Summary


PRSITE20211246
Development - Site
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
LOT 11 AND 12 STREETS OF WEST PRYOR GRADING AND SANITARY
03/19/2021
09/03/2021
07/17/2023
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
DRAKE DEVELOPMENT, LLC, Address:7200 West 132nd Street; Suite 150  
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 03/19/2021 09/03/2021
Dawn Bell
Fees
Paid Fees Amount Paid Owing Date Paid
9110068-Storm Fee $2,237.93 $2,237.93 Paid 09/03/2021
9110071-Site Grading Fee $7,851.00 $7,851.00 Paid 09/03/2021
91100C8-Sanitary Sewer Insp Fees $1,448.94 $1,448.94 Paid 09/03/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sanitary Sewer - Abandonment Failed 11/16/2021 11/16/2021 11/16/2021
Misc
Corrective Action Required
11/16/2021
Earl from ESS removed existing manhole and sanitary pipe to correct abandonment location. Plans called for a cap, but explained that our spec calls for a plug. They plan on correcting this issue tomorrow. RP 11-16-21
Sanitary Sewer - Abandonment Passed 11/18/2021 11/18/2021 02/09/2022
Misc
Corrective Action Required
11/16/2021
Earl from ESS removed existing manhole and sanitary pipe to correct abandonment location. Plans called for a cap, but explained that our spec calls for a plug. They plan on correcting this issue tomorrow. RP 11-16-21
Misc
Informational
02/09/2022
The sanitary line was abandoned correctly. RP 11-17-21
Site Visit Partial 02/09/2022
Misc
Informational
02/09/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Site Visit Partial 2/10/2022 2/10/2022 02/10/2022
Misc
Informational
02/09/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/10/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Erosion Control Inspection Partial 11/16/2021 11/16/2021 02/10/2022
Misc
Informational
02/10/2022
No erosion issues to report. RP 2-10-22
Site Visit Partial 2/14/2022 2/14/2022 02/15/2022
Misc
Informational
02/10/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/10/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/15/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Site Visit Partial 2/18/2022 2/18/2022 02/21/2022
Misc
Informational
02/15/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/15/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/15/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Site Visit Partial 2/22/2022 2/22/2022 02/22/2022
Misc
Informational
02/21/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/21/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/21/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/22/2022
No utility or exterior work being done today. RP 2-22-22
Site Visit Partial 2/24/2022 2/24/2022 02/24/2022
Misc
Informational
02/22/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/22/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/22/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/22/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/22/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
02/24/2022
No exterior work being done today due to snow. RP 2-24-22
Site Visit Partial 2/25/2022 2/25/2022 02/25/2022
Misc
Informational
02/24/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/24/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/24/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/24/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/24/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
02/24/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Sanitary Sewer Construction Inspection Partial 02/28/2022
Misc
Informational
02/28/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Site Visit Partial 2/28/2022 2/28/2022 02/28/2022
Misc
Informational
02/25/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/25/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/25/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/25/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/25/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
02/25/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
02/25/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
02/28/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Sanitary - Material Verification Passed 03/01/2022
Misc
Informational
03/01/2022
Manholes manufactured by Forterra with ML 134 NCR steps. SDR26 Pipe manufactured by Sanderson. RP 3-1-22
Storm - Material Verification Passed 03/01/2022
Misc
Informational
03/01/2022
Storm structures manufactured by Forterra with ML 134 NCR steps. 18” and 24” N-12 Dual Wall Storm Pipe manufactured by ADS. RP 3-1-22
Sanitary Sewer Construction Inspection Partial 3/1/2022 3/1/2022 03/01/2022
Misc
Informational
02/28/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/01/2022
Tyler’s crew set 220 for 8 inch sanitary pipe and set manhole A-2. RP 3-1-22
Site Visit Partial 3/2/2022 3/2/2022 03/02/2022
Misc
Informational
02/28/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
02/28/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
02/28/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
02/28/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
02/28/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
02/28/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
02/28/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
02/28/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/02/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Storm Sewer Construction Inspection Partial 03/02/2022
Misc
Informational
03/02/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Storm Sewer Construction Inspection Partial 3/3/2022 3/3/2022 03/03/2022
Misc
Informational
03/02/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/03/2022
Tyler’s crew laid 165 feet of 18 inch HDPE storm pipe. They also set grate inlets A-2 and A-3. RP 3-3-22
Storm Sewer Construction Inspection Partial 3/4/2022 3/4/2022 03/04/2022
Misc
Informational
03/03/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/03/2022
Tyler’s crew laid 165 feet of 18 inch HDPE storm pipe. They also set grate inlets A-2 and A-3. RP 3-3-22
Misc
Informational
03/04/2022
Tyler’s crew laid another 160 feet of 18 inch HDPE storm pipe. The also poured coals on structures A-2 and A-3, plus invert for A-2. RP 3-4-22
Misc
Informational
03/17/2022
Rudy’s crew installed ~140’ of HDPE pipe and completed storm line A with termination at inlet box A-5. Will pour collars and inverts at later date. Also resumed construction on storm line B. 3/16/22 ES
Site Visit Partial 3/4/2022 3/4/2022 03/14/2022
Misc
Informational
03/02/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
03/02/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
03/02/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
03/02/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/02/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
03/02/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
03/02/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/02/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/02/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/14/2022
No work being done on site today. RP 3-10-22
Site Visit Partial 03/14/2022
Misc
Informational
03/14/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
03/14/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
03/14/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
03/14/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/14/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/14/2022
No work being done on site today. RP 3-10-22
Misc
Informational
03/14/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Storm Sewer Construction Inspection Partial 3/7/2022 3/7/2022 03/17/2022
Misc
Informational
03/04/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/04/2022
Tyler’s crew laid 165 feet of 18 inch HDPE storm pipe. They also set grate inlets A-2 and A-3. RP 3-3-22
Misc
Informational
03/04/2022
Tyler’s crew laid another 160 feet of 18 inch HDPE storm pipe. The also poured coals on structures A-2 and A-3, plus invert for A-2. RP 3-4-22
Misc
Informational
03/17/2022
Rudy’s crew finished storm line A on 3/16/22 and storm line B on 3/17/22. Poured collars on storm line A 3/17/22 along with invert in box A-3. Working on pouring other collars on line B and remaining inverts on 4 remaining boxes 3/17/22. ES
Site Visit Partial 3/15/2022 3/15/2022 03/18/2022
Misc
Informational
03/14/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
03/14/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
03/14/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
03/14/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/14/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
03/14/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
03/14/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/14/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/14/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/14/2022
No work being done on site today. RP 3-10-22
Misc
Informational
03/14/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
03/18/2022
No crews working after last nights weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Erosion Control Inspection Partial 03/23/2022
Misc
Informational
02/10/2022
No erosion issues to report. RP 2-10-22
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Erosion Control Inspection Partial 03/24/2022
Misc
Informational
03/23/2022
No erosion issues to report. RP 2-10-22
Misc
Informational
03/23/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Sanitary Sewer - Air Test Passed 4/6/2022 4/6/2022 04/06/2022
Misc
Informational
04/06/2022
Sanitary line held 4 PSI for the required time. RP 4-6-22
Sanitary Sewer - Mandrel Passed 4/6/2022 4/6/2022 04/06/2022
Misc
Informational
04/06/2022
The correct size mandrel passed through the sanitary line. RP 4-6-22
Sanitary Sewer - Vacuum Passed 4/6/2022 4/6/2022 04/06/2022
Misc
Informational
04/06/2022
Manholes A-1 and A-2 held 10 PSI for the required time. RP 4-6-22
Storm Sewer Construction Inspection Passed 3/31/2022 3/31/2022 04/06/2022
Misc
Informational
03/17/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/17/2022
Tyler’s crew laid 165 feet of 18 inch HDPE storm pipe. They also set grate inlets A-2 and A-3. RP 3-3-22
Misc
Informational
03/17/2022
Tyler’s crew laid another 160 feet of 18 inch HDPE storm pipe. The also poured coals on structures A-2 and A-3, plus invert for A-2. RP 3-4-22
Misc
Informational
03/17/2022
Rudy’s crew finished storm line A on 3/16/22 and storm line B on 3/17/22. Poured collars on storm line A 3/17/22 along with invert in box A-3. Working on pouring other collars on line B and remaining inverts on 4 remaining boxes 3/17/22. ES
Site Visit Partial 04/06/2022
Misc
Informational
03/18/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
03/18/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
03/18/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
03/18/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
03/18/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
03/18/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
03/18/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
03/18/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/18/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
03/18/2022
No work being done on site today. RP 3-10-22
Misc
Informational
03/18/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
03/18/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/06/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Site Visit Partial 4/7/2022 4/7/2022 04/11/2022
Misc
Informational
04/06/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/06/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/06/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/06/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/06/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/06/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/06/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/06/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/06/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/06/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/06/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/06/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/06/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/11/2022
More mass grading happening today. RP 4-11-22
Grading/Excavation/Fill Inspection Partial 04/11/2022
Misc
Informational
04/11/2022
ESS on site grading the lots. RP 4-11-22
Site Visit Partial 4/12/2022 4/12/2022 04/12/2022
Misc
Informational
04/11/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/11/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/11/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/11/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/11/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/11/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/11/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/11/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/11/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/11/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/11/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/11/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/11/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/11/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
04/12/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Grading/Excavation/Fill Inspection Partial 04/12/2022
Misc
Informational
04/11/2022
ESS on site grading the lots. RP 4-11-22
Misc
Informational
04/12/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Sanitary Sewer Construction Inspection Passed 3/2/2022 3/2/2022 04/12/2022
Misc
Informational
03/01/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
03/01/2022
Tyler’s crew set 220 for 8 inch sanitary pipe and set manhole A-2. RP 3-1-22
Misc
Informational
04/12/2022
Sanitary line passed all testing except camera on 4-6-22. RP
Site Visit Partial 4/13/2022 4/13/2022 04/18/2022
Misc
Informational
04/12/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/12/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/12/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/12/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/12/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/12/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/12/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/12/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/12/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/12/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/12/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/12/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/12/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/12/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
04/12/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
04/18/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Site Visit Partial 4/18/2022 4/18/2022 04/19/2022
Misc
Informational
04/18/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/18/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/18/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/18/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/18/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/18/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/18/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/18/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/18/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/18/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/18/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/18/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/18/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/18/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
04/18/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
04/18/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
04/19/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Site Visit Partial 4/20/2022 4/20/2022 04/21/2022
Misc
Informational
04/19/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/19/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/19/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/19/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/19/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/19/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/19/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/19/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/19/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/19/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/19/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/19/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/19/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/19/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
04/19/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
04/19/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
04/19/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
04/21/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Site Visit Partial 4/25/2022 4/25/2022 05/13/2022
Misc
Informational
04/21/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
04/21/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
04/21/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
04/21/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
04/21/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
04/21/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
04/21/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
04/21/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
04/21/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
04/21/2022
No work being done on site today. RP 3-10-22
Misc
Informational
04/21/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
04/21/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
04/21/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
04/21/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
04/21/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
04/21/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
04/21/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
04/21/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
05/13/2022
No utility work has been being performed on site for some time. 5/11/22 ES
Site Visit Partial 5/17/2022 05/25/2022
Misc
Informational
05/13/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
05/13/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
05/13/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
05/13/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/13/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
05/13/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
05/13/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/13/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
05/13/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
05/13/2022
No work being done on site today. RP 3-10-22
Misc
Informational
05/13/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
05/13/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
05/13/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
05/13/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
05/13/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
05/13/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
05/13/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
05/13/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
05/13/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES
Site Visit Partial 05/31/2022
Misc
Informational
05/25/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
05/25/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
05/25/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
05/25/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/25/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
05/25/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
05/25/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/25/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
05/25/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
05/25/2022
No work being done on site today. RP 3-10-22
Misc
Informational
05/25/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
05/25/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
05/25/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
05/25/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
05/25/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
05/25/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
05/25/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
05/25/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
05/25/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES
Sanitary Sewer - Camera Test Partial 6/8/2022 6/8/2022 06/07/2022
Misc
Informational
06/07/2022
Email sent to water to get this section camera’d. 6/7/22 ES
Sanitary Sewer - Camera Test Partial 7/7/2022 06/20/2022
Misc
Informational
06/07/2022
Email sent to water to get this section camera’d. 6/7/22 ES Water was onsite working on bond inspection. 6/17/22 ES
Site Visit Partial 06/20/2022
Misc
Informational
05/31/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
05/31/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
05/31/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
05/31/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
05/31/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
05/31/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
05/31/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
05/31/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
05/31/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
05/31/2022
No work being done on site today. RP 3-10-22
Misc
Informational
05/31/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
05/31/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
05/31/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
05/31/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
05/31/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
05/31/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
05/31/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
05/31/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
05/31/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES Water onsite doing camera work/bond inspection. 6/17/22 ES
Site Visit Partial 07/15/2022
Misc
Informational
06/20/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
06/20/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
06/20/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
06/20/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
06/20/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
06/20/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
06/20/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
06/20/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
06/20/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
06/20/2022
No work being done on site today. RP 3-10-22
Misc
Informational
06/20/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
06/20/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
06/20/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
06/20/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
06/20/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
06/20/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
06/20/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
06/20/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
06/20/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES Water onsite doing camera work/bond inspection. 6/17/22 ES No work being done. 7/15/22 ES
Site Visit Partial 07/18/2022
Misc
Informational
07/15/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
07/15/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
07/15/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
07/15/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
07/15/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
07/15/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
07/15/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
07/15/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
07/15/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
07/15/2022
No work being done on site today. RP 3-10-22
Misc
Informational
07/15/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
07/15/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
07/15/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
07/15/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
07/15/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
07/15/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
07/15/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
07/15/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
07/15/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES Water onsite doing camera work/bond inspection. 6/17/22 ES No work being done. 7/15/22 ES No work being done. 7/18/22 ES
ESC - (Vegetation/Ground Cover) Partial 07/18/2022
Misc
Informational
07/18/2022
Site does not have any established vegetation. 7/18/22 ES
Site Visit Partial 07/19/2022
Misc
Informational
07/18/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
07/18/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
07/18/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
07/18/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
07/18/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
07/18/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
07/18/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
07/18/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
07/18/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
07/18/2022
No work being done on site today. RP 3-10-22
Misc
Informational
07/18/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
07/18/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
07/18/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
07/18/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
07/18/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
07/18/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
07/18/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
07/18/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
07/18/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES Water onsite doing camera work/bond inspection. 6/17/22 ES No work being done. 7/15/22 ES No work being done. 7/18/22 ES No work being done. 7/19/22 ES
Sanitary Sewer - Camera Test Passed 7/20/2022 08/01/2022
Misc
Informational
06/20/2022
Email sent to water to get this section camera’d. 6/7/22 ES Water was onsite working on bond inspection. 6/17/22 ES Spoke with Matt, water approved of Sanitary Sewers. 8/1/22 ES
Erosion Control Inspection Partial 08/01/2022
Misc
Informational
03/24/2022
No erosion issues to report. RP 2-10-22
Misc
Informational
03/24/2022
No erosion issues to report on the job site today. RP 3-23-22
Misc
Informational
03/24/2022
Another rain day, still no erosion issues to report. RP 3-24-22
Misc
Informational
08/01/2022
No erosion issues. 8/1/22 ES
Site Visit Partial 08/01/2022
Misc
Informational
07/19/2022
ESS has started mass grading after last weeks snow event. RP 2-9-22
Misc
Informational
07/19/2022
ESS is still just mass grading the site. Talked with Codi concerning approved set of plans for the lots. He said he will inform his side to submit the plans for approval. RP 2-10-22
Misc
Informational
07/19/2022
ESS has finished mass grading for the sites. Still waiting on approved plans before the laying of any utilities. RP 2-15-22
Misc
Informational
07/19/2022
No work being done due to the snow storm. RP 2-17-22
Misc
Informational
07/19/2022
No utility or exterior work being done today. RP 2-22-22
Misc
Informational
07/19/2022
No exterior work being done today due to snow. RP 2-24-22
Misc
Informational
07/19/2022
No work being done today that needs inspection. RP 2-25-22
Misc
Informational
07/19/2022
Tyler from ESS saw cut the roadway into SWOP. They set manhole A1 and poured the base and invert. RP 2-28-22
Misc
Informational
07/19/2022
Tyler’s crew removed existing storm structure and all but the last 5 feet of storm pipe (utilities on the collar). They also laid 119 feet of 24 inch HDPE storm pipe and set end section A-1. RP 3-2-22
Misc
Informational
07/19/2022
No work being done on site today. RP 3-10-22
Misc
Informational
07/19/2022
ESS is on site just breaking rock for the storm lime. RP 3-14-22
Misc
Informational
07/19/2022
No crews working after last night’s weather. Appears storm box lids were placed after pouring collars and inverts yesterday. 3/18/22 ES
Misc
Informational
07/19/2022
Completed sanitary testing today. Waiting to hear that the line is ready for camera testing before I notify Water. No other work is being done on site today. RP 4-6-22
Misc
Informational
07/19/2022
More mass grading happening today. RP 4-11-22
Misc
Informational
07/19/2022
ESS still mass grading and hauling off excess material. RP 4-12-22
Misc
Informational
07/19/2022
Roy and Son Fencing was on site installing fencing along the perimeter by the highway. 4-18-22
Misc
Informational
07/19/2022
Work being done on site is hauling dirt out for lot 7B. Roy and Son still installing fence along the highway. RP 4-19-22
Misc
Informational
07/19/2022
Roy and sons still installing fencing along the highway perimeter. RP 4-21-22
Misc
Informational
07/19/2022
No utility work has been being performed on site for some time. 5/11/22 ES No utility work or grading taking place. 5/25/22 ES No utility work being done. 5/31/22 ES Water onsite doing camera work/bond inspection. 6/17/22 ES No work being done. 7/15/22 ES No work being done. 7/18/22 ES No work being done. 7/19/22 ES No work being done. 8/1/22 ES
Documents & Images
Date Uploaded File Type Document Name
09/03/2021 Receipt Receipt for transaction: 2021-007124
09/03/2021 Approved Plans Streets of West Pryor, Lots 11 & 12, Private Mass Grading & Storm Sewer Approved 9.3.21
09/03/2021 Approved Plans Streets of West Pryor, Lots 11 & 12, Sanitary Sewer Approved 9.3.21
09/03/2021 Letter DE-Permit
11/16/2021 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/09/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
02/15/2022 Letter INSPECTION SUMMARY
02/21/2022 Letter INSPECTION SUMMARY
02/22/2022 Letter INSPECTION SUMMARY
02/24/2022 Letter INSPECTION SUMMARY
02/25/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
02/28/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/01/2022 Letter INSPECTION SUMMARY
03/02/2022 Approved Plans SOWP LOTS 11 & 12 GRADING PERMIT 2-22-22 Revisions Approved
03/02/2022 Letter INSPECTION SUMMARY
03/02/2022 Letter INSPECTION SUMMARY
03/03/2022 Letter INSPECTION SUMMARY
03/04/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/14/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/17/2022 Letter INSPECTION SUMMARY
03/18/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/23/2022 Letter INSPECTION SUMMARY
03/24/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/06/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/11/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/18/2022 Letter INSPECTION SUMMARY
04/19/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/13/2022 Letter INSPECTION SUMMARY
05/25/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
06/20/2022 Letter INSPECTION SUMMARY
07/15/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/18/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
09/01/2022 Streets of West Pryor Lot 11 and 12 Public Sanitary Substantial Completion
09/02/2022 Letter DE-Punch List
09/02/2022 Streets of West Pryor Lot 11 and 12 Public Sanitary Substantial Completion
09/02/2022 Streets of West Pryor Lot 11 and 12 Public Sanitary Punch List
09/13/2022 Sanitary Sewer Easement - SWP Lots 11-12 (2022E0082653) [RECORDED 09-06-2022]
06/21/2023 SOWP Lot 11 & 12 Final Affidavit and Agreement - X, 6_21_23
06/21/2023 SOWP Lot 11 & 12 Maintenance Bond - X, 6_21_23
06/22/2023 SOWP LOTS 11 & 12 SANITARY RECORD DRAWINGS 6-22-23
07/17/2023 Letter DE-Certificate of Final Acceptance (Commercial)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home