Summary
PRRES20250036
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW SINGLE FAMILY HOME - SLAB ON GRADE, COVERED PORCH
01/02/2025
06/25/2025
Locations
Contacts
Avital Homes, LLC, Address:7500 W 151st Street, #23100, Phone:(816) 914-7128  
Doug Jenson, Address:11010 Nora Dodge Dr, Phone:(816) 266-0685  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
RED DOG ELECTRIC SERVICES, Address:PO BOX 1, Phone:(913) 208-4816  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
Doug Jenson - Avital Homes, Phone:(816) 266-0685  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 05/22/2025
Water Meter Fee $748.03 $748.03 Paid 05/22/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/22/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/22/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/22/2025
Valuation Fee New Single Family $1,081.88 $1,081.88 Paid 05/22/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Piers/Caissons Inspection - Residential Pending
Plot Plan Inspection Pending
Erosion Control Inspection Residential Pending
Gas Service Inspection - Residential Pending
Occupancy Inspection - Codes Residential Pending
Sidewalk Inspection Pending
Driveway Inspection Pending 4/2/2026 4/2/2026
Misc
Corrective Action Required
03/26/2026
3-26-26 Dustin A, Dw has been formed and compacted. Approved to pour
Footing Inspection - Residential Passed 6/20/2025 06/20/2025
Underslab Plumbing Inspection - Residential Passed 7/3/2025 7/3/2025 07/03/2025
Underslab Electrical Inspection - Residential Passed 07/03/2025
Sewer Service Inspection - R Failed 7/16/2025 7/16/2025 07/16/2025
Misc
Corrective Action Required
07/16/2025
Connect tracer wire with underground rated connection
Sewer Service Inspection - R Passed 7/17/2025 7/18/2025 07/18/2025
Misc
Resolved
07/18/2025
Connect tracer wire with underground rated connection
Water Service Inspection - R Failed 7/28/2025 7/29/2025 07/29/2025
Misc
Corrective Action Required
07/29/2025
Reconnect water main tracer wire as discussed on site. Meter well and service line okay
Water Service Inspection - R Passed 8/5/2025 8/5/2025 08/05/2025
Misc
Resolved
08/05/2025
Reconnect water main tracer wire as discussed on site. Meter well and service line okay
All Rough Inspection - Residential Failed 8/29/2025 8/29/2025 08/29/2025
Misc
Corrective Action Required
08/29/2025
Pfh nailing at rear okay No plans on site to check -hanger on front porch missing nails
All Rough Inspection - Residential Failed 1/28/2026 1/28/2026 01/28/2026
Misc
Resolved
01/28/2026
Pfh nailing at rear okay No plans on site to check -hanger on front porch missing nails
Misc
Corrective Action Required
01/28/2026
-tighten all anchor bolts throughout (multiple anchor bolts loose) -seal gaps and penetrations in draft stopping -repair/replace over notched stair strings. At 1/2 bath wall -address over bored studs in garage S wall -secure SE cable within 12” of panel -fill knock out in Service panel not being used -missing nails in hangers above 1st floor bathroom -seal top of dead spaces at bottom of stars and 1st floor bathroom -missing hangers and nails at bottom of stairs -plumbing protection to cover and extend 2” below top plate throughout 2nd floor
Electrical Service Inspection Passed 2/17/2026 2/17/2026 02/17/2026
All Rough Inspection - Residential Passed 2/17/2026 2/17/2026 02/17/2026
Misc
Resolved
02/17/2026
-tighten all anchor bolts throughout (multiple anchor bolts loose) -seal gaps and penetrations in draft stopping -repair/replace over notched stair strings. At 1/2 bath wall -address over bored studs in garage S wall -secure SE cable within 12” of panel -fill knock out in Service panel not being used -missing nails in hangers above 1st floor bathroom -seal top of dead spaces at bottom of stars and 1st floor bathroom -missing hangers and nails at bottom of stairs -plumbing protection to cover and extend 2” below top plate throughout 2nd floor
Driveway Inspection Partial 3/26/2026 3/26/2026 03/26/2026
Misc
Corrective Action Required
03/26/2026
3-26-26 Dustin A, Dw has been formed and compacted. Approved to pour
Documents & Images
Date Uploaded File Type Document Name
01/02/2025 Application Form E Permit Application Signed
01/02/2025 Application Form E Tax application
04/23/2025 Approved Plans Approved Final Grading Plan Lots 48 -59 Reserve at Blackwell
04/23/2025 Approved Plans APPROVED E2 PLANS
05/22/2025 Receipt Receipt for transaction:2025-003751
05/27/2025 Letter DS Building Permit
06/20/2025 25-0227_23090 Blackwell_Struct_Rev#3 (Footing Changes)
06/20/2025 25-0227_Reunion at Blackwell_Struct_Rev#3 Narrative (Footing Change)
06/20/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/03/2025 Letter INSPECTION SUMMARY
07/16/2025 Letter INSPECTION SUMMARY
07/18/2025 Letter INSPECTION SUMMARY
07/29/2025 Letter INSPECTION SUMMARY
08/05/2025 Letter INSPECTION SUMMARY
08/20/2025 Building E2 Foor truss
08/20/2025 Building E2 Roof Truss
08/20/2025 Building E2 Truss seals
08/29/2025 Letter INSPECTION SUMMARY
10/15/2025 Approved Plans Approved struct fix - E1 E2 F1 F2
11/17/2025 Approved Plans Truss repair doc
12/03/2025 Approved Plans Approved - Gyp Board at Stair Stringer Struct Response_Reserves at Blackwell
12/03/2025 Approved Plans Approved - 25-0922_RESERVES BLDG E F DOOR REV - Sealed
12/03/2025 Approved Plans approved - F05 girder truss repair
12/03/2025 Approved Plans approved - Truss fix for Structural end condition on Lots 52-59
12/16/2025 Approved Plans Approved Lot 52 Trusses
01/02/2026 Approved Plans Approved E2 roof and floor trusses
01/14/2026 Approved Plans Approved E2 truss as-built
01/28/2026 Letter INSPECTION SUMMARY
02/06/2026 Engineer Report/Study Stand engineering Structural letter for Reserve buildings
02/17/2026 Letter INSPECTION SUMMARY
02/17/2026 Letter INSPECTION SUMMARY
03/26/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home