Inspection |
Outcome |
Requested |
Scheduled |
Date Inspected |
Site Visit
|
Partial
|
7/24/2020
|
7/24/2020
|
07/24/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
7/28/2020
|
7/28/2020
|
07/28/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
07/31/2020
|
|
Miscellaneous Correction
|
Water Line - Construction Inspection
|
Partial
|
8/4/2020
|
8/4/2020
|
08/04/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/5/2020
|
8/5/2020
|
08/05/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/10/2020
|
8/10/2020
|
08/10/2020
|
|
Misc
|
Storm - Pipe
|
Partial
|
8/11/2020
|
8/11/2020
|
08/11/2020
|
|
Misc
|
Storm - Pipe
|
Partial
|
8/12/2020
|
8/12/2020
|
08/12/2020
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Partial
|
8/12/2020
|
8/12/2020
|
08/12/2020
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Partial
|
8/13/2020
|
8/13/2020
|
08/13/2020
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Partial
|
|
|
08/17/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/17/2020
|
8/17/2020
|
08/17/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/18/2020
|
8/18/2020
|
08/18/2020
|
|
Misc
|
Water Line - Coliform Test 2
|
Partial
|
8/20/2020
|
8/20/2020
|
08/20/2020
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Partial
|
8/24/2020
|
8/24/2020
|
08/24/2020
|
|
Misc
|
Storm - Pipe
|
Partial
|
8/24/2020
|
8/24/2020
|
08/24/2020
|
|
Misc
|
Sidewalk Inspection
|
Partial
|
8/25/2020
|
8/25/2020
|
08/25/2020
|
|
Misc
|
Sidewalk Inspection
|
Partial
|
8/26/2020
|
8/26/2020
|
08/26/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
8/26/2020
|
8/26/2020
|
08/26/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
|
|
08/27/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Partial
|
|
|
08/28/2020
|
|
Misc
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
7/16/2020
|
|
08/31/2020
|
|
Misc
|
Sidewalk Inspection
|
Passed
|
|
|
09/01/2020
|
|
Misc
|
Storm - Pipe
|
Partial
|
9/4/2020
|
9/4/2020
|
09/04/2020
|
|
Misc
|
Storm - Pipe
|
Partial
|
|
|
09/08/2020
|
|
Misc
|
Site Visit
|
Partial
|
9/9/2020
|
9/9/2020
|
09/09/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
9/10/2020
|
9/10/2020
|
09/10/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
9/11/2020
|
9/11/2020
|
09/11/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/15/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/16/2020
|
|
Miscellaneous Correction
|
Water Line - Construction Inspection
|
Partial
|
|
|
09/16/2020
|
|
Misc
|
Site Visit
|
Partial
|
9/18/2020
|
9/18/2020
|
09/18/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
9/21/2020
|
9/21/2020
|
09/21/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/22/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/23/2020
|
|
Miscellaneous Correction
|
Pavement-Stabilized Subgrade
|
Partial
|
9/23/2020
|
9/23/2020
|
09/23/2020
|
|
Misc
|
Pavement-Stabilized Subgrade
|
Partial
|
9/24/2020
|
9/24/2020
|
09/24/2020
|
|
Misc
|
Site Visit
|
Partial
|
|
|
09/25/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/28/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
09/29/2020
|
|
Miscellaneous Correction
|
Pavement-Proof Roll
|
Partial
|
|
|
09/29/2020
|
|
Misc
|
Pavement-Proof Roll
|
Partial
|
9/30/2020
|
9/30/2020
|
09/30/2020
|
|
Misc
|
Site Visit
|
Partial
|
|
|
10/01/2020
|
|
Miscellaneous Correction
|
Pavement-Curb Construction
|
Partial
|
10/5/2020
|
10/5/2020
|
10/05/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
|
|
10/07/2020
|
|
Misc
|
Storm - Pipe
|
Passed
|
10/7/2020
|
10/7/2020
|
10/07/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
10/8/2020
|
10/8/2020
|
10/08/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
10/12/2020
|
10/12/2020
|
10/12/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
10/13/2020
|
10/13/2020
|
10/13/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
10/15/2020
|
10/15/2020
|
10/15/2020
|
|
Misc
|
Pavement-Surface
|
Partial
|
10/16/2020
|
10/16/2020
|
10/16/2020
|
|
Misc
|
Pavement-Curb Construction
|
Partial
|
10/19/2020
|
10/19/2020
|
10/19/2020
|
|
Misc
|
Site Visit
|
Partial
|
|
|
10/21/2020
|
|
Miscellaneous Correction
|
Pavement-Curb Construction
|
Partial
|
10/20/2020
|
10/20/2020
|
10/22/2020
|
|
Misc
|
Commercial Curb Inspection
|
Partial
|
10/22/2020
|
10/22/2020
|
10/22/2020
|
|
Misc
|
Erosion Control Inspection
|
Partial
|
10/23/2020
|
10/23/2020
|
10/23/2020
|
|
Misc
|
Site Visit
|
Partial
|
10/27/2020
|
10/27/2020
|
10/27/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
10/29/2020
|
10/29/2020
|
10/29/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
10/30/2020
|
10/30/2020
|
10/30/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
10/30/2020
|
|
Miscellaneous Correction
|
Driveway Inspection
|
Partial
|
11/2/2020
|
11/2/2020
|
11/02/2020
|
|
Misc
|
Pavement-Surface
|
Partial
|
11/3/2020
|
11/3/2020
|
11/03/2020
|
|
Misc
|
Site Visit
|
Partial
|
|
|
11/04/2020
|
|
Miscellaneous Correction
|
Site Visit
|
Partial
|
|
|
11/05/2020
|
|
Miscellaneous Correction
|
Sidewalk Inspection
|
Partial
|
11/6/2020
|
11/6/2020
|
11/06/2020
|
|
Misc
|
Sidewalk Inspection
|
Partial
|
|
|
11/09/2020
|
|
Misc
|
Site Visit
|
Partial
|
|
|
11/09/2020
|
|
Miscellaneous Correction
|
Pavement-Surface
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Driveway Inspection
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Commercial Curb Inspection
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Pavement-Curb Construction
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Pavement-Proof Roll
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Pavement-Stabilized Subgrade
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Water Line - Construction Inspection
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Sanitary Sewer Construction Inspection
|
Passed
|
|
|
11/10/2020
|
|
Misc
|
Water Line - Hydrostatic Test
|
Passed
|
|
|
11/10/2020
|
Install Street and Stop Signs
|
Passed
|
|
|
11/10/2020
|
Storm - Swales
|
Passed
|
|
|
11/10/2020
|
Water Line - Construction Inspection
|
Passed
|
8/4/2020
|
8/4/2020
|
11/10/2020
|
|
Misc
|
Storm - Material Verification
|
Passed
|
|
|
11/10/2020
|
Water - Material Verification
|
Passed
|
|
|
11/10/2020
|
Water Line - Hydrostatic Test
|
Passed
|
|
|
11/10/2020
|
Water Line - Coliform Test 1
|
Passed
|
|
|
11/10/2020
|
Water Line - Coliform Test 1
|
Passed
|
|
|
11/10/2020
|
Water Line - Hydrostatic Test
|
Passed
|
|
|
11/10/2020
|
Water - Material Verification
|
Passed
|
|
|
11/10/2020
|
Water - Material Verification
|
Passed
|
|
|
11/10/2020
|
Water Line - Coliform Test 2
|
Passed
|
|
|
11/10/2020
|
Erosion Control Inspection
|
Partial
|
11/10/2020
|
11/10/2020
|
11/10/2020
|
|
Misc
|
Water Line - Coliform Test 2
|
Passed
|
|
|
11/11/2020
|
Site Visit
|
Partial
|
11/11/2020
|
11/11/2020
|
11/11/2020
|
|
Miscellaneous Correction
|
Sidewalk Inspection
|
Passed
|
|
|
09/06/2022
|
|
Misc
|