poured small section of sidewalk along Black Twig Cir. 7/29/22 ES JD Bishop poured sidewalk along Black Twig. 8/3/22 ES JD Bishop finished pouring sidewalk using 4K KCMMB along the western edge of Black Twig Cir. 8/5/22 ES Sidewalk was completed up Black Twig Cir to beginning point of townhomes. Remaining sidewalk will be completed under individual townhome permits. 8/23/22 ES
ESC - (Vegetation/Ground Cover) Partial 08/23/2022
Misc
Informational
08/17/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES
Grading/Excavation/Fill Inspection Partial 08/23/2022
Misc
Informational
08/08/2022
ESS has been hauling excess material from lots 11 & 12 and using that as fill for lot 7B. RP 4-12-22
Misc
Informational
08/08/2022
ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES ESS crew on site working on grading roadway from Lowenstein Dr to BlackTwig on west side of project. 6/7/22 ES ESS crew working on grading roadway in preparation for paving.. 7/12/22 ES ESS crew working on final grading for Black Twig. 7/14/22 ES ESS finish grading along Black Twig Cir. 7/15/22 ES Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES ESS finished backfilling behind curbs and worked on getting straw wattles behind sidewalk. 8/8/22 ES ESS has completed most backfilling required. Only small areas remain around backflow vault on Black Twig Cir and minor other small areas. Once back flow vault lid is raised most areas that still require fill will be completed. 8/23/22 ES
Sanitary Sewer Construction Inspection Passed 08/23/2022
Misc
Corrective Action Required
08/11/2022
Tyler’s crew was working on sanitary line B, had set the base for manhole B-3 and plugged the upstream outlet. 3/17/22 ES
Misc
Informational
08/11/2022
Tyler’s crew laid 88 feet of 8 inch sanitary pipe. They also set manhole B-4. RP 3-21-22
Misc
Informational
08/11/2022
Tyler’s crew laid 100 feet of sanitary pipe today. RP 3-28-22
Misc
Informational
08/11/2022
Tyler’s crew laid the last 60 feet of sanitary pipe and set manhole B-5. RP 3-29-22
Misc
Informational
08/11/2022
Miller plumbing did sanitary sewer tie in to 1001 NW Black Twig Cir. 6/6/22 ES Miller plumbing doing tie ins on town homes. 8/11/22 ES
ESC - (Vegetation/Ground Cover) Partial 08/25/2022
Misc
Informational
08/23/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES
Erosion Control Inspection Partial 09/08/2022
Misc
Informational
08/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
08/23/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
08/23/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
08/23/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES
Water Line - Construction Inspection Partial 09/08/2022
Misc
Informational
05/12/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
05/12/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
05/12/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
05/12/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
05/12/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
05/12/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
05/12/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
05/12/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
05/12/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
05/12/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
05/12/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
05/12/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
05/12/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
05/12/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Misc
Informational
05/12/2022
Rudy’s crew is setting meters for the servoIce lines. They are also backfilling the crossings. Water dept is also out doing Taps.
PW-Main inspection
Corrective Action Required
05/12/2022
A main inspection has uncovered the following problems.
Misc
Informational
05/12/2022
Rudy’s crew are installing meters.
Misc
Informational
09/08/2022
ESS brought in and set a riser for the backflow pit on the west side of Black Twig Cir. They also had an 18x18” core cut into the bottom of pit to allow water to drain. Awaiting metal grate to cover this hole in pit. 9/7/22 ES
Erosion Control Inspection Partial 09/09/2022
Misc
Informational
09/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
09/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
09/08/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
09/08/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES
ESC - (Vegetation/Ground Cover) Partial 09/09/2022
Misc
Informational
08/25/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES
Water Service Inspection Partial 09/23/2022
Misc
Informational
08/11/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
08/11/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
08/11/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
Misc
Informational
08/11/2022
Spoke with Rudy, as they have started performing installs on the building service side any meters without 10’ of copper out the back side need to be replaced and a 10’ piece will need to come off the back side for the site plumbers to connect their poly to to run into building. 7/14/22 ES Miller plumbing working on service tie ins to buildings. Copper out of meter pits is shorter than 10’ and ESS will need to come replace copper from back side of meet and extend at least 10’ out of meter pits. 8/10/22 ES Miller working on service connections on town homes. 8/11/22 ES
Misc
Informational
09/23/2022
On Friday, 9-13-2022. I performed a water service inspector for lot’s 28 through 31. Contractor was directed to back fill service’s. (Tom Taylor inspecting)
Erosion Control Inspection Partial 09/27/2022
Misc
Informational
09/09/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
09/09/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
09/09/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
09/09/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES
ESC - (Vegetation/Ground Cover) Partial 09/27/2022
Misc
Informational
09/09/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES
Install Street and Stop Signs Partial 09/27/2022
Misc
Informational
09/27/2022
Spoke with Codi, ESS has a contractor who will be putting up the signs along Black Twig Cir and Lowenstein Dr. 9/26/22 ES
Install Street and Stop Signs Partial 09/27/2022
Misc
Informational
09/27/2022
Spoke with Codi, ESS has a contractor who will be putting up the signs along Black Twig Cir and Lowenstein Dr. 9/26/22 ES
Sanitary Sewer - Camera Test Partial 9/22/2022 09/27/2022
Misc
Informational
09/27/2022
The public areas of this sanitary line were camera'ed and inspected under permit #2021 5386 and passed. 9/27/22 ES
Sanitary Sewer - Air Test Passed 09/27/2022
Misc
Informational
09/27/2022
Testing was completed and passed on 5/10/22 ES
Sanitary Sewer - Mandrel Passed 09/27/2022
Misc
Informational
09/27/2022
Testing was completed and passed on 5/10/22 ES
Sanitary Sewer - Vacuum Passed 09/27/2022
Misc
Informational
09/27/2022
Testing was completed and passed on 5/10/22 ES
Sanitary Sewer - Camera Test Passed 10/27/2022 09/27/2022
Misc
Informational
09/27/2022
The public areas of this sanitary line were camera'ed and inspected under permit #2021 5386 and passed. 9/27/22 ES
Water Service Inspection Passed 09/27/2022
Misc
Informational
09/23/2022
Rudy’s crew began installation of meter pits on 5/10/22. Running copper under road and coming off backside of meters ~10’ with copper. 5/10/22 ES
Misc
Informational
09/23/2022
Rudy’s crew continued installation of meter pits. Running copper under road and coming off backside of meters ~10’ with copper. 5/11/22 ES
Misc
Informational
09/23/2022
Rudy’s crew completed installation of remaining meters. Running copper off back side of main and connecting with compression fittings supplied by water utilities. 5/16/22 ES Miller plumbing working on digging out water trenches to perform tie in from copper off back of meters to residence. 6/6/22 ES Miller plumbing working on water services on two larger buildings. Will call in inspections for the morning. 7/11/22 ES Walked all meter service locations with AN/RH and recorded numbers and conditions. There are multiple pits that will need to be repaired/replaced due to damage. 7/11/22 ES
Misc
Informational
09/23/2022
Spoke with Rudy, as they have started performing installs on the building service side any meters without 10’ of copper out the back side need to be replaced and a 10’ piece will need to come off the back side for the site plumbers to connect their poly to to run into building. 7/14/22 ES Miller plumbing working on service tie ins to buildings. Copper out of meter pits is shorter than 10’ and ESS will need to come replace copper from back side of meet and extend at least 10’ out of meter pits. 8/10/22 ES Miller working on service connections on town homes. 8/11/22 ES
Misc
Informational
09/23/2022
On Friday, 9-23-2022. I performed a water service inspector for lot’s 28 through 31. Contractor was directed to back fill service’s. (Tom Taylor inspecting) Remaining water service inspections will be completed under individual PRCOM permit numbers for each building. 9/27/22 ES
Site Visit Partial 09/27/2022
Misc
Informational
08/08/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
08/08/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
08/08/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
08/08/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
08/08/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES Miller plumbing working on digging out water services for a building. Concrete crews working on footings/pads and framers working on 4/5th buildings. 8/8/22 ES
Misc
Informational
09/19/2022
On Monday, 9-19-2022. I performed and passed a Sanitary Sewer connection for the north side of building #10 for Miller Plumbing. TT Miller Plumbing working on underslap plumbing for building 10 and construction crews continue working on all other units. 9/27/22 ES
Site Visit Partial 09/28/2022
Misc
Informational
09/27/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
09/27/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
09/27/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
09/27/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
09/27/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES Miller plumbing working on digging out water services for a building. Concrete crews working on footings/pads and framers working on 4/5th buildings. 8/8/22 ES
Misc
Informational
09/27/2022
On Monday, 9-19-2022. I performed and passed a Sanitary Sewer connection for the north side of building #10 for Miller Plumbing. Miller Plumbing working on underslap plumbing for building 10 and construction crews continue working on all other units. 9/27/22 ES Miller Plumbing continued working on Bldg 10 underslab plumbing. construction crews continue working on all other units. 9/28/22 ES
Site Visit Partial 09/30/2022
Misc
Informational
09/28/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
09/28/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
09/28/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
09/28/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
09/28/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES Miller plumbing working on digging out water services for a building. Concrete crews working on footings/pads and framers working on 4/5th buildings. 8/8/22 ES
Misc
Informational
09/28/2022
On Monday, 9-19-2022. I performed and passed a Sanitary Sewer connection for the north side of building #10 for Miller Plumbing. Miller Plumbing working on underslap plumbing for building 10 and construction crews continue working on all other units. 9/27/22 ES Miller Plumbing continued working on Bldg 10 underslab plumbing. construction crews continue working on all other units. 9/28/22 ES Construction continues on townhomes. 9/30/22 ES
Erosion Control Inspection Partial 10/03/2022
Misc
Informational
09/27/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
09/27/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
09/27/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
09/27/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES
ESC - (Vegetation/Ground Cover) Partial 10/03/2022
Misc
Informational
09/27/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES
Erosion Control Inspection Partial 10/11/2022
Misc
Informational
10/03/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
10/03/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
10/03/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
10/03/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES Erosion control measures installed, intact, and functioning. 10/10/22 ES
Site Visit Partial 10/11/2022
Misc
Informational
09/30/2022
Too wet to work today with last nights rain, plus more rain coming to the area. No erosion issues to report. RP 3-22-22
Misc
Informational
09/30/2022
No utility work or grading being done today. RP 4-6-22
Misc
Informational
09/30/2022
Only work being done on site is grading dirt hauled in from lots 11 and 12. RP 4-19-22
Misc
Informational
09/30/2022
Rudy’s crew completed tie in on water main and began digging tap holes. 5/9/22 ES Rudy’s crew continued working on tap holes and began putting meters in and digging across black twig for their connections. 5/10/22 ES Rudy’s crew continued digging tap holes, street crossing and setting meters up. 5/11/22 ES Rudy’s crew was working on completing all meter setups. 5/12/22 ES Rudy’s crew completed storm line D at bottom of Black Twig where it connects to the public storm box on Lowenstein. 5/17/22 ES No utility work being done on site. Engineering surveyors were onsite mapping items out. 5/31/22 ES ESS has a crew working on filling in back of pond damn near BlackTwig/Lowenstein Dr. Also working on moving fill from along side of Lowenstein Dr from storm sewer construction. 6/6/22 ES Construction work continues on first 3 building and concrete floors being poured on 1001 Black Twig. 6/6/22 ES Miller plumbing did sanitary sewer tie in for 1001 Black NW Black Twig Cir. They were working on site for water tie ins on other buildings also, but not inspected yet. 6/6/22 ES ESS Crew working on grading west entrance of Black Twig Cir. 6/7/22 ES No roadway or city utility work being done today after last nights rain. 6/8/22 ES ESS worked on grading Black Twig Cir. 6/9/22 ES ESS continued grading work on Black Twig Cir. 6/10/22 ES ESS on site working on geogrid and rock for sub base stabilization. 6/13/22 ES ESS on site working on Black Twig Cir and entrance from Lowenstein Dr. 6/14/22 ES ESS performed a proof roll on the west section of Black Twig in preparation of curb install. 6/15/22 ES ESS started installing curb on west side of Black Twig. 6/16/22 ES Seal-o-matic was onsite performing sub base stabilization on upper part of Black Twig Cir. 6/16/22 ES Performed proof roll on stabilized sub grade. Passed. ESS was also working on wet section on lower portion of Black Twig Cir. 6/17/22 ES ESS working on aggregate base and compaction. 6/20/22 ES
Misc
Informational
09/30/2022
Minor grading work being done. Prepped for asphalt tomorrow. 7/19/22 ES ESS working on east side of black twig, backfilling and clearing around utilities. 7/20/22 ES No utility work being done today. 7/25/22 ES Pad sites work being performed, no utilities work observed. 8/1/22 ES No utility work being done. 8/4/22 ES Miller plumbing working on digging out water services for a building. Concrete crews working on footings/pads and framers working on 4/5th buildings. 8/8/22 ES
Misc
Informational
09/30/2022
On Monday, 9-19-2022. I performed and passed a Sanitary Sewer connection for the north side of building #10 for Miller Plumbing. Miller Plumbing working on underslap plumbing for building 10 and construction crews continue working on all other units. 9/27/22 ES Miller Plumbing continued working on Bldg 10 underslab plumbing. construction crews continue working on all other units. 9/28/22 ES Construction continues on townhomes. 9/30/22 ES Townhome construction continues, no utility inspections required. 10/10/22 ES
ESC - (Vegetation/Ground Cover) Partial 10/14/2022
Misc
Informational
10/03/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES Next to Nature onsite planting trees along west side of Black Twig Cir and Lowenstein Dr. 10/14/22 ES
Water Service Inspection Partial 10/18/2022
Misc
Informational
10/18/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES
Water Service Inspection Partial 10/18/2022
Misc
Informational
10/18/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES
Erosion Control Inspection Partial 10/19/2022
Misc
Informational
10/11/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
10/11/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
10/11/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
10/11/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES Erosion control measures installed, intact, and functioning. 10/10/22 ES Erosion control measures installed, intact and functioning. 10/18/22 ES
ESC - (Vegetation/Ground Cover) Partial 10/19/2022
Misc
Informational
10/14/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES Next to Nature onsite planting trees along west side of Black Twig Cir and Lowenstein Dr. 10/14/22 ES Next to Nature still working on getting trees planted. 10/18/22 ES
Water Service Inspection Partial 10/19/2022
Misc
Informational
10/18/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES Steve and Jeremiah crew working on meter pits, using black ADS pipe. The first pit they were replacing had the meter too high in the pit. Reminded them that the top of the meters need to be within 14-18” from the lid. 10/19/22am ES
Water Service Inspection Partial 10/20/2022
Misc
Informational
10/19/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES Steve and Jeremiah crew working on meter pits, using black ADS pipe. The first pit they were replacing had the meter too high in the pit. Reminded them that the top of the meters need to be within 14-18” from the lid. 10/19/22am ES Jason's crew was onsite and began working on moving meters that would be in driveways at building 9. Will be using existing corp stops and running new continuous copper from corp stop to new meter locations and one continuous piece of copper from meter to existing connection point where poly heads into building. Some of these meter locations will require being stacked one in front of the other, which was approved with discussions with Brent Dye at WU. We also looked at location for existing fire hydrant in front of building 9 that will need to be relocated also. It will be relocated to green space to SE of current location. Hydrant and valve will both be installed outside of drive area with hydrant to be centered as much as possible between drives. 10/20/22 ES
ESC - (Vegetation/Ground Cover) Partial 10/20/2022
Misc
Informational
10/19/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES Next to Nature onsite planting trees along west side of Black Twig Cir and Lowenstein Dr. 10/14/22 ES Next to Nature still working on getting trees planted. 10/18/22 ES Next to Nature planting trees and vegetation. 10/19/22 ES
Water Service Inspection Partial 10/21/2022
Misc
Informational
10/20/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES Steve and Jeremiah crew working on meter pits, using black ADS pipe. The first pit they were replacing had the meter too high in the pit. Reminded them that the top of the meters need to be within 14-18” from the lid. 10/19/22am ES Jason's crew was onsite and began working on moving meters that would be in driveways at building 9. Will be using existing corp stops and running new continuous copper from corp stop to new meter locations and one continuous piece of copper from meter to existing connection point where poly heads into building. Some of these meter locations will require being stacked one in front of the other, which was approved with discussions with Brent Dye at WU. We also looked at location for existing fire hydrant in front of building 9 that will need to be relocated also. It will be relocated to green space to SE of current location. Hydrant and valve will both be installed outside of drive area with hydrant to be centered as much as possible between drives. 10/20/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. All meters had a solid piece of copper from main to meter pit and at least 10’ of copper going out backside to poly connection. 10/21/22 ES
Water Line - Construction Inspection Partial 10/21/2022
Misc
Informational
09/08/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
09/08/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
09/08/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
09/08/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
09/08/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
09/08/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
09/08/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
09/08/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
09/08/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
09/08/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
09/08/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
09/08/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
09/08/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
09/08/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
09/08/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
09/08/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Misc
Informational
09/08/2022
Rudy’s crew is setting meters for the servoIce lines. They are also backfilling the crossings. Water dept is also out doing Taps.
PW-Main inspection
Corrective Action Required
09/08/2022
A main inspection has uncovered the following problems.
Misc
Informational
09/08/2022
Rudy’s crew are installing meters.
Misc
Informational
09/08/2022
ESS brought in and set a riser for the backflow pit on the west side of Black Twig Cir. They also had an 18x18” core cut into the bottom of pit to allow water to drain. Awaiting metal grate to cover this hole in pit. 9/7/22 ES ESS crew onsite working on moving meters from water line. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. They will also be working on moving the fire hydrant that is front of building 9 to the green space. 10/21/22 ES
Water Line - Construction Inspection Partial 10/21/2022
Misc
Informational
10/21/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
10/21/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
10/21/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
10/21/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
10/21/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
10/21/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
10/21/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
10/21/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
10/21/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
10/21/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
10/21/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
10/21/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
10/21/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
10/21/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
10/21/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
10/21/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Misc
Informational
10/21/2022
Rudy’s crew is setting meters for the servoIce lines. They are also backfilling the crossings. Water dept is also out doing Taps.
PW-Main inspection
Corrective Action Required
10/21/2022
A main inspection has uncovered the following problems.
Misc
Informational
10/21/2022
Rudy’s crew are installing meters.
Misc
Informational
10/21/2022
ESS brought in and set a riser for the backflow pit on the west side of Black Twig Cir. They also had an 18x18” core cut into the bottom of pit to allow water to drain. Awaiting metal grate to cover this hole in pit. 9/7/22 ES ESS crew onsite working on moving meters from water line. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. They will also be working on moving the fire hydrant that is front of building 9 to the green space. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. Also setting hydrant using 90 bend anchor coupling off of tee. 10/21/22 ES
Water Service Inspection Partial 10/21/2022
Misc
Informational
10/21/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES Steve and Jeremiah crew working on meter pits, using black ADS pipe. The first pit they were replacing had the meter too high in the pit. Reminded them that the top of the meters need to be within 14-18” from the lid. 10/19/22am ES Jason's crew was onsite and began working on moving meters that would be in driveways at building 9. Will be using existing corp stops and running new continuous copper from corp stop to new meter locations and one continuous piece of copper from meter to existing connection point where poly heads into building. Some of these meter locations will require being stacked one in front of the other, which was approved with discussions with Brent Dye at WU. We also looked at location for existing fire hydrant in front of building 9 that will need to be relocated also. It will be relocated to green space to SE of current location. Hydrant and valve will both be installed outside of drive area with hydrant to be centered as much as possible between drives. 10/20/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. All meters had a solid piece of copper from main to meter pit and at least 10’ of copper going out backside to poly connection. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. 10/21/22 ES
Install Street and Stop Signs Partial 10/12/2022 10/12/2022 10/21/2022
Misc
Informational
09/27/2022
Spoke with Codi, ESS has a contractor who will be putting up the signs along Black Twig Cir and Lowenstein Dr. 9/26/22 ES "NO OUTLET" sign installed on western edge of Lowenstein at Black Twig Cir. Still no "STOP" sign on west outlet of Black Twig Cir. 10/21/22 ES
ESC - (Vegetation/Ground Cover) Partial 10/21/2022
Misc
Informational
10/20/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES Next to Nature onsite planting trees along west side of Black Twig Cir and Lowenstein Dr. 10/14/22 ES Next to Nature still working on getting trees planted. 10/18/22 ES Next to Nature planting trees and vegetation. 10/19/22 ES Next to Nature watering trees. 10/21/22 ES
Water Service Inspection Partial 10/21/2022
Misc
Informational
10/21/2022
Steve's crew with ESS was onsite working on digging up and preparing to repair meter pits/rings/lids that have been damaged from construction equipment. 10/17/22 ES Steve’s crew with ESS was onsite again working on meter pits. Met with Eric Wiggins from WU onsite to look at options they had for repairing meter pits. The options they had available were not sufficient and we relayed as much. Spoke with Brent and Joe from WU to get black ADS pipe approved if they were unable to source the normal white ADS pipe that is used by WU. They will be allowed as long as the black ADS pipe meets or exceeds the spec of the white pipe. 10/18/22 ES Steve and Jeremiah crew working on meter pits, using black ADS pipe. The first pit they were replacing had the meter too high in the pit. Reminded them that the top of the meters need to be within 14-18” from the lid. 10/19/22am ES Jason's crew was onsite and began working on moving meters that would be in driveways at building 9. Will be using existing corp stops and running new continuous copper from corp stop to new meter locations and one continuous piece of copper from meter to existing connection point where poly heads into building. Some of these meter locations will require being stacked one in front of the other, which was approved with discussions with Brent Dye at WU. We also looked at location for existing fire hydrant in front of building 9 that will need to be relocated also. It will be relocated to green space to SE of current location. Hydrant and valve will both be installed outside of drive area with hydrant to be centered as much as possible between drives. 10/20/22 ES ESS crew onsite working on moving meters. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. All meters had a solid piece of copper from main to meter pit and at least 10’ of copper going out backside to poly connection. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. ESS crew got fire hydrant moved(tee remained in same place, but hydrant 90's to the SE and then goes into green space. They also moved/fixed and backfilled meter pits for 1039 and 1041. 10/21/22 ES
Water Line - Construction Inspection Partial 10/21/2022
Misc
Informational
10/21/2022
Rudy’s crew laid 150 feet of C 900 water pipe. They also set the fire hydrant at station 2+44. RP 4-12-22
Misc
Informational
10/21/2022
Rudy’s crew laid another 500 feet of C 900 water pipe. They also set 2 more fire hydrants. RP 4-13-22
Misc
Informational
10/21/2022
Rudy’s crew laid another 150 feet of C 900 water pipe for line A. They also set another fire hydrant. RP 4-14-22
Misc
Informational
10/21/2022
Rudy’s crew laid 50 feet of C 900 water pipe. They also set 1 fire hydrant and backflow vault. RP 4-15-22
Misc
Informational
10/21/2022
Rudy’s crew set the backflow today. They can’t continue until we hear back from Water on who will be affected during the shut off and hand out notifications. RP 4-18-22
Misc
Informational
10/21/2022
Hung door hangers to notify the citizens of the water disruption for 4-21-22 water tie in. RP 4-19-22
Misc
Informational
10/21/2022
Rudy’s crew dug up Lowenstein and added a tee and 2 valves to the water main. We eliminated the valve to the west of the tee. RP 4-21-22
Misc
Informational
10/21/2022
Rudy’s crew had to tiptoe around other utilities. They laid another water valve and 30 feet of C 900 water pipe. RP 4-22-22
Misc
Informational
10/21/2022
Rudy’s crew finished the water line coming from Lowenstein up to the back flow pit. Emailed on 4/24 for construction tap for tomorrow. Also spoke with Rudy about lack of sump pit in backflow vault. 4/25/22 ES
Misc
Informational
10/21/2022
Water stated they were not able to perform tap this morning due to inability to access pipe. Jeremiah cleared out around the pipe for them this afternoon. They will tap line in morning 4/27. 4/26/22 ES
Misc
Informational
10/21/2022
Chlorinated line with Jeremiah and Rudy. Will likely let line sit with chlorine over weekend as we won’t be able to get both samples pulled this week.
Misc
Informational
10/21/2022
Dechlorinated line finished flushing at 10:15am. 5/2/22 ES
Misc
Informational
10/21/2022
Spoke with Reese, they will be doing the tie in for this line on Monday and will begin digging holes for taps then also. Will start getting taps done on Tuesday. 5/6/22 ES
Misc
Informational
10/21/2022
Rudy's crew performed final tie in after passing samples. Line is now live and active. They were also working on digging the tap holes so that water could come and perform their taps starting on 5/10. 5/9/22 ES
Misc
Informational
10/21/2022
Rudy’s crew did final tie in for water line and started digging tap holes. 5/9/22 ES
Misc
Informational
10/21/2022
Rudy’s crew continued working on street crossings for water services and setting meter pits. 5/11/22 ES
Misc
Informational
10/21/2022
Rudy’s crew is setting meters for the servoIce lines. They are also backfilling the crossings. Water dept is also out doing Taps.
PW-Main inspection
Corrective Action Required
10/21/2022
A main inspection has uncovered the following problems.
Misc
Informational
10/21/2022
Rudy’s crew are installing meters.
Misc
Informational
10/21/2022
ESS brought in and set a riser for the backflow pit on the west side of Black Twig Cir. They also had an 18x18” core cut into the bottom of pit to allow water to drain. Awaiting metal grate to cover this hole in pit. 9/7/22 ES ESS crew onsite working on moving meters from water line. They have moved or adjusted meters for addresses 1047-1055 as of this morning and were beginning to backfill. When meters are stacked in narrow green spaces the address on the left will be the front meter. They will also be working on moving the fire hydrant that is front of building 9 to the green space. 10/21/22am ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. Also setting hydrant using 90 bend anchor coupling off of tee. 10/21/22 ES ESS crew continues working on moving meters and repairing damaged pits. Had finished moving and setting pits on 1043 and 1045. ESS crew got fire hydrant moved(tee remained in same place, but hydrant 90's to the SE and then goes into green space). They will pour kickers first part of next week on the hydrant. They also moved/fixed and backfilled meter pits for 1039 and 1041. 10/21/22 ES
Erosion Control Inspection Partial 11/08/2022
Misc
Informational
10/19/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
10/19/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
10/19/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
10/19/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES Erosion control measures installed, intact, and functioning. 10/10/22 ES Erosion control measures installed, intact and functioning. 10/18/22 ES Erosion control measures installed, intact, and functioning. 11/7/22 ES
Pavement-Surface Partial 11/08/2022
Misc
Informational
07/21/2022
Performed proof roll with 20.24 ton load on northern parking lot and all of Black Twig Cir. Only area with issue was Far East end near connection to existing parking lot where a sprinkler had saturated the ground. 7/16/22 ES Seal-O-Matic laying 3” of Type 2 R base asphalt on Black Twig. 7/20/22 ES Seal-O-Matic laying 2” of Type 2 R base asphalt on Black Twig. 7/21/22 ES Seal-O-Matic laying Type 3R surface asphalt on Black Twig Cir. 11/7/22 ES
Erosion Control Inspection Partial 11/18/2022
Misc
Informational
11/08/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
11/08/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
11/08/2022
No noted erosion issues. 7/11/22 ES
Misc
Informational
11/08/2022
Rain day, no major erosion issues noted. 7/25/22 ES Erosion control measures installed around perimeter of project. No major issues or concerns. 8/1/22 ES Erosion control measures installed around perimeter of project. ESS also installed fresh straw wattles along back edge of new sidewalk after backfilling down Black Twig Cir. 8/8/22 ES Also spoke with Codi about putting blocks behind gutter buddies at inlet boxes. 8/8/22 ES Erosion control measures installed around perimeter of project. Still need to get blocks in behind gutter buddies at curb inlets down Black Twig Cir. 8/22/22 ES Erosion control measures installed around perimeter of project. Still in need of blocks behind gutter buddies at curb inlets. Will remind Codi. 9/8/22 ES Codi put cinder blocks behind gutter buddies along western edge of Black Twig Dr. 9/9/22 ES Erosion control measures installed, intact, and functioning. 9/26/22 ES Erosion control measures installed, intact, and functioning. 10/3/22 ES Erosion control measures installed, intact, and functioning. 10/10/22 ES Erosion control measures installed, intact and functioning. 10/18/22 ES Erosion control measures installed, intact, and functioning. 11/7/22 ES Erosion control measures installed, intact, and functioning. 11/18/22 ES
ESC - (Vegetation/Ground Cover) Partial 11/18/2022
Misc
Informational
10/21/2022
Vegetation is being established on hillside behind villas towards retention basin. 7/11/22 ES Next to Nature onsite seeding and laying straw mat down behind townhomes around ponds. 8/17/22 ES Next to Nature completed laying straw mat and grass seed along Black Twig Cir. 8/19/22 ES Areas with straw mat and seed down have began to vegetate. 8/25/22 ES Large portions of areas along western Black Twig Cir and Lowenstein Dr have established vegetation. Left straw wattles in place, but removed gutter buddies from Lowenstein Dr. 9/9/22 ES Vegetation is established around western Black Twig Cir and down Lowenstein Dr. Wattles remain in place currently. 9/26/22 ES Vegetation is established along the East side of Black Twig Cir down to Lowenstein Dr. The western side will need revegetated from back flow vault down to Lowenstein where utility work has recently been performed. 10/3/22 ES Next to Nature onsite planting trees along west side of Black Twig Cir and Lowenstein Dr. 10/14/22 ES Next to Nature still working on getting trees planted. 10/18/22 ES Next to Nature planting trees and vegetation. 10/19/22 ES Next to Nature watering trees. 10/21/22 ES Vegetation along Black Twig still not fully established. 11/18/22 ES
Storm Sewer Construction Inspection Passed 11/18/2022
Misc
Informational
05/17/2022
Rudy’s crew laid 170 feet of 36 inch HDPE storm pipe. They also set curb inlet B-2. RP 3-21-22
Misc
Informational
05/17/2022
Tyler’s crew laid 60 feet of 36 inch HDPE storm pipe. They also set curb inlet B-3. RP 3-28-22
Misc
Corrective Action Required
05/17/2022
Tyler’s crew laid 60 feet of 18 inch HDPE storm pipe for line C. Brandon’s crew laid 60 feet of 18 inch HDPE storm pipe and end section B-4. They also started on line A, but they didn’t have adequate compacted fill. I informed them that they need to remove the pipe and do it again. RP 3-29-22
Misc
Informational
05/17/2022
Rudy’s crew finished up lines A and C. They removed the section that was wrong on line A and did it properly this time. They also poured collars and inverts for C-1 and C-2. RP 4-4-22
Misc
Informational
05/17/2022
Collars and inverts have been poured for curb inlets A-1, A-2, B-2 and B-3. Rudy’s crew set curb D-1 and laid 120 feet of 18 inch HDPE storm pipe for line D. RP 4-5-22
Misc
Informational
05/17/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They hit an existing water line, that Water believes went to the vacant property next door. They just cut and capped the line. RP 4-7-22
Misc
Informational
05/17/2022
Rudy’s crew laid 60 feet of 18 inch HDPE storm pipe. They also set curb inlets D-2 and G-1. RP 4-8-22
Misc
Informational
05/17/2022
Rudy’s crew laid 100 feet of 18 inch HDPE storm pipe for line D. RP 4-9-22
Misc
Informational
05/17/2022
Rudy’s crew laid 110 feet of 18 inch HDPE storm pipe and 35 feet of 15 inch HDPE storm pipe for line D. They also set curb inlets D-3 and D-4. RP 4-11-22
Misc
Informational
05/17/2022
Rudy’s crew laid 34 feet of 18 inch RCP storm pipe and set curb inlet H-1. RP 4-12-22
Misc
Informational
05/17/2022
Rudy’s crew installed HDPE pipe from box D-1 on private line to E-2 on permit 2021 5290 Lowenstein Dr improvements. Also poured collars and invert on box D-1. 5/17/22 ES Storm structures are all installed and functioning. 11/18/22 ES
Documents & Images
Date Uploaded File Type Document Name
02/15/2022 Receipt Receipt for transaction:2022-000825
03/10/2022 Approved Plans Streets of West Pryor, Lot 7B, Townhomes Private Infrastructure - Approved 3.10.22
03/17/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter DE-Permit
03/22/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/22/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/28/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
03/29/2022 Letter INSPECTION SUMMARY
04/04/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/07/2022 Letter INSPECTION SUMMARY
04/08/2022 Letter INSPECTION SUMMARY
04/08/2022 Curb inlet D-2
04/08/2022 Curb inlet D-3
04/08/2022 Broken water line during storm installation
04/08/2022 Capped water line during storm installation
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Curb inlets D-3
04/12/2022 Curb inlet D-4
04/12/2022 Curb inlet H-1
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/13/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/15/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/18/2022 Backflow Vault
04/18/2022 Backflow Vault Floor
04/18/2022 Backflow Meter
04/19/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Water main tee at Lowenstein
04/21/2022 Lowenstein tee thrust block
04/21/2022 Lowenstein valve risers
04/22/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/06/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/10/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/08/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/14/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/15/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/16/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/30/2022 Letter INSPECTION SUMMARY
07/01/2022 Letter INSPECTION SUMMARY
07/05/2022 Letter INSPECTION SUMMARY
07/05/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/07/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/11/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/12/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/14/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/16/2022 Letter INSPECTION SUMMARY
07/16/2022 Letter INSPECTION SUMMARY
07/16/2022 Letter INSPECTION SUMMARY
07/16/2022 Letter INSPECTION SUMMARY
07/16/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/21/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/22/2022 Letter INSPECTION SUMMARY
07/26/2022 Letter INSPECTION SUMMARY
07/26/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/03/2022 Letter INSPECTION SUMMARY
08/04/2022 Letter INSPECTION SUMMARY
08/05/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/08/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/10/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/11/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
08/25/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
09/23/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/27/2022 Letter INSPECTION SUMMARY
09/28/2022 Letter INSPECTION SUMMARY
09/30/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/03/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
10/11/2022 Letter INSPECTION SUMMARY
10/14/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/18/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/19/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/20/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
10/21/2022 Letter INSPECTION SUMMARY
11/08/2022 Letter INSPECTION SUMMARY
11/08/2022 Letter INSPECTION SUMMARY
11/18/2022 Letter INSPECTION SUMMARY
11/18/2022 Letter INSPECTION SUMMARY
11/18/2022 Letter INSPECTION SUMMARY
11/18/2022 Letter INSPECTION SUMMARY
11/21/2022 SWP 2022 0445 Box D-1 A
11/21/2022 SWP 2022 0445 Box D-1 B
11/21/2022 SWP 2022 0445 Box D-1
02/29/2024 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home