Permit Application Status

PRRES20250504


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20250504
Building Permit - Residential
Issued
ACH DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. COVERED PATIO.
02/14/2025
03/04/2025
08/19/2025
Locations
Contacts
A PLACE CALLED HOME CONSTRUCTION CO INC, Address:804 SE WILLOW PL, Phone:(816) 365-4663  
ACH DEVELOPMENT LLC, Address:3170 NE CARNEGIE DR STE 400  
Randy Gish, Address:804 SE WILLOW PL, Phone:(816) 365-4663  
MCDANIEL FURNACE & SHEET METAL, Address:2905 S M 291 FRONTAGE RD, Phone:(816) 373-6370  
CROWN ELECTRICAL SERVICES, Address:1213 SE 11TH TER, Phone:(816) 272-5379  
  
RANDYGISH@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 03/04/2025
Water Meter Fee $748.03 $748.03 Paid 03/04/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 03/04/2025
Right of Way Permit Fee $85.00 $85.00 Paid 03/04/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 03/04/2025
Valuation Fee New Single Family $1,506.98 $1,506.98 Paid 03/04/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 08/07/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 08/07/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Piers/Caissons Inspection - Residential Pending
Misc
Corrective Action Required
07/11/2025
Dig down to original bearing soil
All Rough Inspection - Residential Pending
Misc
Corrective Action Required
08/04/2025
-Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc **Nail to the header per plan. Look at the detail figure R602.10.6.2 on page S1.1 -Window located within 24” of deck door must be safety tempered glazing -Fb basement wall space from ceiling space; fb wall from joist space; provide vertical fire blocking at max 10 ft intervals **Pack fire-blocking insulation tightly in place; fb wall from horizontal spaces (soffits, joist space, fur down ceiling space, etc); provide vertical fire blocking every 10 ft or less **DO NOT ROCK. **3RD FAILED INSPECTION. REINSPECTION FEE ASSESSED
Misc
Corrective Action Required
08/04/2025
7/31-Meet builder on site to go over outstanding deficiencies
Driveway Inspection Pending
Miscellaneous Correction
Informational
08/19/2025
5-13-25 NS Site visited and it appears driveway has not yet started. 8-19-25 NS Site visited for a driveway and sidewalk and it appears both meet city standards
Sidewalk Inspection Pending
Misc
Informational
08/19/2025
5-13-25 NS Site visited, and it appears sidewalk has not yet started. 8-19-25 NS Site visited for a driveway and sidewalk and it appears both meet city standards
Erosion Control Inspection Residential Pending 8/26/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/08/2025
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND REAR OF LOT. CLEAN DIRT AND DEBRIS OFF THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. 8-8-24 NS Site visited and no erosion control is installed and site has failed
Footing Inspection - Residential Passed 3/27/2025 03/27/2025
Informational
03/27/2025
Footing approved by engineer
Erosion Control Inspection Residential Partial 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/27/2025
Erosion control is in compliance
Underslab Plumbing Inspection - Residential Not Ready 3/27/2025 3/27/2025 03/27/2025
Misc
Corrective Action Required
03/27/2025
Not ready for inspection
Underslab Plumbing Inspection - Residential Passed 3/28/2025 3/28/2025 03/28/2025
Misc
Resolved
03/28/2025
Not ready for inspection
Driveway Inspection Partial 5/14/2025 05/13/2025
Miscellaneous Correction
Informational
05/13/2025
5-13-25 NS Site visited and it appears driveway has not yet started.
Sidewalk Inspection Partial 5/14/2025 05/13/2025
Misc
Informational
05/13/2025
5-13-25 NS Site visited, and it appears sidewalk has not yet started.
Erosion Control Inspection Residential Failed 7/1/2025 07/01/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
03/27/2025
DEFICIENT EROSION CONTROL INSTALLATION. CLEAN DIRT AND DEBRIS OFF THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Water Service Inspection - R Passed 7/1/2025 7/1/2025 07/01/2025
Erosion Control Inspection Residential Failed 7/3/2025 07/03/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/01/2025
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND REAR OF LOT. CLEAN DIRT AND DEBRIS OFF THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Sewer Service Inspection - R Passed 7/3/2025 7/3/2025 07/03/2025
Gas Service Inspection - Residential Passed 7/3/2025 7/3/2025 07/03/2025
Piers/Caissons Inspection - Residential Failed 7/11/2025 7/11/2025 07/11/2025
Misc
Corrective Action Required
07/11/2025
Dig down to original bearing soil
Electrical Service Inspection Failed 7/17/2025 07/17/2025
Misc
Corrective Action Required
07/17/2025
Grounding clamp must be listed for rebar connection
All Rough Inspection - Residential Failed 7/18/2025 7/17/2025 07/17/2025
Misc
Corrective Action Required
07/17/2025
**Clean mulch off the street -Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc -Provide “2x2”x3/16” washers for PFH -Nail corner studs 16d@12” oc or equivalent nailing -Toe nail ceiling joists to top plates (3-10d) -Nail hanger at lvl-lvl connection above rear dinette -Provide security blocking at rear deck door -Window located within 24” of deck door must be safety tempered glazing -Brace ends of lvl roof beams against rotation -Fb fireplace wall space from roof; fb wall plate penetrations at master bedroom/bathroom wall -Protect wiring at wall plates adjacent to master bedroom entrance door -Move smoke alarm minimum 3 ft from master bathroom door opening -Provide hanger support for ceiling joist at bathroom walls -Secure wiring per code within soffit -Fb basement wall space from ceiling space; fb wall from joist space; fb all wall plate penetrations throughout; provide vertical fire blocking at max 20 ft intervals -Toe nail all joists to basement plates per code -Provide full bearing support for 3x lvl beam at exterior wall -Anchor all steel columns to floor -Move lvl beam close to align with bearing wall (laundry) **DO NOT INSULATE
All Rough Inspection - Residential Failed 7/25/2025 7/25/2025 07/25/2025
Misc
Corrective Action Required
07/17/2025
-Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc **Nail to the header per plan. Look at the detail figure R602.10.6.2 on page S1.1 -Toe nail ceiling joists in garage, small office, and pantry -Window located within 24” of deck door must be safety tempered glazing -Secure wiring per code within soffit **Securely fasten NM in place every 4.5 ft -Fb basement wall space from ceiling space; fb wall from joist space; provide vertical fire blocking at max 10 ft intervals **Pack fire-blocking insulation tightly in place; fb wall from horizontal spaces (soffits, joist space, fur down ceiling space, etc); provide vertical fire blocking every 10 ft or less -Toe nail all joists to basement plates per code **OK TO INSULATE. PROVIDE LADDER ON SITE FOR RE-INSPECTION
All Rough Inspection - Residential Not Ready 7/30/2025 7/30/2025 07/30/2025
Misc
Corrective Action Required
07/25/2025
-Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc **Nail to the header per plan. Look at the detail figure R602.10.6.2 on page S1.1 -Window located within 24” of deck door must be safety tempered glazing -Fb basement wall space from ceiling space; fb wall from joist space; provide vertical fire blocking at max 10 ft intervals **Pack fire-blocking insulation tightly in place; fb wall from horizontal spaces (soffits, joist space, fur down ceiling space, etc); provide vertical fire blocking every 10 ft or less **DO NOT ROCK. **3RD FAILED INSPECTION. REINSPECTION FEE ASSESSED
Electrical Service Inspection Passed 7/31/2025 07/31/2025
Misc
Resolved
07/31/2025
Grounding clamp must be listed for rebar connection
All Rough Inspection - Residential Failed 7/31/2025 7/31/2025 07/31/2025
Misc
Corrective Action Required
07/30/2025
-Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc **Nail to the header per plan. Look at the detail figure R602.10.6.2 on page S1.1 -Window located within 24” of deck door must be safety tempered glazing -Fb basement wall space from ceiling space; fb wall from joist space; provide vertical fire blocking at max 10 ft intervals **Pack fire-blocking insulation tightly in place; fb wall from horizontal spaces (soffits, joist space, fur down ceiling space, etc); provide vertical fire blocking every 10 ft or less **DO NOT ROCK. **3RD FAILED INSPECTION. REINSPECTION FEE ASSESSED
Misc
Corrective Action Required
07/31/2025
7/31-Meet builder on site to go over outstanding deficiencies
All Rough Inspection - Residential Passed 8/4/2025 8/4/2025 08/05/2025
Misc
Corrective Action Required
07/31/2025
-Nail garage PFH wall sheathing to studs, sill plates, and header w/ 8d@3” oc **Nail to the header per plan. Look at the detail figure R602.10.6.2 on page S1.1 -Window located within 24” of deck door must be safety tempered glazing -Fb basement wall space from ceiling space; fb wall from joist space; provide vertical fire blocking at max 10 ft intervals **Pack fire-blocking insulation tightly in place; fb wall from horizontal spaces (soffits, joist space, fur down ceiling space, etc); provide vertical fire blocking every 10 ft or less **DO NOT ROCK. **3RD FAILED INSPECTION. REINSPECTION FEE ASSESSED
Misc
Corrective Action Required
07/31/2025
7/31-Meet builder on site to go over outstanding deficiencies
Erosion Control Inspection Residential Failed 8/8/2025 08/08/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/03/2025
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND REAR OF LOT. CLEAN DIRT AND DEBRIS OFF THE STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. 8-8-24 NS Site visited and no erosion control is installed and site has failed
Driveway Inspection Partial 8/19/2025 8/19/2025 08/19/2025
Miscellaneous Correction
Informational
05/13/2025
5-13-25 NS Site visited and it appears driveway has not yet started. 8-19-25 NS Site visited for a driveway and sidewalk and it appears both meet city standards
Sidewalk Inspection Partial 8/19/2025 8/19/2025 08/19/2025
Misc
Informational
05/13/2025
5-13-25 NS Site visited, and it appears sidewalk has not yet started. 8-19-25 NS Site visited for a driveway and sidewalk and it appears both meet city standards
Documents & Images
Date Uploaded File Type Document Name
02/20/2025 Permit Codes Residential Plan Review
02/21/2025 Application Form APPLICATION
02/21/2025 Approved Plans APPROVED PLANS
02/21/2025 Plot Plan APPROVED PLOT PLAN
02/21/2025 Permit Codes Residential Plan Review
03/04/2025 Permit DS Building Permit
03/04/2025 Receipt Receipt for transaction:2025-001269
03/10/2025 M L Crose 4331 NE Hideaway Dr LSMO 3rd Party Footing Inspection Report 3-10-25
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/27/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/01/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/11/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/17/2025 Letter INSPECTION SUMMARY
07/25/2025 Letter INSPECTION SUMMARY
07/30/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter INSPECTION SUMMARY
07/31/2025 Letter INSPECTION SUMMARY
08/04/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/07/2025 Receipt Receipt for transaction:2025-006219
08/08/2025 Letter INSPECTION SUMMARY
08/08/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/19/2025 Letter INSPECTION SUMMARY
08/21/2025 2025_08_19_4331 NE Hideaway Dr_DPier
08/21/2025 2025_08_19_4331 NE Hideaway Dr_DPier_Sealed
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home