Permit Application Status

PRSITE20183167


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSITE20183167
Development - Site
Final Acceptance
TOWNSEND SUMMIT LLC
DEVELOPMENT COMPLETE
FULL SITE DEVELOPMENT FOR APARTMENT COMPLEX
09/18/2018
11/21/2018
03/09/2021
Locations
Contacts
EMERY SAPP AND SONS INC, Address:2301 I-70 DR NW, Phone:(573) 445-8331  
TOWNSEND SUMMIT LLC, Address:1311 MCCORMICK RD STE 470, Phone:(303) 947-2044  
CITY OF LEES SUMMIT MO, Address:220 SE GREEN ST  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 09/18/2018 09/18/2018
Mike Weisenborn
Fees
Paid Fees Amount Paid Owing Date Paid
91100C8-Sanitary Sewer Insp Fees $1,125.83 $1,125.83 Paid 09/28/2018
91100C9-Water Insp Fee $4,829.52 $4,829.52 Paid 09/28/2018
9110072-Water Test Fee $400.00 $400.00 Paid 09/28/2018
9110068-Storm Sewer Inspection Fee $14,245.27 $14,245.27 Paid 09/28/2018
9110081-Paved Surface Inspection Fee $20,401.53 $20,401.53 Paid 09/28/2018
9110071-Site Grading Fee $8,925.54 $8,925.54 Paid 09/28/2018
Outstanding Fees Amount Paid Owing Date Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $370.00 $0.00 $370.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $150.00 $0.00 $150.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $22.50 $0.00 $22.50 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $22.50 $0.00 $22.50 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $150.00 $0.00 $150.00 Not Paid
9110069-After Hours Inspections (Public Works)(Per Hour) $100.00 $0.00 $100.00 Not Paid


$815.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Thrust Restraint Partial 12/13/2018 12/18/2018
Misc
Informational
12/18/2018
Joe Starlin 12/18/2018 7:40 AM On building 1 and 5 thrust blocks have been installed at the building.
Misc
Informational
04/16/2019
5-16-19 All thrust restraints are in for the fire line.
Sanitary Sewer Construction Inspection Partial 2/12/2019 at 12:30 PM 02/12/2019
Misc
Informational
02/12/2019
The contractor dug up the existing public MH that is located on Donovan rd. They also had to remove a small section of storm pipe in order to put there shoring in the trench. The contractor core drilled into the MH and inserted a boot in order to connect the private 8" sanitary line to the existing MH.Steve Robbins 02/12/2019 4:00 PM
Sanitary Sewer Construction Inspection Partial 02/13/2019
Misc
Informational
02/13/2019
2-13-19 The crew laid approximately 100’ of sanitary line. Manhole 1-B is set.
Sanitary Sewer Construction Inspection Partial 2/13/2019 at 2:30 PM 02/21/2019
Misc
Informational
02/21/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Sanitary Sewer Construction Inspection Partial 02/26/2019
Misc
Corrective Action Required
02/26/2019
2-25-19 The crew installed approximately 30 ft. sanitary line starting at manhole 2B. They are working on inverts.
Storm - Pipe Partial 02/28/2019
Misc
Informational
02/28/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Storm - Pipe Partial 02/28/2019
Misc
Informational
02/28/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
02/28/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Storm - Pipe Partial 03/01/2019
Misc
Informational
02/28/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
02/28/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/01/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Storm - Pipe Partial 03/01/2019
Misc
Informational
03/01/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/01/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/01/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/01/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Sanitary Sewer Construction Inspection Partial 03/02/2019
Misc
Informational
02/26/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Misc
Informational
03/02/2019
3-2-19 7am The crew for Sapp are laying sanitary line starting at 2-B the air temp is at 24 degrees.
Misc
Informational
03/02/2019
3-2-19 28 degrees. The crew placed approximately 210 feet of sanitary line and back filled with loader and sheep’s foot. Storm boxes were also back filled.
Storm - Pipe Partial 03/06/2019
Misc
Informational
03/01/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/01/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/01/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/01/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/06/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Storm - Pipe Partial 3/7/2019 03/07/2019
Misc
Informational
03/06/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/06/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/06/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/06/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/06/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/07/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Storm - Pipe Partial 03/11/2019
Misc
Informational
03/07/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/07/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/07/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/07/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/07/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/07/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/11/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Site Visit/Devices Installed Passed 4/5/2019 03/12/2019
Misc
Informational
03/12/2019
3-12-19 The Sapp crew are trying to shoot some grades but rain is setting in. They are most likely done for the day.
Storm - Pipe Partial 03/14/2019
Misc
Informational
03/11/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/11/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/11/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/11/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/11/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/11/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/11/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/14/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Storm - Pipe Partial 03/15/2019
Misc
Informational
03/14/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/14/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/14/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/14/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/14/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/14/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/14/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/14/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/15/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Storm - Pipe Partial 3/18/2019 03/19/2019
Misc
Informational
03/15/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/15/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/15/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/15/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/15/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/15/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/15/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/15/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/15/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/19/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Storm - Pipe Partial 03/19/2019
Misc
Informational
03/19/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/19/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/19/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/19/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/19/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/19/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/19/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/19/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/19/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/19/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/19/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Storm - Pipe Partial 03/20/2019
Misc
Informational
03/19/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/19/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/19/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/19/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/19/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/19/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/19/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/19/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/19/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/19/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/19/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/20/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Storm - Pipe Partial 03/21/2019
Misc
Informational
03/20/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/20/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/20/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/20/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/20/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/20/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/20/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/20/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/20/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/20/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/20/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/20/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/21/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Storm - Pipe Partial 03/21/2019
Misc
Informational
03/21/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/21/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/21/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/21/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/21/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/21/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/21/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/21/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/21/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/21/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/21/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/21/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/21/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/21/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Storm - Pipe Partial 03/25/2019
Misc
Informational
03/21/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/21/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/21/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/21/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/21/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/21/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/21/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/21/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/21/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/21/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/21/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/21/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/21/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/21/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Misc
Informational
03/22/2019
The SAPP crew had installed approx 40ft of storm line from A2.
Misc
Informational
03/22/2019
3-23-19 The Sapp crew placed box A-3 and laid storm pipe from A-2 to A-3. Collars will have to be poured. The top to A-2 is damaged and will need replaced.
Misc
Informational
03/25/2019
3-25-19 The crew placed box G-1, G-2, and G-3 along with pipe and back filled. They will try to pour collars today as well.
Storm - Pipe Partial 3/26/2019 03/26/2019
Misc
Informational
03/25/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/25/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/25/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/25/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/25/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/25/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/25/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/25/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/25/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/25/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/25/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/25/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/25/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/25/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Misc
Informational
03/25/2019
The SAPP crew had installed approx 40ft of storm line from A2.
Misc
Informational
03/25/2019
3-23-19 The Sapp crew placed box A-3 and laid storm pipe from A-2 to A-3. Collars will have to be poured. The top to A-2 is damaged and will need replaced.
Misc
Informational
03/25/2019
3-25-19 The crew placed box G-1, G-2, and G-3 along with pipe and back filled. They will try to pour collars today as well.
Misc
Informational
03/26/2019
3-26-19 The collars on the G line appear to have been poured and are covered in rock.
Storm - Pipe Partial 3/27/2019 03/27/2019
Misc
Informational
03/26/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/26/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/26/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/26/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/26/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Misc
Informational
03/26/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/26/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/26/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/26/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/26/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/26/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/26/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/26/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/26/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/26/2019
The SAPP crew had installed approx 40ft of storm line from A2.
Misc
Informational
03/26/2019
3-23-19 The Sapp crew placed box A-3 and laid storm pipe from A-2 to A-3. Collars will have to be poured. The top to A-2 is damaged and will need replaced.
Misc
Informational
03/26/2019
3-25-19 The crew placed box G-1, G-2, and G-3 along with pipe and back filled. They will try to pour collars today as well.
Misc
Informational
03/26/2019
3-26-19 The collars on the G line appear to have been poured and are covered in rock.
Misc
Informational
03/27/2019
3-27-19 10:15am The Sapp crew have set box H-1 and ran pipe from G-4 to H-1. 2:45pm The crew have set box G-4 and are placing pipe. They will be pouring collars and covering with rock.
Storm - Pipe Partial 3/28/2019 03/28/2019
Misc
Informational
03/27/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/27/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/27/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/27/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/27/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Misc
Informational
03/27/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/27/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/27/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/27/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/27/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/27/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/27/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/27/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/27/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/27/2019
The SAPP crew had installed approx 40ft of storm line from A2.
Misc
Informational
03/27/2019
3-23-19 The Sapp crew placed box A-3 and laid storm pipe from A-2 to A-3. Collars will have to be poured. The top to A-2 is damaged and will need replaced.
Misc
Informational
03/27/2019
3-25-19 The crew placed box G-1, G-2, and G-3 along with pipe and back filled. They will try to pour collars today as well.
Misc
Informational
03/27/2019
3-26-19 The collars on the G line appear to have been poured and are covered in rock.
Misc
Informational
03/27/2019
3-27-19 10:15am The Sapp crew have set box H-1 and ran pipe from G-4 to H-1. 2:45pm The crew have set box G-4 and are placing pipe. They will be pouring collars and covering with rock.
Misc
Informational
03/28/2019
3-28-19 The crew have placed box G-4 and running approximately 80ft of pipe to box G-5.
Water Line - Construction Inspection Partial 04/09/2019
Misc
Informational
04/09/2019
4-9-19 The Sapp crew have placed approximately 210 feet of 8” water line.
Water Line - Construction Inspection Partial 4/22/2019 at 3:10 PM 04/10/2019
Misc
Informational
04/10/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Informational
04/22/2019
Joe Starlin 04/22/2019 3:54 PM The Sapp crew placed 40' of 8" water line and back filled. They also placed two risers in building no.4.
Water Line - Construction Inspection Partial 4/11/2019 04/11/2019
Misc
Informational
04/10/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/11/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Water Line - Construction Inspection Partial 4/11/2019 04/12/2019
Misc
Informational
04/12/2019
4-12-19 The crew have poured kickers and are working on fire line. John Jackson will follow up later today.
Water Line - Construction Inspection Partial 4/12/2019 at 2:05 PM 04/15/2019
Misc
Informational
04/12/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/12/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/15/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Water Line - Construction Inspection Partial 4/15/2019 04/15/2019
Misc
Informational
04/15/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/15/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/15/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/15/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Water Line - Construction Inspection Partial 04/16/2019
Misc
Informational
04/15/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/15/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/15/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/15/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
04/16/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Sanitary Sewer - Mandrel Partial 04/18/2019
Misc
Informational
04/18/2019
4-17-19 The Sapp crew pulled the mandrel from station 13+86.71 to 12+00. John Jackson preformed this inspection. The mandrel was then pulled from station 12+00 to 10+00. The inspection for this was preformed by Joe Starlin. It has passed at these locations.
Misc
Corrective Action Required
08/09/2019
8/8/9 Contractor needs to grind down invert at Manhole 2C to complete mandrel test for line #2. Mandrel was successful complete through all other manholes and 8”PVC SDR-26 piping.
Water Line - Construction Inspection Partial 4/22/2019 at 3:10 PM 04/22/2019
Misc
Informational
04/16/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/16/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/16/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/16/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
04/16/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
04/22/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Water Line - Construction Inspection Partial 04/23/2019
Misc
Informational
04/22/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/22/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/22/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/22/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
04/22/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
04/22/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
04/23/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Water Line - Construction Inspection Partial 04/24/2019
Misc
Informational
04/23/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/23/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/23/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/23/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
04/23/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
04/23/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
04/23/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
04/24/2019
The crew placed fire line and domestic water line out of the building.
Driveway Inspection Partial 04/25/2019
Misc
Informational
04/25/2019
The Sapp crew have set up both approaches and they appear to be in spec.
Misc
Informational
04/25/2019
4-25-19 The Sapp crew have poured the approache on the east side and are currently pouring the approache on the west side.
Sanitary Sewer Construction Inspection Partial 3/8/2019 05/06/2019
Misc
Informational
03/02/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Misc
Informational
03/02/2019
3-2-19 7am The crew for Sapp are laying sanitary line starting at 2-B the air temp is at 24 degrees.
Misc
Informational
03/02/2019
3-2-19 28 degrees. The crew placed approximately 210 feet of sanitary line and back filled with loader and sheep’s foot. Storm boxes were also back filled.
Misc
Informational
04/26/2019
4-26-19 The Sapp crew are digging out to place the last of the sanitary line along with the last manhole.
Misc
Informational
05/06/2019
Joe Starlin 05/06/2019 7:10 AM The crew placed 51' of sanitary line to manhole 2-C. They ran the service line out of 2-C manhole to the building. The have done the encasement as well.
Water Line - Construction Inspection Partial 5/6/2019 05/06/2019
Misc
Informational
05/06/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/06/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/06/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/06/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/06/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/06/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/06/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/06/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/06/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/06/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/06/2019
5-6-19 They have placed 130’ of water line.
Water Line - Construction Inspection Partial 05/09/2019
Misc
Informational
05/06/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/06/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/06/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/06/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/06/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/06/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/06/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/06/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/06/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/06/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/06/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/09/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Site Visit/Devices Installed Passed 05/10/2019
Misc
Informational
04/24/2019
4-24-19 I gave a set of Utility plan 1 to Rudy the Forman for Sapp 10:15am
Misc
Informational
05/10/2019
5-10-19 We performed a water test shutdown for Ward road.
Water Line - Construction Inspection Partial 05/10/2019
Misc
Informational
05/09/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/09/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/09/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/09/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/09/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/09/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/09/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/09/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/09/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/09/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/09/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/09/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/10/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Water Line - Construction Inspection Partial 5/11/2019 05/13/2019
Misc
Informational
05/10/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/10/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/10/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/10/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/10/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/10/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/10/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/10/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/10/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/10/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/10/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/10/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/10/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
05/13/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Sidewalk Inspection Partial 05/14/2019
Misc
Informational
05/14/2019
5-14-19 The Sapp crew formed up sidewalk along NW Tudor Road. All forms were in spec and aggregate was compacted. They are using 4K mix and white cure.
Water Line - Construction Inspection Partial 5/14/2019 05/14/2019
Misc
Informational
05/13/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/13/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/13/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/13/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/13/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/13/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/13/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/13/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/13/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/13/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/13/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/13/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/13/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
05/13/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
05/14/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Sidewalk Inspection Partial 05/15/2019
Misc
Informational
05/15/2019
5-15-19 The Sapp crew set forms to spec. Aggregate was compacted. They were informed to keep in compliance with ADA requirements and city spec.
Water Line - Construction Inspection Partial 5/15/2019 05/15/2019
Misc
Informational
05/14/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/14/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/14/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/14/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/14/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/14/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/14/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/14/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/14/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/14/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/14/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/14/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/14/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
05/14/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
05/14/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
05/15/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Water Line - Construction Inspection Partial 5/16/2019 at 8:35 AM 05/16/2019
Misc
Informational
05/15/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/15/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/15/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/15/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/15/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/15/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/15/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/15/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/15/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/15/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/15/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/15/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/15/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
05/15/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
05/15/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
05/15/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
05/16/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Erosion Control Inspection Failed 05/28/2019
Misc
Informational
05/23/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
05/28/2019
5-28-19 No attempts have been made on correcting erosion control. Silt fence is still down on the north,south and west side of the job site. Gutter buddy’s are full as well.
Sidewalk Inspection Failed 5/17/2019 06/11/2019
Misc
Informational
05/15/2019
5-15-19 The Sapp crew set forms to spec. Aggregate was compacted. They were informed to keep in compliance with ADA requirements and city spec.
Misc
Informational
06/11/2019
6-11-19 All sidewalk is ADA compliant except for one panel on the east side that comes into the approach. This panel was checked twice with myself and Bob Burns and will need replaced.
Erosion Control Inspection Failed 06/11/2019
Misc
Informational
05/23/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
06/11/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Sanitary Sewer Construction Inspection Partial 6/13/2019 06/13/2019
Misc
Informational
05/06/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Misc
Informational
05/06/2019
3-2-19 7am The crew for Sapp are laying sanitary line starting at 2-B the air temp is at 24 degrees.
Misc
Informational
05/06/2019
3-2-19 28 degrees. The crew placed approximately 210 feet of sanitary line and back filled with loader and sheep’s foot. Storm boxes were also back filled.
Misc
Informational
05/06/2019
4-26-19 The Sapp crew are digging out to place the last of the sanitary line along with the last manhole.
Misc
Informational
05/06/2019
Joe Starlin 05/06/2019 7:10 AM The crew placed 51' of sanitary line to manhole 2-C. They ran the service line out of 2-C manhole to the building. The have done the encasement as well.
Misc
Informational
06/13/2019
6-13-19 The Sapp crew are connecting sanitary line to building 4.
Pavement-Stabilized Subgrade Partial 06/14/2019
Misc
Informational
06/14/2019
6-14-19 8:20am Rain is moving in at 8:45am We proof rolled along the south side of the site. Half passed and half failed. We rolled at the SW corner of the site and had some failures. It will need another proof roll.
Pavement-Stabilized Subgrade Partial 06/14/2019
Misc
Informational
06/14/2019
6-14-19 8:20am Rain is moving in at 8:45am We proof rolled along the south side of the site. Half passed and half failed. We rolled at the SW corner of the site and had some failures. It will need another proof roll. When returned at 1:30 for a second proof roll the contractor was placing type 5 base on top[ of fail sub grade. I spoke with Dan Harper about this and he said to get it in writing that they made corrections and get load tickets. He also said moving forward any coverage on failed sub grade will be removed.
Sanitary Sewer Construction Inspection Partial 06/14/2019
Misc
Informational
06/13/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Misc
Informational
06/13/2019
3-2-19 7am The crew for Sapp are laying sanitary line starting at 2-B the air temp is at 24 degrees.
Misc
Informational
06/13/2019
3-2-19 28 degrees. The crew placed approximately 210 feet of sanitary line and back filled with loader and sheep’s foot. Storm boxes were also back filled.
Misc
Informational
06/13/2019
4-26-19 The Sapp crew are digging out to place the last of the sanitary line along with the last manhole.
Misc
Informational
06/13/2019
Joe Starlin 05/06/2019 7:10 AM The crew placed 51' of sanitary line to manhole 2-C. They ran the service line out of 2-C manhole to the building. The have done the encasement as well.
Misc
Informational
06/13/2019
6-13-19 The Sapp crew are connecting sanitary line to building 4.
Misc
Informational
06/14/2019
6-14-19 light rain building 4,5,1 are tied in. The crew are working on connecting building 2 now at 9:am. They have completed building 2 connection and poured concrete over the pipe. Concrete is over the pipe at building five as well.
Storm - Pipe Partial 06/14/2019
Misc
Informational
03/28/2019
3-19-19 The crew placed storm box D2 and are starting to work on storm box D-4.
Misc
Informational
03/28/2019
3-19-19 The crew placed box D-4 and ran pipe to D-5 and to F-1. They are getting ready to pour collars.
Misc
Informational
03/28/2019
3-20-19 The crew poured collars and inverts on D-4 to F-1 and back filled. They have set box D-5 and D-6.
Misc
Informational
03/28/2019
3-21-19 All collars are poured and storm inlets are back filled per plans on Line D. SAPP crews are starting on Line A.
Misc
Informational
03/28/2019
3-21-19 The Sapp crew have placed A-2 and laid storm pipe from A-1 to A-2 Aggregate is good.
Misc
Informational
03/28/2019
2-28-19 18 degrees air temp. Emery Sapp has set curb inlet [B2] [B3] and junction box [B4] and all pipe connecting. They have poured the collars and have been informed to cover collars with blankets till suitable backfill can be put in place.
Misc
Informational
03/28/2019
2-28-19 Emery Sapp set box (B5) and ran pipe from (B4) to (B5). They have set (B6). All collars have been covered.
Misc
Informational
03/28/2019
3-1-19 Sapp crew have set [B7] and [ B8]. They are working on getting [B9] set.
Misc
Informational
03/28/2019
3-1-19 Sapp crew poured collars and covered with blankets.
Misc
Informational
03/28/2019
2-6-19 10:50am The crew placed box B-9 through B-11 and installed storm pipe and rock. I returned at 3:10pm the crew installed B-12 and installed pipe with rock. The collars and inverts have been poured and they are back filling the storm pipe. The collars will be back filled after curing.
Misc
Informational
03/28/2019
3-7-19 The storm inverts have been poured B-9 through B-12 and look to be correct.
Misc
Informational
03/28/2019
3-11-19 The Sapp crew placed box M-2 and are working on storm pipe install. 3:15pm The crew have placed storm pipe from B-8 to the stake for the foundation. They have poured collars and inverts.
Misc
Informational
03/28/2019
3-14-19 Crew installed storm line from box B-5 to B-6 and are starting work on C line.
Misc
Informational
03/28/2019
3-15-19 The Sapp crew installed C-1 and are working there way to C-2.
Misc
Informational
03/28/2019
The SAPP crew had installed approx 40ft of storm line from A2.
Misc
Informational
03/28/2019
3-23-19 The Sapp crew placed box A-3 and laid storm pipe from A-2 to A-3. Collars will have to be poured. The top to A-2 is damaged and will need replaced.
Misc
Informational
03/28/2019
3-25-19 The crew placed box G-1, G-2, and G-3 along with pipe and back filled. They will try to pour collars today as well.
Misc
Informational
03/28/2019
3-26-19 The collars on the G line appear to have been poured and are covered in rock.
Misc
Informational
03/28/2019
3-27-19 10:15am The Sapp crew have set box H-1 and ran pipe from G-4 to H-1. 2:45pm The crew have set box G-4 and are placing pipe. They will be pouring collars and covering with rock.
Misc
Informational
03/28/2019
3-28-19 The crew have placed box G-4 and running approximately 80ft of pipe to box G-5.
Misc
Informational
06/14/2019
6-14-19 2 sticks of pipe are in at C3 box
Pavement-Stabilized Subgrade Passed 6/18/2019 06/18/2019
Misc
Informational
06/14/2019
6-14-19 8:20am Rain is moving in at 8:45am We proof rolled along the south side of the site. Half passed and half failed. We rolled at the SW corner of the site and had some failures. It will need another proof roll. When returned at 1:30 for a second proof roll the contractor was placing type 5 base on top[ of fail sub grade. I spoke with Dan Harper about this and he said to get it in writing that they made corrections and get load tickets. He also said moving forward any coverage on failed sub grade will be removed.
Misc
Informational
06/18/2019
6-18-19 7:44am We are proof rolling the sub grade on the west side of the site in front of building two. 8:20am The proof roll passed with a few small areas needing corrections.
Water Line - Construction Inspection Partial 6/13/2019 06/18/2019
Misc
Informational
05/16/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
05/16/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
05/16/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
05/16/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
05/16/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
05/16/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
05/16/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
05/16/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
05/16/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/16/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
05/16/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
05/16/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
05/16/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
05/16/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
05/16/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
05/16/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
05/16/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Misc
Informational
05/17/2019
5-17-19 Sapp installed water line from the valve to the vault and will be pouring thrust blocks later in the afternoon.
Misc
Informational
06/18/2019
6-18-19 Sapp crew have placed 240’ of 3” water line next to building 3. They have placed the fire hydrant on the north side of building 3 and are running waterline tracer wire are on both.
Pavement-Stabilized Subgrade Partial 06/18/2019
Misc
Informational
06/18/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Driveway Inspection Partial 06/19/2019
Misc
Informational
04/25/2019
The Sapp crew have set up both approaches and they appear to be in spec.
Misc
Informational
04/25/2019
4-25-19 The Sapp crew have poured the approache on the east side and are currently pouring the approache on the west side.
Misc
Informational
06/19/2019
6-19-19 All approach’s are done on Tudor and they are pouring the drive approach on Donavon. Aggregate is compacted and forms are set. They were told to keep the approach ADA compliant.
Pavement-Stabilized Subgrade Partial 6/13/2019 06/19/2019
Misc
Informational
06/12/2019
6-12-19 8” of aggregate base has been put in, A third party inspector inspected the proof roll and will be sending me documentation showing it passed. 11:10am They are now laying base rock MO type 5 on the west side of the site.
Misc
Informational
06/13/2019
6-13-19 2:05pm 75 degrees full sun.We proof rolled the south west corner of the site and it failed pumping and rutting. See pics. Wes is the Forman on site for the base, he’s demeanor is not the best and he removed and kicked his hard hat across the grade when I told him it was a fail.
Pavement-Stabilized Subgrade Partial 06/19/2019
Misc
Informational
06/18/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/19/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Water Line - Construction Inspection Partial 6/19/2019 06/19/2019
Misc
Informational
06/18/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
06/18/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
06/18/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
06/18/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
06/18/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
06/18/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
06/18/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
06/18/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
06/18/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
06/18/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
06/18/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
06/18/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
06/18/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
06/18/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
06/18/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
06/18/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
06/18/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Misc
Informational
06/18/2019
5-17-19 Sapp installed water line from the valve to the vault and will be pouring thrust blocks later in the afternoon.
Misc
Informational
06/18/2019
6-18-19 Sapp crew have placed 240’ of 3” water line next to building 3. They have placed the fire hydrant on the north side of building 3 and are running waterline tracer wire are on both.
Misc
Informational
06/19/2019
6-19-19 10am. On 6-18-19 The crew installed 180’ of 8” c900. And 208’ of 3”. They installed one hydrant and poured 4 kickers. They are currently placing water line on the north side of building 1 working there way east to tie in.
Misc
Informational
06/19/2019
6-19-19 2:20pm The crew installed 130’ of 3” waterline and 110’ of 8” waterline for fire. All kickers are poured and the crew are done for today.
Curb - Proof Roll Partial 6/20/2019 06/20/2019
Misc
Informational
06/20/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Pavement-Stabilized Subgrade Partial 06/20/2019
Misc
Informational
06/19/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/19/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
06/20/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Curb - Proof Roll Partial 06/20/2019
Misc
Informational
06/20/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
06/20/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on the west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage at the south end failed. It was pumping excessively. Approximately 30’.It will need reworked and another proof roll performed.
Water Line - Hydrostatic Test Passed 6/20/2019 06/20/2019
Misc
Informational
06/20/2019
6-20-19 The domestic water line is at 150 psi. It will be a 2 hour test.
Misc
Informational
06/20/2019
6-20-19 The waterline held for 2 hours at 150psi. Four building 5
Fire Line - Hydrostatic Test Passed 6/20/2019 06/20/2019
Misc
Informational
06/20/2019
6-20-19 we are testing the fire line for building 5 and 4.
Misc
Informational
06/20/2019
6-20-19 We are testing the fire line for building 5 and 4 at 200 psi for 2 hours. The fire line for building 4 and 5 held for 2 hours at 200psi.
Water Line - Hydrostatic Test Partial 6/24/2019 06/24/2019
Misc
Informational
06/24/2019
6-24-19 8:25am Test has started for building 4. 9:00am The test for the clubhouse has started. The line for building 4 has passed it held at 150 for two hours.11:00am The waterline for the club house has passed it held for two hours at 150.
Fire Line - Hydrostatic Test Passed 6/24/2019 06/24/2019
Misc
Informational
06/24/2019
6-24-19 8:40am test is started for fireline for building 1,2,3 and clubhouse.
Misc
Informational
06/24/2019
6-24-19 8:40am test is started for fireline for building 1,2,3 and clubhouse. The line had a leak so we restarted the test. 12:05pm. The fireline has passed. It. Held for two hours at 200.
Water Line - Hydrostatic Test Failed 6/24/2019 06/24/2019
Misc
Informational
06/24/2019
6-24-19 8:25am Test has started for building 4. 9:00am The test for the clubhouse has started. The line for building 4 has passed it held at 150 for two hours.11:00am The waterline for the club house has passed it held for two hours at 150.
Misc
Informational
06/24/2019
6-24-19 1:28pm The waterline at building 1 is at 150 and holding.The pressure fell off 7 pounds.
Curb - Proof Roll Failed 06/24/2019
Misc
Informational
06/20/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
06/20/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on the west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage at the south end failed. It was pumping excessively. Approximately 30’.It will need reworked and another proof roll performed.
Misc
Informational
06/24/2019
6-24-19 3:00pm They attempted a proof roll, the trucks front tire sank so we stoped. The base is to wet at this time.
Water Line - Hydrostatic Test Passed 6/25/2019 06/25/2019
Misc
Informational
06/24/2019
6-24-19 8:25am Test has started for building 4. 9:00am The test for the clubhouse has started. The line for building 4 has passed it held at 150 for two hours.11:00am The waterline for the club house has passed it held for two hours at 150.
Misc
Informational
06/24/2019
6-24-19 1:28pm The waterline at building 1 is at 150 and holding.The pressure fell off 7 pounds.
Misc
Informational
06/25/2019
6-25-19 9:00am The water line for building 1,2,and 3 is at 150psi. We Will check the gauge at 11:00am The water line has passed it held for two hours.
Pavement-Stabilized Subgrade Partial 06/25/2019
Misc
Informational
06/20/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/20/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
06/20/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
06/25/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Pavement-Stabilized Subgrade Partial 06/26/2019
Misc
Informational
06/25/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/25/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
06/25/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
06/25/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
06/26/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Curb - Proof Roll Failed 6/26/2019 06/28/2019
Misc
Informational
06/24/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
06/24/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on the west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage at the south end failed. It was pumping excessively. Approximately 30’.It will need reworked and another proof roll performed.
Misc
Informational
06/24/2019
6-24-19 3:00pm They attempted a proof roll, the trucks front tire sank so we stoped. The base is to wet at this time.
Misc
Informational
06/28/2019
John Jackson did a proof roll for curb on 6-26-19. It failed.
Pavement-Stabilized Subgrade Partial 6/28/2019 06/28/2019
Misc
Informational
06/26/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/26/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
06/26/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
06/26/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
06/26/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
06/28/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Curb - Proof Roll Partial 6/28/2019 06/28/2019
Misc
Informational
06/28/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
06/28/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on the west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage at the south end failed. It was pumping excessively. Approximately 30’.It will need reworked and another proof roll performed.
Misc
Informational
06/28/2019
6-24-19 3:00pm They attempted a proof roll, the trucks front tire sank so we stoped. The base is to wet at this time.
Misc
Informational
06/28/2019
John Jackson did a proof roll for curb on 6-26-19. It failed.
Misc
Informational
06/28/2019
6-28-19 The curb line going from Donavon around following Ward rd. Failed with heavy pumping. The line on the back side of the garages along Ward rd. Were good with three areas needing addressed. The north side of garages along Ward rd was half and half, corrections will need to be made. The island area on the south side of the garages at the corner of Donavon and Ward failed. The curb line running east and west at the south end of the site along Donavon was good with corrections needing made around inlet boxes. The inside curb line that is at the south east corner of the site was good half way through. The other half to will need some corrections. The outside curb line at the south east corner of the site passed Everything is marked out with paint and I walked though the intire site with Sapp so everyone new what was needed.
Water Line - Construction Inspection Partial 7/2/2019 07/02/2019
Misc
Informational
06/19/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
06/19/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
06/19/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
06/19/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
06/19/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
06/19/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
06/19/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
06/19/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
06/19/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
06/19/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
06/19/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
06/19/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
06/19/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
06/19/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
06/19/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
06/19/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
06/19/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Misc
Informational
06/19/2019
5-17-19 Sapp installed water line from the valve to the vault and will be pouring thrust blocks later in the afternoon.
Misc
Informational
06/19/2019
6-18-19 Sapp crew have placed 240’ of 3” water line next to building 3. They have placed the fire hydrant on the north side of building 3 and are running waterline tracer wire are on both.
Misc
Informational
06/19/2019
6-19-19 10am. On 6-18-19 The crew installed 180’ of 8” c900. And 208’ of 3”. They installed one hydrant and poured 4 kickers. They are currently placing water line on the north side of building 1 working there way east to tie in.
Misc
Informational
06/19/2019
6-19-19 2:20pm The crew installed 130’ of 3” waterline and 110’ of 8” waterline for fire. All kickers are poured and the crew are done for today.
Misc
Informational
07/02/2019
7-2-19 SAPP made a repair to the domestic water line for building 4. It was hit by another contractor.
Curb - Proof Roll Partial 7/2/2019 07/02/2019
Misc
Informational
06/28/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
06/28/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on Cthe west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage. at the south end failed. It was pumping excessively. Approximately 30’.It w. ill need reworked and another proof roll performed.
Misc
Informational
06/28/2019
6-24-19 3:00pm They attempted a proof roll, the trucks front tire sank so we stoped. The base is to wet at this time.
Misc
Informational
06/28/2019
John Jackson did a proof roll for curb on 6-26-19. It failed.
Misc
Informational
06/28/2019
6-28-19 The curb line going from Donavon around following Ward rd. Failed with heavy pumping. The line on the back side of the garages along Ward rd. Were good with three areas needing addressed. The north side of garages along Ward rd was half and half, corrections will need to be made. The island area on the south side of the garages at the corner of Donavon and Ward failed. The curb line running east and west at the south end of the site along Donavon was good with corrections needing made around inlet boxes. The inside curb line that is at the south east corner of the site was good half way through. The other half to will need some corrections. The outside curb line at the south east corner of the site passed Everything is marked out with paint and I walked though the intire site with Sapp so everyone new what was needed.
Misc
Informational
07/02/2019
7-2-19 The proof roll passed on the south west side with the exception of a 12’ area that will need corrected. There are areas in front of inlet boxes in front of the garages on the south side that will need corrected. These will be hand poured at a later date. Tim Fritz with Terracon was on site and agreed with all corrections needed.
Curb - Proof Roll Passed 07/08/2019
Misc
Informational
07/08/2019
Proof Roll passed accept for a few areas of concern .
Pavement-Curb Construction Partial 07/09/2019
Misc
Informational
07/08/2019
Misc
Informational
07/09/2019
Contractor continued to install curbs on job site .
Misc
Informational
07/09/2019
Contractor continued to install curbs on job site .
Curb - Proof Roll Partial 07/10/2019
Misc
Informational
07/10/2019
Proof roll was canceled due to inclement weather . Continued proof roll at 1:30PM . Proof roll passed with the exception of a few small areas of concern . The problem areas were marked .
Pavement-Curb Construction Partial 07/11/2019
Misc
Informational
07/11/2019
Contractor continued to pour curbs .
Misc
Informational
07/12/2019
Contractor continued to pour and form curbs .
Curb - Proof Roll Partial 07/12/2019
Misc
Informational
07/12/2019
Two areas failed out of the five areas retested for curbs . I took pictures and uploaded them to Documents and Images file also inbox Dan Harper, Steven Robbins, Joe Starlin .
Curb - Proof Roll Partial 07/15/2019
Misc
Informational
07/02/2019
6-20-19 We proof rolled the curb line at the south west corner of the site. Donavon road curving around and following Ward road. It passed.
Misc
Informational
07/02/2019
6-20-19 3:15pm we are proof rolling curb line behind the garages on Cthe west side of the site and across from the garages to the east. We rolled the small island at the SW corner. The south side of the garage. at the south end failed. It was pumping excessively. Approximately 30’.It w. ill need reworked and another proof roll performed.
Misc
Informational
07/02/2019
6-24-19 3:00pm They attempted a proof roll, the trucks front tire sank so we stoped. The base is to wet at this time.
Misc
Informational
07/02/2019
John Jackson did a proof roll for curb on 6-26-19. It failed.
Misc
Informational
07/02/2019
6-28-19 The curb line going from Donavon around following Ward rd. Failed with heavy pumping. The line on the back side of the garages along Ward rd. Were good with three areas needing addressed. The north side of garages along Ward rd was half and half, corrections will need to be made. The island area on the south side of the garages at the corner of Donavon and Ward failed. The curb line running east and west at the south end of the site along Donavon was good with corrections needing made around inlet boxes. The inside curb line that is at the south east corner of the site was good half way through. The other half to will need some corrections. The outside curb line at the south east corner of the site passed Everything is marked out with paint and I walked though the intire site with Sapp so everyone new what was needed.
Misc
Informational
07/02/2019
7-2-19 The proof roll passed on the south west side with the exception of a 12’ area that will need corrected. There are areas in front of inlet boxes in front of the garages on the south side that will need corrected. These will be hand poured at a later date. Tim Fritz with Terracon was on site and agreed with all corrections needed.
Misc
Informational
07/15/2019
7-15-19 We proof rolled a section on the east side of the site in front of the garages at the N inlet box. This section has passed.
Pavement-Stabilized Subgrade Partial 07/15/2019
Misc
Informational
06/28/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
06/28/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
06/28/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
06/28/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
06/28/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
06/28/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
07/15/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Pavement-Curb Construction Partial 7/16/2019 07/15/2019
Misc
Informational
07/09/2019
Misc
Informational
07/09/2019
Contractor continued to install curbs on job site .
Misc
Corrective Action Required
07/15/2019
2:56pm They hand poured curb on the south east side of the site. They are applying the cure properly and are grouting all honeycomb on back side of curb that is formed. They are using KCMMB 4 k mix.
Pavement-Curb Construction Partial 7/16/2019 07/16/2019
Misc
Informational
07/15/2019
Contractor continued to pour curbs .
Misc
Informational
07/15/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/16/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Pavement-Proof Roll Partial 6/18/2019 07/16/2019
Misc
Informational
07/16/2019
7-16-19 3:19pm We are proof rolling with 20 ton on the south west corner of the site heading north along Ward rd.
Misc
Informational
07/16/2019
7-16-19 3:19pm We are proof rolling with 20 ton on the south west corner of the site heading north along Ward rd. Everything passed except for the north side of the small road on the south side of the garage. It pumped for approximately 10 feet. Another correction needs to be made on the west side of site starting forty feet back from inlet to approximately sixty feet back and starting 16 feet over from curb and approximately 10 feet wide. This area is soft and pumped with small rutting and cracking.
Site Visit Partial 07/17/2019
Misc
Informational
07/17/2019
7-16-19 I spoke with the site GC Beenie about erosion control and having a swppp book onsite he said Jonathan Myers said electronic was fine.
Pavement-Proof Roll Partial 7/17/2019 at 3:30 PM 07/17/2019
Misc
Informational
07/16/2019
7-16-19 3:19pm We are proof rolling with 20 ton on the south west corner of the site heading north along Ward rd.
Misc
Informational
07/16/2019
7-16-19 3:19pm We are proof rolling with 20 ton on the south west corner of the site heading north along Ward rd. Everything passed except for the north side of the small road on the south side of the garage. It pumped for approximately 10 feet. Another correction needs to be made on the west side of site starting forty feet back from inlet to approximately sixty feet back and starting 16 feet over from curb and approximately 10 feet wide. This area is soft and pumped with small rutting and cracking.
Misc
Informational
07/17/2019
7-17-19 The areas we proof rolled have passed. The south west corner of the site can be paved if we have no rain prior.
Pavement-Curb Construction Partial 7/17/2019 07/17/2019
Misc
Informational
07/16/2019
Contractor continued to pour curbs .
Misc
Informational
07/16/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/16/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
07/17/2019
6-17-19 11:19am They are forming for curb.
Pavement-Curb Construction Partial 7/18/2019 07/18/2019
Misc
Informational
07/17/2019
Contractor continued to pour curbs .
Misc
Informational
07/17/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/17/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
07/17/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
07/18/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Pavement-Curb Construction Partial 7/19/2019 07/19/2019
Misc
Informational
07/18/2019
Contractor continued to pour curbs .
Misc
Informational
07/18/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/18/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
07/18/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
07/18/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Pavement-Surface Partial 7/19/2019 07/20/2019
Misc
Informational
07/19/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Pavement-Surface Partial 7/20/2019 07/20/2019
Misc
Informational
07/20/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
07/20/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
07/20/2019
Street - Surface Course Partial 7/22/2019 07/22/2019
Misc
Informational
07/22/2019
7-22-19 The asphalt plant has shut down due to heavy rain on Sunday. The crew will try again tomorrow 7-23-19.
Pavement-Curb Construction Partial 07/23/2019
Misc
Informational
07/19/2019
Contractor continued to pour curbs .
Misc
Informational
07/19/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/19/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
07/19/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
07/19/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/19/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/23/2019
7-23-19 11:45am they are pouring curb on the east side.
Street - Surface Course Partial 7/23/2019 07/23/2019
Misc
Informational
07/23/2019
7-23-19 The first truck arrived at 8:10am
Misc
Informational
07/23/2019
7-23-19 The first truck arrived at 8:10am. Temperatures are in spec coming out of the truck, average truckload is 30 ton. I talked to the Forman for Musselman & Hall about the ADA parking he said we would address it at a later date. 6:29pm They are pulling off the header now. 6:40pm just received the load tickets.
Erosion Control Inspection Failed 07/24/2019
Misc
Informational
06/11/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
06/11/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
07/24/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Pavement-Proof Roll Passed 7/23/2019 07/25/2019
Misc
Informational
07/23/2019
7-23-19 The truck was scheduled for 11:30am he did not show untill 12 noon. The proof roll took 45 minutes. It passed in all areas with a correction needed in one area on the north east side of garages on the south end of the site.
Informational
07/25/2019
Proof Roll passed in areas of concern . see 7/23 for describtion of area of concern passed by Field Engineering Inspector .John Jackson 07/25/2019 2:19 PM
Site Visit Partial 07/29/2019
Misc
Informational
07/17/2019
7-16-19 I spoke with the site GC Beenie about erosion control and having a swppp book onsite he said Jonathan Myers said electronic was fine.
Misc
Informational
07/29/2019
7-29-19 Spoke with GC Ben. They are hoping to lay asphalt on Wen. We went over some of the specs in the D&C.
Proof roll parking lot Partial 7/30/2019 07/30/2019
Misc
Informational
07/30/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Pavement-Surface Partial 8/1/2019 08/01/2019
Misc
Informational
07/20/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
07/20/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
07/20/2019
Misc
Informational
08/01/2019
8-1-19 7:59am We are waiting for asphalt trucks on the south end of the job site.There is a overcast and a chance for rain. Temps out of the truck are averaging 280 degrees. 1:30pm They are done with the south side parking area and are moving to the north side of the parking lot.
Pavement-Surface Partial 8/2/2019 08/02/2019
Misc
Informational
08/01/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
08/01/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
08/01/2019
Misc
Informational
08/01/2019
8-1-19 7:59am We are waiting for asphalt trucks on the south end of the job site.There is a overcast and a chance for rain. Temps out of the truck are averaging 280 degrees. 1:30pm They are done with the south side parking area and are moving to the north side of the parking lot.
Misc
Informational
08/02/2019
8-2-19 They are laying asphalt on the east side temps out of the truck are averaging 280 degrees. ESS is the crew laying the asphalt. The crew are now putting down the two inch lift in the road. They will be placing the cap on Monday 8-5-19.
Street - Surface Course Partial 8/8/2019 08/09/2019
Misc
Informational
07/22/2019
7-22-19 The asphalt plant has shut down due to heavy rain on Sunday. The crew will try again tomorrow 7-23-19.
Misc
Informational
08/08/2019
8-8-19 The first truck arrived at 8:20am. There is rain in the forcast for today but they are expecting it to go around the job site. Temp out of the first truck was 277 degrees. They finished the surface Terracon said compaction was good.
Sanitary Sewer - Air Test Passed 08/09/2019
Misc
Informational
04/18/2019
4-17-19 The crew air tested from station 10+00 to 13+86.71 John Jackson performed the inspection.
Misc
Informational
08/09/2019
All sanitary sewer air test passed on line #2. 8/9/19 Thursday
Sanitary Sewer - Vacuum Passed 08/09/2019
Misc
Informational
04/18/2019
4-17-19 The crew preformed a vacuum test at station 12+00. It has passed at this location.
Misc
Informational
08/09/2019
8/9/19 vacuum test passed for 2C & 2B on line #2.
Pavement-Stabilized Subgrade Partial 8/12/2019 08/12/2019
Misc
Informational
07/15/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
07/15/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
07/15/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
07/15/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
07/15/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
07/15/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
07/15/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Misc
Informational
08/12/2019
8-12-19 8:25am We proof rolled the subgrade, corrections will need to be made on the east side of building five and the east side of jobsite and on the south side of building 5, 10 foot from the edge of building. The north edge between the garages south of building 5 will need corrected.
Pavement-Stabilized Subgrade Partial 8/13/2019 08/13/2019
Misc
Informational
08/12/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
08/12/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
08/12/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
08/12/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
08/12/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
08/12/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
08/12/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Misc
Informational
08/12/2019
8-12-19 8:25am We proof rolled the subgrade, corrections will need to be made on the east side of building five and the east side of jobsite and on the south side of building 5, 10 foot from the edge of building. The north edge between the garages south of building 5 will need corrected.
Misc
Informational
08/13/2019
8-13-19 8:25am The sub-grade on the east side of the site failed again and will need corrected. The exit lane on the north east side passed and the entrance lane on the north west side failed. Corrections will need to be made along the north east side of building 5. Parking area on the west side of the site along Ward failed and will need corrected.
Pavement-Stabilized Subgrade Partial 8/14/2019 08/14/2019
Misc
Informational
08/13/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
08/13/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
08/13/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
08/13/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Misc
Informational
08/13/2019
8-12-19 8:25am We proof rolled the subgrade, corrections will need to be made on the east side of building five and the east side of jobsite and on the south side of building 5, 10 foot from the edge of building. The north edge between the garages south of building 5 will need corrected.
Misc
Informational
08/13/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
08/13/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
08/13/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
08/13/2019
8-13-19 8:25am The sub-grade on the east side of the site failed again and will need corrected. The exit lane on the north east side passed and the entrance lane on the north west side failed. Corrections will need to be made along the north east side of building 5. Parking area on the west side of the site along Ward failed and will need corrected.
Misc
Informational
08/14/2019
8-14-19 We proof rolled corrected areas and it still fail in most spots. They will make more corrections and we will proof roll again.
Pavement-Stabilized Subgrade Partial 8/15/2019 08/15/2019
Misc
Informational
08/14/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
08/14/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
08/14/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
08/14/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Misc
Informational
08/14/2019
8-12-19 8:25am We proof rolled the subgrade, corrections will need to be made on the east side of building five and the east side of jobsite and on the south side of building 5, 10 foot from the edge of building. The north edge between the garages south of building 5 will need corrected.
Misc
Informational
08/14/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
08/14/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
08/14/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
08/14/2019
8-13-19 8:25am The sub-grade on the east side of the site failed again and will need corrected. The exit lane on the north east side passed and the entrance lane on the north west side failed. Corrections will need to be made along the north east side of building 5. Parking area on the west side of the site along Ward failed and will need corrected.
Misc
Informational
08/14/2019
8-14-19 We proof rolled corrected areas and it still fail in most spots. They will make more corrections and we will proof roll again.
Misc
Informational
08/15/2019
8-15-19 The area in front of building 5 east side needs to dry out. The east side of the job site passed. Both turn lanes need corrections. West side of site road on the west side of building 5 has not been corrected yet.
Site Visit Partial 8/21/2019 08/21/2019
Misc
Informational
07/29/2019
7-16-19 I spoke with the site GC Beenie about erosion control and having a swppp book onsite he said Jonathan Myers said electronic was fine.
Misc
Informational
07/29/2019
7-29-19 Spoke with GC Ben. They are hoping to lay asphalt on Wen. We went over some of the specs in the D&C.
Misc
Informational
08/21/2019
9-21-19 light rain. I Spoke with the Forman about what there planning moving ahead.
Erosion Control Inspection Failed 8/21/2019 08/21/2019
Misc
Informational
07/24/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
07/24/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
07/24/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/21/2019
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Site Visit Partial 08/22/2019
Misc
Informational
08/21/2019
7-16-19 I spoke with the site GC Beenie about erosion control and having a swppp book onsite he said Jonathan Myers said electronic was fine.
Misc
Informational
08/21/2019
7-29-19 Spoke with GC Ben. They are hoping to lay asphalt on Wen. We went over some of the specs in the D&C.
Misc
Informational
08/21/2019
9-21-19 light rain. I Spoke with the Forman about what there planning moving ahead.
Misc
Informational
08/22/2019
8-22-19 8:52AM Andrew’s crew are wrecking forms and cleaning up today.
Water Line - Construction Inspection Partial 8/22/2019 08/23/2019
Misc
Informational
07/02/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
07/02/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
07/02/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
07/02/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
07/02/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
07/02/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
07/02/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
07/02/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
07/02/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
07/02/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
07/02/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
07/02/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
07/02/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
07/02/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
07/02/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
07/02/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
07/02/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Misc
Informational
07/02/2019
5-17-19 Sapp installed water line from the valve to the vault and will be pouring thrust blocks later in the afternoon.
Misc
Informational
07/02/2019
6-18-19 Sapp crew have placed 240’ of 3” water line next to building 3. They have placed the fire hydrant on the north side of building 3 and are running waterline tracer wire are on both.
Misc
Informational
07/02/2019
6-19-19 10am. On 6-18-19 The crew installed 180’ of 8” c900. And 208’ of 3”. They installed one hydrant and poured 4 kickers. They are currently placing water line on the north side of building 1 working there way east to tie in.
Misc
Informational
07/02/2019
6-19-19 2:20pm The crew installed 130’ of 3” waterline and 110’ of 8” waterline for fire. All kickers are poured and the crew are done for today.
Misc
Informational
07/02/2019
7-2-19 SAPP made a repair to the domestic water line for building 4. It was hit by another contractor.
Misc
Informational
08/23/2019
8-23-19 7:14am Andrew’s and his crew chlorinated all the water service lines going to the buildings. I have verified all water lines are chlorinated.
Pavement-Stabilized Subgrade Passed 8/23/2019 08/23/2019
Misc
Informational
08/15/2019
6-25-19 The parking area on the east side of the site passed the proof roll except for the north edge, approximately 5’. The road running north and south was good. There is a area by the inlet box that will need a small correction along with a small area on the south west side of the road that will need corrected. Wes said he would dig down and add rock to this spot.
Misc
Informational
08/15/2019
6-26-19 We proof rolled the sub grade on the north side of building 4. Eight feet out from building 4 was pumping and on the north side of of the east and west road in front of building 4 was pumping. They will make corrections and do another proof roll. The truck has a 28 ton load on.
Misc
Informational
08/15/2019
6-28-19 The majority of the sub grade passed. The parking on the north edge of the east side of the site was pumping and will need addressed. Two other small areas approximately 6’ need addressed on the north side of the site.
Misc
Informational
08/15/2019
7-15-19 9:52am We proof rolled a section of sub-grade on the east side of the site north of the garages. It has passed.
Misc
Informational
08/15/2019
8-12-19 8:25am We proof rolled the subgrade, corrections will need to be made on the east side of building five and the east side of jobsite and on the south side of building 5, 10 foot from the edge of building. The north edge between the garages south of building 5 will need corrected.
Misc
Informational
08/15/2019
6-18-19 proof roll in front of building 3 passed with two small corrections.
Misc
Informational
08/15/2019
6-19-19 Yesterday 6-18-19 at approximately 3:30pm when we proof rolled Wes told me he would make the few small corrections by digging out the soft and adding more type5.
Misc
Informational
08/15/2019
6-20-19 We proof rolled the north east side of building 3. There is one area approximately 15’ long and 3’ wide against the building edge that needs addressed the rest of the area was good. Wes said he would dig it out and determine what is needed to correct the issue. He said he would let me know and take a pic of the area when its dug out. The parking area on the Far East side of the site across from building 3 passed on the south end and failed on the north side. Wes is going to make nessasary corrections and we will do another proof roll.
Misc
Informational
08/15/2019
8-13-19 8:25am The sub-grade on the east side of the site failed again and will need corrected. The exit lane on the north east side passed and the entrance lane on the north west side failed. Corrections will need to be made along the north east side of building 5. Parking area on the west side of the site along Ward failed and will need corrected.
Misc
Informational
08/15/2019
8-14-19 We proof rolled corrected areas and it still fail in most spots. They will make more corrections and we will proof roll again.
Misc
Informational
08/15/2019
8-15-19 The area in front of building 5 east side needs to dry out. The east side of the job site passed. Both turn lanes need corrections. West side of site road on the west side of building 5 has not been corrected yet.
Misc
Informational
08/23/2019
8-23-19 The entrance and exit on the north east side are good with a correction needing made on the entrance side. West entrance needs corrected 20 feet in from the entrance.They are going to correct with geogrid at all areas. 1:49pm They have made all the corrections needed.
Water Line - Construction Inspection Partial 8/26/2019 08/26/2019
Misc
Informational
08/23/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
08/23/2019
The crew is 4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
08/23/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
08/23/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
08/23/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
08/23/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
08/23/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
08/23/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
08/23/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
08/23/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Misc
Informational
08/23/2019
5-6-19 They have placed 130’ of water line.
Misc
Informational
08/23/2019
5-9-19 The crew are digging out for water taps and have rain water line from the north building out approximately 100 feet.
Misc
Informational
08/23/2019
5-10-19 Approximately 75 feet of water line has been placed from building 5 to the vault along with one hydrant.
Misc
Informational
08/23/2019
Joe Starlin 05/13/2019 7:14 AM On 5-11-19 John Jackson inspected the Sapp crew digging two holes to get to the water main for tee's.
Misc
Informational
08/23/2019
5-14-19 The Sapp crew cut in three tee’s on the 8” main and installed valves. We restored water and flushed the hydrant for the appropriate amount of time.
Misc
Informational
08/23/2019
5-15-19 The Sapp crew have hooked on to the 3 water taps off the main and placed copper pipe to the meters. They have installed the fire line from the main to the vault on the south end along ward and are digging out for another vault.
Misc
Informational
08/23/2019
5-16-19 8:35am The Sapp crew have placed a meter well and placed bricks around the fire vault on the south end for valve clearance. Steve Robbins inspected this with me and determand that Fire Dept. will have final say. 1:40pm The crew have tied in the rest of the water line form building 5 to the meter. 2:48pm The Sapp crew are placing the copper line to the meter vault on the far south end of the main.
Misc
Informational
08/23/2019
5-17-19 Sapp installed water line from the valve to the vault and will be pouring thrust blocks later in the afternoon.
Misc
Informational
08/23/2019
6-18-19 Sapp crew have placed 240’ of 3” water line next to building 3. They have placed the fire hydrant on the north side of building 3 and are running waterline tracer wire are on both.
Misc
Informational
08/23/2019
6-19-19 10am. On 6-18-19 The crew installed 180’ of 8” c900. And 208’ of 3”. They installed one hydrant and poured 4 kickers. They are currently placing water line on the north side of building 1 working there way east to tie in.
Misc
Informational
08/23/2019
6-19-19 2:20pm The crew installed 130’ of 3” waterline and 110’ of 8” waterline for fire. All kickers are poured and the crew are done for today.
Misc
Informational
08/23/2019
7-2-19 SAPP made a repair to the domestic water line for building 4. It was hit by another contractor.
Misc
Informational
08/23/2019
8-23-19 7:14am Andrew’s and his crew chlorinated all the water service lines going to the buildings. I have verified all water lines are chlorinated.
Misc
Informational
08/26/2019
8-26-19 10:30am All water lines have been flushed free of chlorine. Water samples can be taken on 8-27-19.
Water Line - Coliform Test 1 Partial 8/27/2019 08/27/2019
Misc
Informational
08/27/2019
8-27-19 1:18pm We have pulled 6 water samples from all buildings and John Jackson is taking the samples to the lab.
Sidewalk Inspection Partial 08/28/2019
Misc
Informational
06/11/2019
5-15-19 The Sapp crew set forms to spec. Aggregate was compacted. They were informed to keep in compliance with ADA requirements and city spec.
Misc
Informational
06/11/2019
6-11-19 All sidewalk is ADA compliant except for one panel on the east side that comes into the approach. This panel was checked twice with myself and Bob Burns and will need replaced.
Misc
Informational
08/28/2019
8-28-19 They are setting up for sidewalk on the south side of the site. They needed some direction on ADA.
Erosion Control Inspection Partial 08/30/2019
Misc
Informational
08/21/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
08/21/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
08/21/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/21/2019
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
08/30/2019
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Proof roll parking lot Partial 9/3/2019 09/03/2019
Misc
Informational
07/30/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Misc
Informational
09/03/2019
I observed the proof roll for the majority of he north side of the site. I verified the correct load weight and the equipment used. The areas that were roll tested passed with little to no deflection of the sub-grade. There are a few parking areas that were not tested due to the base rock being freshly installed and not ready or cured yet. I will mark the plans with the areas that passed and are ready for curb install. The crew plans to pour curb on Thursday 9/5/19 for the accepted areas and will call for an additional proof roll of the areas that were not tested today prior to installing curb.
Water Line - Coliform Test 2 Partial 8/28/2019 09/04/2019
Misc
Informational
08/28/2019
8-28-19 We pulled the first water sample at 12:40pm Last sample was pulled1:07pm. Samples were delivered to the lab at 1:40pm.
Water Line - Coliform Test 1 Partial 9/4/2019 09/04/2019
Misc
Informational
08/27/2019
8-27-19 1:18pm We have pulled 6 water samples from all buildings and John Jackson is taking the samples to the lab.
Misc
Informational
09/04/2019
9-4-19 All samples passed except for 1-E. John Jackson pulled a new sample at approximately 1:45pm and is taking it to the lab.
Curb - Proof Roll Partial 9/4/2019 09/04/2019
Misc
Informational
09/04/2019
9-4-19 Marquelle Willams did the proof roll at summit square. He said it passed for curb.
Water Line - Coliform Test 2 Partial 9/5/2019 09/07/2019
Misc
Informational
09/04/2019
8-28-19 We pulled the first water sample at 12:40pm Last sample was pulled1:07pm. Samples were delivered to the lab at 1:40pm.
Misc
Informational
09/07/2019
9-5-19 John Jackson pulled 1-E sample and took it to the lab.
Curb - Proof Roll Passed 09/07/2019
Misc
Informational
09/04/2019
Two areas failed out of the five areas retested for curbs . I took pictures and uploaded them to Documents and Images file also inbox Dan Harper, Steven Robbins, Joe Starlin .
Misc
Informational
09/07/2019
9-4-19 All curb line has passsed the proof roll.
Pavement-Curb Construction Partial 09/07/2019
Misc
Informational
07/23/2019
Contractor continued to pour curbs .
Misc
Informational
07/23/2019
Contractor continued to pour and form curbs .
Misc
Informational
07/23/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
07/23/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
07/23/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
07/23/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
07/23/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/23/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/23/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
07/23/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/07/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Pavement-Curb Construction Partial 9/9/2019 09/09/2019
Misc
Informational
09/07/2019
Contractor continued to pour curbs .
Misc
Informational
09/07/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/07/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/07/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/07/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/07/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/07/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/07/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/07/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/07/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/07/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/09/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Water Line - Coliform Test 1 Passed 9/10/2019 09/10/2019
Misc
Informational
09/04/2019
8-27-19 1:18pm We have pulled 6 water samples from all buildings and John Jackson is taking the samples to the lab.
Misc
Informational
09/04/2019
9-4-19 All samples passed except for 1-E. John Jackson pulled a new sample at approximately 1:45pm and is taking it to the lab.
Misc
Informational
09/10/2019
9-10-19 The sample passed.
Water Line - Coliform Test 2 Passed 09/10/2019
Misc
Informational
09/07/2019
8-28-19 We pulled the first water sample at 12:40pm Last sample was pulled1:07pm. Samples were delivered to the lab at 1:40pm.
Misc
Informational
09/07/2019
9-5-19 John Jackson pulled 1-E sample and took it to the lab.
Misc
Informational
09/10/2019
9-10-19 The sample passed.
Pavement-Curb Construction Partial 9/10/2019 09/10/2019
Misc
Informational
09/09/2019
Contractor continued to pour curbs .
Misc
Informational
09/09/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/09/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/09/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/09/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/09/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/09/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/09/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/09/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/09/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/09/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/09/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/10/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Pavement-Curb Construction Partial 9/11/2019 09/11/2019
Misc
Informational
09/10/2019
Contractor continued to pour curbs .
Misc
Informational
09/10/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/10/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/10/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/10/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/10/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/10/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/10/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/10/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/10/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/10/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/10/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/10/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Misc
Informational
09/11/2019
9-11-19 They are pouring curb on the north east side of the site. They are setting up more hand pours for tomorrow the 12th.
Pavement-Curb Construction Partial 9/12/2019 09/12/2019
Misc
Informational
09/11/2019
Contractor continued to pour curbs .
Misc
Informational
09/11/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/11/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/11/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/11/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/11/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/11/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/11/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/11/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/11/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/11/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/11/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/11/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Misc
Informational
09/11/2019
9-11-19 They are pouring curb on the north east side of the site. They are setting up more hand pours for tomorrow the 12th.
Misc
Informational
09/12/2019
9-12-19 10:23am They are pouring curb on the north side of site and are setting forms along the east side of site.1:42pm The crew are removing forms on the west side. They are done pouring. They have 492 feet of curb poured today.
Pavement-Curb Construction Partial 09/13/2019
Misc
Informational
09/12/2019
Contractor continued to pour curbs .
Misc
Informational
09/12/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/12/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/12/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/12/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/12/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/12/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/12/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/12/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/12/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/12/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/12/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/12/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Misc
Informational
09/12/2019
9-11-19 They are pouring curb on the north east side of the site. They are setting up more hand pours for tomorrow the 12th.
Misc
Informational
09/12/2019
9-12-19 10:23am They are pouring curb on the north side of site and are setting forms along the east side of site.1:42pm The crew are removing forms on the west side. They are done pouring. They have 492 feet of curb poured today.
Misc
Informational
09/13/2019
9-13-19 The curb is poured on the east side.
Pavement-Curb Construction Partial 9/17/2019 09/17/2019
Misc
Informational
09/13/2019
Contractor continued to pour curbs .
Misc
Informational
09/13/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/13/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/13/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/13/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/13/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/13/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/13/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/13/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/13/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/13/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/13/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/13/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Misc
Informational
09/13/2019
9-11-19 They are pouring curb on the north east side of the site. They are setting up more hand pours for tomorrow the 12th.
Misc
Informational
09/13/2019
9-12-19 10:23am They are pouring curb on the north side of site and are setting forms along the east side of site.1:42pm The crew are removing forms on the west side. They are done pouring. They have 492 feet of curb poured today.
Misc
Informational
09/13/2019
9-13-19 The curb is poured on the east side.
Misc
Informational
09/17/2019
9-17-19 All curb is poured on site and they have made cuts to add sidewalk.
Sidewalk Inspection Partial 9/17/2019 09/17/2019
Misc
Informational
09/17/2019
9-17-19 9:00am All sidewalk on the south side of the site along Donavon meets ADA spec.
Proof roll parking lot Partial 9/20/2019 09/20/2019
Misc
Informational
09/03/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Misc
Informational
09/03/2019
I observed the proof roll for the majority of he north side of the site. I verified the correct load weight and the equipment used. The areas that were roll tested passed with little to no deflection of the sub-grade. There are a few parking areas that were not tested due to the base rock being freshly installed and not ready or cured yet. I will mark the plans with the areas that passed and are ready for curb install. The crew plans to pour curb on Thursday 9/5/19 for the accepted areas and will call for an additional proof roll of the areas that were not tested today prior to installing curb.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site. The truck has a 20.69 ton load on. I looked in the truck at the load to confirm. Everything passed the proof roll except the entrance off Ward and infront of building 3 along with a small correction by building 5.
Proof roll parking lot Partial 09/20/2019
Misc
Informational
09/20/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Misc
Informational
09/20/2019
I observed the proof roll for the majority of he north side of the site. I verified the correct load weight and the equipment used. The areas that were roll tested passed with little to no deflection of the sub-grade. There are a few parking areas that were not tested due to the base rock being freshly installed and not ready or cured yet. I will mark the plans with the areas that passed and are ready for curb install. The crew plans to pour curb on Thursday 9/5/19 for the accepted areas and will call for an additional proof roll of the areas that were not tested today prior to installing curb.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site. The truck has a 20.69 ton load on. I looked in the truck at the load to confirm. Everything passed the proof roll except the entrance off Ward and infront of building 3 along with a small correction by building 5.
Misc
Informational
09/20/2019
9-20-19 2:28pm We have proof rolled the entrance on the west side of the site off Ward Rd. It has passed at this time. The proof roll on the east side of building 3 has two small areas that still need corrected. Rain is in the forecast. The job site could be subject to a new proof roll in all areas.
Erosion Control Inspection Partial 9/23/2019 09/23/2019
Misc
Informational
08/30/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/30/2019
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
08/30/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
08/30/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
08/30/2019
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
09/23/2019
9-23-19 All erosion control appears to be in place and working.
Site Visit Partial 9/23/2019 09/23/2019
Misc
Informational
09/23/2019
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Proof roll parking lot Partial 9/25/2019 09/25/2019
Misc
Informational
09/20/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Misc
Informational
09/20/2019
I observed the proof roll for the majority of he north side of the site. I verified the correct load weight and the equipment used. The areas that were roll tested passed with little to no deflection of the sub-grade. There are a few parking areas that were not tested due to the base rock being freshly installed and not ready or cured yet. I will mark the plans with the areas that passed and are ready for curb install. The crew plans to pour curb on Thursday 9/5/19 for the accepted areas and will call for an additional proof roll of the areas that were not tested today prior to installing curb.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site.
Misc
Informational
09/20/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site. The truck has a 20.69 ton load on. I looked in the truck at the load to confirm. Everything passed the proof roll except the entrance off Ward and infront of building 3 along with a small correction by building 5.
Misc
Informational
09/20/2019
9-20-19 2:28pm We have proof rolled the entrance on the west side of the site off Ward Rd. It has passed at this time. The proof roll on the east side of building 3 has two small areas that still need corrected. Rain is in the forecast. The job site could be subject to a new proof roll in all areas.
Misc
Informational
09/25/2019
9-25-19 We proof rolled the north end of the site again, it was holding up fine. All moisture will need to evaporate before asphalt can be laid. The entrance on the west side still needs a proof roll alone with the north entrance. The area infront of building 3 will need proof rolled as well.
Proof roll parking lot Partial 9/26/2019 09/26/2019
Misc
Informational
09/25/2019
7-30-19 proof roll passed on the east side of the site. The base rock is tight and ready for asphalt at this time.
Misc
Informational
09/25/2019
I observed the proof roll for the majority of he north side of the site. I verified the correct load weight and the equipment used. The areas that were roll tested passed with little to no deflection of the sub-grade. There are a few parking areas that were not tested due to the base rock being freshly installed and not ready or cured yet. I will mark the plans with the areas that passed and are ready for curb install. The crew plans to pour curb on Thursday 9/5/19 for the accepted areas and will call for an additional proof roll of the areas that were not tested today prior to installing curb.
Misc
Informational
09/25/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site.
Misc
Informational
09/25/2019
9-20-19 We are proof rolling the parking lot on the north end of the job site. The truck has a 20.69 ton load on. I looked in the truck at the load to confirm. Everything passed the proof roll except the entrance off Ward and infront of building 3 along with a small correction by building 5.
Misc
Informational
09/25/2019
9-20-19 2:28pm We have proof rolled the entrance on the west side of the site off Ward Rd. It has passed at this time. The proof roll on the east side of building 3 has two small areas that still need corrected. Rain is in the forecast. The job site could be subject to a new proof roll in all areas.
Misc
Informational
09/25/2019
9-25-19 We proof rolled the north end of the site again, it was holding up fine. All moisture will need to evaporate before asphalt can be laid. The entrance on the west side still needs a proof roll alone with the north entrance. The area infront of building 3 will need proof rolled as well.
Misc
Informational
09/26/2019
9-26-19 We proof rolled the north entrance and west entrance and they were pumping. They are going to dig them out and add more material. The section infront of building 3 pumped and it will be corrected with more material.
Pavement-Surface Partial 9/26/2019 09/26/2019
Misc
Informational
08/02/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
08/02/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
08/02/2019
Misc
Informational
08/02/2019
8-1-19 7:59am We are waiting for asphalt trucks on the south end of the job site.There is a overcast and a chance for rain. Temps out of the truck are averaging 280 degrees. 1:30pm They are done with the south side parking area and are moving to the north side of the parking lot.
Misc
Informational
08/02/2019
8-2-19 They are laying asphalt on the east side temps out of the truck are averaging 280 degrees. ESS is the crew laying the asphalt. The crew are now putting down the two inch lift in the road. They will be placing the cap on Monday 8-5-19.
Misc
Informational
09/26/2019
9-26-19 8:15am They are starting on the east side of the site. They have two loads of asphalt on the ground. The temps out of the trucks were 231 degrees. 10:28am They are working on the parking stalls on the east side. Musselman & Hall are laying the asphalt. The paver broke down at approximately 11:45am. 3:09pm The paver is fixed and the first truck has just arrived to continue to lay asphalt. 335 ton is laid so far. They are going to lay 800 ton today.
Pavement-Surface Partial 9/27/2019 09/27/2019
Misc
Informational
09/26/2019
9-26-19 8:15am They are starting on the east side of the site. They have two loads of asphalt on the ground. The temps out of the trucks were 231 degrees. 10:28am They are working on the parking stalls on the east side. Musselman & Hall are laying the asphalt. The paver broke down at approximately 11:45am. 3:09pm The paver is fixed and the first truck has just arrived to continue to lay asphalt. 335 ton is laid so far. They are going to lay 800 ton today.
Misc
Informational
09/26/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
09/26/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
09/26/2019
Misc
Informational
09/26/2019
8-1-19 7:59am We are waiting for asphalt trucks on the south end of the job site.There is a overcast and a chance for rain. Temps out of the truck are averaging 280 degrees. 1:30pm They are done with the south side parking area and are moving to the north side of the parking lot.
Misc
Informational
09/26/2019
8-2-19 They are laying asphalt on the east side temps out of the truck are averaging 280 degrees. ESS is the crew laying the asphalt. The crew are now putting down the two inch lift in the road. They will be placing the cap on Monday 8-5-19.
Misc
Informational
09/27/2019
9-27-19 8:40AM They layer 820 ton yesterday and have started laying asphalt on the north end this morning. Two trucks have arrived so far. 11:55am They have over 30 ton on the ground.
Pavement-Surface Partial 09/30/2019
Misc
Informational
09/27/2019
9-26-19 8:15am They are starting on the east side of the site. They have two loads of asphalt on the ground. The temps out of the trucks were 231 degrees. 10:28am They are working on the parking stalls on the east side. Musselman & Hall are laying the asphalt. The paver broke down at approximately 11:45am. 3:09pm The paver is fixed and the first truck has just arrived to continue to lay asphalt. 335 ton is laid so far. They are going to lay 800 ton today.
Misc
Informational
09/27/2019
7-19-19 8:30am 81 degrees outside. Musselman & Hall contractors are laying the asphalt. They have tac coated the curb and are now laying asphalt. The temp out of the trucks are meeting spec. Average temp has been 280 degrees. 1:30pm They are still laying asphalt, they are doing the road sections in two lifts due to the depth.
Misc
Informational
09/27/2019
7-20-19 6:10am 77 degrees with a high of 96 today. They are waiting on trucks to continue laying the base layer of asphalt. 6:53am The first truck as arrived. The temperature of the mix coming out of the truck is good, they have sprayed tac down for the second lift on the road ways. The average truck load is 30 ton. I have collected 7-19-19 load tickets. They are expecting to be finished with base by noon.
Misc
Informational
09/27/2019
Misc
Informational
09/27/2019
8-1-19 7:59am We are waiting for asphalt trucks on the south end of the job site.There is a overcast and a chance for rain. Temps out of the truck are averaging 280 degrees. 1:30pm They are done with the south side parking area and are moving to the north side of the parking lot.
Misc
Informational
09/27/2019
8-2-19 They are laying asphalt on the east side temps out of the truck are averaging 280 degrees. ESS is the crew laying the asphalt. The crew are now putting down the two inch lift in the road. They will be placing the cap on Monday 8-5-19.
Misc
Informational
09/27/2019
9-27-19 8:40AM They layer 820 ton yesterday and have started laying asphalt on the north end this morning. Two trucks have arrived so far. 11:55am They have over 30 ton on the ground.
Misc
Informational
09/30/2019
9-30-19 They have all of the first layer of the base down.
Street - Wedge Lift Partial 9/30/2019 09/30/2019
Misc
Informational
09/30/2019
9-30-19 9:18am They received to first truck at approximately 8:30am. They have started at the east end of the site.
Misc
Informational
09/30/2019
9-30-19 9:18am They received to first truck at approximately 8:30am. They have started at the east end of the site.
Misc
Informational
09/30/2019
9-30-19 9:18am They received to first truck at approximately 8:30am. They have started at the east end of the site. 1:23pm They are on the far north end of the site on there second pass.They have 545 ton down so far today.
Street - Surface Course Partial 10/1/2019 10/01/2019
Misc
Informational
08/09/2019
7-23-19 The first truck arrived at 8:10am
Misc
Informational
08/09/2019
7-23-19 The first truck arrived at 8:10am. Temperatures are in spec coming out of the truck, average truckload is 30 ton. I talked to the Forman for Musselman & Hall about the ADA parking he said we would address it at a later date. 6:29pm They are pulling off the header now. 6:40pm just received the load tickets.
Misc
Informational
10/01/2019
10-1-19 8:35am They have the north end of the site sprayed with tac. They will be laying the surface after they move there equipment into place. They are laying asphalt at the north west end of the site. 11:42am they are working on the road infront of building 5. 1:57pm They are at the north east side of the site now. Tuck temps are averaging 245 degrees.
Street - Surface Course Partial 10/2/2019 10/02/2019
Misc
Informational
10/01/2019
7-23-19 The first truck arrived at 8:10am
Misc
Informational
10/01/2019
7-23-19 The first truck arrived at 8:10am. Temperatures are in spec coming out of the truck, average truckload is 30 ton. I talked to the Forman for Musselman & Hall about the ADA parking he said we would address it at a later date. 6:29pm They are pulling off the header now. 6:40pm just received the load tickets.
Misc
Informational
10/01/2019
10-1-19 8:35am They have the north end of the site sprayed with tac. They will be laying the surface after they move there equipment into place. They are laying asphalt at the north west end of the site. 11:42am they are working on the road infront of building 5. 1:57pm They are at the north east side of the site now. Tuck temps are averaging 245 degrees.
Misc
Informational
10/02/2019
10-2-19 8:23am The parking lot has the top coat on except for the entrance lane on the north end of the site. They have the lane tac coated and are waiting on asphalt. 9:55am They have finished the lane and all surface is complete. I have collected all tickets from Musselman & Hall Contractors.
Sidewalk Inspection Partial 10/4/2019 10/04/2019
Misc
Informational
08/28/2019
5-15-19 The Sapp crew set forms to spec. Aggregate was compacted. They were informed to keep in compliance with ADA requirements and city spec.
Misc
Informational
08/28/2019
6-11-19 All sidewalk is ADA compliant except for one panel on the east side that comes into the approach. This panel was checked twice with myself and Bob Burns and will need replaced.
Misc
Informational
08/28/2019
8-28-19 They are setting up for sidewalk on the south side of the site. They needed some direction on ADA.
Misc
Informational
10/03/2019
10-3-19 2:11PM They are setting up sidewalk around the dumpster. This does have a ADA ramp. They are planning on pouring tomorrow.
Misc
Informational
10/04/2019
10-4-19 They have poured the sidewalk by the dumpster, it still needs cured. I will check it for ADA compliance after it has set up.
Sidewalk Inspection Partial 10/22/2019 10/28/2019
Misc
Informational
10/04/2019
9-17-19 9:00am All sidewalk on the south side of the site along Donavon meets ADA spec.
Sidewalk Inspection Partial 10/25/2019 10/28/2019
Misc
Informational
10/28/2019
9-17-19 9:00am All sidewalk on the south side of the site along Donavon meets ADA spec.
Misc
Informational
10/28/2019
10-25-19 The sidewalk ADA on Tudor a the east end has been removed and replaced, it is now ADA compliant.
Sidewalk Inspection Partial 10/28/2019 10/28/2019
Misc
Informational
10/28/2019
9-17-19 9:00am All sidewalk on the south side of the site along Donavon meets ADA spec.
Misc
Informational
10/28/2019
10-25-19 The sidewalk ADA on Tudor a the east end has been removed and replaced, it is now ADA compliant.
Misc
Informational
10/28/2019
10-28-19 There is two broke panels on the sidewalk on the east side of the site.
Erosion Control Inspection Partial 10/31/2019 10/31/2019
Misc
Informational
09/23/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
09/23/2019
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
09/23/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
09/23/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
09/23/2019
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
09/23/2019
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
10/31/2019
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Sanitary Sewer Construction Inspection Passed 03/16/2020
Misc
Informational
06/14/2019
Joe Starlin 02/21/2019 3:24 PM They have cored manhole 2-a on the north east side of the project to tie in the sanitary line.
Misc
Informational
06/14/2019
3-2-19 7am The crew for Sapp are laying sanitary line starting at 2-B the air temp is at 24 degrees.
Misc
Informational
06/14/2019
3-2-19 28 degrees. The crew placed approximately 210 feet of sanitary line and back filled with loader and sheep’s foot. Storm boxes were also back filled.
Misc
Informational
06/14/2019
4-26-19 The Sapp crew are digging out to place the last of the sanitary line along with the last manhole.
Misc
Informational
06/14/2019
Joe Starlin 05/06/2019 7:10 AM The crew placed 51' of sanitary line to manhole 2-C. They ran the service line out of 2-C manhole to the building. The have done the encasement as well.
Misc
Informational
06/14/2019
6-13-19 The Sapp crew are connecting sanitary line to building 4.
Misc
Informational
06/14/2019
6-14-19 light rain building 4,5,1 are tied in. The crew are working on connecting building 2 now at 9:am.
Water Line - Construction Inspection Passed 5/3/2019 03/16/2020
Misc
Informational
04/24/2019
4-10-19 The crew placed 200ft of pipe and set one hydrant.
Misc
Corrective Action Required
04/24/2019
4-11-19 The Sapp crew have placed approximately 200ft of water line along with rock and tape. They will be pouring kickers on 4-12-19.
Misc
Informational
04/24/2019
Joe Starlin 04/15/2019 7:37 AM John Jackson covered my projects Friday afternoon 4-12-19 The crew placed approximately 100' of water line and set a hydrant in the evening. They went under a storm pipe with 18" of clearance.
Misc
Informational
04/24/2019
4-15-19 8:45am Talked with the Forman Rudy, they will be installing water line to two buildings and a be setting a hydrant. I will be checking back with them later this morning. 2:05pm The crew have placed approximately 90’ of water line and are still working to get to the hydrant.
Misc
Informational
04/24/2019
4-16-19 The Sapp crew placed 17 sticks of water line in. Rock and backfill were to spec.
Misc
Informational
04/24/2019
Joe Starlin 04/22/2019 3:57 PM The Sapp crew placed 40' of 8" water line and back filled on the west side of the job site. They installed two risers in building no..4.
Misc
Informational
04/24/2019
4-23-19 The Sapp crew have placed 16 sticks approximately 320 feet of water line on the east side of the job. They have the correct amount of rock placed and tracer wire with tape.
Misc
Informational
04/24/2019
The crew placed fire line and domestic water line out of the building.
Misc
Informational
04/25/2019
4-25-19 The crew placed approximately 60’ of water line with risers. They are currently prepping for a vault.
Misc
Informational
05/06/2019
Joe Starlin 05/06/2019 7:15 AM The crew placed 20' of 6" SDR 21.
Water - Material Verification Passed 03/16/2020
Water - Material Verification Passed 03/16/2020
Sidewalk Inspection Passed 03/16/2020
Misc
Informational
10/28/2019
9-17-19 9:00am All sidewalk on the south side of the site along Donavon meets ADA spec.
Misc
Informational
10/28/2019
10-25-19 The sidewalk ADA on Tudor a the east end has been removed and replaced, it is now ADA compliant.
Misc
Informational
10/28/2019
10-28-19 There is two broke panels on the sidewalk on the east side of the site.
Pavement-Curb Construction Passed 03/16/2020
Misc
Informational
09/17/2019
Contractor continued to pour curbs .
Misc
Informational
09/17/2019
Contractor continued to pour and form curbs .
Misc
Informational
09/17/2019
10:06am 7-16-19 They are pouring curb on the east side of the job site. 2:59PM They are pulling forms and grouting curb, along with setting up more curb for hand pours.
Misc
Informational
09/17/2019
6-17-19 11:19am They are forming for curb.
Misc
Informational
09/17/2019
1:41pm 7-18-19 93 degrees with a excessive heat warning. They have poured more curb on the south and east side of the job site. I have collected the tickets and reminded them about grouting honeycomb. There are two crews James is heading one and Richard is heading the other. They are done pouring for the day.
Misc
Informational
09/17/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours” 11:30am They are done with hand pours.
Misc
Informational
09/17/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/17/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/17/2019
7-19-19 8:00am 81 degrees out side.They are pouring curb on the east side of the site “hand pours”
Misc
Informational
09/17/2019
7-23-19 11:45am they are pouring curb on the east side.
Misc
Informational
09/17/2019
5-7-19 They have all machine curb pours completed, this was done on 9-6-19 while I was off work. They are setting up on hand pours for Monday the 9th. I have collected all the concrete tickets KCMMB 4K mix. They poured all ADA sidewalk on Thursday on the south side as well.
Misc
Informational
09/17/2019
9-9-19 11:06am They are pouring curb on the north west side of the job site. 356 feet poured today. The are going to set up more hand pours. I will get tickets from Rich tomorrow.
Misc
Informational
09/17/2019
9-10-19 10:30am They are setting up forms for hand pours on the north east side.3:19pm They poured 412 feet of curb today. They are setting up forms for tomorrow.
Misc
Informational
09/17/2019
9-11-19 They are pouring curb on the north east side of the site. They are setting up more hand pours for tomorrow the 12th.
Misc
Informational
09/17/2019
9-12-19 10:23am They are pouring curb on the north side of site and are setting forms along the east side of site.1:42pm The crew are removing forms on the west side. They are done pouring. They have 492 feet of curb poured today.
Misc
Informational
09/17/2019
9-13-19 The curb is poured on the east side.
Misc
Informational
09/17/2019
9-17-19 All curb is poured on site and they have made cuts to add sidewalk.
Erosion Control Inspection Failed 03/18/2020
Misc
Informational
10/31/2019
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
10/31/2019
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
10/31/2019
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
10/31/2019
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
10/31/2019
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
10/31/2019
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
10/31/2019
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
03/18/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Site Visit Partial 8/22/2019 03/24/2020
Misc
Informational
08/22/2019
7-16-19 I spoke with the site GC Beenie about erosion control and having a swppp book onsite he said Jonathan Myers said electronic was fine.
Misc
Informational
08/22/2019
7-29-19 Spoke with GC Ben. They are hoping to lay asphalt on Wen. We went over some of the specs in the D&C.
Misc
Informational
08/22/2019
9-21-19 light rain. I Spoke with the Forman about what there planning moving ahead.
Misc
Informational
08/22/2019
8-22-19 8:52AM Andrew’s crew are wrecking forms and cleaning up today.
Misc
Informational
03/24/2020
3-23-20 10:19am Steve Robins and I had a talk with the carpenter for building number 5.
Misc
Informational
03/24/2020
3-23-20 10:19am Steve Robins and I had a talk with the carpenter for building number 5. Steve is going to talk with Public Works right of way about equipment being on the sidewalk on the north side of the site along Tudor Rd..
Site Visit Partial 04/01/2020
Misc
Informational
03/24/2020
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Misc
Informational
04/01/2020
4-1-20 I spoke with Ben the Superintendent of the site about the sidewalk on Tudor. One of the subcontractors are going to be driving on it to get material to the apartments.The sidewalk is a 10’ path and is in perfect condition. I informed them that they will need to replace any damaged panels and that it is on them to prove to us the that they were damaged before. I personally walked and checked the panels. There are no sags, dips, or cracks.
Erosion Control Inspection Failed 06/08/2020
Misc
Informational
03/18/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
03/18/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
03/18/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
03/18/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
03/18/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
03/18/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
03/18/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
03/18/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
06/08/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made.
Site Visit Partial 06/17/2020
Misc
Informational
04/01/2020
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Misc
Informational
04/01/2020
4-1-20 I spoke with Ben the Superintendent of the site about the sidewalk on Tudor. One of the subcontractors are going to be driving on it to get material to the apartments.The sidewalk is a 10’ path and is in perfect condition. I informed them that they will need to replace any damaged panels and that it is on them to prove to us the that they were damaged before. I personally walked and checked the panels. There are no sags, dips, or cracks. 6-17-20 9:42am We had a final walk through for the site. Sidewalk needs installed on Donavon and vegetation needs established.
Erosion Control Inspection Failed 07/10/2020
Misc
Informational
06/08/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
06/08/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
06/08/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
06/08/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
06/08/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
06/08/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
06/08/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
06/08/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
06/08/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken.
Erosion Control Inspection Failed 07/28/2020
Misc
Informational
07/10/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
07/10/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
07/10/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
07/10/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
07/10/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
07/10/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
07/10/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
07/10/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
07/10/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall.
Erosion Control Inspection Partial 08/07/2020
Misc
Informational
07/28/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
07/28/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
07/28/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
07/28/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
07/28/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
07/28/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
07/28/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
07/28/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
07/28/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall. 8-7-20 3:33pm I met with Brett Holbrook on site to talk about erosion controls. The erosion controls are in place but no extras have been added to help with the issues on the west and north side of the site.
Erosion Control Inspection Partial 8/10/2020 8/10/2020 08/10/2020
Misc
Informational
08/07/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/07/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
08/07/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
08/07/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
08/07/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
08/07/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
08/07/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
08/07/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
08/07/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall. 8-7-20 3:33pm I met with Brett Holbrook on site to talk about erosion controls. The erosion controls are in place but no extras have been added to help with the issues on the west and north side of the site. 8-10-20 2:57pm All erosion controls are in place at this time and working.
Erosion Control Inspection Failed 08/17/2020
Misc
Informational
08/10/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/10/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
08/10/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
08/10/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
08/10/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
08/10/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
08/10/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
08/10/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
08/10/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall. 8-7-20 3:33pm I met with Brett Holbrook on site to talk about erosion controls. The erosion controls are in place but no extras have been added to help with the issues on the west and north side of the site. 8-10-20 2:57pm All erosion controls are in place at this time and working.
Misc
Informational
08/17/2020
8-17-20 2:38pm There is excessive silt on the sidewalk and cutters on the north end of the job site running along Tudor Rd. There is silt on top of the storm boxes as well. The driveways on Tudor at the NE corner have silt that needs addressed as well.
Site Visit Partial 8/18/2020 8/18/2020 08/18/2020
Misc
Informational
06/17/2020
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Misc
Informational
06/17/2020
4-1-20 I spoke with Ben the Superintendent of the site about the sidewalk on Tudor. One of the subcontractors are going to be driving on it to get material to the apartments.The sidewalk is a 10’ path and is in perfect condition. I informed them that they will need to replace any damaged panels and that it is on them to prove to us the that they were damaged before. I personally walked and checked the panels. There are no sags, dips, or cracks. 6-17-20 9:42am We had a final walk through for the site. Sidewalk needs installed on Donavon and vegetation needs established. 8-19-20 8:01am Steve Robbins and I spoke with Ben about the slopes on the north side of the site. Kent Monter will be coming on site to verify the 3:1 slope.
Erosion Control Inspection Partial 10/28/2020
Misc
Informational
08/17/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
08/17/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
08/17/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
08/17/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
08/17/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
08/17/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
08/17/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
08/17/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
08/17/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall. 8-7-20 3:33pm I met with Brett Holbrook on site to talk about erosion controls. The erosion controls are in place but no extras have been added to help with the issues on the west and north side of the site. 8-10-20 2:57pm All erosion controls are in place at this time and working.
Misc
Informational
08/17/2020
8-17-20 2:38pm There is excessive silt on the sidewalk and cutters on the north end of the job site running along Tudor Rd. There is silt on top of the storm boxes as well. The driveways on Tudor at the NE corner have silt that needs addressed as well.
Misc
Informational
10/28/2020
10-28-20 2:33pm There is a section of silt fence down on the north east side of the site. This will need to be corrected.
Erosion Control Inspection Partial 11/10/2020 11/10/2020 11/10/2020
Misc
Informational
10/28/2020
7-24-19 10:22AM Silt fence is down on the west side of site along Ward RD. Silt fence is down along the north side of site alone Tudor RD. As well. There is lots of silt on the sidewalks that needs cleaned up.
Misc
Informational
10/28/2020
8-21-19 There is one small section of silt fence down along Ward rd. Everything else seems to be compliant at this time. I will call Jonathan Myers so that he is aware of it.
Misc
Informational
10/28/2020
5-23-19 Silt fence is down in random spots of the job site. I called Jonathan Myers the project manager at 8:45am about the erosion control, he said he would address the problem areas.
Misc
Informational
10/28/2020
6-11-19 The silt fence is down on the south side of the site. The west side of the site has silt fence down and is missing sections completely. I will be emailing Jonathan Myers about the matter.
Misc
Informational
10/28/2020
8-30-19 10:03am Rain. All erosion control appears to be in place and working at this time.
Misc
Informational
10/28/2020
9-23-19 All erosion control appears to be in place and working.
Misc
Informational
10/28/2020
10-31-19 29 degrees with snow. All erosion controls appear to be holding up.
Misc
Informational
10/28/2020
3-18-20 The silt fence is down and needs added in two spots along Ward Rd. There is debris on the north side of the site along Tudor Rd. on the walking path. The entrance/exit on the north side of the site need some erosion controls in place and silt/debris cleaned up.
Misc
Informational
10/28/2020
6-8-20 7:55am The silt fence is down on the East side of the site and the North side of the site. Gutter buddy’s are full on the North and South side as well and need cleaned out. I have spoke with the superintendent Cori about the corrections that need to be made. 7-10-20 9:15am There is silt on the sidewalk on the North side of the site running along Tudor Rd. The silt fence is up but not controlling the erosion. Extra measures need to be taken. 7-28-20 2:59pm Silt is running off the hillside on the west side of the site. There is no stabilization on the hill and the straw waddles are not holding back the silt. The slop here does not appear to be 3:1 and will require a wall if not at 3:1. On Tudor Rd at the north end of the site the silt fence is down again and the sidewalk and gutter buddy’s are full of silt. This area needs more erosion control than just silt fence. The hillside need stabilization. The slope here does not appear to be 3:1 and will require a wall. 8-7-20 3:33pm I met with Brett Holbrook on site to talk about erosion controls. The erosion controls are in place but no extras have been added to help with the issues on the west and north side of the site. 8-10-20 2:57pm All erosion controls are in place at this time and working.
Misc
Informational
10/28/2020
8-17-20 2:38pm There is excessive silt on the sidewalk and cutters on the north end of the job site running along Tudor Rd. There is silt on top of the storm boxes as well. The driveways on Tudor at the NE corner have silt that needs addressed as well.
Misc
Informational
10/28/2020
10-28-20 2:33pm There is a section of silt fence down on the north east side of the site. This will need to be corrected. 11-10-20 2:13pm The erosion controls are in place. One section of fence is down and will put back in place.
Site Visit Partial 11/24/2020
Misc
Informational
08/18/2020
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Misc
Informational
08/18/2020
4-1-20 I spoke with Ben the Superintendent of the site about the sidewalk on Tudor. One of the subcontractors are going to be driving on it to get material to the apartments.The sidewalk is a 10’ path and is in perfect condition. I informed them that they will need to replace any damaged panels and that it is on them to prove to us the that they were damaged before. I personally walked and checked the panels. There are no sags, dips, or cracks. 6-17-20 9:42am We had a final walk through for the site. Sidewalk needs installed on Donavon and vegetation needs established. 8-19-20 8:01am Steve Robbins and I spoke with Ben about the slopes on the north side of the site. Kent Monter will be coming on site to verify the 3:1 slope. 11-24-20 9:41am They are building a small wall around the manhole on the north side of the site. We still have not herd back on the shots for the 3:1 slope.
Site Visit Partial 12/09/2020
Misc
Informational
11/24/2020
9-23-19 They are pulling plastic up that was covering the base rock. We will be proof rolling on Tuesday 9-24-19.
Misc
Informational
11/24/2020
4-1-20 I spoke with Ben the Superintendent of the site about the sidewalk on Tudor. One of the subcontractors are going to be driving on it to get material to the apartments.The sidewalk is a 10’ path and is in perfect condition. I informed them that they will need to replace any damaged panels and that it is on them to prove to us the that they were damaged before. I personally walked and checked the panels. There are no sags, dips, or cracks. 6-17-20 9:42am We had a final walk through for the site. Sidewalk needs installed on Donavon and vegetation needs established. 8-19-20 8:01am Steve Robbins and I spoke with Ben about the slopes on the north side of the site. Kent Monter will be coming on site to verify the 3:1 slope. 11-24-20 9:41am They are building a small wall around the manhole on the north side of the site. We still have not herd back on the shots for the 3:1 slope. 12-9-20 3:27pm They have laid sod and the slope on the north side of the site is at 3:1.
Retaining Wall Inspection Passed 02/12/2021
Documents & Images
Date Uploaded File Type Document Name
09/28/2018 Receipt Receipt for transaction: 2018-006592
10/10/2018 Letter DE-Permit
12/18/2018 Letter DE-Daily Inspection Summary
02/12/2019 Letter DE-Daily Inspection Summary
02/13/2019 Letter INSPECTION SUMMARY
02/13/2019 Letter INSPECTION SUMMARY
02/13/2019 Letter INSPECTION SUMMARY
02/21/2019 Letter DE-Daily Inspection Summary
02/26/2019 Letter INSPECTION SUMMARY
02/26/2019 Letter INSPECTION SUMMARY
02/28/2019 Letter INSPECTION SUMMARY
03/01/2019 Letter INSPECTION SUMMARY
03/01/2019 Letter INSPECTION SUMMARY
03/01/2019 image
03/01/2019 image0
03/01/2019 Letter INSPECTION SUMMARY
03/01/2019 Letter INSPECTION SUMMARY
03/01/2019 image1
03/01/2019 image2
03/01/2019 image3
03/01/2019 Letter INSPECTION SUMMARY
03/02/2019 image4
03/02/2019 Letter INSPECTION SUMMARY
03/06/2019 image5
03/06/2019 image6
03/06/2019 image7
03/06/2019 image8
03/06/2019 Letter INSPECTION SUMMARY
03/07/2019 image9
03/07/2019 image10
03/07/2019 image11
03/07/2019 image12
03/07/2019 Letter INSPECTION SUMMARY
03/11/2019 image13
03/11/2019 image14
03/11/2019 image15
03/11/2019 image16
03/11/2019 image17
03/11/2019 Letter INSPECTION SUMMARY
03/12/2019 Letter INSPECTION SUMMARY
03/14/2019 image18
03/14/2019 image19
03/14/2019 Letter INSPECTION SUMMARY
03/15/2019 image20
03/15/2019 Letter INSPECTION SUMMARY
03/18/2019 image21
03/18/2019 image22
03/19/2019 image23
03/19/2019 Letter INSPECTION SUMMARY
03/19/2019 Letter INSPECTION SUMMARY
03/19/2019 image24
03/19/2019 image25
03/19/2019 image26
03/19/2019 Letter INSPECTION SUMMARY
03/20/2019 image27
03/20/2019 image28
03/20/2019 Letter INSPECTION SUMMARY
03/21/2019 Letter INSPECTION SUMMARY
03/21/2019 image29
03/21/2019 image30
03/21/2019 Letter INSPECTION SUMMARY
03/22/2019 image31
03/22/2019 image32
03/22/2019 image33
03/22/2019 image34
03/25/2019 image35
03/25/2019 image36
03/25/2019 image37
03/25/2019 image38
03/25/2019 image39
03/25/2019 Letter INSPECTION SUMMARY
03/26/2019 Letter INSPECTION SUMMARY
03/27/2019 image40
03/27/2019 image41
03/27/2019 image42
03/27/2019 Letter INSPECTION SUMMARY
03/28/2019 image43
03/28/2019 Letter INSPECTION SUMMARY
04/09/2019 image44
04/09/2019 image45
04/09/2019 image46
04/09/2019 image47
04/09/2019 Letter INSPECTION SUMMARY
04/10/2019 image48
04/10/2019 image49
04/10/2019 image50
04/10/2019 image51
04/10/2019 image52
04/10/2019 Letter INSPECTION SUMMARY
04/11/2019 image53
04/11/2019 image54
04/11/2019 Letter INSPECTION SUMMARY
04/12/2019 image55
04/12/2019 image56
04/12/2019 image57
04/12/2019 image58
04/12/2019 image59
04/12/2019 image60
04/12/2019 Letter INSPECTION SUMMARY
04/15/2019 Letter DE-Daily Inspection Summary
04/15/2019 image61
04/15/2019 image62
04/15/2019 image63
04/15/2019 image64
04/15/2019 Letter INSPECTION SUMMARY
04/15/2019 Letter INSPECTION SUMMARY
04/16/2019 image65
04/16/2019 image66
04/16/2019 image67
04/16/2019 image68
04/16/2019 Letter INSPECTION SUMMARY
04/16/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/18/2019 Letter INSPECTION SUMMARY
04/22/2019 Letter DE-Daily Inspection Summary
04/23/2019 image69
04/23/2019 Letter INSPECTION SUMMARY
04/23/2019 Letter INSPECTION SUMMARY
04/24/2019 image70
04/24/2019 image71
04/24/2019 Letter INSPECTION SUMMARY
04/25/2019 image72
04/25/2019 image73
04/25/2019 image74
04/25/2019 image75
04/25/2019 Letter INSPECTION SUMMARY
04/25/2019 image76
05/03/2019 image77
05/06/2019 Letter DE-Daily Inspection Summary
05/06/2019 image78
05/06/2019 image79
05/06/2019 image80
05/06/2019 image81
05/06/2019 Letter INSPECTION SUMMARY
05/09/2019 image82
05/09/2019 image83
05/09/2019 Letter INSPECTION SUMMARY
05/10/2019 Letter INSPECTION SUMMARY
05/10/2019 image84
05/10/2019 image85
05/10/2019 image86
05/10/2019 Letter INSPECTION SUMMARY
05/13/2019 Letter DE-Daily Inspection Summary
05/14/2019 image87
05/14/2019 image88
05/14/2019 image89
05/14/2019 image90
05/14/2019 image91
05/14/2019 image92
05/14/2019 image93
05/14/2019 image94
05/14/2019 image95
05/14/2019 image96
05/14/2019 image97
05/14/2019 image98
05/14/2019 image99
05/14/2019 image100
05/14/2019 image101
05/14/2019 Letter INSPECTION SUMMARY
05/14/2019 Letter INSPECTION SUMMARY
05/15/2019 Letter INSPECTION SUMMARY
05/15/2019 image valve at main
05/15/2019 image north vault
05/15/2019 image line that goes to building 4
05/15/2019 image102
05/15/2019 image fire line to vault
05/15/2019 image main and fire line south side
05/15/2019 image second line from the south
05/15/2019 Letter INSPECTION SUMMARY
05/16/2019 summit square
05/16/2019 IMG_0301
05/16/2019 Letter INSPECTION SUMMARY
05/23/2019 Letter INSPECTION SUMMARY
05/28/2019 image north side
05/28/2019 image south side
05/28/2019 image103
05/28/2019 image south side inlet
05/28/2019 image south side dirt in the road
05/28/2019 image west side
05/28/2019 Letter INSPECTION SUMMARY
06/11/2019 Letter INSPECTION SUMMARY
06/11/2019 Letter INSPECTION SUMMARY
06/12/2019 image104
06/12/2019 image105
06/13/2019 image tie in building number 4 sanitary
06/13/2019 image Sanitary for building four
06/13/2019 image sanitary or building for two
06/13/2019 Letter INSPECTION SUMMARY
06/13/2019 image Subgrade proof roll
06/13/2019 image proof roll
06/13/2019 image proof roll pumping
06/13/2019 image proof roll pumping SW corner subgrade
06/13/2019 image sub grade pumping proof roll SW
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 image building five sanitary
06/14/2019 image building five sanitary two
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 Letter INSPECTION SUMMARY
06/14/2019 image building 2 sanitary
06/14/2019 image sanitary building 2
06/14/2019 image storm pipe at C-3
06/14/2019 imageBuilding five sanitary line concrete
06/14/2019 Letter INSPECTION SUMMARY
06/17/2019 image storm pipe from C3
06/17/2019 C-4 box image
06/17/2019 image box C-4
06/17/2019 image collar pour C-4
06/18/2019 image c4 collar
06/18/2019 Letter INSPECTION SUMMARY
06/18/2019 Letter INSPECTION SUMMARY
06/18/2019 image fire hydrant building 3
06/18/2019 Letter INSPECTION SUMMARY
06/18/2019 image correction spot
06/18/2019 Letter INSPECTION SUMMARY
06/19/2019 Letter INSPECTION SUMMARY
06/19/2019 image waterline N side of building 1
06/19/2019 image106
06/19/2019 Summit Square PH2 SWPPP
06/19/2019 Letter INSPECTION SUMMARY
06/19/2019 image north side of building 1
06/19/2019 image N side of building 1
06/19/2019 Letter INSPECTION SUMMARY
06/20/2019 image sanitary line building 3
06/20/2019 image proof roll ticket for curb S side
06/20/2019 image Domestic water line 150
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 image proof roll ticket
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/24/2019 image pressure gauge 4
06/24/2019 image fireline pressure gauge for 1,2,3 clubhouse
06/24/2019 image pressure gauge for clubhouse
06/24/2019 Letter INSPECTION SUMMARY
06/24/2019 Letter INSPECTION SUMMARY
06/24/2019 image pressure gauge building one for domestic water
06/24/2019 Letter INSPECTION SUMMARY
06/25/2019 Letter INSPECTION SUMMARY
06/25/2019 Letter INSPECTION SUMMARY
06/26/2019 image Subgrade proof roll between building four and five
06/26/2019 image Subgrade proof roll building four and five
06/26/2019 58325238379__3AEB48A0-19DD-4937-A313-30043177EE65
06/26/2019 image get in their parking lot proof roll north east side of site
06/26/2019 58325405565__CBB360DD-E402-4FC3-B844-FDA38CE4E088
06/26/2019 image107
06/26/2019 image building for Northside
06/28/2019 image108
06/28/2019 image rub proof roll fail pic
07/02/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter INSPECTION SUMMARY
07/08/2019 image curb proof roll AC
07/08/2019 image Curb Proof Roll AC 1
07/08/2019 image curb proof roll AC 2
07/08/2019 image curb proof roll AC 3
07/09/2019 Letter INSPECTION SUMMARY
07/09/2019 Letter INSPECTION SUMMARY
07/10/2019 Letter INSPECTION SUMMARY
07/10/2019 Letter INSPECTION SUMMARY
07/11/2019 Letter INSPECTION SUMMARY
07/12/2019 IMG_0371 Summit curb proof roll Fail
07/12/2019 IMG_0372 Summit curb proof roll 1
07/12/2019 Letter DE-Daily Inspection Summary
07/15/2019 Letter INSPECTION SUMMARY
07/15/2019 Letter INSPECTION SUMMARY
07/15/2019 Letter INSPECTION SUMMARY
07/16/2019 image curb east side
07/16/2019 image curb east side0
07/16/2019 Letter INSPECTION SUMMARY
07/16/2019 image parking stall west side
07/16/2019 Letter INSPECTION SUMMARY
07/18/2019 Letter INSPECTION SUMMARY
07/19/2019 image ticket for asphalt
07/19/2019 image asphalt laying
07/19/2019 image tac coat curb
07/19/2019 image109
07/19/2019 Letter INSPECTION SUMMARY
07/20/2019 Letter INSPECTION SUMMARY
07/22/2019 Letter INSPECTION SUMMARY
07/23/2019 image top coat asphalt
07/23/2019 image curb eastside
07/23/2019 Letter INSPECTION SUMMARY
07/23/2019 Letter INSPECTION SUMMARY
07/24/2019 Letter INSPECTION SUMMARY
07/25/2019 Letter INSPECTION SUMMARY
07/30/2019 Letter INSPECTION SUMMARY
08/01/2019 Asphalt ticket for 8-1-19
08/01/2019 Asphalt S side 8-1-9
08/02/2019 East side asphalt
08/08/2019 Asphalt surface
08/12/2019 Sub grade proof roll 8-10 east side
08/12/2019 Sub roll building 5
08/14/2019 East side of building 5
08/14/2019 South east side building 5
08/15/2019 Entrance off Tudor
08/21/2019 Letter INSPECTION SUMMARY
08/23/2019 Proof roll ticket
08/23/2019 West entrance fail
08/27/2019 Letter INSPECTION SUMMARY
08/30/2019 Letter INSPECTION SUMMARY
09/03/2019 19
09/03/2019 Letter INSPECTION SUMMARY
09/07/2019 North side of site curb
09/09/2019 Curb north west side
09/09/2019 Curb NW corner
09/10/2019 water report 2 passed
09/10/2019 test
09/10/2019 water samples 1 passed
09/10/2019 Letter INSPECTION SUMMARY
09/20/2019 Proof roll fail east side of building
09/26/2019 East side parking lot
09/26/2019 Asphalt east side
01/23/2020 1I90135 Final Report water samples 1
01/23/2020 Summit Square Apts - Phase II_Proofrolling Observation_2019-07-02_Rpt.0370 3
01/23/2020 Summit Square Apts - Phase II_Proofrolling Observation_2019-07-02_Rpt.0370 4
01/23/2020 Summit Square Apts - Phase II_Proofrolling Observation_2019-07-02_Rpt.0370 number2
01/23/2020 Summit Square Apts - Phase II_Proofrolling Observation_2019-07-02_Rpt.0370
01/23/2020 1I90135 Final Report water samples 1 passed
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter DE-Daily Inspection Summary
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/18/2020 Letter INSPECTION SUMMARY
03/24/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
07/28/2020 Letter INSPECTION SUMMARY
08/07/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/17/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
08/18/2020 Letter INSPECTION SUMMARY
10/28/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter INSPECTION SUMMARY
11/24/2020 Letter DE-Punch List
11/24/2020 Letter DE-Punch List
12/09/2020 Letter INSPECTION SUMMARY
02/16/2021 Letter INSPECTION SUMMARY
02/16/2021 Letter DE-Punch List
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
02/16/2021 Letter DE-Certificate of Substantial Completion Multiple Lot
03/09/2021 Letter DE-Certificate of Final Acceptance (Commercial)
03/09/2021 The Donovan Summit Square Apartments Phase II Final Acceptance
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home