Permit Application Status

PRSITE20183577


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20183577
Development - Site
Final Acceptance
L & M INVESTMENTS LLC
DEVELOPMENT COMPLETE
FULL SITE DEVELOPMENT
10/17/2018
03/20/2019
11/04/2019
Locations
Contacts
L & M INVESTMENTS LLC, Address:301 DUCK RD  
AL HUBER, Address:10770 EL MONTE, Phone:(913) 341-4880  
KDORRIAN@ASHUBER.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 10/17/2018 01/07/2019
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 11/28/2018
91100C8-Sanitary Sewer Insp Fees $545.70 $545.70 Paid 11/28/2018
91100C9-Water Insp Fee $744.78 $744.78 Paid 11/28/2018
9110072-Water Test Fee $200.00 $200.00 Paid 11/28/2018
9110068-Storm Fee $911.31 $911.31 Paid 11/28/2018
9110081-Paved Surface Inspection Fee $4,656.05 $4,656.05 Paid 11/28/2018
9110071-Site Grading Fee $1,183.95 $1,183.95 Paid 11/28/2018
8331401-Water Tap Fee $9,102.00 $9,102.00 Paid 11/28/2018
8350015-Water Meter Fee $656.17 $656.17 Paid 11/28/2018
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $260.00 $0.00 $260.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $462.50 $0.00 $462.50 Not Paid



(None of the fees owing can be paid online)
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Partial 3/13/2019 03/20/2019
Informational
03/20/2019
Contractor was Grading site as per plans. I meet with Brain Thomas Supperintendent/Project Manager Co. A.L. Huber. John Jackson 03/20/2019 3:15 PM
Storm - Pipe Partial 05/10/2019
Informational
05/09/2019
Contractor installed Approximately 40' feet of 18" HDPE, began installation of Nyloplast Manhole, and approximately 32' more of 18" HDPE.
Storm - Pipe Partial 5/10/2019 05/10/2019
Informational
05/10/2019
Contractor layed 18" HDPE pipe into newly installed Curb Inlet Str. 1-2 ,and approximately 97' of 30" HDPE to Junction Box Str. 1-3. Contractor continued installing 30" HDPE from Junction box approximately 40'. ( Icon Construction is the contractor installing storm sewer main).
Storm - Pipe Partial 05/11/2019
Misc
Informational
05/11/2019
Contractor (Icon Grading & Cons.)continued to install 30” HDPE storm sewer main. Contractor had to adjust 3” copper domestic main to continue installation of 30” HDPE storm sewer main. Storm sewer main line one installed. Collar and invert ar schedule to be poured Monday 5/13/19.
Storm - Outlet Structure Passed 5/13/2019 5/13/2019 05/13/2019
Misc
Informational
05/13/2019
Contractor poured collars and inverts on storm box 1-2 and junction box 1-3.
Storm - Material Verification Passed 5/9/2019 05/14/2019
Misc
Informational
05/14/2019
Materials passed.
Sanitary Sewer Construction Inspection Partial 06/24/2019
Misc
Informational
06/24/2019
Contractor began to bore under Independence Ave to install 4” PVC SDR - 26 sanitary main to existing 8” sanitary main .
Misc
Informational
06/24/2019
Contractor began to bore under Independence Ave to install 4” PVC SDR - 26 sanitary main to existing 8” sanitary main .
Misc
Informational
06/25/2019
Contractor began to bore under Independence Ave to install 4” PVC SDR - 26 sanitary main to existing 8” sanitary main .
Misc
Informational
06/25/2019
Icon construction installed encasement under Indeoendence Ave to lay 4” PVC SDR - 26 sanitary service to connect with 8”x4” wye .
Sanitary Sewer Construction Inspection Partial 7/2/2019 06/26/2019
Misc
Informational
06/26/2019
Contractor installed approximately 161’ of 4” SDR - 26 sanitary main. 42’ of 8”encasement piping with 8x2 4” casing spacers. ICON supervisor will send pictures of 8x4 wye installation into exiting main. Contractor will send picture of sewer tie-in.
Water Line - Construction Inspection Partial 07/02/2019
Misc
Informational
06/24/2019
ICON construction began boring under NE Pavestone Drive to install 12” encasement for 6” PVC water pipe to be installed. Jeremy Young of LS water was emailed to schedule test shut for 8” water main to install 8”x6” Tee to connect with 6” water line to bore.
Misc
Informational
07/02/2019
Test shut 16” main 11:45 AM to 1:00 PM to install 8X6 tee and 6” valve to existing 8” main for 8PM shut . All business were notified of shut.
Misc
Informational
07/02/2019
The 8” water main was actual a 12” main , so a 12”X8” Tee was installed with and 8”X6” reducer & 6” valve that couples into the newly installed 6” water main . Main was flushed after tie-in was completed .
Water Line - Construction Inspection Partial 07/09/2019
Misc
Informational
07/09/2019
Contractor installed hydrant and poured backing blocks and straddle block . One of the backing blocks behind 12”X8” Tee and one behind the newly installed hydrant and one straddle .
Sanitary Sewer Construction Inspection Partial 07/11/2019
Misc
Informational
07/11/2019
Contractor installed approximately 161’ of 4” SDR - 26 sanitary main. 42’ of 8”encasement piping with 8x2 4” casing spacers. ICON supervisor will send pictures of 8x4 wye installation into exiting main. Contractor will send picture of sewer tie-in.
Misc
Informational
07/11/2019
7/11/19 Contractor installed approximately 120’ of 4” SDR-26 sanitary lines . Two clean out with wyes were installed 45 Degree bend , near the main and 22 Degree bend before the clean out near the building .
Water Line - Construction Inspection Partial 7/15/2019 07/17/2019
Misc
Informational
07/15/2019
ICON Construction chlorinated water line approximately 100' @ 3:30 PM . John Jackson 07/15/2019 4:25 PM
Misc
Informational
07/16/2019
Under direction of (Redford Const.) water main was chlorinated and dechlorinated. John Jackson 07/16/2019 4:00PM
Misc
Informational
07/17/2019
Water sample was collected @ approximately 8:50 AM .
Curb - Proof Roll Passed 8/22/2019 08/22/2019
Informational
08/22/2019
Curb proof roll was done by 3rd party, contractor will pass on paper to me. A visual inspection was done and curbs passed inspection grouting areas that had been done by hand. John Jackson 08/22/2019 4:31 PM
Pavement-Curb Construction Passed 8/22/2019 08/22/2019
Informational
08/22/2019
Newly installed curbs passed visual inspection. John Jackson 08/22/2019 4:33 PM
Proof roll parking lot Passed 8/22/2019 08/22/2019
Informational
08/22/2019
Proof roll of parking lot passed.John Jackson 08/22/2019 4:37 PM
Driveway Inspection Partial 8/23/2019 08/23/2019
Informational
08/23/2019
Contractor began pouring conrete portion of parking lot & Driveway and continued prepping other areas for concrete pour or asphalt laying. Asphalt installation is schedule for 8/26/19. John Jackson 08/23/2019 3:15 PM
Water Line - Tapping Sleeve Passed 9/6/2019 09/09/2019
Informational
09/09/2019
Water tap 12" water main so the contractor Icon could run a 2" domestic water line to the water meter. From the meter connect to the building.
Driveway Inspection Passed 9/5/2019 09/09/2019
Informational
09/09/2019
Concrete Parking Lot was poured in the rear of building & Asphalt was layed in the front of business.
Misc
Informational
09/09/2019
Contractor completed pouring driveway approach on Friday 9/6/19 and asphalted patch & repaired street on 9/9/19.
Water - Material Verification Passed 09/26/2019
Water Line - Hydrostatic Test Passed 09/26/2019
Water Line - Coliform Test 1 Passed 09/26/2019
Water Line - Coliform Test 2 Passed 09/26/2019
Water Line - Fire Hydrant Passed 09/26/2019
Water Line - Thrust Restraint Passed 09/26/2019
Water Line - Construction Taps Removed Passed 09/26/2019
Site Visit Complete 09/26/2019
Misc
Informational
08/30/2019
8-30-19 11:48am Rain has stoped. There is no activity on site at this time. There is silt fence down and it will need to be corrected.
Site Visit Complete 09/26/2019
Misc
Informational
08/30/2019
8-30-19 11:48am Rain has stoped. There is no activity on site at this time. There is silt fence down and it will need to be corrected.
Driveway Inspection Passed 09/26/2019
Sanitary Sewer Construction Inspection Passed 09/26/2019
Misc
Informational
06/24/2019
Contractor began to bore under Independence Ave to install 4” PVC SDR - 26 sanitary main to existing 8” sanitary main .
Misc
Informational
06/24/2019
Contractor began to bore under Independence Ave to install 4” PVC SDR - 26 sanitary main to existing 8” sanitary main .
Storm - Inlets Clean Passed 09/26/2019
Erosion Control Inspection Passed 09/26/2019
Curb - Proof Roll Passed 09/26/2019
Driveway Inspection Passed 09/26/2019
Informational
03/20/2019
Contractor was Grading site as per plans. I meet with Brain Thomas Supperintendent/Project Manager Co. A.L. Huber. John Jackson 03/20/2019 3:15 PM
Water Line - Valve Passed 09/26/2019
Pavement-Surface Passed 09/26/2019
Storm - Rip Rap Passed 09/26/2019
Storm - Swales Passed 09/26/2019
Sewer Service Inspection Passed 09/26/2019
Retaining Wall Inspection Passed 09/26/2019
Water - Material Verification Passed 09/26/2019
Water Line - Construction Inspection Passed 09/26/2019
Sewer Service Inspection Passed 09/26/2019
Storm - Inlets Clean Passed 9/26/2019 09/26/2019
ESC - (Vegetation/Ground Cover) Partial 9/27/2019 09/27/2019
Informational
09/27/2019
Vegetation needs to be establish on two off site location where Storm Sewer Main and Water Tie-in was performed.
Retaining Wall Inspection Passed 10/11/2019
Grading/Excavation/Fill Inspection Passed 10/11/2019
ESC - (Vegetation/Ground Cover) Passed 9/26/2019 11/01/2019
Grading/Excavation/Fill Inspection Passed 3/26/2019 11/01/2019
Informational
03/27/2019
Contractor continued the grading of site.
ESC - (Vegetation/Ground Cover) Passed 11/1/2019 11/01/2019
Documents & Images
Date Uploaded File Type Document Name
11/28/2018 Receipt Receipt for transaction: 2018-007373
01/09/2019 Letter DE-Permit
03/20/2019 Permit -Site IBC
03/20/2019 Letter DE-Daily Inspection Summary
03/27/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter DE-Daily Inspection Summary
05/10/2019 Letter DE-Daily Inspection Summary
05/11/2019 Letter INSPECTION SUMMARY
05/11/2019 Letter INSPECTION SUMMARY
05/11/2019 Letter INSPECTION SUMMARY
05/11/2019 Letter INSPECTION SUMMARY
05/11/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
06/24/2019 Letter INSPECTION SUMMARY
06/25/2019 Letter INSPECTION SUMMARY
06/26/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter DE-Daily Inspection Summary
07/02/2019 12X8 TEE TIE - IN
07/09/2019 Letter INSPECTION SUMMARY
07/09/2019 Letter INSPECTION SUMMARY
07/09/2019 Letter INSPECTION SUMMARY
07/11/2019 image IBC 4” Sanitary
07/15/2019 Letter DE-Daily Inspection Summary
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 Letter INSPECTION SUMMARY
08/22/2019 Letter DE-Daily Inspection Summary
08/22/2019 Letter DE-Daily Inspection Summary
08/22/2019 Letter DE-Daily Inspection Summary
08/23/2019 Letter DE-Daily Inspection Summary
08/30/2019 Letter INSPECTION SUMMARY
09/09/2019 Letter DE-Daily Inspection Summary
09/26/2019 Letter INSPECTION SUMMARY
09/27/2019 Letter DE-Certificate of Substantial Completion Multiple Lot
10/11/2019 IBC signed certificated of substantial
10/11/2019 IBC signed punch list
11/01/2019 Letter DE-Certificate of Final Acceptance (Commercial)
11/01/2019 scan_99694_2019-11-01-09-35-19
12/07/2020 Letter DE-Certificate of Final Acceptance (Commercial)
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter DE-Daily Inspection Summary
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter DE-Punch List
12/07/2020 Letter DE-Punch List
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter DE-Certificate of Substantial Completion Multiple Lot
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
12/07/2020 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home