Summary


PRSITE20193157
Development - Site
Final Acceptance
CITY OF LEES SUMMIT
DEVELOPMENT COMPLETE
Summit at West Pryor site development
10/25/2019
11/01/2019
08/17/2022
Locations
Contacts
BRINKMANN CONSTRUCTORS, Address:16650 CHESTERFIELD GROVE RD, Phone:(636) 537-9700  
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/25/2019 10/30/2019
Joe Starlin
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $506.07 $506.07 Paid Not payable online 10/25/2019
91100C9-Water Insp Fee $1,517.93 $1,517.93 Paid Not payable online 10/25/2019
9110072-Water Test Fee $600.00 $600.00 Paid Not payable online 10/25/2019
9110068-Storm Fee $1,136.09 $1,136.09 Paid Not payable online 10/25/2019
9110081-Paved Surface Inspection Fee $18,202.05 $18,202.05 Paid Not payable online 10/25/2019
9110071-Site Grading Fee $5,392.41 $5,392.41 Paid Not payable online 10/25/2019
8331401-Water Tap Fee $115,900.00 $115,900.00 Paid Not payable online 10/25/2019
8350015-Water Meter Fee $2,363.00 $2,363.00 Paid Not payable online 10/25/2019
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $410.00 $0.00 $410.00 Not Paid


$410.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Storm Sewer Construction Inspection Partial 11/8/2019 11/08/2019
Misc
Informational
11/08/2019
11-9-19 1:27pm They have installed 3 sticks of storm pipe coming out of B2.
Grading/Excavation/Fill Inspection Partial 11/21/2019 11/21/2019
Misc
Informational
11/20/2019
Misc
Informational
11/20/2019
Misc
Informational
11/21/2019
They have been grading and are now installing subgrade stabilization.
Storm Sewer Construction Inspection Partial 1/3/2020 01/03/2020
Misc
Informational
11/08/2019
11-9-19 1:27pm They have installed 3 sticks of storm pipe coming out of B2.
Misc
Informational
01/03/2020
1-3-2020 9:25am They have dug out and cored the storm box for the drains.
Storm Sewer Construction Inspection Partial 01/07/2020
Misc
Informational
01/06/2020
11-9-19 1:27pm They have installed 3 sticks of storm pipe coming out of B2.
Misc
Informational
01/06/2020
1-3-2020 9:25am They have dug out and cored the storm box for the drains.
Misc
Informational
01/06/2020
1-6-2020 They have completed the storm on the south end of the building and are now digging out for the north end.9:37am They are still digging out. 1:33pm They have the storm drains connected and are working on backfilling.
Misc
Informational
01/07/2020
1-7-20 They have installed approximately 60ft of storm pipe along the west end of the building. They have plenty of rock and are using good backfill.
Storm Sewer Construction Inspection Partial 1/8/2020 01/08/2020
Misc
Informational
01/07/2020
11-9-19 1:27pm They have installed 3 sticks of storm pipe coming out of B2.
Misc
Informational
01/07/2020
1-3-2020 9:25am They have dug out and cored the storm box for the drains.
Misc
Informational
01/07/2020
1-6-2020 They have completed the storm on the south end of the building and are now digging out for the north end.9:37am They are still digging out. 1:33pm They have the storm drains connected and are working on backfilling.
Misc
Informational
01/07/2020
1-7-20 They have installed approximately 60ft of storm pipe along the west end of the building. They have plenty of rock and are using good backfill.
Misc
Informational
01/08/2020
1-8-20 10:50am They have installed approximately 60ft of storm pipe at the south west side of the building and are backfilling.
Water Line - Construction Inspection Partial 04/21/2020
Misc
Informational
04/21/2020
4-21-20 2:44pm ESS as installed 2 sticks of 6” waterline and 2 sticks of 4” waterline coming out of the vault. They are now backfilling.
Water Line - Construction Inspection Partial 4/28/2020 04/28/2020
Misc
Informational
04/28/2020
They have a total of 60’ of 4” and 6” of water line coming out of the vault heading to the building.
Water Line - Construction Inspection Partial 5/1/2020 05/01/2020
Misc
Informational
04/28/2020
4-21-20 2:44pm ESS as installed 2 sticks of 6” waterline and 2 sticks of 4” waterline coming out of the vault. They are now backfilling. 5-1-20 The water line is ran to the building from the vault.
Water Line - Construction Inspection Partial 6/3/2020 6/3/2020 06/03/2020
Misc
Informational
05/01/2020
4-21-20 2:44pm ESS as installed 2 sticks of 6” waterline and 2 sticks of 4” waterline coming out of the vault. They are now backfilling. 5-1-20 The water line is ran to the building from the vault. 6-3-20 John Jackson inspected the pressure test for the 8” line. It has passed.
Water Line - Hydrostatic Test Partial 06/03/2020
Misc
Informational
06/03/2020
6-3-20 The 8” line has passed.
Curb - Proof Roll Partial 06/15/2020
Misc
Informational
06/15/2020
6-15-20 3:06pm We are proof rolling at the East side of the building for curb. The proof roll passed. CFS was on site for it and agreed.
Curb - Proof Roll Partial 06/18/2020
Misc
Informational
06/15/2020
6-15-20 3:06pm We are proof rolling at the East side of the building for curb. The proof roll passed. CFS was on site for it and agreed. 6-18-20 ESS, CFS and my self performed a second proof roll at the building on the east side. They had made some corrections. It has passed at this time and is subject for another proof roll if it rains. Rain is forecasted and they have been made aware.
Pavement-Curb Construction Partial 6/19/2020 6/19/2020 06/19/2020
Misc
Informational
06/19/2020
6-19-20 8:08am Freedom Concrete are pouring the curbs. I have informed them to make sure there is good coverage when they cure.
Pavement-Curb Construction Partial 06/22/2020
Misc
Informational
06/19/2020
6-19-20 8:08am Freedom Concrete are pouring the curbs. I have informed them to make sure there is good coverage when they cure. 6-22-20 8:21am Freedom Concrete are on site and are setting up islands and pouring on the East side of the building.
Pavement-Curb Construction Partial 06/22/2020
Misc
Informational
06/22/2020
6-19-20 8:08am Freedom Concrete are pouring the curbs. I have informed them to make sure there is good coverage when they cure. 6-22-20 8:21am Freedom Concrete are on site and are setting up islands and pouring on the East side of the building.
Misc
Informational
06/22/2020
6-22-20 Freedom Concrete finished pouring and curing islands and round curbs on the East side of the building.
Fire Line - Flush Passed 06/25/2020
Misc
Informational
06/25/2020
Fire Line was flushed at 1:00pm. Fire Line appeared to be clear of debris.
Pavement-Surface Partial 6/26/2020 6/26/2020 06/26/2020
Misc
Informational
06/26/2020
06/26/2020 On Thursday 06/25/20 Metro Asphalt installed the Type 2R base lift for the east half of the parking lot. Temps were compliant and the equipment and methods used were compliant. On Friday 06/26/2020 Way & Sons installed the Type 1R base lift for the west half of the parking lot. The temps were compliant and the equipment and methods used were compliant. Friday 06/26/2020 After Metro installed the base lift for the public road they moved over the drive and turn lanes of the project. The crew laid Type 3R base for these lanes. The temps were compliant and the equipment and methods used were compliant. 6-28-20 Way & Sons spread asphalt leftovers on the base at the southeast side of the parking lot. This was not rolled in and is laying on top of the base. I spoke with Mike with CFS and he and I agree that it will need to be removed before surface is put down.
Site Visit Partial 06/30/2020
Misc
Informational
06/30/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time.
Pavement-Surface Partial 07/08/2020
Misc
Informational
06/26/2020
06/26/2020 On Thursday 06/25/20 Metro Asphalt installed the Type 2R base lift for the east half of the parking lot. Temps were compliant and the equipment and methods used were compliant. On Friday 06/26/2020 Way & Sons installed the Type 1R base lift for the west half of the parking lot. The temps were compliant and the equipment and methods used were compliant. Friday 06/26/2020 After Metro installed the base lift for the public road they moved over the drive and turn lanes of the project. The crew laid Type 3R base for these lanes. The temps were compliant and the equipment and methods used were compliant. 7-8-20 8:32am Way & Sons are on site milling out some bad base at the south east end of the apartment building parking lot. They will not be doing surface for quite some times. CFS is overseeing the mill as well.
Site Visit Partial 7/10/2020 7/10/2020 07/10/2020
Misc
Informational
06/30/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date.
Site Visit Partial 07/13/2020
Misc
Informational
07/10/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time.
Site Visit Partial 07/14/2020
Misc
Informational
07/13/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of.
Site Visit Partial 08/18/2020
Misc
Informational
07/14/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday.
Driveway Inspection Partial 08/19/2020
Misc
Informational
08/19/2020
8-19-20 3:25pm They have the drive set up for concrete. They will be pouring 8-20-20.
Driveway Inspection Partial 08/20/2020
Misc
Informational
08/19/2020
8-19-20 3:25pm They have the drive set up for concrete. They will be pouring 8-20-20. 8-20-20 7:42am The base is set and they are will be pouring at 10am.
Driveway Inspection Passed 8/21/2020 8/21/2020 08/21/2020
Misc
Informational
08/20/2020
8-19-20 3:25pm They have the drive set up for concrete. They will be pouring 8-20-20. 8-20-20 7:42am The base is set and they are will be pouring at 10am. 8-21-20 9:16am They have poured the concrete and saw cut the joints.
Erosion Control Inspection Partial 08/31/2020
Misc
Informational
08/31/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections.
Proof roll parking lot Passed 09/14/2020
Misc
Informational
09/14/2020
9-14-20 9:42am We have proof rolled the North side of the apartments for the trash enclosure. It has passed. They will be using a 4K mix.
Street - Surface Course Partial 9/14/2020 9/14/2020 09/14/2020
Misc
Informational
09/14/2020
9-14-20 3:04pm They are pouring concrete on private road A on the north side of the site. Geiger is supplying the concrete. The superintendent will be sending the tickets in a email.
Site Visit Partial 09/16/2020
Misc
Informational
08/18/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections.
Site Visit Partial 9/17/2020 9/17/2020 09/17/2020
Misc
Informational
09/16/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement.
Site Visit Partial 09/18/2020
Misc
Informational
09/17/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time.
Site Visit Partial 09/21/2020
Misc
Informational
09/18/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time.
Site Visit Partial 10/01/2020
Misc
Informational
09/21/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time.
Site Visit Partial 10/5/2020 10/5/2020 10/05/2020
Misc
Informational
10/01/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time.
Site Visit Partial 10/07/2020
Misc
Informational
10/05/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time.
Site Visit Partial 10/12/2020
Misc
Informational
10/07/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time.
Site Visit Partial 10/15/2020 10/15/2020 10/15/2020
Misc
Informational
10/12/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me.
Site Visit Partial 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
10/15/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time.
Site Visit Partial 10/21/2020 10/21/2020 10/21/2020
Misc
Informational
10/19/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time.
Erosion Control Inspection Partial 10/23/2020
Misc
Informational
08/31/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time.
Site Visit Partial 10/29/2020 10/29/2020 10/29/2020
Misc
Informational
10/21/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time.
Site Visit Partial 10/30/2020 10/30/2020 10/30/2020
Misc
Informational
10/29/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time.
Erosion Control Inspection Partial 10/30/2020 10/30/2020 10/30/2020
Misc
Informational
10/23/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time. 10-30-20 8:18am The erosion controls are in place and are working at this time.
Site Visit Partial 11/2/2020 11/2/2020 11/02/2020
Misc
Informational
10/30/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll.
Curb - Proof Roll Partial 11/4/2020 11/4/2020 11/04/2020
Misc
Informational
11/04/2020
11-4-20 9:34am The proof roll on the west side has passed with a small correction to be made.
Curb - Proof Roll Passed 11/05/2020
Misc
Informational
06/18/2020
6-15-20 3:06pm We are proof rolling at the East side of the building for curb. The proof roll passed. CFS was on site for it and agreed. 6-18-20 ESS, CFS and my self performed a second proof roll at the building on the east side. They had made some corrections. It has passed at this time and is subject for another proof roll if it rains. Rain is forecasted and they have been made aware. 11-4-20 Steve did the proof roll on the north side and it passed. I did the west side and it passed.
Pavement-Curb Construction Partial 11/5/2020 11/5/2020 11/05/2020
Misc
Informational
11/05/2020
11-5-20 10:08am Freedom Concrete is pouring the curb on the west side of the building and the north side. The have been informed to cure it and to make sure its covered evenly. They have everydthing complete and will be setting up inlet throats.
Pavement-Proof Roll Partial 11/6/2020 11/6/2020 11/06/2020
Misc
Informational
11/06/2020
11-6-20 3:18PM The proof Roll passed. The curb is green and might need repaired.
Pavement-Proof Roll Passed 11/07/2020
Misc
Informational
11/06/2020
11-6-20 3:18PM The proof Roll passed. The curb is green and might need repaired.
Street - Wedge Lift Passed 11/7/2020 11/7/2020 11/07/2020
Misc
Informational
11/07/2020
11-7-20 7:15am The curbs have tac and the first truck has arrived. They are using Type 1 for the base. The temperature out of the truck is approximately 300 degrees. Way&Sons is doing the work. They have started on the west side parking stalls. Mike with CFS is on site for testing. 12:29pm They are finishing the west side and will be moving to the north side. 2:18pm They have just put down the last truck load. I have collected the tickets.
Site Visit Partial 11/09/2020
Misc
Informational
11/02/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site.
Erosion Control Inspection Partial 11/10/2020 11/10/2020 11/10/2020
Misc
Informational
10/30/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time. 10-30-20 8:18am The erosion controls are in place and are working at this time. 11-10-20 1:44pm All erosion controls are in place and working at this time.
Site Visit Partial 11/12/2020
Misc
Informational
11/09/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time.
Site Visit Partial 11/16/2020 11/16/2020 11/16/2020
Misc
Informational
11/12/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time.
Site Visit Partial 11/17/2020 11/17/2020 11/17/2020
Misc
Informational
11/16/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed.
Site Visit Partial 11/18/2020
Misc
Informational
11/17/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time.
Site Visit Partial 11/20/2020
Misc
Informational
11/18/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time.
Site Visit Partial 11/23/2020
Misc
Informational
11/20/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time.
Site Visit Partial 11/24/2020 11/24/2020 11/24/2020
Misc
Informational
11/23/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building.
Erosion Control Inspection Partial 11/25/2020 11/25/2020 11/25/2020
Misc
Informational
11/10/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time. 10-30-20 8:18am The erosion controls are in place and are working at this time. 11-10-20 1:44pm All erosion controls are in place and working at this time. 11-25-20 10:14am All erosion controls are in place and working at this time.
Sidewalk Inspection Partial 11/25/2020
Misc
Informational
11/25/2020
11-125-20 10:20am They are pouring sidewalk on west side of the site.
Site Visit Partial 11/30/2020 11/30/2020 11/30/2020
Misc
Informational
11/24/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections.
Site Visit Partial 12/7/2020 12/7/2020 12/07/2020
Misc
Informational
11/30/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time.
Sidewalk Inspection Partial 12/08/2020
Misc
Informational
11/25/2020
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins.
Sidewalk Inspection Partial 12/08/2020
Misc
Informational
12/08/2020
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it.
Site Visit Partial 12/10/2020 12/10/2020 12/10/2020
Misc
Informational
12/07/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time.
Sidewalk Inspection Partial 12/10/2020 12/10/2020 12/10/2020
Misc
Informational
12/08/2020
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced.
Site Visit Partial 12/15/2020 12/15/2020 12/15/2020
Misc
Informational
12/10/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time.
Site Visit Partial 12/16/2020
Misc
Informational
12/15/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather.
Site Visit Partial 12/17/2020
Misc
Informational
12/16/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time.
Site Visit Partial 12/18/2020 12/18/2020 12/18/2020
Misc
Informational
12/17/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 18-18-20 3:18pm no inspections needed.
Site Visit Partial 12/21/2020 12/21/2020 12/21/2020
Misc
Informational
12/18/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time.
Site Visit Partial 12/22/2020 12/22/2020 12/22/2020
Misc
Informational
12/21/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time.
Site Visit Partial 12/23/2020
Misc
Informational
12/22/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time.
Site Visit Partial 12/28/2020 12/28/2020 12/28/2020
Misc
Informational
12/23/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time.
Site Visit Partial 12/29/2020 12/29/2020 12/29/2020
Misc
Informational
12/28/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather.
Site Visit Partial 12/31/2020 12/31/2020 12/31/2020
Misc
Informational
12/29/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time.
Site Visit Partial 01/05/2021
Misc
Informational
12/31/2020
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time.
Site Visit Partial 1/12/2021 1/12/2021 01/12/2021
Misc
Informational
01/05/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time.
Erosion Control Inspection Partial 1/20/2021 1/20/2021 01/20/2021
Misc
Informational
11/25/2020
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time. 10-30-20 8:18am The erosion controls are in place and are working at this time. 11-10-20 1:44pm All erosion controls are in place and working at this time. 11-25-20 10:14am All erosion controls are in place and working at this time. 1-20-21 2:47pm The erosion controls are in place.
Site Visit Partial 01/25/2021
Misc
Informational
01/12/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time.
Site Visit Partial 1/26/2021 1/26/2021 01/26/2021
Misc
Informational
01/25/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow.
Site Visit Partial 2/2/2021 2/2/2021 02/02/2021
Misc
Informational
01/26/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.
Site Visit Partial 02/08/2021
Misc
Informational
02/02/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place.
Site Visit Partial 2/10/2021 2/10/2021 02/10/2021
Misc
Informational
02/08/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up.
Site Visit Partial 02/22/2021
Misc
Informational
02/10/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time.
Site Visit Partial 2/25/2021 02/25/2021
Misc
Informational
02/22/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up.
Site Visit Partial 3/1/2021 3/1/2021 03/01/2021
Misc
Informational
02/25/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time.
Sidewalk Inspection Failed 03/02/2021
Misc
Informational
12/10/2020
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced.
Site Visit Partial 03/02/2021
Misc
Informational
03/01/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour.
Sidewalk Inspection Partial 03/02/2021
Misc
Informational
03/02/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour.
Sidewalk Inspection Partial 03/03/2021
Misc
Informational
03/02/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time.
Sidewalk Inspection Partial 3/4/2021 3/4/2021 03/04/2021
Misc
Informational
03/03/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time.
Sidewalk Inspection Partial 3/5/2021 3/5/2021 03/05/2021
Misc
Informational
03/04/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant.
Sidewalk Inspection Partial 03/06/2021
Misc
Informational
03/05/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts.
Sidewalk Inspection Partial 03/08/2021
Misc
Informational
03/06/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this.
Site Visit Partial 3/9/2021 3/9/2021 03/09/2021
Misc
Informational
03/02/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week.
Sidewalk Inspection Partial 03/10/2021
Misc
Informational
03/08/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door.
Sidewalk Inspection Partial 3/11/2021 3/11/2021 03/11/2021
Misc
Informational
03/10/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building.
Sidewalk Inspection Partial 03/12/2021
Misc
Informational
03/11/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time.
Site Visit Partial 3/15/2021 3/15/2021 03/15/2021
Misc
Informational
03/09/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean.
Erosion Control Inspection Partial 3/16/2021 3/16/2021 03/16/2021
Misc
Informational
01/20/2021
8-31-20 9:36am Rain. I spoke with the superintendent about silt leaving the site and getting into the gutter. He said he will make the necessary corrections. 10-23-20 9:21 Raining. All erosion controls are in place and working at this time. 10-30-20 8:18am The erosion controls are in place and are working at this time. 11-10-20 1:44pm All erosion controls are in place and working at this time. 11-25-20 10:14am All erosion controls are in place and working at this time. 1-20-21 2:47pm The erosion controls are in place. 3-16-21 9:19am The erosion controls appear to be working.
Sidewalk Inspection Partial 3/16/2021 3/16/2021 03/16/2021
Misc
Informational
03/12/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb.
Sidewalk Inspection Partial 03/17/2021
Misc
Informational
03/16/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th.
Sidewalk Inspection Partial 3/18/2021 3/18/2021 03/18/2021
Misc
Informational
03/17/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th. 3-18-21 2:34pm Bottorff has poured curb on the east side of the site and are setting up to pour curb on the west side.
Sidewalk Inspection Partial 3/19/2021 3/19/2021 03/19/2021
Misc
Informational
03/18/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th. 3-18-21 2:34pm Bottorff has poured curb on the east side of the site and are setting up to pour curb on the west side. 7pm Bottorff did not have blankets on the curb a temps were going to drop below freezing. I called Shawn and he had them come out and put blankets down. 3-19-21 7am Bottorff is on site setting up curb around the building. The blankets are on the poured curb. 10:53am They have all the curb forms set and ready to pour. Two of the sidewalk panels that were poured on the west side are out of compliants for ADA. The Forman for Bottorff put his level next to mine and our readings were 2.9 and 2.7 the panels will need to be replaced. 2:30pm The removed the two bad panels and re-poured them. They were going to use white cure and cover with blankets.
Sidewalk Inspection Partial 03/22/2021
Misc
Informational
03/19/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th. 3-18-21 2:34pm Bottorff has poured curb on the east side of the site and are setting up to pour curb on the west side. 7pm Bottorff did not have blankets on the curb a temps were going to drop below freezing. I called Shawn and he had them come out and put blankets down. 3-19-21 7am Bottorff is on site setting up curb around the building. The blankets are on the poured curb. 10:53am They have all the curb forms set and ready to pour. Two of the sidewalk panels that were poured on the west side are out of compliants for ADA. The Forman for Bottorff put his level next to mine and our readings were 2.9 and 2.7 the panels will need to be replaced. 2:30pm The removed the two bad panels and re-poured them. They were going to use white cure and cover with blankets. 3-22-21 9:23am The blankets are still on the curb and sidewalk. I will check the sidewalk for ADA compliants when the blankets are removed.
Sidewalk Inspection Partial 03/23/2021
Misc
Informational
03/22/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th. 3-18-21 2:34pm Bottorff has poured curb on the east side of the site and are setting up to pour curb on the west side. 7pm Bottorff did not have blankets on the curb a temps were going to drop below freezing. I called Shawn and he had them come out and put blankets down. 3-19-21 7am Bottorff is on site setting up curb around the building. The blankets are on the poured curb. 10:53am They have all the curb forms set and ready to pour. Two of the sidewalk panels that were poured on the west side are out of compliants for ADA. The Forman for Bottorff put his level next to mine and our readings were 2.9 and 2.7 the panels will need to be replaced. 2:30pm The removed the two bad panels and re-poured them. They were going to use white cure and cover with blankets. 3-22-21 9:23am The blankets are still on the curb and sidewalk. I will check the sidewalk for ADA compliants when the blankets are removed. 3-23-21 2:45pm The replaced two panels of sidewalk on the west side and they are ADA compliant.
Site Visit Partial 3/26/2021 3/26/2021 03/26/2021
Misc
Informational
03/15/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections.
Sidewalk Inspection Passed 03/29/2021
Misc
Informational
03/23/2021
11-125-20 10:20am They are pouring sidewalk on west side of the site. 12-8-20 8:25am There are two sections of sidewalk that are not ADA compliant. I will discuss this with Steve Robbins. 12-8-20 I spoke with Brett with ESS. I informed him about sidewalk panels out of ASA spec. He said he would let them know to fix it. 12-10-20 3:39pm All of the sidewalk on the west side of the building has been checked for ADA compliance. There are 8 panels that need replaced. 3-2-21 8am Bottorff construction set up and poured sidewalk on the south east corner of the building without a inspection. The cross slop is out of compliance. The sidewalk will need to be removed and replaced. 3-2-21 11:12am Bottorff are removing the sidewalk that is not ADA compliant. They have a section of sidewalk set up in the middle of the parking lot on the east side that is ready to pour. 3-3-21 7:08am They have removed the sidewalk and set forms again. The forms are ADA compliant at this time. 3-4-21 7:32am The sidewalk they poured is ADA compliant. They are now setting up sidewalk on the north west corner. 10:47am They have the forms set and aggregate compacted. It is compliant at this time. 3-5-21 9:42am They are pouring the sidewalk on the north west corner. They have been informed to stay ADA compliant. 3-6-21 7:27am The Forman for Bottorff informed me Friday the 5th that they would need a inspection Saturday the 6th. The forms are set on the south east corner of the building. The aggregate is in and compacted. They have steel in place with grade pins. Geiger is supplying approximately 15 yards of concrete for the pour. They have pulled the sidewalk forms on the north west corner and will be making saw cuts. 3-8-21 7:12am Bottorff is on site removing forms. The grade from the patio to the curb seems excessive. I will be checking on this. 3-10-21 7:10am They have poured the steps and sidewalk going in the south door. 3-11-21 8:30am I met with Shawn on site to talk about sidewalk on the back side of the building. 3-12-21 10:27AM They have not set up the sidewalk on the back side of the site at this time. 3-16-21 2:14pm I walked the site with Shawn and marked out damaged curb and sidewalk. Bottorff is on site to replace the damaged curb. 3-17-21 1:19PM They are not working today due to weather. They are hoping to pour tomorrow the 18th. 3-18-21 2:34pm Bottorff has poured curb on the east side of the site and are setting up to pour curb on the west side. 7pm Bottorff did not have blankets on the curb a temps were going to drop below freezing. I called Shawn and he had them come out and put blankets down. 3-19-21 7am Bottorff is on site setting up curb around the building. The blankets are on the poured curb. 10:53am They have all the curb forms set and ready to pour. Two of the sidewalk panels that were poured on the west side are out of compliants for ADA. The Forman for Bottorff put his level next to mine and our readings were 2.9 and 2.7 the panels will need to be replaced. 2:30pm The removed the two bad panels and re-poured them. They were going to use white cure and cover with blankets. 3-22-21 9:23am The blankets are still on the curb and sidewalk. I will check the sidewalk for ADA compliants when the blankets are removed. 3-23-21 2:45pm The replaced two panels of sidewalk on the west side and they are ADA compliant
Site Visit Partial 03/30/2021
Misc
Informational
03/26/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time.
Site Visit Partial 03/30/2021
Misc
Informational
03/30/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation.
Site Visit Partial 03/31/2021
Misc
Informational
03/30/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building.
Site Visit Partial 4/2/2021 4/2/2021 04/02/2021
Misc
Informational
03/31/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th.
Street - Surface Course Partial 4/5/2021 04/06/2021
Misc
Informational
09/14/2020
9-14-20 3:04pm They are pouring concrete on private road A on the north side of the site. Geiger is supplying the concrete. The superintendent will be sending the tickets in a email. 4-5-21 8:02am Way & Sons are on site grinding on the asphalt base to prepare for surface. 9:07am They are sweeping and will be laying asphalt in approximately 1 hour. They are starting on the North end of the site and will work there way to the east side of the site. 9:32am The first truck as arrived. The temperature out of the truck is 270 degrees. The temperature behind the paver is 295 degrees. They are using Type 3.
Street - Surface Course Partial 4/6/2021 04/06/2021
Misc
Informational
04/06/2021
9-14-20 3:04pm They are pouring concrete on private road A on the north side of the site. Geiger is supplying the concrete. The superintendent will be sending the tickets in a email. 4-5-21 8:02am Way & Sons are on site grinding on the asphalt base to prepare for surface. 9:07am They are sweeping and will be laying asphalt in approximately 1 hour. They are starting on the North end of the site and will work there way to the east side of the site. 9:32am The first truck as arrived. The temperature out of the truck is 270 degrees. The temperature behind the paver is 295 degrees. They are using Type 3. 4-6-21 8:17am Way & Sons are on site prepping the NW side of the site for surface asphalt. They have the tac down and will be laying asphalting in approximately 1 hour. CFS is on site for testing. 76 Degrees for the high today. They have made repairs to the base asphalt and are now laying surface. 10:50am Way & Sons are on the north side and working there way to the west side parking lot. 3:20pm They have finished on the west side of the site and are now in Firebirds parking to fill in the north west corner. They will be patching a small section on private road B. 3:39pm The asphalt truck has arrived to fill in the parking lot. 4:13pm Firebirds parking lot is done and they have just finished the patch on private road B. Way & Sons are now cleaning up the area. There is a overcast and rain is expected.
Street - Surface Course Passed 04/07/2021
Misc
Informational
04/06/2021
9-14-20 3:04pm They are pouring concrete on private road A on the north side of the site. Geiger is supplying the concrete. The superintendent will be sending the tickets in a email. 4-5-21 8:02am Way & Sons are on site grinding on the asphalt base to prepare for surface. 9:07am They are sweeping and will be laying asphalt in approximately 1 hour. They are starting on the North end of the site and will work there way to the east side of the site. 9:32am The first truck as arrived. The temperature out of the truck is 270 degrees. The temperature behind the paver is 295 degrees. They are using Type 3. 4-6-21 8:17am Way & Sons are on site prepping the NW side of the site for surface asphalt. They have the tac down and will be laying asphalting in approximately 1 hour. CFS is on site for testing. 76 Degrees for the high today. They have made repairs to the base asphalt and are now laying surface. 10:50am Way & Sons are on the north side and working there way to the west side parking lot. 3:20pm They have finished on the west side of the site and are now in Firebirds parking to fill in the north west corner. They will be patching a small section on private road B. 3:39pm The asphalt truck has arrived to fill in the parking lot. 4:13pm Firebirds parking lot is done and they have just finished the patch on private road B. Way & Sons are now cleaning up the area. There is a overcast and rain is expected.
Site Visit Partial 04/07/2021
Misc
Informational
04/02/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time.
Site Visit Partial 04/21/2021
Misc
Informational
04/07/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building.
Site Visit Partial 4/23/2021 04/23/2021
Misc
Informational
04/21/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed.
Site Visit Partial 04/26/2021
Misc
Informational
04/23/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed.
Site Visit Partial 04/27/2021
Misc
Informational
04/26/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed. 4-27-21 11:15am The site is clean and there are no inspections needed at this time.
Site Visit Partial 04/28/2021
Misc
Informational
04/27/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed. 4-27-21 11:15am The site is clean and there are no inspections needed at this time. 4-28-21 11:45am The site is clean of debris.
Site Visit Partial 5/4/2021 05/04/2021
Misc
Informational
04/28/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed. 4-27-21 11:15am The site is clean and there are no inspections needed at this time. 4-28-21 11:45am The site is clean of debris. 5-4-21 11:28am They are landscaping and the site is clean.
Water Line - Hydrostatic Test Passed 06/03/2021
Misc
Informational
06/03/2020
6-3-20 The 8” line has passed.
Site Visit Partial 6/15/2021 06/15/2021
Misc
Informational
05/04/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed. 4-27-21 11:15am The site is clean and there are no inspections needed at this time. 4-28-21 11:45am The site is clean of debris. 5-4-21 11:28am They are landscaping and the site is clean. 6-15-21 11am There is no cleaning taking place at this time.
Site Visit Partial 7/6/2021 07/06/2021
Misc
Informational
06/15/2021
6-30-20 8:22am The fire department is on site. I was told that a gas line got broken. There are no inspections needed at this time. 7-10-20 11:41am ESS are working on the valve boxes. They have to raise them. They are still forming them up and will pour them at a later date. 7-13-20 7:49am ESS are working on the vaults at the SE corner of the site. No other inspections are needed at this time. 7-14-20 8:39am I spoke with the superintendent for Brinkmann about grouting the vaults. He said it would be taken care of. 8-18-20 I met with Brinkmann on site to go over the plan for private road C. The base is good and they will be pouring Thursday. 9-16-20 9:42am There is no work being done at this time that requires inspections. 9-17-20 11:07am There are no inspections needed at this time. I will be talking to the superintendent about erosion control placement. 9-18-20 10:33am The work being done does not required inspections at this time. 9-21-20 1:23pm There are no inspections needed at this time. 10-1-20 9:20am There is no work that requires inspection at this time. 10-5-20 3:18pm No inspections need at this time. 10-7-20 1:10pm There are no inspections needed at this time. 10-12-20 9:01am They are keeping cars off the open road and the streets are clean. There are no inspections needed at this time. 10-15-20 3:11pm The work taking place does not require inspections from me. 10-19-20 2:00pm There are no inspections needed at this time. 10-21-20 9:19AM No inspections are needed at this time. 10-29-20 9:34am There are no inspections needed at this time. 10-30-20 8:17am No inspections needed at this time. 11-2-20 9:33am I spoke with the superintendent about laying the base rock on the west side of the site. ESS is doing the work and will call for a proof roll. 11-9-20 1:47pm ESS are backfilling the curbs on the West side of the site. 11-12-20 3:22pm No inspections are needed at this time. 11-16-20 There are no inspections needed at this time. 11-17-20 3:27pm No inspections needed. 11-18-20 11:01am No inspections are needed at this time. 11-20-20 9:23am There are no inspections needed at this time. 11-23-20 10:09am The work taking place does not require any inspections from me at this time. 11-24-20 8:28am Bottorff Construction is on site setting up sidewalk on the west side of the building 11-30-20 9:01am The work taking place does not require any inspections. 12-7-20 10:14am There is no work on site that requires inspections at this time. 12-10-20 3:24pm No inspections needed at this time. 12-15-20 1:22PM The work being done needs no inspections at this time. 12-16-20 8:44am They poured slabs on the east side of the building on 12-15-20. They have them covered with blankets do to weather. 12-17-20 2:10pm The activity taking place on site does not require inspections at this time. 12-18-20 3:18pm no inspections needed. 12-21-20 2:08pm No inspections are needed at this time. 12-22-20 8:48am No work is taking place that requires inspections at this time. 12-23-20 11:27am No inspections are needed at this time. 12-28-20 10:38am No inspections needed at this time. 12-29-20 11:10am There is no work due to weather. 12-31-20 1:01pm No inspections needed at this time. 1-5-21 8:56am The work taking place does not require inspections at this time. 1-12-21 10:11am There are no inspections needed at this time. 1-25-21 10:07am There is no work taking place that requires inspections at this time. 1-26-21 8:15am There are no inspections needed at this time. The site is frozen with light snow. 2-2-21 9:33am There is debris around the site that needed addressed. There are no inspections needed at this time.] 2-8-21 8:15am There is no work taking place. 2-10-21 9:24am Light snow. The work taking place is inside the building. When weather allows the site will need to be cleaned up. 2-22-21 7:17am There are no inspections needed at this time. The site still needs to be picked up. The ground is frozen at this time. 2-25-21 7:46am The site still needs to be cleaned up. 3-1-21 8:55am There are no inspections needed at this time. 3-2-21 9:46am I spoke with Shawn about the sidewalk at the south west corner being out of compliance. I conveyed to him that the sub contractor’s need to notify me when they are set up and ready for a pour. 3-9-21 9:39am The site to the north west has been cleaned up. ESS will be doing grading later this week. 3-15-21 8:15am The work taking place is inside the building. The site is clean. 3-26-21 8:39am There is no work taking place that requires inspections. 3-30-21 9:03am They have done some grainding. They have not cleaned the base asphalt for surface at this time. 11:18am They are working on installing irrigation. 3-31-21 11:01am Next To Nature Landscape is on site planting trees. There are crews sealing the sidewalk on the east side of the building. 4-2-21 11:32am No inspections are needed at this time. I spoke with Shawn the superintendent and they will be laying asphalt on Monday the 5th and 7th. 4-7-21 10:10am The site is clean and there are no inspections needed at this time. 4-21-21 9:57am Next To Nature Landscape are on site laying sod around the building. 4-23-21 9:43am The site is picked up and no inspections are needed. 4-26-21 11:05am The landscapers are on site. No inspections are needed. 4-27-21 11:15am The site is clean and there are no inspections needed at this time. 4-28-21 11:45am The site is clean of debris. 5-4-21 11:28am They are landscaping and the site is clean. 6-15-21 11am There is no cleaning taking place at this time. 7-6-21 9:22am The signs are not up and the silt fence has not been removed from the inlet on the north east side.
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home